Hybrid City Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Mar 2025
- Last 24 months
- 2 permits filed
15 permits since 2000: 12 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2025 | In progress filed Mar 2025, not yet issued | 495 Ralston St | new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen.Details
new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen. | $95,000 |
| Nov 6, 2024 | Completed final sign-off Jul 2025 | 495 Ralston St | interior renovation of (e) sfd, demo and repair of garage slab and creation of a new bahtroom @ basement lvl, 2 new window openings @ garage lvl, and a new folding door system opening (12'in length) @ great room. all new windows in (e) openings.Details
interior renovation of (e) sfd, demo and repair of garage slab and creation of a new bahtroom @ basement lvl, 2 new window openings @ garage lvl, and a new folding door system opening (12'in length) @ great room. all new windows in (e) openings. | $75,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2025 | 495 Ralston St | demo (e) 2/f bathroom and create (2) new bathrooms, demo (e) kitchen replace with new kitchen. replace one bathroom window.Details
demo (e) 2/f bathroom and create (2) new bathrooms, demo (e) kitchen replace with new kitchen. replace one bathroom window. | $80,000 |
| Jun 13, 2024 | Completed final sign-off Jul 2025 | 191 Pine St | revision to pa#201912119260. minor ceiling framing layout requested by bid to document changes infield.Details
revision to pa#201912119260. minor ceiling framing layout requested by bid to document changes infield. | |
| Feb 8, 2024 | Completed final sign-off Jul 2025 | 191 Pine St | revision to pa# 201912119260. minor framing changes and layout. request by bid to document changes in fieldDetails
revision to pa# 201912119260. minor framing changes and layout. request by bid to document changes in field | |
| Jun 20, 2023 | Completed final sign-off Oct 2023 | 1450 Fillmore St | expansion of grocery store from 1460 to 1450, create opening in partition wall, no change in lighting & electricalDetails
expansion of grocery store from 1460 to 1450, create opening in partition wall, no change in lighting & electrical | $3,000 |
| Nov 22, 2022 | Completed final sign-off Oct 2023 | 770 22nd Av | interior: add 1 bathroom. remodel e bathroom, move w/d. relocate kitchen to existing dinning room. add recessed lights. interior painting. no exterior work. no work at 772 22nd ave.Details
interior: add 1 bathroom. remodel e bathroom, move w/d. relocate kitchen to existing dinning room. add recessed lights. interior painting. no exterior work. no work at 772 22nd ave. | $110,000 |
| Mar 22, 2022 | Completed final sign-off Aug 2022 | 1507 Masonic Av | 2 and 1/2 bathrooms - all replacing plumbing fixtures only , tile work and paint.Details
2 and 1/2 bathrooms - all replacing plumbing fixtures only , tile work and paint. | $70,500 |
| Oct 18, 2021 | Never finaled issued Apr 2022, no final | 5801 Mission St | removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight.Details
removal & construction of non bearing walls, new lighting, plumbing and heating system. no changing of existing floor sq ft. change of use from retail to cannabis dispensary. no consumption onsight. | $58,000 |
| Jul 26, 2021 | In progress issued Dec 2023 | 1915 33rd Av | horizontal & vertical addition (25'x20') of two-story single family dwelling , and adding 15'x7' rear deckDetails
horizontal & vertical addition (25'x20') of two-story single family dwelling , and adding 15'x7' rear deck | $170,000 |
| Dec 30, 2019 | Completed final sign-off Jul 2025 | 191 Pine St | mechanical for existing t.i. reference permit #201912119260Details
mechanical for existing t.i. reference permit #201912119260 | $100,000 |
| Dec 11, 2019 | Completed final sign-off Jul 2025 | 191 Pine St | proposed interior tenant improvement for restaurantDetails
proposed interior tenant improvement for restaurant | $200,000 |
| Dec 10, 2019 | Completed final sign-off Jul 2025 | 191 Pine St | demolish interior walls and merge 2 tenant spaces into 1Details
demolish interior walls and merge 2 tenant spaces into 1 | $5,000 |
| Jul 13, 2018 | Completed final sign-off Jun 2019 | 299 Fremont St | concrete leveling slab in preparation for new tenant. ti on a sep permit ref 201807114243Details
concrete leveling slab in preparation for new tenant. ti on a sep permit ref 201807114243 | $6,000 |
| Jul 11, 2018 | Completed final sign-off May 2019 | 299 Fremont St | arch/mech/plumbing ti project with 2 new toilets, 3 showers. reception area and gym. new heating and ventilation systems. no new fsd's n/a for maherDetails
arch/mech/plumbing ti project with 2 new toilets, 3 showers. reception area and gym. new heating and ventilation systems. no new fsd's n/a for maher | $100,000 |