Block 5286A, lot 021
2241 Jerrold Ave
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 58,435 sq ft
- Zoning
- M2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2020 | Completed final sign-off May 2021 | 2241 Jerrold Av | S J Amoroso Construction | evacuation maps per sffd bulletin 2.11.Details
evacuation maps per sffd bulletin 2.11. | |
| Aug 20, 2020 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | Johnson Controls Fire | install "errcs" emergency response radio coverage system. ambulance serviceDetails
install "errcs" emergency response radio coverage system. ambulance service | $1,500 |
| Apr 20, 2020 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | S J Amoroso Construction | installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129.Details
installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129. | $2,977,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 2241 Jerrold Av | Value Fire Protection Inc | install overhead fire sprinkler system. ref pa# 201612013886.Details
install overhead fire sprinkler system. ref pa# 201612013886. | $103,250 |
| May 15, 2019 | Completed final sign-off May 2021 | 2241 Jerrold Av | Johnson Controls Fire | install (n) automotive fire alarm system & manual stations. system including sprinkler monitoring & 2 way emergency communication system with one call boxes on ewach floor by the elevator lobby.Details
install (n) automotive fire alarm system & manual stations. system including sprinkler monitoring & 2 way emergency communication system with one call boxes on ewach floor by the elevator lobby. | $122,194 |
| Apr 3, 2019 | Completed final sign-off Apr 2021 | 2241 Jerrold Av | revision to 201612013886 s1/r1 to remove artitle 708 critical operations power system cops annotation from elec drawingsDetails
revision to 201612013886 s1/r1 to remove artitle 708 critical operations power system cops annotation from elec drawings | ||
| Sep 28, 2018 | Completed final sign-off Apr 2021 | 2241 Jerrold Av | rev to pa# 201612013886 added lactation room at 3rd level, misc coordination to plumbing, civil, architectural, mechanical ,electrical & structuralDetails
rev to pa# 201612013886 added lactation room at 3rd level, misc coordination to plumbing, civil, architectural, mechanical ,electrical & structural | ||
| Oct 18, 2017 | Never finaled issued Nov 2017, no final | 2241 Jerrold Av | per fire department request, at block 5286a, lot 004, create address for fire station ems as; 2241 jerrodl ave.Details
per fire department request, at block 5286a, lot 004, create address for fire station ems as; 2241 jerrodl ave. | ||
| Dec 23, 2016 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | Asbetos Management Group | priority processing. at lot 004 & 006, demolish 2 story, s-1 storage buildings (2-buildings). maher n/aDetails
priority processing. at lot 004 & 006, demolish 2 story, s-1 storage buildings (2-buildings). maher n/a | $10,000 |
| Dec 1, 2016 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | S J Amoroso Construction | priority processing. to erect 4 story type 2b, ambulance deployment facility, building sit on both lot 004 & 006. arch/mep/life safety deferred to addenda.Details
priority processing. to erect 4 story type 2b, ambulance deployment facility, building sit on both lot 004 & 006. arch/mep/life safety deferred to addenda. | $28,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S J Amoroso Construction (3), Johnson Controls Fire (2), Asbetos Management Group, Value Fire Protection Inc
- Architects
- Meimei Chan, Vito Vanoni
- Engineers
- Edward Wong