34 permits since 2000 (architect on 33 permits, authorized agent-others on 1 permit): 20 completed, 3 in progress, 10 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 27, 2026 | In progress issued May 2026 | 1814 Stockton St | install new metal ladder and metal safety railing for access by maintenance personnel to roof of the stair penthouseDetails
install new metal ladder and metal safety railing for access by maintenance personnel to roof of the stair penthouse | $10,000 | |
| Dec 26, 2025 | In progress filed Dec 2025, not yet issued | 551 26th Av | replace (e) generator, belly tank, concrete pad, & exhaust piping in rear yard w/ new in same location. replace ats inside building with new ats. remove (e) interior window and fill-in opening to match (e) partition. provide new accessible restroom signage at (e) single user restroom.Details
replace (e) generator, belly tank, concrete pad, & exhaust piping in rear yard w/ new in same location. replace ats inside building with new ats. remove (e) interior window and fill-in opening to match (e) partition. provide new accessible restroom signage at (e) single user restroom. | $800,000 | |
| Oct 17, 2024 | In progress issued Nov 2024 | 1000 Ocean Av | revision to approved permit 201909101242. revisions include minor changes to vertical circulation within unoccupied tower, (4) new electrical convenience outlets, and new metal conduit for emergency raiod communication systems.Details
revision to approved permit 201909101242. revisions include minor changes to vertical circulation within unoccupied tower, (4) new electrical convenience outlets, and new metal conduit for emergency raiod communication systems. | $600,000 | |
| Aug 18, 2021 | Completed final sign-off Mar 2023 | 630 Valencia St | Evra Construction | structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms.Details
structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms. | $200,000 |
| Jul 21, 2021 | Completed final sign-off Sep 2022 | 1340 Powell St | Argo Construction Inc | differed submittl for (n) pull piping installation for (n) roof generator ref pa# 2019-0211-2558.Details
differed submittl for (n) pull piping installation for (n) roof generator ref pa# 2019-0211-2558. | $100,000 |
| Dec 30, 2019 | Never finaled issued Feb 2020, no final | 200 Cashmere St | voluntary exterior stair serving rear yard. new and altered gates for tnew stair. accessible path of travel improvments.Details
voluntary exterior stair serving rear yard. new and altered gates for tnew stair. accessible path of travel improvments. | $110,000 | |
| Dec 30, 2019 | Never finaled issued Feb 2021, no final | 762 Fulton St | revision to pa #201805017873. to clarify occupancy use details per plan. no construction - no chnage to occupant load. establish occupancy for assembly permit only.Details
revision to pa #201805017873. to clarify occupancy use details per plan. no construction - no chnage to occupant load. establish occupancy for assembly permit only. | ||
| Jun 29, 2018 | Completed final sign-off Jul 2020 | 441 12th Av | replacement of emergency diesel generator at grade in rear yard (same size same location) and above ground belly fuel tank upgrade from 30 gallon to 521 gallon size to provide minimum 72 hour run time of generator for supporting all loads of building.Details
replacement of emergency diesel generator at grade in rear yard (same size same location) and above ground belly fuel tank upgrade from 30 gallon to 521 gallon size to provide minimum 72 hour run time of generator for supporting all loads of building. | $200,000 | |
| Jun 11, 2018 | Never finaled issued Jul 2018, no final | 285 Olympia Wy | replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doorsDetails
replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doors | $75,000 | |
| Jun 11, 2018 | Never finaled issued Jul 2018, no final | 2430 San Bruno Av | replacement of (e) apparatus bay doors (telescoping door) with (n) bi-foldingdoors for fire station 42Details
replacement of (e) apparatus bay doors (telescoping door) with (n) bi-foldingdoors for fire station 42 | $50,000 | |
| Jun 11, 2018 | Never finaled issued Jul 2018, no final | 551 26th Av | replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doorsDetails
replacement of (e) apparatus bay doors (sectional doors) with (n) four-fold doors | $50,000 | |
| Jun 11, 2018 | Never finaled issued Jul 2018, no final | 1348 45th Av | replacement of (e) apparatus bay door (telecsoping door) with new four-fold door. maher naDetails
replacement of (e) apparatus bay door (telecsoping door) with new four-fold door. maher na | $25,000 | |
| May 1, 2018 | Never finaled issued Jun 2018, no final | 762 Fulton St | Ccsf-Dept. Public Works | no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2.Details
no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2. | |
| Feb 26, 2018 | Never finaled issued Apr 2018, no final | 762 Fulton St | no construction. establish occupancy for assembly permit.Details
no construction. establish occupancy for assembly permit. | ||
| Feb 26, 2018 | Completed final sign-off Feb 2019 | 499 41st Av | replacement of (e) apparatus bay door (telescoping door) with (n) ceiling doorDetails
replacement of (e) apparatus bay door (telescoping door) with (n) ceiling door | $40,000 | |
| Dec 19, 2017 | Completed final sign-off Feb 2020 | 1 Dr. Carlton B. Goodlett Pl | assesor's office tenant improvement of interior space. the scope include selective demolitio, ada barrier removal, construction of interior low wall partition, architectural finishes and fresh air ventilationl no impact to exterior; work to non-historic features. n/a maherDetails
assesor's office tenant improvement of interior space. the scope include selective demolitio, ada barrier removal, construction of interior low wall partition, architectural finishes and fresh air ventilationl no impact to exterior; work to non-historic features. n/a maher | $400,000 | |
| May 23, 2017 | Completed final sign-off Nov 2017 | 1067 Post St | revision to pa #2015-0630-0285. location of fuel filler and location of fuel tank and new control circuit requested by electrical inspector.Details
revision to pa #2015-0630-0285. location of fuel filler and location of fuel tank and new control circuit requested by electrical inspector. | $850,000 | |
| Dec 23, 2016 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | Asbetos Management Group | priority processing. at lot 004 & 006, demolish 2 story, s-1 storage buildings (2-buildings). maher n/aDetails
priority processing. at lot 004 & 006, demolish 2 story, s-1 storage buildings (2-buildings). maher n/a | $10,000 |
| Nov 23, 2016 | Never finaled issued Dec 2016, no final | 299 Vermont St | removal & replacement of (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units. maher naDetails
removal & replacement of (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units. maher na | $200,000 | |
| Nov 23, 2016 | Completed final sign-off Dec 2017 | 285 Olympia Wy | removal & replacement of (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech unitsDetails
removal & replacement of (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units | $200,000 | |
| Nov 23, 2016 | Completed final sign-off Dec 2017 | 1348 45th Av | removal & replacement of (e) roofing system, down to (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech unitsDetails
removal & replacement of (e) roofing system, down to (e) roofing system, down to (e) conc. roof deck. new fluid flashings. replace (e) roof drains overflows. replace skylights. electrical disconnect & reconnect at mech units | $200,000 | |
| Jul 29, 2016 | Never finaled issued Aug 2016, no final | 390 Buckingham Wy | shower restoration at 4 shower stalls. new tile, waterproofing & backing, drain and fixture replacement. recessed light replacement at 3 shower stalls. new glass shower doors.Details
shower restoration at 4 shower stalls. new tile, waterproofing & backing, drain and fixture replacement. recessed light replacement at 3 shower stalls. new glass shower doors. | $80,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 1899 Waller St | barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher naDetails
barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher na | $75,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 2345 24th Av | barrier removal: provide tactile signage, replace door closers & power door operators, new digital telephone, demo & replace concrete pad for new level accessible parking space, remove/replace wall & restroom accessories, new way finding signageDetails
barrier removal: provide tactile signage, replace door closers & power door operators, new digital telephone, demo & replace concrete pad for new level accessible parking space, remove/replace wall & restroom accessories, new way finding signage | $75,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 1 Sgt John V Young St | barrier removal: provide tactile signage as req. replace door closers, power door operator. install digital telephone, new accessible service counter, new concrete ramp & new handrails, new contrast, striping, new accessible stall & concrete pad, new parking stall striping & new signage pole. maherDetails
barrier removal: provide tactile signage as req. replace door closers, power door operator. install digital telephone, new accessible service counter, new concrete ramp & new handrails, new contrast, striping, new accessible stall & concrete pad, new parking stall striping & new signage pole. maher | $75,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 461 06th Av | barrier removal: new tactile signage, new door closers, new power door operators, new digital telephone, new accessible service counter, new sign pole at existing curb, replace entry doors at community room entry; repair door to women's restroomDetails
barrier removal: new tactile signage, new door closers, new power door operators, new digital telephone, new accessible service counter, new sign pole at existing curb, replace entry doors at community room entry; repair door to women's restroom | $75,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 350 Amber Dr | barrier removal: provide tactile signage, replace door closers & other hardware, new power door operators, new concrete pad for (2) new accessible parking stalls. new accessible ramp at public lobby with new handrails and contrast striping. renovate restrooms to be accessible & replace case workDetails
barrier removal: provide tactile signage, replace door closers & other hardware, new power door operators, new concrete pad for (2) new accessible parking stalls. new accessible ramp at public lobby with new handrails and contrast striping. renovate restrooms to be accessible & replace case work | $75,000 | |
| Dec 7, 2015 | Expired or cancelled expired Jul 2019 | 1295 Shafter Av | R & S Construction Management Inc | renovation of (4) existing shower stalls, including installation of new accessible stall. replacement of plumbing valves, shower heads, assoc plbg work. new framed walls for tile finish. new slab openings for floor drain relocation. n/a maher ordinanceDetails
renovation of (4) existing shower stalls, including installation of new accessible stall. replacement of plumbing valves, shower heads, assoc plbg work. new framed walls for tile finish. new slab openings for floor drain relocation. n/a maher ordinance | $80,000 |
| Sep 28, 2015 | Completed final sign-off Jan 2017 | 766 Vallejo St | demo & replace (e) slate tile at station entrance and along memory lane. at lobby - provide tactile ecit & room id signage. replace door closers at doors indicated & replace (e) phone, new door installed into (e) frame. maher naDetails
demo & replace (e) slate tile at station entrance and along memory lane. at lobby - provide tactile ecit & room id signage. replace door closers at doors indicated & replace (e) phone, new door installed into (e) frame. maher na | $20,000 | |
| Jun 30, 2015 | Completed final sign-off Nov 2017 | 1067 Post St | remove & replace roofing, hvac, generator, skylights. n/a maher ordinanceDetails
remove & replace roofing, hvac, generator, skylights. n/a maher ordinance | $850,000 | |
| Jun 19, 2015 | Completed final sign-off Sep 2019 | 1301 Turk St | Alten Construction Inc, Johnson Controls Fire | erect a three story fire station and one family dwelling mix use building.Details
erect a three story fire station and one family dwelling mix use building. | $13,000,000 |
| Jun 19, 2015 | Completed final sign-off Apr 2017 | 1301 Turk St | Alten Construction Inc | demolish two story fire station building.Details
demolish two story fire station building. | $1,000,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2016 | 285 Olympia Wy | shower replacement at 3 stalls inclusive of tile removal & replacmeent, drain & valve replacement, removal of (e) marble partitions & installation of new framed partitoin walls w/glass shower doors. installation of new waterproofing throughout. n/a maher ordinanceDetails
shower replacement at 3 stalls inclusive of tile removal & replacmeent, drain & valve replacement, removal of (e) marble partitions & installation of new framed partitoin walls w/glass shower doors. installation of new waterproofing throughout. n/a maher ordinance | $70,000 | |
| Jun 2, 2015 | Completed final sign-off May 2016 | 530 Sansome St | shower replacement at 1 stall inclusive of tile removal & replacmeent, drain & valve replacement, widening of (e) stall opening, & new glass shower door. installation of new water proofing throughout. n/a maher ordinanceDetails
shower replacement at 1 stall inclusive of tile removal & replacmeent, drain & valve replacement, widening of (e) stall opening, & new glass shower door. installation of new water proofing throughout. n/a maher ordinance | $30,000 |