188 permits since 2000: 135 completed, 5 in progress, 31 never finaled, 17 expired or cancelled.
Of the 31 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 188.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2026 | In progress issued Feb 2026 | 470 25th Av | 3rd fl apt #3: reconfigure existing bedrooms.Details
3rd fl apt #3: reconfigure existing bedrooms. | $7,500 |
| Nov 12, 2025 | In progress issued Nov 2025 | 470 25th Av | apt 3: remodel kitchen and bathroom. remove kitchen cabinets, tub, toilet, sink - replace w/new cabinets, bathroom fixtures, ceiling lights. no change on walls. all like for like.Details
apt 3: remodel kitchen and bathroom. remove kitchen cabinets, tub, toilet, sink - replace w/new cabinets, bathroom fixtures, ceiling lights. no change on walls. all like for like. | $12,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 525 05th St | add 57 new pendent below new t-bar/dropped cieling per nfpa#13. add 2 new dry pendent head per nfpa#13. ref pa #202212309578Details
add 57 new pendent below new t-bar/dropped cieling per nfpa#13. add 2 new dry pendent head per nfpa#13. ref pa #202212309578 | $15,000 |
| Jun 13, 2025 | Completed final sign-off Aug 2025 | 419 38th Av | new, 1-story, wood-framed deck @ rear of building.Details
new, 1-story, wood-framed deck @ rear of building. | $8,000 |
| May 5, 2025 | Completed final sign-off May 2025 | 555 Fulton St | relocate 1 sidewalk and 1 pendent head for remodel unit. ref 202309055925Details
relocate 1 sidewalk and 1 pendent head for remodel unit. ref 202309055925 | $1,000 |
| Jan 3, 2025 | In progress issued Jan 2025 | 1 Dr Carlton B Goodlett Pl | remove all existing fire sprinkler heads and piping at elevator's machine rooms #s: 4,5,6,10 & 11 per d.r.w. ref permit bldg permit #202108236905.Details
remove all existing fire sprinkler heads and piping at elevator's machine rooms #s: 4,5,6,10 & 11 per d.r.w. ref permit bldg permit #202108236905. | $2,500 |
| Feb 29, 2024 | Completed final sign-off Apr 2025 | 419 38th Av | replace front window with wood aluminum craft casement window in kind.u factor 0.3 max. repair and replace front stucco. replace 8 non visible windows in kind along lightwell and rear building. u factor 0.3 maxDetails
replace front window with wood aluminum craft casement window in kind.u factor 0.3 max. repair and replace front stucco. replace 8 non visible windows in kind along lightwell and rear building. u factor 0.3 max | $25,000 |
| Dec 8, 2023 | Completed final sign-off Apr 2024 | 32 Acton St | revision to pa# 202309156658, to update nfpa13-r to nfpa13-d requirement.Details
revision to pa# 202309156658, to update nfpa13-r to nfpa13-d requirement. | |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 32 Acton St | install 12 new sprinklers @ ground floor per nfpa 13-r underground per nfpa 24. ref 202112144360.Details
install 12 new sprinklers @ ground floor per nfpa 13-r underground per nfpa 24. ref 202112144360. | $7,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 1 Dr Carlton B Goodlett Pl | remove 4 (e) sprinkler heads at elevator machine room & piping per drw. ref to 202108236905Details
remove 4 (e) sprinkler heads at elevator machine room & piping per drw. ref to 202108236905 | $2,500 |
| Apr 10, 2023 | Completed final sign-off Nov 2023 | 3844 Fulton St | install (19) sprinklers throughout ground floor per nfpa #13, underground per nfpa#24. ref bpa#202012030204Details
install (19) sprinklers throughout ground floor per nfpa #13, underground per nfpa#24. ref bpa#202012030204 | $10,000 |
| Jan 31, 2023 | Completed final sign-off Apr 2023 | 750 Brannan St | install (4) new sprinklers at (e) skylights in main warehouse only building permit# 2022-0114-6009Details
install (4) new sprinklers at (e) skylights in main warehouse only building permit# 2022-0114-6009 | $2,000 |
| Sep 6, 2022 | Completed final sign-off Aug 2025 | 419 38th Av | revise previous approved pa# 202110150530 for (e) structural conditions. no change to floor plans or exterior.Details
revise previous approved pa# 202110150530 for (e) structural conditions. no change to floor plans or exterior. | $10,000 |
| Jul 26, 2022 | Completed final sign-off Apr 2024 | 184 Jordan Av | install (51) sprinklers throughout per nfpa#13-d underground per nfps#24. re 2019 1119 7651 & 2020 0708 9808Details
install (51) sprinklers throughout per nfpa#13-d underground per nfps#24. re 2019 1119 7651 & 2020 0708 9808 | $20,000 |
| Jan 11, 2022 | Completed final sign-off Sep 2022 | 1459 17th Av | unit 1459: top floor replace rear yard facing 6 windows in kind: 4 windows along larger lightwell in kind and 2 windows in the smaller lightwell in kind. all windows are non visible to the street.u-factor 0.30 or better.Details
unit 1459: top floor replace rear yard facing 6 windows in kind: 4 windows along larger lightwell in kind and 2 windows in the smaller lightwell in kind. all windows are non visible to the street.u-factor 0.30 or better. | $3,500 |
| Jan 7, 2022 | Completed final sign-off Oct 2023 | 1461 17th Av | 1461 17th av: 2/f: renovate (e) bathroom and kitchen in0-kind. covert (e) office into 2 new bathrooms. all work on 2/f only. remodel living,dining and bedroom, relocate (e) laundry. replace rear windows non street visiable and along lightwell. u-factor 0.30 or better.Details
1461 17th av: 2/f: renovate (e) bathroom and kitchen in0-kind. covert (e) office into 2 new bathrooms. all work on 2/f only. remodel living,dining and bedroom, relocate (e) laundry. replace rear windows non street visiable and along lightwell. u-factor 0.30 or better. | $48,000 |
| Dec 28, 2021 | Never finaled issued Jan 2022, no final | 2157 Grove St | relocate (10) sprinklers on 2nd & 3rd fl only. add single snoot fdc to main riser.Details
relocate (10) sprinklers on 2nd & 3rd fl only. add single snoot fdc to main riser. | $5,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 683 Brannan St | tenant improvements existing fire sprinkler system add 12 and relocate 11 sprinklers apn 2016-07-15-2439Details
tenant improvements existing fire sprinkler system add 12 and relocate 11 sprinklers apn 2016-07-15-2439 | $12,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2023 | 1459 17th Av | renovate extg bath and kitchen, convert extg office and 2 new bathrooms. remodel living, dinning and bedroom/add new skylight 3'x3' . relocate extg laundry and whDetails
renovate extg bath and kitchen, convert extg office and 2 new bathrooms. remodel living, dinning and bedroom/add new skylight 3'x3' . relocate extg laundry and wh | $38,000 |
| Nov 5, 2021 | Completed final sign-off Mar 2023 | 1050 Pine St | install 30 fire sprinklers throughout g/f per nfpa13. u/g per nfpa 24. ref pa 201708296351Details
install 30 fire sprinklers throughout g/f per nfpa13. u/g per nfpa 24. ref pa 201708296351 | $10,000 |
| Oct 15, 2021 | Completed final sign-off Aug 2025 | 419 38th Av | front bldg - interior remodel of (e) single family dwelling; infill below 2nd fl a total of 10 sf; no change to front facade; no change to bldg height or depth; repair (e) foundationDetails
front bldg - interior remodel of (e) single family dwelling; infill below 2nd fl a total of 10 sf; no change to front facade; no change to bldg height or depth; repair (e) foundation | $100,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2022 | 673 Brannan St | 4/f & 6/f: tenant improvements - existing fire sprinkler system. added 21 and relocate 12 sprinklers. ref pa 201707283265 (work to be permoformed on lots: 201,202,203,206,210,212,213,214,217,218,219,221,222,225,226,228,229,231)Details
4/f & 6/f: tenant improvements - existing fire sprinkler system. added 21 and relocate 12 sprinklers. ref pa 201707283265 (work to be permoformed on lots: 201,202,203,206,210,212,213,214,217,218,219,221,222,225,226,228,229,231) | $16,500 |
| Oct 5, 2021 | Expired or cancelled withdrawn Dec 2021 | 683 Brannan St | tenant improvements - existing fire sprinkler system. add 15 and relocate 10 sprinklers. ref pa 201607152439. original sprinklers pa 200602174932. (work to be performed on lot 248,249,250,251,252,253,255,257,258,260,262,263,264,265,266,267,268,270,271)Details
tenant improvements - existing fire sprinkler system. add 15 and relocate 10 sprinklers. ref pa 201607152439. original sprinklers pa 200602174932. (work to be performed on lot 248,249,250,251,252,253,255,257,258,260,262,263,264,265,266,267,268,270,271) | $12,500 |
| Oct 5, 2021 | Completed final sign-off May 2022 | 178 Bluxome St | 4/f: tenant improvements - existing fire sprinkler system, 12 added sprinklers. original sprinkler pa 200902202506. (work to be performed on lots: 289,290,091,292,295,296,297,298,299,300,301,302,304,305,306,310,311,312,313)Details
4/f: tenant improvements - existing fire sprinkler system, 12 added sprinklers. original sprinkler pa 200902202506. (work to be performed on lots: 289,290,091,292,295,296,297,298,299,300,301,302,304,305,306,310,311,312,313) | $6,000 |
| Sep 21, 2021 | Completed final sign-off Jan 2022 | 19 Clementina St | 4-6-8/f: (e) fire sprinkler system t.i.; 4/f: 7 added & 4 relocated sprinklers; 6/f: 5 added & 1 relocated sprinkler; 8/f: 1 added & 1 removed sprinklerDetails
4-6-8/f: (e) fire sprinkler system t.i.; 4/f: 7 added & 4 relocated sprinklers; 6/f: 5 added & 1 relocated sprinkler; 8/f: 1 added & 1 removed sprinkler | $9,000 |
| Jul 15, 2021 | Completed final sign-off Jun 2022 | 1071 Portola Dr | install 35 fire sprinlers throughout per nfpa13r. u/g per nfpa24. ref pa 201609299136.Details
install 35 fire sprinlers throughout per nfpa13r. u/g per nfpa24. ref pa 201609299136. | $15,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2025 | 1504 Bryant St | rerouting all exposed branch lines piping on second floor only to be within joist bays. this is a volunteer work by tenants new bracing & strapping.Details
rerouting all exposed branch lines piping on second floor only to be within joist bays. this is a volunteer work by tenants new bracing & strapping. | $16,000 |
| Mar 10, 2021 | Completed final sign-off Dec 2021 | 1544 Powell St | install (17) new sprinklers throughout basement floor per nfpa#13. underground per nfpa#24. b.a. # 2019.1018.4947Details
install (17) new sprinklers throughout basement floor per nfpa#13. underground per nfpa#24. b.a. # 2019.1018.4947 | $8,000 |
| Feb 25, 2021 | Completed final sign-off Jul 2022 | 2403 Keith St | install (218) sprinklers throughout per nfpa#13. underground per nfpa# 24 & relocate (1) existing fire department connection to front lawn b.a.# 2019-0506-9853Details
install (218) sprinklers throughout per nfpa#13. underground per nfpa# 24 & relocate (1) existing fire department connection to front lawn b.a.# 2019-0506-9853 | $95,000 |
| Jan 14, 2021 | Completed final sign-off Jun 2021 | 556 05th Av | install (27) sprinklers throughout ground floor per nfpa # 13. underground per nfpa # 24Details
install (27) sprinklers throughout ground floor per nfpa # 13. underground per nfpa # 24 | $8,000 |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 1927 22nd Av | revision to approved pa# 201907024880 add full bathroom at ground floor.Details
revision to approved pa# 201907024880 add full bathroom at ground floor. | $5,000 |
| Oct 30, 2020 | Completed final sign-off Jun 2022 | 385 Eddy St | install (382) sprinklers throughout per nfpa 13. no underground work. ba# 2019-0502-9560.Details
install (382) sprinklers throughout per nfpa 13. no underground work. ba# 2019-0502-9560. | $200,000 |
| Oct 6, 2020 | In progress issued Jul 2024 | 470 25th Av | addition of dwelling unit per ordinance #162-16Details
addition of dwelling unit per ordinance #162-16 | $70,000 |
| May 22, 2020 | Completed final sign-off Dec 2020 | 1286 23rd Av | install 59 sprinklers throughout per nfpa#13r, garage per npa13 and u/g per nfpa24. ref pa201901220846.Details
install 59 sprinklers throughout per nfpa#13r, garage per npa13 and u/g per nfpa24. ref pa201901220846. | $25,000 |
| May 22, 2020 | Completed final sign-off Oct 2021 | 6 Arleta Av | install 17 new sprinkler heads throughout ground floor per nfpa#13 and u/g per nfpa#24. ref pa201312184453.Details
install 17 new sprinkler heads throughout ground floor per nfpa#13 and u/g per nfpa#24. ref pa201312184453. | $8,500 |
| Feb 18, 2020 | Completed final sign-off Oct 2020 | 1130 Folsom St | install 17 new pendent sprinklers below new drop ceiling per nfpa #13 commercial space only. ref pa 2019-0823-9675Details
install 17 new pendent sprinklers below new drop ceiling per nfpa #13 commercial space only. ref pa 2019-0823-9675 | $6,000 |
| Feb 12, 2020 | Completed final sign-off Jun 2020 | 1927 22nd Av | replace front building existing windows (total 3) with wood/aluminum craft windows by marvin co. at same size and location. max u factor 0.32. same operation, style.Details
replace front building existing windows (total 3) with wood/aluminum craft windows by marvin co. at same size and location. max u factor 0.32. same operation, style. | $4,600 |
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 1927 22nd Av | new deck at 2nd fl rearDetails
new deck at 2nd fl rear | $20,000 |
| Dec 11, 2019 | Completed final sign-off Nov 2020 | 118 Holloway Av | ref pa# 201505126140; install 107 sprinklers througout ground fl. per nfpa#13-r underground per nfpa#24Details
ref pa# 201505126140; install 107 sprinklers througout ground fl. per nfpa#13-r underground per nfpa#24 | $5,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2021 | 50 Bowling Green Dr | install 91 sprinklers throughout per nfpa 13 underground per nfpa 24 ref 201805149026Details
install 91 sprinklers throughout per nfpa 13 underground per nfpa 24 ref 201805149026 | $55,000 |
| Nov 6, 2019 | Completed final sign-off Jul 2020 | 728 Pacific Av | extend 100 drops to new drop ceiling per nfpa 13 ref 201908067963Details
extend 100 drops to new drop ceiling per nfpa 13 ref 201908067963 | $20,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2020 | 850 Sacramento St | install 48 sprinklers throughout per nfpa 13. underground under sep permit ti 201712196882Details
install 48 sprinklers throughout per nfpa 13. underground under sep permit ti 201712196882 | $15,000 |
| Aug 8, 2019 | Completed final sign-off Mar 2021 | 777 Silver Av | t.i # 2015-1020-0292: install 27 sprinklers throughout per nfpa 13r. under ground per nfpa 24.Details
t.i # 2015-1020-0292: install 27 sprinklers throughout per nfpa 13r. under ground per nfpa 24. | $10,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2020 | 2829 25th St | install 110 sprinklers throughout per nfpa #13 stand pipe per nfpa #14 underground per nfpa #24 ref pa 2015-0422-4286Details
install 110 sprinklers throughout per nfpa #13 stand pipe per nfpa #14 underground per nfpa #24 ref pa 2015-0422-4286 | $48,000 |
| Jul 2, 2019 | Completed final sign-off Apr 2021 | 1927 22nd Av | add 2 bedrooms, 1 full bathroom and mud storage room at ground floor. add 1 master suite, remodel (e) kitchen w/ lightwell removal. relocate (e) bathroom with interior stair at 2nd flr.Details
add 2 bedrooms, 1 full bathroom and mud storage room at ground floor. add 1 master suite, remodel (e) kitchen w/ lightwell removal. relocate (e) bathroom with interior stair at 2nd flr. | $80,000 |
| May 31, 2019 | Completed final sign-off Oct 2020 | 850 Sacramento St | ref pa# 201712196882; install 28 feet of new underground fire service piping per nfpa#24Details
ref pa# 201712196882; install 28 feet of new underground fire service piping per nfpa#24 | $4,000 |
| May 9, 2019 | Completed final sign-off Oct 2020 | 3229 Lincoln Wy | install 46 sprinklers throughout per nfpa 13-r underground per nfpa #24. ref pa 2015-0722-2200Details
install 46 sprinklers throughout per nfpa 13-r underground per nfpa #24. ref pa 2015-0722-2200 | $15,000 |
| Feb 11, 2019 | Completed final sign-off Oct 2019 | 333 Diamond St | install 52 sprinklers throughout per nfpa 13r nfpa #13 in garage & nfpa 24 for underground ref pa 2016-1027-1260Details
install 52 sprinklers throughout per nfpa 13r nfpa #13 in garage & nfpa 24 for underground ref pa 2016-1027-1260 | $15,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2018 | 470 25th Av | rev to pa201312184545: unit 2: restore floor plan back to original confguration. modify (e) floor plan on 2/f unit 2: add new bedroom and remove all between family room and kitchen.Details
rev to pa201312184545: unit 2: restore floor plan back to original confguration. modify (e) floor plan on 2/f unit 2: add new bedroom and remove all between family room and kitchen. | |
| Aug 30, 2018 | Completed final sign-off Nov 2020 | 2386 34th Av | install 15 sprinklers on ground floor only per nfpa#13, underground per nfpa#24. ref app#201609228561Details
install 15 sprinklers on ground floor only per nfpa#13, underground per nfpa#24. ref app#201609228561 | $6,000 |
| Jul 31, 2018 | Completed final sign-off Nov 2018 | 470 25th Av | recommencement & completion of work approved under pa#201312184545.Details
recommencement & completion of work approved under pa#201312184545. | $20,000 |
| Jul 31, 2018 | Completed final sign-off Nov 2018 | 470 25th Av | recommencement & completion of work approved under pa#201409267468.Details
recommencement & completion of work approved under pa#201409267468. | $3,000 |
| Jul 30, 2018 | Never finaled issued Jul 2018, no final | 2146 12th Av | install 4 new sprinklers at garage and egress path per nfpa # 13-r, underground per nfpa# 24. t.i # 201511243543Details
install 4 new sprinklers at garage and egress path per nfpa # 13-r, underground per nfpa# 24. t.i # 201511243543 | $2,000 |
| Jul 30, 2018 | Completed final sign-off Nov 2018 | 1148 Mission St | install 3 new dry pendent sprinklers at new coolers per nfpa # 13. t.i # 201806141931. n/a for maher.Details
install 3 new dry pendent sprinklers at new coolers per nfpa # 13. t.i # 201806141931. n/a for maher. | $1,500 |
| Jul 20, 2018 | Completed final sign-off Aug 2019 | 461 32nd Av | install 56 new sprinklers thoughout per nfpa 13-r and underground per nfpa #24. ref app#201506027757Details
install 56 new sprinklers thoughout per nfpa 13-r and underground per nfpa #24. ref app#201506027757 | $20,000 |
| Jul 3, 2018 | Completed final sign-off Jul 2019 | 3431 Taraval St | install 48 new sprinklers. new sprinklers throughout per nfpa 13, underground per nfpa #24. ref pa 2016-0914-7642Details
install 48 new sprinklers. new sprinklers throughout per nfpa 13, underground per nfpa #24. ref pa 2016-0914-7642 | $15,000 |
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 125 Bay Shore Bl | install (95) sprinklers throughout per nfpa #13 underground work under separate permit. ref ti #201805159091.Details
install (95) sprinklers throughout per nfpa #13 underground work under separate permit. ref ti #201805159091. | $25,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 125 Bay Shore Bl | install 20 feet of underground piping per nfpa 24. n/a for maher.Details
install 20 feet of underground piping per nfpa 24. n/a for maher. | $10,000 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 900 North Point St | add and relocate 15 sprinklers on 1st and 2nd fl per nfpa 13 ti 201711204389Details
add and relocate 15 sprinklers on 1st and 2nd fl per nfpa 13 ti 201711204389 | $8,000 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 2000 Oakdale Av | fire sprinkler alteration. t.i. #2016-10-17-0497 49 sprinklers. maher n/aDetails
fire sprinkler alteration. t.i. #2016-10-17-0497 49 sprinklers. maher n/a | $15,000 |
| Jun 12, 2017 | Completed final sign-off Feb 2019 | 51 Havelock St | install 200 new heads throughout per nfpa #13 & underground per nfpa #24 ref ti 2015-0903-6068Details
install 200 new heads throughout per nfpa #13 & underground per nfpa #24 ref ti 2015-0903-6068 | $50,000 |
| May 26, 2017 | Completed final sign-off Jun 2018 | 236 Euclid Av | install 15 heads per nfpa#13 r underground per nfpa#24 ti 201512114877, 201510028748Details
install 15 heads per nfpa#13 r underground per nfpa#24 ti 201512114877, 201510028748 | $7,000 |
| Feb 3, 2017 | Completed final sign-off Jul 2018 | 470 25th Av | apt #2. remodel kitchen and bathroom. remove all kitchen cabinet, tub, toilet, sink, replace with new cabinet, bathroom fixtures. ceiling light. no change on walls.Details
apt #2. remodel kitchen and bathroom. remove all kitchen cabinet, tub, toilet, sink, replace with new cabinet, bathroom fixtures. ceiling light. no change on walls. | $7,800 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 470 25th Av | legalizatioin of gr fl unit. install 17 sprinlklers through out per nfpa 13r underground. nfpa 24. t.i. 2013-12-18-4545Details
legalizatioin of gr fl unit. install 17 sprinlklers through out per nfpa 13r underground. nfpa 24. t.i. 2013-12-18-4545 | $8,000 |
| Aug 25, 2016 | Completed final sign-off Aug 2017 | 4400 Pacheco St | install (19) sprinkler head in garage & 3/f only per nfpa #13-d, underground per nfpa #24. t.i. pa# 201512013892Details
install (19) sprinkler head in garage & 3/f only per nfpa #13-d, underground per nfpa #24. t.i. pa# 201512013892 | $6,000 |
| Jul 13, 2016 | Completed final sign-off Sep 2016 | 1489 Webster St | remove 3 and added 9 sprinklers. existing sprinkler system - tenant improvments unit 319, pa 2016-0614-9913, unit 507 pa 2016-0623-0696, unit 1401, pa 2016-0616-0166, unit 1408, pa 2016-0623-0697;maher n/aDetails
remove 3 and added 9 sprinklers. existing sprinkler system - tenant improvments unit 319, pa 2016-0614-9913, unit 507 pa 2016-0623-0696, unit 1401, pa 2016-0616-0166, unit 1408, pa 2016-0623-0697;maher n/a | $4,500 |
| Jul 12, 2016 | Completed final sign-off Sep 2016 | 1489 Webster St | 15 removed/17 added (e)fire sprinkler syste-ti #316-201606149916,,#320 201606301305,#520-201606301302,,#810-201606168164,#1009-201606149915,;maher n/aDetails
15 removed/17 added (e)fire sprinkler syste-ti #316-201606149916,,#320 201606301305,#520-201606301302,,#810-201606168164,#1009-201606149915,;maher n/a | $9,500 |
| Jun 9, 2016 | Never finaled issued Jun 2016, no final | 1489 Webster St | flrs: 3,8,9,11 & 13: existing fire sprinkler system, 3rd flr 201605238154(2 spkrs),8th 201605278612(3 spkrs),9th 201606099516(1 spkr),10th 201605238155(1 spkr),11th 201605167556 & 201605238153(4 spkrs),13th 201605096964(6 spkrs).Details
flrs: 3,8,9,11 & 13: existing fire sprinkler system, 3rd flr 201605238154(2 spkrs),8th 201605278612(3 spkrs),9th 201606099516(1 spkr),10th 201605238155(1 spkr),11th 201605167556 & 201605238153(4 spkrs),13th 201605096964(6 spkrs). | $10,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 1489 Webster St | 14th flr: existing fire sprinkler system 2 heads, apn. 20160509691Details
14th flr: existing fire sprinkler system 2 heads, apn. 20160509691 | $1,000 |
| May 24, 2016 | Never finaled issued May 2016, no final | 1489 Webster St | 4th, 5th & 8th floor: fire sprinklers ref pa's 2016 0415 4949 - 4th flr, 2016 0509 6963- 5th flr, 2016 0509 6962 - 8th flrDetails
4th, 5th & 8th floor: fire sprinklers ref pa's 2016 0415 4949 - 4th flr, 2016 0509 6963- 5th flr, 2016 0509 6962 - 8th flr | $2,000 |
| May 6, 2016 | Never finaled issued May 2016, no final | 1489 Webster St | 8th floors: (e) fire sprinklers system ti apt 807. ref pa 2016 0419 5186Details
8th floors: (e) fire sprinklers system ti apt 807. ref pa 2016 0419 5186 | $600 |
| May 6, 2016 | Never finaled issued May 2016, no final | 1489 Webster St | 3rd & 11th floors: (e) fire sprinklers system ti apt 319 ref pa 2016 0425 5605 3rd flr apt 1107 ref pa 2016 0415 4950 - 11th floor added 2 sprinklersDetails
3rd & 11th floors: (e) fire sprinklers system ti apt 319 ref pa 2016 0425 5605 3rd flr apt 1107 ref pa 2016 0415 4950 - 11th floor added 2 sprinklers | $1,000 |
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 1489 Webster St | existing fire sprinkler system ti for suite 421 - 2 speakers, ref pa 2016-0415-4948; suite 306 - 2 speakers, ref 2016-0414-4792, 3rd floorDetails
existing fire sprinkler system ti for suite 421 - 2 speakers, ref pa 2016-0415-4948; suite 306 - 2 speakers, ref 2016-0414-4792, 3rd floor | $2,000 |
| Apr 11, 2016 | Completed final sign-off Apr 2016 | 1489 Webster St | fire sprinkler system. t.i. 12 (n) heads & 2 relo. 3rd, 4th, 5th, 7th, 9th, 11th, 12th floor. 308: 2016-0308-1520; 313 & 513: 2016-0324-2978; 402: 2016-0302-1041; 401 & 701: 2016-0407-9229; 908: 2016-0302-7038; 1103: 2016-0308-1521; 1208: 2016-0401-3770.Details
fire sprinkler system. t.i. 12 (n) heads & 2 relo. 3rd, 4th, 5th, 7th, 9th, 11th, 12th floor. 308: 2016-0308-1520; 313 & 513: 2016-0324-2978; 402: 2016-0302-1041; 401 & 701: 2016-0407-9229; 908: 2016-0302-7038; 1103: 2016-0308-1521; 1208: 2016-0401-3770. | $7,000 |
| Dec 2, 2015 | Completed final sign-off Jan 2016 | 731 Washington St | to obtain final inspection for work approved under pa#200305094222. all work is complete.Details
to obtain final inspection for work approved under pa#200305094222. all work is complete. | |
| Dec 2, 2015 | Expired or cancelled cancelled Jun 2016 | 2349 27th Av | new fire sprinkler system for ground floor only, total 25 heads. t.i. pa# 201504214153Details
new fire sprinkler system for ground floor only, total 25 heads. t.i. pa# 201504214153 | $10,000 |
| Dec 2, 2015 | Completed final sign-off Oct 2016 | 15 Montclair Tr | install additional fire sprinkler, total 40 heads, as per nfpa 13 requirement. t.i. pa# 201507232272Details
install additional fire sprinkler, total 40 heads, as per nfpa 13 requirement. t.i. pa# 201507232272 | $15,000 |
| Nov 30, 2015 | Completed final sign-off Apr 2016 | 1489 Webster St | fire sprinkler ti - 18 new sprinklers apt 317 - 2015-1104-1771, apt 415 & 416 - 20151123-3370, apt 710 - 2015-1103-1619, apt 804 & 811 - 2015-1103-1630, apt 905, 1003 & 1205 - 2015-1123-3372Details
fire sprinkler ti - 18 new sprinklers apt 317 - 2015-1104-1771, apt 415 & 416 - 20151123-3370, apt 710 - 2015-1103-1619, apt 804 & 811 - 2015-1103-1630, apt 905, 1003 & 1205 - 2015-1123-3372 | $10,000 |
| Aug 14, 2015 | Completed final sign-off Sep 2015 | 1489 Webster St | 4th,6th & 9th flrs: fire sprinkler tenant improvements, unit 410-4 spkrs, 201505267121; units 601 & 901 9 spkrs- 201507070793; maher n/aDetails
4th,6th & 9th flrs: fire sprinkler tenant improvements, unit 410-4 spkrs, 201505267121; units 601 & 901 9 spkrs- 201507070793; maher n/a | $6,500 |
| May 15, 2015 | Never finaled issued May 2015, no final | 1735 Polk St | revamp 71 sprinklers in basement & 1st flr, per nfpa #13 ref pa 2014 0213 8488. maher naDetails
revamp 71 sprinklers in basement & 1st flr, per nfpa #13 ref pa 2014 0213 8488. maher na | $21,000 |
| Apr 24, 2015 | Completed final sign-off May 2015 | 1520 Stockton St | add 3 new sprinkler heads and relocate 6 (e) on 4/f. t.i. pa# 201312305254Details
add 3 new sprinkler heads and relocate 6 (e) on 4/f. t.i. pa# 201312305254 | $2,500 |
| Feb 13, 2015 | Completed final sign-off Apr 2015 | 655 Ellis St | relocate and install 2 fire sprinkler head for t.i. at penthouse floor, remodel t.i. pa#201408053018Details
relocate and install 2 fire sprinkler head for t.i. at penthouse floor, remodel t.i. pa#201408053018 | $800 |
| Feb 6, 2015 | Completed final sign-off Oct 2015 | 280 06th Av | install fire sprinkler system for entire bldg total of 96 heads as per nfpa 13. ref pa #2008.0408.9107 & 2014.1124.2295.Details
install fire sprinkler system for entire bldg total of 96 heads as per nfpa 13. ref pa #2008.0408.9107 & 2014.1124.2295. | $23,000 |
| Jan 15, 2015 | Completed final sign-off Sep 2016 | 1200 32nd Av | legalization unit per ordinance 43-14. legalize as-build kitchen on 1st floor per plan as 2nd unit. add partition wall on 1st floor per plan.Details
legalization unit per ordinance 43-14. legalize as-build kitchen on 1st floor per plan as 2nd unit. add partition wall on 1st floor per plan. | $38,000 |
| Jan 9, 2015 | Completed final sign-off Nov 2016 | 2724 San Bruno Av | install 85 sprinkler heads throughout as per nafa #13 & 13r and new underground piping per #24. ref. appl. #2010.0406.9730.Details
install 85 sprinkler heads throughout as per nafa #13 & 13r and new underground piping per #24. ref. appl. #2010.0406.9730. | $20,000 |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 3324 Broderick St | install fire sprinkler heads for basement recreation room per building appl. 2014.0813.3761. total 7 heads. maher n/a.Details
install fire sprinkler heads for basement recreation room per building appl. 2014.0813.3761. total 7 heads. maher n/a. | $5,000 |
| Oct 7, 2014 | Completed final sign-off Jan 2015 | 2451 19th Av | install fire sprinkler system for entire building as per nfpa 13d and 24 requirements, ti 201304184893. new 1" combo meter and connection to 8" cwm on 19th ave.Details
install fire sprinkler system for entire building as per nfpa 13d and 24 requirements, ti 201304184893. new 1" combo meter and connection to 8" cwm on 19th ave. | $8,500 |
| Oct 3, 2014 | Completed final sign-off Oct 2015 | 681 Broadway | install 1 refrigerated display case and sink per planDetails
install 1 refrigerated display case and sink per plan | $2,500 |
| Aug 28, 2014 | Never finaled issued Aug 2014, no final | 535 Stevenson St | provide hydraulic calculation of existing overhead sprinkler system (no work). new underground service under: pa#201408012794.Details
provide hydraulic calculation of existing overhead sprinkler system (no work). new underground service under: pa#201408012794. | |
| Aug 11, 2014 | Completed final sign-off Oct 2014 | 1200 32nd Av | revision appl.#2012.1105.3496. add nonbearing wall between study and laundry. add two closets and one door entry door on 1st floor at right side. relocate heater and furnace per plan.Details
revision appl.#2012.1105.3496. add nonbearing wall between study and laundry. add two closets and one door entry door on 1st floor at right side. relocate heater and furnace per plan. | |
| Aug 1, 2014 | Completed final sign-off May 2024 | 535 Stevenson St | install (6) feet of (n) 4 inch underground piping & (n) backflow preventer in basement. overhead sprinklers calc and f/a under seperate permit.Details
install (6) feet of (n) 4 inch underground piping & (n) backflow preventer in basement. overhead sprinklers calc and f/a under seperate permit. | $8,500 |
| May 9, 2014 | Never finaled issued May 2014, no final | 4035 18th St | install new sprinkler system per nfpa# 13. (54) new sprinklers. 16 feet of new underground piping. t.i. pa# 200805192371Details
install new sprinkler system per nfpa# 13. (54) new sprinklers. 16 feet of new underground piping. t.i. pa# 200805192371 | $15,000 |
| Apr 4, 2014 | Never finaled issued Apr 2014, no final | 327 25th Av | install 4 additional fire sprinklers for added bathroom & exercise room on 1/f as per pa# 201402057840Details
install 4 additional fire sprinklers for added bathroom & exercise room on 1/f as per pa# 201402057840 | $1,800 |
| Oct 25, 2013 | Completed final sign-off Nov 2013 | 1035 Market St | ground & 1st floor-modify (e) fire sprinkler system for partial basement & ground floor areas. (22) new sprinklers. (21) relocates. no underground workDetails
ground & 1st floor-modify (e) fire sprinkler system for partial basement & ground floor areas. (22) new sprinklers. (21) relocates. no underground work | $5,000 |
| Oct 17, 2013 | Completed final sign-off Apr 2015 | 11 Castenada Av | remove 3rd and 4th floor 2nd exit stairDetails
remove 3rd and 4th floor 2nd exit stair | $3,000 |
| Sep 27, 2013 | Completed final sign-off Sep 2014 | 194 Parker Av | new sprinkler system with 15 ft of underground. install 21 new heads for entire and new addition on 1st & 2nd flr: ti #201210232627.Details
new sprinkler system with 15 ft of underground. install 21 new heads for entire and new addition on 1st & 2nd flr: ti #201210232627. | $5,000 |
| Jul 11, 2013 | Completed final sign-off Feb 2014 | 622 27th Av | as-builts to permit 201306260595; to install 1 1/2 " straight fire meter instead of combination meter; ti #201007146596Details
as-builts to permit 201306260595; to install 1 1/2 " straight fire meter instead of combination meter; ti #201007146596 | |
| Jun 26, 2013 | Never finaled issued Jun 2013, no final | 246 Ritch St | revision to pa# 201210172241. change sprinkler layout for 2nd to 5th floor. add 3 relocate 10. jjcDetails
revision to pa# 201210172241. change sprinkler layout for 2nd to 5th floor. add 3 relocate 10. jjc | |
| Jun 26, 2013 | Completed final sign-off Jan 2014 | 622 27th Av | install new fire sprinkler system (56 sprinklers) for entire building, per nfpa 13d. includes 10' of underground.Details
install new fire sprinkler system (56 sprinklers) for entire building, per nfpa 13d. includes 10' of underground. | $16,000 |
| Jun 6, 2013 | Completed final sign-off Oct 2013 | 1095 Mission St | add 6 gallon boiler feeder. connect existing 50 gal surge tank to boiler feeder vent. run drain from surge tank & boiler feeder to existing floor sink, add steam trap at drain of surge tank. revision to pa# 201001215124Details
add 6 gallon boiler feeder. connect existing 50 gal surge tank to boiler feeder vent. run drain from surge tank & boiler feeder to existing floor sink, add steam trap at drain of surge tank. revision to pa# 201001215124 | $5,000 |