David Kesler
- Listed as
- architect, authorized agent-others, engineer
- Firm
- David Kesler Architect
- Based in
- San Francisco
- On San Francisco permits
- May 2002 to Jul 2026
31 permits since 2000 (architect on 29 permits, authorized agent-others on 1 permit, engineer on 1 permit): 17 completed, 3 in progress, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 2677 California St | Fay Construction & Restoration Inc | interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3Details
interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3 | $240,000 |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 1584 36th Av | his nov# 202541454. legalization of an existing udu. the unit is a 1 bedroom, 1 bathroom apartment on the grade level behind the garage facing the rear yard.Details
his nov# 202541454. legalization of an existing udu. the unit is a 1 bedroom, 1 bathroom apartment on the grade level behind the garage facing the rear yard. | $100,000 | |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 3 Topaz Wy | selective demo portion of level 1 & 2 decks as needed for access of 1 topaz work to install footings, post & lvl framing reconnect level 1 & 2 decks joists to new post & lvl framing. repair or replace wood rot to wind walls joists, decking, railings & patch in new wood shingle siding.Details
selective demo portion of level 1 & 2 decks as needed for access of 1 topaz work to install footings, post & lvl framing reconnect level 1 & 2 decks joists to new post & lvl framing. repair or replace wood rot to wind walls joists, decking, railings & patch in new wood shingle siding. | $100 | |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 1 Topaz Wy | Done Right Home Remodeling Inc. | replacement in kind of an (e) deck for an upper floor unit in an (e) 3 story/2-unit condominium. deck will include open railings and conforms with pcs 188. comply w/nov 202311581.Details
replacement in kind of an (e) deck for an upper floor unit in an (e) 3 story/2-unit condominium. deck will include open railings and conforms with pcs 188. comply w/nov 202311581. | $100,000 |
| Mar 6, 2025 | In progress filed Mar 2025, not yet issued | 495 Ralston St | Hybrid City Construction Inc | new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen.Details
new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen. | $95,000 |
| Nov 6, 2024 | Completed final sign-off Jul 2025 | 495 Ralston St | Hybrid City Construction Inc | interior renovation of (e) sfd, demo and repair of garage slab and creation of a new bahtroom @ basement lvl, 2 new window openings @ garage lvl, and a new folding door system opening (12'in length) @ great room. all new windows in (e) openings.Details
interior renovation of (e) sfd, demo and repair of garage slab and creation of a new bahtroom @ basement lvl, 2 new window openings @ garage lvl, and a new folding door system opening (12'in length) @ great room. all new windows in (e) openings. | $75,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2025 | 495 Ralston St | Hybrid City Construction Inc | demo (e) 2/f bathroom and create (2) new bathrooms, demo (e) kitchen replace with new kitchen. replace one bathroom window.Details
demo (e) 2/f bathroom and create (2) new bathrooms, demo (e) kitchen replace with new kitchen. replace one bathroom window. | $80,000 |
| Dec 8, 2021 | Completed final sign-off Apr 2022 | 2835 Broderick St | to address complaint from sf planning 2021-007030enf. change material at stair and stair landing area from wire to wood pickets. ref to 201304255497 & 201610059621.Details
to address complaint from sf planning 2021-007030enf. change material at stair and stair landing area from wire to wood pickets. ref to 201304255497 & 201610059621. | $3,500 | |
| Sep 12, 2020 | Completed final sign-off Nov 2020 | 840 Brannan St | D & A Builders Inc | remove and add a dew walls, remove plumbing. remove and add a few new outlets.Details
remove and add a dew walls, remove plumbing. remove and add a few new outlets. | $30,000 |
| Feb 19, 2020 | Completed final sign-off May 2020 | 1754 31st Av | to comply w/nov 200853932 & 200854674 legalize 2 rooms & bathroomDetails
to comply w/nov 200853932 & 200854674 legalize 2 rooms & bathroom | ||
| Oct 4, 2019 | Completed final sign-off Jan 2023 | 855 Castro St | Casement Construction | legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641.Details
legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641. | $7,000 |
| Jun 19, 2019 | Never finaled filed Jun 2019, never issued | 855 Castro St | Astoria Construction | replace siding at four walls - same in kind and color at back of building. also replacement in kind of existing deck with new deck. to comply with nov #201960641.Details
replace siding at four walls - same in kind and color at back of building. also replacement in kind of existing deck with new deck. to comply with nov #201960641. | $10,000 |
| Jun 11, 2019 | Never finaled filed Jun 2019, never issued | 2627 30th Av | legalizing an (e)(1) bedroom unit. unit legalization per ordinance 43-13Details
legalizing an (e)(1) bedroom unit. unit legalization per ordinance 43-13 | $400 | |
| Mar 26, 2019 | Completed final sign-off Aug 2019 | 1431 Shafter Av | Jose Viera | renovaton of 2nd fl., replacement in kind of bathroom, new lighting and partitions, bedroom count (2) to remainDetails
renovaton of 2nd fl., replacement in kind of bathroom, new lighting and partitions, bedroom count (2) to remain | $25,000 |
| Feb 21, 2019 | Never finaled filed Feb 2019, never issued | 2485 Folsom St | renovation of an (e) basement then the addition of (3) dwelling units to basement per adu ord 162-16.Details
renovation of an (e) basement then the addition of (3) dwelling units to basement per adu ord 162-16. | $150,000 | |
| Jul 6, 2018 | Completed final sign-off Oct 2025 | 5616 Mission St | Wickman Development And Construction | demolish a one story type v commercial buildingDetails
demolish a one story type v commercial building | $50,000 |
| Jul 6, 2018 | Completed final sign-off Oct 2025 | 5616 Mission St | Patrick Uniacke, Wickman Development And Construction | erect a 4 stories,no basement, type ia,iiia, 8 dwelling multi-family with commercial/retail on 1st fl building.Details
erect a 4 stories,no basement, type ia,iiia, 8 dwelling multi-family with commercial/retail on 1st fl building. | $1,000,000 |
| Jun 12, 2017 | Never finaled issued Apr 2018, no final | 1386 Revere Av | Gmbc Construction Inc, California Remodeling Service | revision to pa 2015-1223-5806 updated kitchen, bathrooms, bedroom, closet layouts.Details
revision to pa 2015-1223-5806 updated kitchen, bathrooms, bedroom, closet layouts. | |
| Apr 25, 2016 | Completed final sign-off Oct 2017 | 2438 California St | relocating bathrooms & kitchen, adding some light, new interior doors & partitions.Details
relocating bathrooms & kitchen, adding some light, new interior doors & partitions. | $40,000 | |
| Dec 23, 2015 | Never finaled issued Sep 2016, no final | 1386 Revere Av | Gmbc Construction Inc, Hon's Construction Inc., California Remodeling Service | remodel 2nd floor with no change in bedroom count. add 2 new bedrooms, 1 new bath& 1 new kitchen on g/f. 2nd floor: remodel (e) bathroom and kitchen & add new bathroom. replace windows & add new rear egress stair.add rear deck, all new electric/plumbingDetails
remodel 2nd floor with no change in bedroom count. add 2 new bedrooms, 1 new bath& 1 new kitchen on g/f. 2nd floor: remodel (e) bathroom and kitchen & add new bathroom. replace windows & add new rear egress stair.add rear deck, all new electric/plumbing | $40,000 |
| Oct 3, 2014 | Completed final sign-off Apr 2019 | 532 Day St | vertical addition. add 1 bed / bath / deck above (e) structure.Details
vertical addition. add 1 bed / bath / deck above (e) structure. | $40,000 | |
| Jan 10, 2014 | Completed final sign-off Jan 2014 | 2299 Post St | A K Home Improvement Inc | revision to pa#201311141853 - as built for reference only ada bathroom not installed. compliance with ordinance no. 155-13 not required.Details
revision to pa#201311141853 - as built for reference only ada bathroom not installed. compliance with ordinance no. 155-13 not required. | |
| Nov 14, 2013 | Never finaled issued Nov 2013, no final | 2299 Post St | A K Home Improvement Inc | tenant improvement including demolition of existing partitions (interior) and doors, new ada bathroom, construction of new non-structural partitions. sprinklers under separate permit. mep under separate permit.Details
tenant improvement including demolition of existing partitions (interior) and doors, new ada bathroom, construction of new non-structural partitions. sprinklers under separate permit. mep under separate permit. | $13,500 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 3244 Geary Bl | a.d.a. restroom upgrade, barrier removal. space remains vacant.Details
a.d.a. restroom upgrade, barrier removal. space remains vacant. | $9,037 | |
| Feb 6, 2013 | Never finaled issued Nov 2013, no final | 287 Cresta Vista Dr | Ke Construction Co. | erect 2-story, no basement, type 5, single family dwelling bldg.Details
erect 2-story, no basement, type 5, single family dwelling bldg. | $500,000 |
| Oct 2, 2007 | Completed final sign-off May 2008 | 1345 Taraval St | legalize (e) bathroom, kitchen and laundry on 2nd and 3rd floor units to comply with 3r report for condo conversion. ref 200710024335 for items 1 and 2Details
legalize (e) bathroom, kitchen and laundry on 2nd and 3rd floor units to comply with 3r report for condo conversion. ref 200710024335 for items 1 and 2 | $100,000 | |
| Oct 2, 2007 | Expired or cancelled expired May 2008 | 1345 Taraval St | illegal rear structure/storage shed 10'x12'to be removed.Details
illegal rear structure/storage shed 10'x12'to be removed. | $95 | |
| Dec 5, 2006 | Expired or cancelled expired Feb 2008 | 843 Howard St | change of use to m.c.d., per new ordinace reference case # 20061333d.Details
change of use to m.c.d., per new ordinace reference case # 20061333d. | ||
| May 24, 2006 | Expired or cancelled cancelled Mar 2007 | 843 Howard St | upgrade to ada compliance. install new exit door. no structrual work. upgraded ventilation.Details
upgrade to ada compliance. install new exit door. no structrual work. upgraded ventilation. | $2,000 | |
| Jun 3, 2003 | Never finaled issued Mar 2005, no final | 67 Valparaiso St | addition of 630 sq.ft to (e) 3 story apartment bldf. adding 4th floor to be combinedDetails
addition of 630 sq.ft to (e) 3 story apartment bldf. adding 4th floor to be combined | $120,000 | |
| May 15, 2002 | Completed final sign-off Apr 2004 | 5323 Mission St | horizontal/vertical addition: erect garage and expand kitchenDetails
horizontal/vertical addition: erect garage and expand kitchen | $50,000 |