11 permits since 2000 (engineer on 11 permits): 4 completed, 4 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2024 | In progress filed Nov 2024, not yet issued | 750 Phelps St | proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas,Details
proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas, | $6,800,000 | |
| Mar 5, 2024 | In progress issued Mar 2025 | 1419 Bryant St | build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to includeDetails
build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to include | $2,924,895 | |
| Dec 27, 2022 | In progress issued May 2024 | 1135 Powell St | priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of goldDetails
priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of gold | $19,000,000 | |
| Dec 14, 2022 | In progress issued Dec 2023 | 375 Woodside Av | replace an existing boiler to two modular boilers in the mechanical room.Details
replace an existing boiler to two modular boilers in the mechanical room. | $1,000,000 | |
| Jan 14, 2022 | Completed final sign-off Mar 2024 | 750 Brannan St | new shelving units, all under 12' tall, associated electrical modifications. no change of use or occupancy. accessibility, egress, and signage upgrades completed with permits 201611072146 and 201702229918Details
new shelving units, all under 12' tall, associated electrical modifications. no change of use or occupancy. accessibility, egress, and signage upgrades completed with permits 201611072146 and 201702229918 | $150,000 | |
| Jun 7, 2021 | Completed final sign-off Apr 2025 | 970 47th Av | Treaty Construction | erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical.Details
erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical. | $1,500,000 |
| Jan 4, 2021 | Completed final sign-off Jan 2022 | 55 Sherman St | Cazadoro Construction | addition of sports lighting at ballfield & basketball court. upgrades of pathway lighting. minor security updates to pathways, low walls, and fencing, to create better circulation and site visibility.Details
addition of sports lighting at ballfield & basketball court. upgrades of pathway lighting. minor security updates to pathways, low walls, and fencing, to create better circulation and site visibility. | $600,000 |
| Feb 27, 2020 | Never finaled issued Mar 2020, no final | 1 South Van Ness Av | 8th floor: add power and data receptacles to 3 offices. revision to app#202001303126Details
8th floor: add power and data receptacles to 3 offices. revision to app#202001303126 | ||
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 1 South Van Ness Av | revision to pa 2019-1212-9305 add electrical outlets & data outletsDetails
revision to pa 2019-1212-9305 add electrical outlets & data outlets | $10,000 | |
| Jan 24, 2020 | Completed final sign-off Dec 2020 | 200 John F Shelley Dr | Cazadoro Construction | preparking area near roadway for prefabricated restroom with a concrete pad, retaining wall, bike parking, drinking fountain, and landscape. prefabricated rest will be permitted by state. playgroung permitted under sfdbi permits 201903185487 and 201907297227Details
preparking area near roadway for prefabricated restroom with a concrete pad, retaining wall, bike parking, drinking fountain, and landscape. prefabricated rest will be permitted by state. playgroung permitted under sfdbi permits 201903185487 and 201907297227 | $600,000 |
| Nov 15, 2019 | Never finaled issued Dec 2019, no final | 100 Larkin St | basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout.Details
basement/lower level only: selective demo of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout. | $600,000 |