Charles Smith
- Listed as
- architect, authorized agent-others
- On San Francisco permits
- Feb 2010 to Apr 2016
5 permits since 2000 (architect on 3 permits, authorized agent-others on 2 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 1899 Waller St | barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher naDetails
barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher na | $75,000 | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 461 06th Av | barrier removal: new tactile signage, new door closers, new power door operators, new digital telephone, new accessible service counter, new sign pole at existing curb, replace entry doors at community room entry; repair door to women's restroomDetails
barrier removal: new tactile signage, new door closers, new power door operators, new digital telephone, new accessible service counter, new sign pole at existing curb, replace entry doors at community room entry; repair door to women's restroom | $75,000 | |
| Aug 4, 2010 | Completed final sign-off Oct 2010 | 275 Battery St | Hathaway Dinwiddie Co. | 5th floor - reverse swing of door, remove door & infill w/glass, new partitions to create 2 offices & 1 conf. room, new demising wall @ col. line 3. no increase in area, no change in occupancy or use.Details
5th floor - reverse swing of door, remove door & infill w/glass, new partitions to create 2 offices & 1 conf. room, new demising wall @ col. line 3. no increase in area, no change in occupancy or use. | $48,000 |
| Aug 2, 2010 | Expired or cancelled cancelled Jan 2026 | 275 Battery St | 5th floor (reliant group) - reverse swing of door 01-a. conference room 5109: remove one door and fill in with glazing. new partitions to form 2 offices and one conference room. new demising wall at column line 3.Details
5th floor (reliant group) - reverse swing of door 01-a. conference room 5109: remove one door and fill in with glazing. new partitions to form 2 offices and one conference room. new demising wall at column line 3. | $40,000 | |
| Feb 26, 2010 | Completed final sign-off Apr 2010 | 1182 Market St | R.M.R. Construction Company | new partitions and door for new office space on 4th floor. soft demo done under 201002116356. separate permit for mech /elec. maintain 2-hour wall separation at new opening per plans.Details
new partitions and door for new office space on 4th floor. soft demo done under 201002116356. separate permit for mech /elec. maintain 2-hour wall separation at new opening per plans. | $136,000 |