Afshar Jalalian
- License
- 3261
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Mar 2019 to Oct 2024
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Herrero Builders Incorporated (2), Rudolph And Sletten Inc
- Architects
- Kevin C Day, Kevin Dai, Vito Vanoni
- Engineers
- Jon Alan Inman, Paul O'connell
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 17, 2024 | In progress issued Nov 2024 | 1000 Ocean Av | revision to approved permit 201909101242. revisions include minor changes to vertical circulation within unoccupied tower, (4) new electrical convenience outlets, and new metal conduit for emergency raiod communication systems.Details
revision to approved permit 201909101242. revisions include minor changes to vertical circulation within unoccupied tower, (4) new electrical convenience outlets, and new metal conduit for emergency raiod communication systems. | $600,000 | |
| Mar 20, 2019 | Completed final sign-off Sep 2020 | 2100 Webster St | Herrero Builders Incorporated, Rudolph And Sletten Inc | 5th flr selective demo and partial ti. work includes new accessible toilet room, new partitions, ceilings, and finishes and hvac and elecDetails
5th flr selective demo and partial ti. work includes new accessible toilet room, new partitions, ceilings, and finishes and hvac and elec | $1,416,303 |
| Mar 12, 2019 | Completed final sign-off Sep 2020 | 2333 Buchanan St | Herrero Builders Incorporated | 2nd fl: selective demo and partial ti. work includes: new acessible toilet roomsl new partitions, ceilings and finishes; associated modifcation to (e) poweder/data, lighting and (e) hvac; new roof mounted condensing units. mep under seperate permit.Details
2nd fl: selective demo and partial ti. work includes: new acessible toilet roomsl new partitions, ceilings and finishes; associated modifcation to (e) poweder/data, lighting and (e) hvac; new roof mounted condensing units. mep under seperate permit. | $3,000,000 |