Back to bathroom remodel contractors
Casement Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Jun 2024
- Last 24 months
- 0 permits filed
39 permits since 2000: 31 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 53 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2024 | Completed final sign-off Mar 2025 | 36 Cragmont Av | revision to 202404029185: new slab at ground floor for approved family rm & half bathDetails
revision to 202404029185: new slab at ground floor for approved family rm & half bath | $5,000 |
| Apr 2, 2024 | Completed final sign-off Mar 2025 | 36 Cragmont Av | replace extg windows @ kitchen, demo 2 windows in lvng r. demo ext brick fireplace, replace with nw gas unit. kitchen renovation. half bath reno at flr 2 and full bath reno. @ floor 3. new half bath at ground level. relocate laundry to floor 2. new deck at floor 2 with nw sliding drs,Details
replace extg windows @ kitchen, demo 2 windows in lvng r. demo ext brick fireplace, replace with nw gas unit. kitchen renovation. half bath reno at flr 2 and full bath reno. @ floor 3. new half bath at ground level. relocate laundry to floor 2. new deck at floor 2 with nw sliding drs, | $175,000 |
| Sep 15, 2022 | Completed final sign-off Jun 2023 | 190 Stillings Av | renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd flDetails
renovation of (e) kitchen and (e) bathroom on 2nd fl; new skylight for kitchen. replace (e) skylights @ bathroom and hall; new deck @ ground floor master bedrom; repair (e) stairs from ground floor to garden; replace (e) windows @ front facade & (e) garage door; replace (e) rear door & window 2nd fl | $35,000 |
| Feb 3, 2021 | Completed final sign-off Jul 2024 | 877 Carolina St | interior remodel & vertical addition to an (e) single family house that is one story above a basement. on the basement level, the entry and mudroom will be enlarged while retaining the (e) one car garage. the 1/f will be reconfigured to owner's suite, 2 bed, 2 bath, laundry, and family studyDetails
interior remodel & vertical addition to an (e) single family house that is one story above a basement. on the basement level, the entry and mudroom will be enlarged while retaining the (e) one car garage. the 1/f will be reconfigured to owner's suite, 2 bed, 2 bath, laundry, and family study | $458,961 |
| Dec 3, 2020 | Completed final sign-off Jun 2021 | 190 Stillings Av | demolish existing ground floor laundry and bathroom. construct new bathroom laundry area, tradesmen corridor. new closet, new doors, and window to gardenDetails
demolish existing ground floor laundry and bathroom. construct new bathroom laundry area, tradesmen corridor. new closet, new doors, and window to garden | $24,000 |
| Apr 3, 2019 | Completed final sign-off Feb 2021 | 3065 26th Av | (n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn.Details
(n) bathroom on 2nd floor. extend (e) bedroom at 2nd floor & reduce size of (e) deck as drawn. (n) skylight over (n) bathroom. (n) doors & windows for bedroom as drawn. (n) guard rail for deck as drawn. | $25,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2016 | 3035 Baker St | remodel unit 102 at 1st fl. convert kitchen to office, relocate existing kitchen, add bath, add washer and dryer. verify 2nd means of egress maintainedDetails
remodel unit 102 at 1st fl. convert kitchen to office, relocate existing kitchen, add bath, add washer and dryer. verify 2nd means of egress maintained | $35,000 |