Koa Pickering
- License
- 4699
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Based in
- Irvine
- On San Francisco permits
- Apr 2019 to Aug 2026
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Chiang C M Construction Inc., Skyline Construction
- Architects
- Evan Raabe (2), Colin Mosher, Meimei Chan
- Engineers
- Antonio Jakosalem, Jenny Chan, Jonathan Chang, Mahvash Harms, Neil Joson, Raymond Lui
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 141 Quint St | new reconfigured parking lot stripping and expansion of pakring stripping as approved by 2a. new free standing shade canopies. new perimeter fencinig + landscaping at property line. new it data structure. new site lighting and protection bolland.Details
new reconfigured parking lot stripping and expansion of pakring stripping as approved by 2a. new free standing shade canopies. new perimeter fencinig + landscaping at property line. new it data structure. new site lighting and protection bolland. | $250,000 | |
| Apr 28, 2026 | In progress issued Aug 2026 | 301 Toland St | Skyline Construction | work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular liftDetails
work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular lift | $300,000 |
| May 2, 2024 | In progress issued Jun 2025 | 2401 Keith St | Chiang C M Construction Inc. | tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.Details
tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. | $8,950,000 |
| Apr 15, 2019 | Completed final sign-off Nov 2022 | 3850 17th St | partial interior renovations. exterior building seismic upgrade & landscape improvement.Details
partial interior renovations. exterior building seismic upgrade & landscape improvement. | $5,000,000 |