Block 3179, lot 011
51 Havelock St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 1,045,000 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2022 | Expired or cancelled withdrawn Nov 2025 | 1 Sgt John V Young St | to erect a one story, type va, community meeting room.Details
to erect a one story, type va, community meeting room. | $6,000,000 | |
| Dec 29, 2022 | In progress issued Mar 2026 | 1 Sgt John V Young St | Clark Construction Group Ca Lp | to erect a 2-story, type 2a, office building.Details
to erect a 2-story, type 2a, office building. | $15,000,000 |
| Dec 29, 2022 | In progress issued Jun 2026 | 1 Sgt John V Young St | Clark Construction Group Ca Lp | existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures.Details
existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures. | $14,000,000 |
| Dec 4, 2019 | Completed final sign-off May 2021 | 51 Havelock St | revision to pa 2015-0903-6068 relocating c02 tankDetails
revision to pa 2015-0903-6068 relocating c02 tank | $10,000 | |
| Jun 18, 2018 | Never finaled issued Jun 2018, no final | 51 Havelock St | street spaceDetails
street space | ||
| Jun 12, 2018 | Completed final sign-off Nov 2020 | 1 Sgt John V Young St | Wickman Development And Construction | replace (e) outdoor self contained generator in kind maher naDetails
replace (e) outdoor self contained generator in kind maher na | $40,000 |
| Jun 6, 2018 | Never finaled issued Jul 2018, no final | 51 Havelock St | installation of new electrical service - 600 amp. new work related to permit #201509036068. maher n/a.Details
installation of new electrical service - 600 amp. new work related to permit #201509036068. maher n/a. | $200,000 | |
| Jun 12, 2017 | Completed final sign-off Feb 2019 | 51 Havelock St | D & S Leong Associates | install 200 new heads throughout per nfpa #13 & underground per nfpa #24 ref ti 2015-0903-6068Details
install 200 new heads throughout per nfpa #13 & underground per nfpa #24 ref ti 2015-0903-6068 | $50,000 |
| Mar 21, 2017 | Completed final sign-off Feb 2019 | 51 Havelock St | Volk Electric Inc | new fire alarm system includes: 1 fire alarm control unit, 1 remote power supply/charger, 1 duct detector, 1 smoke detector, 1 manual pull station, 1 dual monitor module, 2 relay modules, 5 strobes, 13 horn/strobes ref 201509086068Details
new fire alarm system includes: 1 fire alarm control unit, 1 remote power supply/charger, 1 duct detector, 1 smoke detector, 1 manual pull station, 1 dual monitor module, 2 relay modules, 5 strobes, 13 horn/strobes ref 201509086068 | $18,000 |
| Dec 21, 2016 | Completed final sign-off Nov 2020 | 1 Sgt John V Young St | amep and structural plans for mechanical upgrades and preparation of future generator replacement.new fluid applied roof,roof drains,curbs & flashing. structural mechanical supports.generator demo and work under separate permit,dwg generator included for reference only, maher n/aDetails
amep and structural plans for mechanical upgrades and preparation of future generator replacement.new fluid applied roof,roof drains,curbs & flashing. structural mechanical supports.generator demo and work under separate permit,dwg generator included for reference only, maher n/a | $700,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 1 Sgt John V Young St | barrier removal: provide tactile signage as req. replace door closers, power door operator. install digital telephone, new accessible service counter, new concrete ramp & new handrails, new contrast, striping, new accessible stall & concrete pad, new parking stall striping & new signage pole. maherDetails
barrier removal: provide tactile signage as req. replace door closers, power door operator. install digital telephone, new accessible service counter, new concrete ramp & new handrails, new contrast, striping, new accessible stall & concrete pad, new parking stall striping & new signage pole. maher | $75,000 | |
| Sep 3, 2015 | Completed final sign-off May 2021 | 51 Havelock St | reconfiguration of (e) lockers, restrooms, and offices (n) community room. repair of (e) pool. (n) glazing in (e) window system. new entry ramp, stairs and canopy. new mechanical enclosure.Details
reconfiguration of (e) lockers, restrooms, and offices (n) community room. repair of (e) pool. (n) glazing in (e) window system. new entry ramp, stairs and canopy. new mechanical enclosure. | $3,000,000 | |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 51 Havelock St | balboa park address at block 3179, lot 011 as; 51 havelock streetDetails
balboa park address at block 3179, lot 011 as; 51 havelock street | ||
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 1 Sgt John V Young St | Joseph Murphy Construction Inc | reroofingDetails
reroofing | $115,000 |
| Sep 7, 2011 | Completed final sign-off May 2013 | 100 Sgt John V Young St | remodel of both women's anmen's restrooms, compliance w/ ada that includes remodel of the entrances, ada stall signage, relocation of plbg fixtures, drinking fountain, wall ile, new floor finish and paint, window repairDetails
remodel of both women's anmen's restrooms, compliance w/ ada that includes remodel of the entrances, ada stall signage, relocation of plbg fixtures, drinking fountain, wall ile, new floor finish and paint, window repair | $150,000 | |
| Mar 11, 2011 | Never finaled issued Oct 2011, no final | 100 Sgt John V Young St | new address assignment for restroomDetails
new address assignment for restroom | ||
| Oct 23, 2008 | Completed final sign-off Aug 2009 | 1 Sgt John V Young St | sele demo of existing wall and ceiling to install new fire wall, and 1 new sprinkler head, automatic fire door, fire & smoke damper, and misc. painting & patching. fire alarm and sprinkler system will be design built and under separate permit. to renew pa #200212062958.Details
sele demo of existing wall and ceiling to install new fire wall, and 1 new sprinkler head, automatic fire door, fire & smoke damper, and misc. painting & patching. fire alarm and sprinkler system will be design built and under separate permit. to renew pa #200212062958. | $50,000 | |
| Dec 6, 2002 | Expired or cancelled expired Dec 2008 | 1 Sgt John V Young St | selective demolition of extg wall & ceiling to install new fire wall, sprinkler heads/autmc fire drsDetails
selective demolition of extg wall & ceiling to install new fire wall, sprinkler heads/autmc fire drs | $50,000 | |
| Apr 30, 2002 | Completed final sign-off Jul 2002 | 1 Sgt John V Young St | Alpha Bay Builders, Inc. | renew 200004207814: for final inspectionDetails
renew 200004207814: for final inspection | |
| Apr 20, 2000 | Expired or cancelled expired Jan 2002 | 1 Sgt John V Young St | to erect restrooms/office - city jobDetails
to erect restrooms/office - city job |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Clark Construction Group Ca Lp (2), Alpha Bay Builders, Inc., D & S Leong Associates, Joseph Murphy Construction Inc, Volk Electric Inc, Wickman Development And Construction
- Architects
- Thomas Matthew Jasmin (3), Jane Chan Architecture (2), Kuth Ranieri (2), Clarence Mamuyac Jr, Vito Vanoni
- Engineers
- Daniel Manhelm, Rosanna Lerma
- Authorized agent-otherss
- Jane Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.