Back to bathroom remodel contractors
D & S Leong Associates
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2026
- Last 24 months
- 6 permits filed
188 permits since 2000: 135 completed, 5 in progress, 31 never finaled, 17 expired or cancelled.
Of the 31 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 608 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2025 | In progress issued Nov 2025 | 470 25th Av | apt 3: remodel kitchen and bathroom. remove kitchen cabinets, tub, toilet, sink - replace w/new cabinets, bathroom fixtures, ceiling lights. no change on walls. all like for like.Details
apt 3: remodel kitchen and bathroom. remove kitchen cabinets, tub, toilet, sink - replace w/new cabinets, bathroom fixtures, ceiling lights. no change on walls. all like for like. | $12,000 |
| Jan 7, 2022 | Completed final sign-off Oct 2023 | 1461 17th Av | 1461 17th av: 2/f: renovate (e) bathroom and kitchen in0-kind. covert (e) office into 2 new bathrooms. all work on 2/f only. remodel living,dining and bedroom, relocate (e) laundry. replace rear windows non street visiable and along lightwell. u-factor 0.30 or better.Details
1461 17th av: 2/f: renovate (e) bathroom and kitchen in0-kind. covert (e) office into 2 new bathrooms. all work on 2/f only. remodel living,dining and bedroom, relocate (e) laundry. replace rear windows non street visiable and along lightwell. u-factor 0.30 or better. | $48,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2023 | 1459 17th Av | renovate extg bath and kitchen, convert extg office and 2 new bathrooms. remodel living, dinning and bedroom/add new skylight 3'x3' . relocate extg laundry and whDetails
renovate extg bath and kitchen, convert extg office and 2 new bathrooms. remodel living, dinning and bedroom/add new skylight 3'x3' . relocate extg laundry and wh | $38,000 |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 1927 22nd Av | revision to approved pa# 201907024880 add full bathroom at ground floor.Details
revision to approved pa# 201907024880 add full bathroom at ground floor. | $5,000 |
| Jul 2, 2019 | Completed final sign-off Apr 2021 | 1927 22nd Av | add 2 bedrooms, 1 full bathroom and mud storage room at ground floor. add 1 master suite, remodel (e) kitchen w/ lightwell removal. relocate (e) bathroom with interior stair at 2nd flr.Details
add 2 bedrooms, 1 full bathroom and mud storage room at ground floor. add 1 master suite, remodel (e) kitchen w/ lightwell removal. relocate (e) bathroom with interior stair at 2nd flr. | $80,000 |
| Feb 3, 2017 | Completed final sign-off Jul 2018 | 470 25th Av | apt #2. remodel kitchen and bathroom. remove all kitchen cabinet, tub, toilet, sink, replace with new cabinet, bathroom fixtures. ceiling light. no change on walls.Details
apt #2. remodel kitchen and bathroom. remove all kitchen cabinet, tub, toilet, sink, replace with new cabinet, bathroom fixtures. ceiling light. no change on walls. | $7,800 |
| Apr 4, 2014 | Never finaled issued Apr 2014, no final | 327 25th Av | install 4 additional fire sprinklers for added bathroom & exercise room on 1/f as per pa# 201402057840Details
install 4 additional fire sprinklers for added bathroom & exercise room on 1/f as per pa# 201402057840 | $1,800 |
| Nov 5, 2012 | Completed final sign-off Oct 2014 | 1200 32nd Av | convert (e) storage room into a bedroom, add study room, 1 bedroom, 1 mud room, 1 laundry room & 2 bathrooms on 1st floor per plan (garage)Details
convert (e) storage room into a bedroom, add study room, 1 bedroom, 1 mud room, 1 laundry room & 2 bathrooms on 1st floor per plan (garage) | $58,000 |
| Oct 2, 2012 | Completed final sign-off Oct 2014 | 1200 32nd Av | exterior painting, remodel kitchen & bathrooms with new cabinet, tile, new plumbing fixtures, plumbing and electric work, remodel work on 2nd flr, lighting must comply with cec 150(k)Details
exterior painting, remodel kitchen & bathrooms with new cabinet, tile, new plumbing fixtures, plumbing and electric work, remodel work on 2nd flr, lighting must comply with cec 150(k) | $20,000 |
| Nov 22, 2005 | Completed final sign-off Mar 2006 | 243 Ramsell St | replace kitchen cabinet, stove, sink & bath fixture as tub, toilet & sink on 2nd fl.Details
replace kitchen cabinet, stove, sink & bath fixture as tub, toilet & sink on 2nd fl. | $8,000 |