40 permits since 2000 (engineer on 39 permits, authorized agent-others on 1 permit): 13 completed, 14 in progress, 10 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 515 Grant Av | repair sub-sidewalk basement roof slabDetails
repair sub-sidewalk basement roof slab | $5,000 | |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 1828 Egbert Av | Clark Construction Group Ca Lp | ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steelDetails
ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel | $700,000 |
| Nov 7, 2025 | Completed final sign-off Jul 2026 | 2601 40th Av | Argo Construction Inc | alteration to (e) roof framing with addition of roof travel restraint anchors.Details
alteration to (e) roof framing with addition of roof travel restraint anchors. | $20,000 |
| Sep 22, 2025 | In progress issued Mar 2026 | 1200 Carroll Av | Swinerton Builders | site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2bDetails
site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2b | $45,000,000 |
| Jul 29, 2025 | Completed final sign-off Jul 2026 | 2601 40th Av | Argo Construction Inc | revision to pa 202403258517 and comprises alteration of existing concrete footingDetails
revision to pa 202403258517 and comprises alteration of existing concrete footing | |
| Jun 3, 2025 | In progress filed Jun 2025, not yet issued | 800 Grant Av | R & S Construction Management Inc | revision to pa #202402276649 to include removal of existing steel beams and replaced with a 10" thick reinforced concrete slabDetails
revision to pa #202402276649 to include removal of existing steel beams and replaced with a 10" thick reinforced concrete slab | |
| Apr 7, 2025 | In progress issued Mar 2026 | 1828 Egbert Av | Clark Construction Group Ca Lp | project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.Details
project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility. | $7,000,000 |
| Nov 5, 2024 | In progress filed Nov 2024, not yet issued | 750 Phelps St | Clark Construction Group Ca Lp | proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3)Details
proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3) | $75,000,000 |
| May 2, 2024 | In progress issued Jun 2025 | 2401 Keith St | Chiang C M Construction Inc. | tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.Details
tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. | $8,950,000 |
| Mar 5, 2024 | In progress issued Mar 2025 | 1419 Bryant St | build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to includeDetails
build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to include | $2,924,895 | |
| Feb 27, 2024 | In progress issued Jun 2024 | 391 Sutter St | R & S Construction Management Inc | alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalkDetails
alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk | $100,000 |
| Feb 27, 2024 | In progress issued Jun 2024 | 800 Grant Av | R & S Construction Management Inc | alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalkDetails
alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk | $100,000 |
| Jan 29, 2024 | In progress issued Feb 2024 | 387 Ellis St | R & S Construction Management Inc | structural alteration of subsidewalk basement roof slab to install new accessible curb rampsDetails
structural alteration of subsidewalk basement roof slab to install new accessible curb ramps | $80,000 |
| Sep 28, 2023 | In progress issued Apr 2024 | 1003 Market St | Esquivel Grading & Paving, Inc. | reconstructing a portion of basement under sidewalk, will include mew reinforced concrete slab and new steel beamsDetails
reconstructing a portion of basement under sidewalk, will include mew reinforced concrete slab and new steel beams | $180,000 |
| Aug 2, 2023 | Never finaled filed Aug 2023, never issued | 415 Jones St | revision to 202303093396: no construction on bldg, work is only at sidewalk. revise basement roof slab design. basement area is used as storage for corner store, basement slab is being rebuiltDetails
revision to 202303093396: no construction on bldg, work is only at sidewalk. revise basement roof slab design. basement area is used as storage for corner store, basement slab is being rebuilt | $500,000 | |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 415 Jones St | R & S Construction Management Inc | reconstructing sub sidewalk basement slabDetails
reconstructing sub sidewalk basement slab | $400,000 |
| Dec 23, 2022 | In progress issued Mar 2024 | 1490 Mason St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | priority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2)Details
priority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2) | $42,487,700 |
| Dec 14, 2022 | In progress issued Dec 2023 | 375 Woodside Av | replace an existing boiler to two modular boilers in the mechanical room.Details
replace an existing boiler to two modular boilers in the mechanical room. | $1,000,000 | |
| Apr 6, 2022 | Completed final sign-off Oct 2022 | 101 Horne Av | Arana Group, Inc. | revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil.Details
revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil. | $50,000 |
| Aug 18, 2021 | Completed final sign-off Mar 2023 | 630 Valencia St | Evra Construction | structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms.Details
structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms. | $200,000 |
| Jun 17, 2021 | Completed final sign-off Apr 2022 | 49 South Van Ness Av | Mik Construction Inc | construct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary.Details
construct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary. | $40,000 |
| May 26, 2021 | Never finaled issued Oct 2021, no final | 401 25th St | to erect a 1 story type v building for sfmta fare collectionDetails
to erect a 1 story type v building for sfmta fare collection | $9,300,000 | |
| May 26, 2021 | Never finaled issued Oct 2021, no final | 401 25th St | to erect a 1 story type v building for sfmta bus washDetails
to erect a 1 story type v building for sfmta bus wash | $9,300,000 | |
| May 20, 2021 | Never finaled issued Oct 2021, no final | 401 25th St | to erect a 1 story type v building for sfmtaDetails
to erect a 1 story type v building for sfmta | $13,400,000 | |
| Apr 5, 2021 | Never finaled issued Apr 2022, no final | 995 Market St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new acessible curb ramps and installaion of new light pole foundations inside sub sidewalk basement.Details
alteration of subsidewalk basement roof slab to install new acessible curb ramps and installaion of new light pole foundations inside sub sidewalk basement. | $57,750 |
| Apr 5, 2021 | Never finaled issued Apr 2022, no final | 201 06th St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new accessible curb ramp and installation of new light pole founddation inside basement.Details
alteration of subsidewalk basement roof slab to install new accessible curb ramp and installation of new light pole founddation inside basement. | $123,960 |
| Apr 2, 2021 | Never finaled issued Apr 2022, no final | 35 06th St | Esquivel Grading & Paving, Inc. | alteration of sub sidewalk basement roof slab to install new accessible curb ramps.Details
alteration of sub sidewalk basement roof slab to install new accessible curb ramps. | $34,000 |
| Apr 1, 2021 | Never finaled issued Apr 2022, no final | 26 06th St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new accessible sidewalk slab to support curb rampDetails
alteration of subsidewalk basement roof slab to install new accessible sidewalk slab to support curb ramp | $20,000 |
| Mar 5, 2021 | Completed final sign-off May 2023 | 602 Jackson St | R & S Construction Management Inc | alteration of subsidewalk basement roof slab to install new accessible curb ramp.Details
alteration of subsidewalk basement roof slab to install new accessible curb ramp. | $80,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 101 Horne Av | Arana Group, Inc. | convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable**Details
convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable** | $3,000,000 |
| Oct 30, 2018 | Never finaled issued Jan 2019, no final | 80 09th St | R & S Construction Management Inc | alteration of subsidewalk basement slab to accomodate new curb ramp.Details
alteration of subsidewalk basement slab to accomodate new curb ramp. | $120,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2022 | 355 Mcallister St | Cal State Constructors Inc | replace existing vent with new vents, capping the remainder of opening not covered by vent with concrete slab, maher not reqDetails
replace existing vent with new vents, capping the remainder of opening not covered by vent with concrete slab, maher not req | $200,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2018 | 545 Geneva Av | G E C M S Inc | community garden improvement, including structural concrete walls, concrete ramp, wood fence, metal fence and gates and park name sign.Details
community garden improvement, including structural concrete walls, concrete ramp, wood fence, metal fence and gates and park name sign. | $285,000 |
| Apr 4, 2013 | Completed final sign-off Nov 2015 | 109 Oak St | Roebuck Construction | comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors.Details
comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors. | $3,140,000 |
| Oct 22, 2012 | Expired or cancelled cancelled Sep 2014 | 340 31st Av | Empire Engineering & Construction Inc | erect 1 story restroom.Details
erect 1 story restroom. | $250,000 |
| Oct 22, 2012 | Expired or cancelled cancelled Oct 2014 | 340 31st Av | Empire Engineering & Construction Inc | demolish 1 story, type 5, restroom building.Details
demolish 1 story, type 5, restroom building. | $25,000 |
| Apr 20, 2012 | Completed final sign-off Sep 2013 | 122 States St | Pattani Construction Co Inc | demolish 1 stories of public restrooms.Details
demolish 1 stories of public restrooms. | $20,000 |
| Apr 20, 2012 | Completed final sign-off Aug 2013 | 122 States St | Pattani Construction Co Inc | erect one story public restroom.Details
erect one story public restroom. | $400,000 |
| Dec 11, 2007 | Completed final sign-off Sep 2012 | 1 Dr. Carlton B. Goodlett Pl | barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais.Details
barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais. | $300,000 | |
| Dec 7, 2001 | Expired or cancelled expired Dec 2002 | 5809 California St | revision to 2001/05/18/9538. reflect as built chg laundry area to wet bar as shown.on a-1.Details
revision to 2001/05/18/9538. reflect as built chg laundry area to wet bar as shown.on a-1. |