Block 0807, lot 009
570 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 6
- Rooms
- 7 bathrooms
- Building
- 5,646 sq ft
- Lot
- 2,752 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2021 | Never finaled issued Apr 2022, no final | 570 Hayes St | Commercial Fire Protection Inc | install low frequecny sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. .Details
install low frequecny sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. . | $17,552 |
| Jul 9, 2015 | Completed final sign-off Jan 2016 | 568 Hayes St | R 3 Builders Inc. | t.i. interior remodel, expose floor brick at entry, move push pad to interior side wall.Details
t.i. interior remodel, expose floor brick at entry, move push pad to interior side wall. | $5,000 |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 568 Hayes St | Strong Builders Construction Inc. | revision to pa# 2014 1211 3536 to lower foundation wall an additional 5'0" to prevent need to underpinn future permit scope on adjacent lotDetails
revision to pa# 2014 1211 3536 to lower foundation wall an additional 5'0" to prevent need to underpinn future permit scope on adjacent lot | $8,000 |
| Feb 20, 2015 | Never finaled issued Feb 2015, no final | 570 Hayes St | streetspaceDetails
streetspace | ||
| Dec 11, 2014 | Never finaled issued Feb 2015, no final | 568 Hayes St | Strong Builders Construction Inc. | voluntary structural foundation strengthening in basement. no other work.Details
voluntary structural foundation strengthening in basement. no other work. | $75,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2016 | 568 Hayes St | Casement Construction | temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s.Details
temporary excavation shoring & underpinning of (e) building footing for new construction at 580 hayes st. ref pa#201312093685s. | $13,500 |
| Sep 19, 2014 | Completed final sign-off Oct 2015 | 570 Hayes St | Strong Builders Construction Inc. | replace left and rear side of the house siding approx. 40' by 30'x2 with wood siding.Details
replace left and rear side of the house siding approx. 40' by 30'x2 with wood siding. | $2,000 |
| Jul 21, 2014 | Never finaled issued Jul 2014, no final | 570 Hayes St | Strong Builders Construction Inc. | units 1 & 2: revision to pa #2014-0519-6105. change appliances from electric range to gas, add hood & vent to roof, provide gas power & venting for stack washer/dryer.Details
units 1 & 2: revision to pa #2014-0519-6105. change appliances from electric range to gas, add hood & vent to roof, provide gas power & venting for stack washer/dryer. | $1,000 |
| Jul 21, 2014 | Completed final sign-off Oct 2015 | 570 Hayes St | Strong Builders Construction Inc. | unit 3: revision to pa #2014-0519-6103. provide undercounter duplex gfi outlet for dishwasher. provide additional undercounter gfi outlet per plans.Details
unit 3: revision to pa #2014-0519-6103. provide undercounter duplex gfi outlet for dishwasher. provide additional undercounter gfi outlet per plans. | $1,000 |
| May 19, 2014 | Never finaled issued Jun 2014, no final | 570 Hayes St | Strong Builders Construction Inc. | remodel of unit #1 on 2nd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope.Details
remodel of unit #1 on 2nd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope. | $120,000 |
| May 19, 2014 | Completed final sign-off Oct 2015 | 570 Hayes St | Strong Builders Construction Inc. | remodel of unit #3 on 3rd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope.Details
remodel of unit #3 on 3rd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope. | $60,000 |
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 570 Hayes St | Strong Builders Construction Inc. | remove of walls finishing of 3 units lath & plaster only on walls and install new drywall. no change on walls and openingsDetails
remove of walls finishing of 3 units lath & plaster only on walls and install new drywall. no change on walls and openings | $5,000 |
| Apr 16, 2010 | Never finaled issued Apr 2010, no final | 568 Hayes St | street space and mta parkingDetails
street space and mta parking | ||
| Dec 7, 2009 | Never finaled issued Jan 2010, no final | 568 Hayes St | Clear Channel Outdoor | obtain a building permit for sign located at 568 - 572 hayes st. as required by sign i.d. # "orig 242" per n.o.v. dated november 9, 2009. block & lot # 0807/009.Details
obtain a building permit for sign located at 568 - 572 hayes st. as required by sign i.d. # "orig 242" per n.o.v. dated november 9, 2009. block & lot # 0807/009. | $1,500 |
| Sep 13, 2006 | Never finaled issued Sep 2006, no final | 568 Hayes St | streetspaceDetails
streetspace |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Strong Builders Construction Inc. (8), Casement Construction, Clear Channel Outdoor, Commercial Fire Protection Inc, R 3 Builders Inc.
- Architects
- Jeff Acuff (2), Jeffrey K Acuff (2)
- Engineers
- Danil Botushansky, Gregory K Rodrigues, Vincent Kelly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.