Mahvash Harms
- License
- 2639
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Biggs Cardosa Architects
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Apr 2019
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Jay Turnbull, Koa Pickering, Meimei Chan
- Engineers
- Antonio Jakosalem, Neil Joson, Raymond Lui, Victor H.W. Tong
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2019 | Completed final sign-off Nov 2022 | 3850 17th St | partial interior renovations. exterior building seismic upgrade & landscape improvement.Details
partial interior renovations. exterior building seismic upgrade & landscape improvement. | $5,000,000 | |
| Dec 11, 2007 | Completed final sign-off Sep 2012 | 1 Dr. Carlton B. Goodlett Pl | barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais.Details
barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais. | $300,000 |