Ricky Choi
- Listed as
- engineer
- Firm
- Sf Public Works -Bdc
- Based in
- San Francisco
- On San Francisco permits
- May 2019 to Apr 2026
7 permits since 2000 (engineer on 7 permits): 6 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 8, 2026 | In progress issued May 2026 | 934 Brannan St | revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaustDetails
revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust | ||
| May 14, 2025 | In progress issued Jun 2025 | 693 Vermont St | Yerba Buena Engineering & Construction | relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site.Details
relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site. | $250,000 |
| Mar 26, 2025 | In progress issued Apr 2025 | 435 Martin Luther King Jr Dr | N B C Construction | mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical workDetails
mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work | $200,000 |
| Nov 21, 2024 | In progress filed Nov 2024, not yet issued | 750 Phelps St | proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas,Details
proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas, | $6,800,000 | |
| Dec 27, 2022 | In progress issued May 2024 | 1135 Powell St | priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of goldDetails
priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of gold | $19,000,000 | |
| Dec 14, 2022 | In progress issued Dec 2023 | 375 Woodside Av | replace an existing boiler to two modular boilers in the mechanical room.Details
replace an existing boiler to two modular boilers in the mechanical room. | $1,000,000 | |
| May 23, 2019 | Expired or cancelled expired Jun 2020 | 1700 25th St | pre-fabricated trailer, provide wood deck accessible ramp and stairs. provide power, water & sewer connections.Details
pre-fabricated trailer, provide wood deck accessible ramp and stairs. provide power, water & sewer connections. | $50,000 |