Casement Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Jun 2024
- Last 24 months
- 0 permits filed
39 permits since 2000: 31 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2024 | Completed final sign-off Mar 2025 | 36 Cragmont Av | revision to 202404029185: new slab at ground floor for approved family rm & half bathDetails
revision to 202404029185: new slab at ground floor for approved family rm & half bath | $5,000 |
| Apr 26, 2024 | Completed final sign-off May 2024 | 1903 23rd St | repair dryrot and replace siding on west side of building.Details
repair dryrot and replace siding on west side of building. | $30,000 |
| Apr 2, 2024 | Completed final sign-off Mar 2025 | 36 Cragmont Av | replace extg windows @ kitchen, demo 2 windows in lvng r. demo ext brick fireplace, replace with nw gas unit. kitchen renovation. half bath reno at flr 2 and full bath reno. @ floor 3. new half bath at ground level. relocate laundry to floor 2. new deck at floor 2 with nw sliding drs,Details
replace extg windows @ kitchen, demo 2 windows in lvng r. demo ext brick fireplace, replace with nw gas unit. kitchen renovation. half bath reno at flr 2 and full bath reno. @ floor 3. new half bath at ground level. relocate laundry to floor 2. new deck at floor 2 with nw sliding drs, | $175,000 |
| Feb 16, 2023 | In progress issued Jul 2024 | 109 Grand View Av | remodel & addition to (e) single-family dwelling. add (n) 2nd dwelling unit. add (n) basement & 3rd floor addition. (n) horizontal addition at rear. (n) nfpa-d fire sprinklers throughout - under separate permit.Details
remodel & addition to (e) single-family dwelling. add (n) 2nd dwelling unit. add (n) basement & 3rd floor addition. (n) horizontal addition at rear. (n) nfpa-d fire sprinklers throughout - under separate permit. | $1,195,000 |
| Dec 20, 2022 | Completed final sign-off Jun 2023 | 190 Stillings Av | to comply with correction notice report for permit 202209152547. engineering for unsafe (e) header in living/dining room, unsafe (e) 6x6 posts, bracing and base anchors at (e) deck.Details
to comply with correction notice report for permit 202209152547. engineering for unsafe (e) header in living/dining room, unsafe (e) 6x6 posts, bracing and base anchors at (e) deck. | $1,500 |
| Sep 15, 2022 | Completed final sign-off Jun 2023 | 190 Stillings Av | renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd flDetails
renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd fl | $35,000 |
| Feb 3, 2021 | Completed final sign-off Jul 2024 | 877 Carolina St | interior remodel & vertical addition to an (e) single family house that is one story above a basement. on the basement level, the entry and mudroom will be enlarged while retaining the (e) one car garage. the 1/f will be reconfigured to owner's suite, 2 bed, 2 bath, laundry, and family studyDetails
interior remodel & vertical addition to an (e) single family house that is one story above a basement. on the basement level, the entry and mudroom will be enlarged while retaining the (e) one car garage. the 1/f will be reconfigured to owner's suite, 2 bed, 2 bath, laundry, and family study | $458,961 |
| Dec 3, 2020 | Completed final sign-off Jun 2021 | 190 Stillings Av | demolish existing ground floor laundry and bathroom. construct new bathroom laundry area, tradesmen corridor. new closet, new doors, and window to gardenDetails
demolish existing ground floor laundry and bathroom. construct new bathroom laundry area, tradesmen corridor. new closet, new doors, and window to garden | $24,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2020 | 580 Hayes St | installation of a fixed safety ladder at the (e) lightwell to provide osha compliant access for buiding maintenance. maher n/a.Details
installation of a fixed safety ladder at the (e) lightwell to provide osha compliant access for buiding maintenance. maher n/a. | $3,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2023 | 855 Castro St | legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641.Details
legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641. | $7,000 |
| Apr 3, 2019 | Completed final sign-off Feb 2021 | 3065 26th Av | (n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn.Details
(n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn. | $25,000 |
| Feb 27, 2018 | Never finaled issued Feb 2018, no final | 580 Hayes St | street spaceDetails
street space | |
| Feb 26, 2018 | Completed final sign-off May 2018 | 580 Hayes St | provide final connection of gas appliances at common area roof deck. ref pa 2013-1209-3685. new constructionDetails
provide final connection of gas appliances at common area roof deck. ref pa 2013-1209-3685. new construction | $2,000 |
| Feb 14, 2018 | In progress issued Oct 2024 | 4250 26th St | erect (4) stories, (1) basement, type v-b, single family residence.Details
erect (4) stories, (1) basement, type v-b, single family residence. | $1,500,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 580 Hayes St | install access cpontrol system for select interior and exterior doors as security improvements for a new buildingDetails
install access cpontrol system for select interior and exterior doors as security improvements for a new building | $12,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 580 Hayes St | modify room for stationary storage battery system to accomodate equioment supplied to project and add required signage and information per sffd criteriaDetails
modify room for stationary storage battery system to accomodate equioment supplied to project and add required signage and information per sffd criteria | |
| Mar 22, 2017 | Completed final sign-off Dec 2017 | 1871 Hayes St | mandatory soft story retrofit per s.f. orfdinance per sfbc chapter 34b 2012 iebc appendix a-4. (residential ref #201703222062) ada for commercial area portionDetails
mandatory soft story retrofit per s.f. orfdinance per sfbc chapter 34b 2012 iebc appendix a-4. (residential ref #201703222062) ada for commercial area portion | $8,000 |
| Mar 22, 2017 | Completed final sign-off Dec 2017 | 1871 Hayes St | mandatory soft story retrofit per s.f. orfdinance per sfbc chapter 34b 2012 iebc appendix a-4. (commercial ref#201703222060)Details
mandatory soft story retrofit per s.f. orfdinance per sfbc chapter 34b 2012 iebc appendix a-4. (commercial ref#201703222060) | $40,000 |
| Oct 24, 2016 | Completed final sign-off May 2018 | 580 Hayes St | revision to pa #201312093685 - permit modification for design revisions to the ground floor retail storefronts.Details
revision to pa #201312093685 - permit modification for design revisions to the ground floor retail storefronts. | |
| Nov 6, 2015 | Completed final sign-off Feb 2016 | 3035 Baker St | remodel unit 102 at 1st fl. convert kitchen to office, relocate existing kitchen, add bath, add washer and dryer. verify 2nd means of egress maintainedDetails
remodel unit 102 at 1st fl. convert kitchen to office, relocate existing kitchen, add bath, add washer and dryer. verify 2nd means of egress maintained | $35,000 |
| Jun 19, 2015 | Completed final sign-off Jan 2018 | 331 Pennsylvania Av | temporary earth shoring system to accomadate earthwork for new construction at 333 pennsylvania maher reqDetails
temporary earth shoring system to accomadate earthwork for new construction at 333 pennsylvania maher req | $40,000 |
| Jun 19, 2015 | Completed final sign-off Jan 2018 | 355 Pennsylvania Av | temporary earth shoring system to accomadate earthwork for new construction at 333 pennsylvaniaDetails
temporary earth shoring system to accomadate earthwork for new construction at 333 pennsylvania | $75,000 |
| Jun 19, 2015 | Completed final sign-off Jan 2018 | 333 Pennsylvania Av | temporary earth shoring system to accomodate earthwork for new constructionDetails
temporary earth shoring system to accomodate earthwork for new construction | $70,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2016 | 469 Ivy St | temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s.Details
temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s. | $12,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2016 | 568 Hayes St | temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s.Details
temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s. | $13,500 |
| Jan 9, 2014 | Never finaled issued Jan 2014, no final | 1710 Diamond St | revision to app#200702063543. revised sheets to show 4th bedroom and type 5a construction with 13-d sprinklers.Details
revision to app#200702063543. revised sheets to show 4th bedroom and type 5a construction with 13-d sprinklers. | $5,000 |
| Feb 5, 2013 | Completed final sign-off Jul 2014 | 49 Gold Mine Dr | tie backs for shoring of #1710,1718, 1728 & 1738 diamond st.Details
tie backs for shoring of #1710,1718, 1728 & 1738 diamond st. | $35,000 |
| Jan 29, 2013 | Completed final sign-off Sep 2014 | 1738 Diamond St | excavation and new retaining wall for future dwelling unit at 1738 diamondDetails
excavation and new retaining wall for future dwelling unit at 1738 diamond | $17,025 |
| Jan 29, 2013 | Completed final sign-off Sep 2014 | 1728 Diamond St | excavation and new retaining wall for future dwelling unit at 1728 diamondDetails
excavation and new retaining wall for future dwelling unit at 1728 diamond | $22,700 |
| Jan 29, 2013 | Completed final sign-off Sep 2014 | 1718 Diamond St | excavation retaining wall for new dwelling unit.Details
excavation retaining wall for new dwelling unit. | $34,050 |
| Jan 29, 2013 | Completed final sign-off Jul 2014 | 1710 Diamond St | excavation retaining wall for new dwelling unit.Details
excavation retaining wall for new dwelling unit. | $39,725 |
| Sep 17, 2012 | Completed final sign-off Apr 2013 | 306 Ridgewood Av | replace dryrotted threads and rissers at front entry stairs, less than 50% to comply with complaint #201216301Details
replace dryrotted threads and rissers at front entry stairs, less than 50% to comply with complaint #201216301 | $800 |
| Sep 17, 2012 | Expired or cancelled expired Aug 2019 | 1220 La Playa | revision to pa# 201205029617. voluntary structural repair & elevation remodel. add 4 steel posts, 4 footings, replace dry rotted plywood. replace all window (84), like size for like size. replace exterior stucco with pre-finished fiber cement hardi board. maintain access to egress at all times.Details
revision to pa# 201205029617. voluntary structural repair & elevation remodel. add 4 steel posts, 4 footings, replace dry rotted plywood. replace all window (84), like size for like size. replace exterior stucco with pre-finished fiber cement hardi board. maintain access to egress at all times. | $30,000 |
| May 2, 2012 | Expired or cancelled expired Aug 2019 | 1220 La Playa | voluntary structural repair. install temporary supports. replace 4 steel beam sections (1 each corner) of 2nd floor framing. not visible from streetDetails
voluntary structural repair. install temporary supports. replace 4 steel beam sections (1 each corner) of 2nd floor framing. not visible from street | $30,000 |
| May 11, 2011 | Completed final sign-off Jun 2011 | 1627 Irving St | new3 uinderpinning pits at property line and rear of builidng , 4 totalDetails
new3 uinderpinning pits at property line and rear of builidng , 4 total | $8,000 |
| May 2, 2011 | Completed final sign-off May 2011 | 1544 Pacific Av | to obtain final inspection for work approved under pa #200710115112. all work is complete.Details
to obtain final inspection for work approved under pa #200710115112. all work is complete. | |
| Aug 31, 2010 | Completed final sign-off Nov 2010 | 580 Hayes St | consolidate & modify renovation permits#200803184379, #200906301728 & #201001082379 to clarify scope of work for accessibility & exiting of (e) subdivided commercial building.Details
consolidate & modify renovation permits#200803184379, #200906301728 & #201001082379 to clarify scope of work for accessibility & exiting of (e) subdivided commercial building. | |
| Jan 8, 2008 | Expired or cancelled expired Sep 2008 | 976 Elizabeth St | additional demo floor and wall sq ft. deemed not structurally sound, in severe state of disrepair per dbi inspector joe duffy. revision to pa# 200607186891 for additional demo. demo 2nd floor and walls on 1st and 2nd floorsDetails
additional demo floor and wall sq ft. deemed not structurally sound, in severe state of disrepair per dbi inspector joe duffy. revision to pa# 200607186891 for additional demo. demo 2nd floor and walls on 1st and 2nd floors | $4,000 |
| Dec 2, 2004 | Completed final sign-off Apr 2009 | 1536 Pacific Av | to erect 4 stories, 6 dwelling units, 1 basement with commercial.Details
to erect 4 stories, 6 dwelling units, 1 basement with commercial. | $1,500,000 |