Block 1065, lot 026A
3250 Geary Blvd
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 3
- Units
- 7
- Rooms
- 4 bedrooms, 5 bathrooms
- Building
- 6,815 sq ft
- Lot
- 4,200 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2020 | Never finaled issued Jun 2020, no final | 3250 Geary Bl | street space | ||
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 3244 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install new power door operator & kick plate.Details
accessible business entrance program per ordinance 51-16. install new power door operator & kick plate. | $3,000 |
| Nov 8, 2019 | Completed final sign-off Oct 2020 | 196 Parker Av | Jon K Takata Corp Dba Restoration Mgmt | drywall, flooring, plumbing bathrooms, rough frame, windows plaster due to explosion on city street. all repairs with plaster back to original. existing fixtures to remain in kitchen and bathsDetails
drywall, flooring, plumbing bathrooms, rough frame, windows plaster due to explosion on city street. all repairs with plaster back to original. existing fixtures to remain in kitchen and baths | $149,000 |
| Sep 13, 2019 | Completed final sign-off Aug 2020 | 3250 Geary Bl | Bai Construction | provide accessible toilet roomDetails
provide accessible toilet room | $31,684 |
| Aug 30, 2019 | Completed final sign-off Aug 2020 | 3250 Geary Bl | Bai Construction | accessibility upgrades only. including compliance with abe ord. 51-61 andDetails
accessibility upgrades only. including compliance with abe ord. 51-61 and | $7,856 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 3250 Geary Bl | street space | ||
| Jun 27, 2019 | Expired or cancelled withdrawn Aug 2019 | 3250 Geary Bl | voluntary seismic upgrade 3 stories (residential) | $9,000 | |
| Jun 27, 2019 | Expired or cancelled withdrawn Aug 2019 | 3250 Geary Bl | vountary upgrades to ada bathroom at ground fl | $6,000 | |
| May 17, 2019 | Completed final sign-off Oct 2019 | 3250 Geary Bl | Jon K Takata Corp Dba Restoration Mgmt | due to fire damage rewire electrical, insulation, metal framing, drywall, replace (13) windows, replace glass at storefront.Details
due to fire damage rewire electrical, insulation, metal framing, drywall, replace (13) windows, replace glass at storefront. | $116,000 |
| Feb 22, 2019 | Completed final sign-off Feb 2019 | 190 Parker Av | Jon K Takata Corp Dba Restoration Mgmt | comply w/ n.o.v 201927561. units 190, 192, 194. remove board up on windows and doors so tenants can re-occupy. no damages to units. ref from fergal clancy. no new work, replace (e) door w/ equal fire ratingDetails
comply w/ n.o.v 201927561. units 190, 192, 194. remove board up on windows and doors so tenants can re-occupy. no damages to units. ref from fergal clancy. no new work, replace (e) door w/ equal fire rating | $10,000 |
| Mar 19, 2014 | Completed final sign-off Dec 2014 | 194 Parker Av | Crime Watch Security Sys Llc | installation of a sprinkler monitoring system including: fire alarm control pnael, manual pull station, smoke detector, & ref ti #2012.1023.2627.Details
installation of a sprinkler monitoring system including: fire alarm control pnael, manual pull station, smoke detector, & ref ti #2012.1023.2627. | $2,000 |
| Sep 27, 2013 | Completed final sign-off Sep 2014 | 194 Parker Av | D & S Leong Associates | new sprinkler system with 15 ft of underground. install 21 new heads for entire and new addition on 1st & 2nd flr: ti #201210232627.Details
new sprinkler system with 15 ft of underground. install 21 new heads for entire and new addition on 1st & 2nd flr: ti #201210232627. | $5,000 |
| Sep 4, 2013 | Completed final sign-off Dec 2013 | 3244 Geary Bl | install two sink, eight receptacle at ground floor & one hand sink at mezzanine floor. space remains vacant.Details
install two sink, eight receptacle at ground floor & one hand sink at mezzanine floor. space remains vacant. | $3,000 | |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 194 Parker Av | street space | ||
| Aug 7, 2013 | Completed final sign-off Dec 2013 | 3244 Geary Bl | revision to app#201306048594 to move ada bathroom forward 3'-8"Details
revision to app#201306048594 to move ada bathroom forward 3'-8" | ||
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 3244 Geary Bl | a.d.a. restroom upgrade, barrier removal. space remains vacant.Details
a.d.a. restroom upgrade, barrier removal. space remains vacant. | $9,037 | |
| Oct 23, 2012 | Completed final sign-off Nov 2014 | 194 Parker Av | Will P K Ng Construction Inc. | convert (e) storge space into one(1) new dwelling unit by altering ground level storage space at the rear of the (e) 3 unit building with horizontal extension of the first floor.Details
convert (e) storge space into one(1) new dwelling unit by altering ground level storage space at the rear of the (e) 3 unit building with horizontal extension of the first floor. | $130,000 |
| Jun 17, 2011 | Completed final sign-off Jun 2012 | 190 Parker Av | replace kitchen cabinets, counter and flooring, replace bathtub and tile floor in bathroom. no work to be done in other rooms. replace stucco in front of buildingDetails
replace kitchen cabinets, counter and flooring, replace bathtub and tile floor in bathroom. no work to be done in other rooms. replace stucco in front of building | $18,000 | |
| Jun 22, 2010 | Completed final sign-off Dec 2010 | 192 Parker Av | Tong Cheong Construction Co | work @ #192 only - remodel kitchen & bathroom, replace cabinet, countertop, bathtub, toilet, vanity. with lighting comply w/150(k). kitchen: at least 50% high efficacy (by wattage). bathroom: high efficacy or occupancy sensor. no change to exhaust system.Details
work @ #192 only - remodel kitchen & bathroom, replace cabinet, countertop, bathtub, toilet, vanity. with lighting comply w/150(k). kitchen: at least 50% high efficacy (by wattage). bathroom: high efficacy or occupancy sensor. no change to exhaust system. | $12,000 |
| Jun 15, 2007 | Completed final sign-off Nov 2007 | 196 Parker Av | Kai Szeto Construction | 2 bathroom remodel to include new tile, toilet, bathtub, cabinets, countertop, existing lighting to remain. non structuralDetails
2 bathroom remodel to include new tile, toilet, bathtub, cabinets, countertop, existing lighting to remain. non structural | $6,500 |
| Oct 28, 2005 | Completed final sign-off Dec 2005 | 3250 Geary Bl | Market Contractors Ltd | construct new 5' high partition, add minor elect data outlets, new furnishes,change of use . no structural work.Details
construct new 5' high partition, add minor elect data outlets, new furnishes,change of use . no structural work. | $15,302 |
| Dec 6, 2004 | Expired or cancelled expired Aug 2008 | 192 Parker Av | replace bthrm fixtures, kchn fixture/ install baseboard heater/2kchn/2 bthrmsDetails
replace bthrm fixtures, kchn fixture/ install baseboard heater/2kchn/2 bthrms | $38,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bai Construction (3), Jon K Takata Corp Dba Restoration Mgmt (3), Crime Watch Security Sys Llc, D & S Leong Associates, Kai Szeto Construction, Market Contractors Ltd, Tong Cheong Construction Co, Will P K Ng Construction Inc.
- Architects
- Michael Hilliard (2), Daniel Howard, David Kesler, Gene Lam, Mca Architectes
- Engineers
- Dominic Chu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.