Munson Fong
- License
- 10760
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Fw Associates
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Feb 2008
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Vila Construction Co
- Architects
- Douglas Tom, Douglas Tom, Jay Turnbull
- Engineers
- Mahvash Harms, Raymond Lui
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | Vila Construction Co | revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.Details
revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes. | |
| Dec 11, 2007 | Completed final sign-off Sep 2012 | 1 Dr. Carlton B. Goodlett Pl | barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais.Details
barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais. | $300,000 | |
| Sep 18, 2007 | Never finaled issued Feb 2008, no final | 1011 Turk St | modifications include demolition of partitions, portions of existing mechanical and electrical systems, construction of new conference room w/ audio visual system, new exterior exit stairs and upgrading existing ada components.modify (e) sprinkler &fire alarm systems.Details
modifications include demolition of partitions, portions of existing mechanical and electrical systems, construction of new conference room w/ audio visual system, new exterior exit stairs and upgrading existing ada components.modify (e) sprinkler &fire alarm systems. |