Jonathan Chang
- License
- M40988
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M40988 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2024 to May 2024
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Chiang C M Construction Inc.
- Architects
- Colin Mosher, Patricia Solis
- Engineers
- Raymond Lui (2), Jenny Chan, Karl Gaffud, Koa Pickering
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2024 | In progress issued Jun 2025 | 2401 Keith St | Chiang C M Construction Inc. | tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.Details
tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. | $8,950,000 |
| Mar 5, 2024 | In progress issued Mar 2025 | 1419 Bryant St | build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to includeDetails
build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to include | $2,924,895 |