Eugene Tuan
- Listed as
- architect, engineer
- Firm
- Tuan & Robinson Str. Engineer
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Sep 2026
71 permits since 2000 (engineer on 69 permits, architect on 2 permits): 45 completed, 4 in progress, 15 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 2025 Anza St | Houseworks Enterprises Inc. | build a new bedroom closet on the side of the house, not visible from the public right of way.address leaking siding and windows on the east elevation. install saloon style doors between the kichen and dining room.Details
build a new bedroom closet on the side of the house, not visible from the public right of way.address leaking siding and windows on the east elevation. install saloon style doors between the kichen and dining room. | $5,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 1635 Grove St | O'shea Co. Home Grown Construction | project is to replace front porch/deck and stair and add a canopy over the main entry. added square footage at porch and stair is 57 sq ft. space under porch/deck and stair is not habitable space but used for storage. project complies with planning setbacks.Details
project is to replace front porch/deck and stair and add a canopy over the main entry. added square footage at porch and stair is 57 sq ft. space under porch/deck and stair is not habitable space but used for storage. project complies with planning setbacks. | $40,000 |
| May 30, 2025 | Completed final sign-off Jan 2026 | 180 Geary St | Bevilacqua & Sons | remove existing sidewalk around existing elevator opening. attach new l 4x4 3/8 around inside of face of (e) sidewalk elevator opening concrete walls. weld (n) steel deck and place concrete topping over steel deck. place (n) sidewalk topping slab around (e) grade and over (n) opening elevatorDetails
remove existing sidewalk around existing elevator opening. attach new l 4x4 3/8 around inside of face of (e) sidewalk elevator opening concrete walls. weld (n) steel deck and place concrete topping over steel deck. place (n) sidewalk topping slab around (e) grade and over (n) opening elevator | $30,000 |
| Nov 12, 2024 | Expired or cancelled withdrawn Dec 2024 | 3433 03rd St | Nibbi Bros Assoc Inc. | excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices.Details
excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices. | $583,600 |
| Nov 12, 2024 | In progress issued Mar 2025 | 3433 03rd St | Nibbi Bros Assoc Inc. | to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2)Details
to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2) | $15,551,608 |
| Oct 14, 2024 | Completed final sign-off Aug 2025 | 2519 Pacific Av | Add A Garage Inc. | to comply with nov #202291403: construction of a new cast-in-place concrete retaining wall with hand dug pier foundations cast against the (e) damaged concrete retaining wall at back of property line 13'-6" high x 47'-6'' long between adjacent property lines.Details
to comply with nov #202291403: construction of a new cast-in-place concrete retaining wall with hand dug pier foundations cast against the (e) damaged concrete retaining wall at back of property line 13'-6" high x 47'-6'' long between adjacent property lines. | $350,000 |
| Jun 14, 2023 | Expired or cancelled cancelled Jan 2026 | 8 Mission St | new exterior pergola @ (e) hotel's dining patioDetails
new exterior pergola @ (e) hotel's dining patio | $180,000 | |
| May 25, 2023 | Completed final sign-off Jul 2023 | 1601 Grant Av | revision to pa# 202303234271 & 201609016627. remove new concrete and all other welding inspectionsDetails
revision to pa# 202303234271 & 201609016627. remove new concrete and all other welding inspections | ||
| Dec 27, 2022 | In progress issued May 2024 | 1135 Powell St | priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of goldDetails
priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of gold | $19,000,000 | |
| Sep 29, 2022 | Never finaled filed Sep 2022, never issued | 635 Steiner St | concrete retaining wall crack repair using steel dowesl embedded in expoxy and fill in crack. patrial demo & reconstruction of (e) concrete stairs & repair retaining wall crack.Details
concrete retaining wall crack repair using steel dowesl embedded in expoxy and fill in crack. patrial demo & reconstruction of (e) concrete stairs & repair retaining wall crack. | $15,000 | |
| Sep 27, 2022 | Never finaled filed Sep 2022, never issued | 500 Sutter St | facade repairs including brick, terracotta, wood windows and metal cornicesDetails
facade repairs including brick, terracotta, wood windows and metal cornices | $1,500,000 | |
| Sep 22, 2022 | Never finaled issued Jan 2023, no final | 747 Howard St | Bauman Landscape & Construction Inc. | new dog spot with new landscaping, irrigation, bollard lights, drainage. upgrade to '19 cbc path of travel itmes per 11b-202.4Details
new dog spot with new landscaping, irrigation, bollard lights, drainage. upgrade to '19 cbc path of travel itmes per 11b-202.4 | $200,000 |
| Aug 4, 2022 | Completed final sign-off Nov 2023 | 650 Townsend St | Bevilacqua & Sons | infilling an abandoned elevator pit under an existing hallway elevator pit is not visible from street view.Details
infilling an abandoned elevator pit under an existing hallway elevator pit is not visible from street view. | $48,000 |
| Jul 14, 2022 | Completed final sign-off Nov 2022 | 108 Cole St | Bevilacqua & Sons | rev to pa 202204122039 repair non conforming guardrail per ab 005Details
rev to pa 202204122039 repair non conforming guardrail per ab 005 | |
| Mar 24, 2022 | Completed final sign-off Aug 2022 | 600 07th St | Guzman Construction Group Inc. | torque down piles- indicator/test piles reference site pa# 2020-1019-6871Details
torque down piles- indicator/test piles reference site pa# 2020-1019-6871 | $100,000 |
| Feb 7, 2022 | Completed final sign-off Nov 2022 | 267 08th St | Sc Builders, Inc | ph 3 - minor interior demo of partitions & light fixtures; new partitions, doors, touch-up finishes ceiling affected by new constrution; new interior roof access hatch and new ladder. mep under separate permitDetails
ph 3 - minor interior demo of partitions & light fixtures; new partitions, doors, touch-up finishes ceiling affected by new constrution; new interior roof access hatch and new ladder. mep under separate permit | $1,100,000 |
| Aug 18, 2021 | Completed final sign-off Oct 2023 | 450 Powell St | Centric Construction Inc | lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...Details
lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area... | $2,000,000 |
| Apr 12, 2021 | Never finaled issued Jan 2023, no final | 747 Howard St | Bauman Landscape & Construction Inc. | landscape work inside planter beds. replace irrigation lines. install (n) pole lights & uplights and structural pole bases.Details
landscape work inside planter beds. replace irrigation lines. install (n) pole lights & uplights and structural pole bases. | $1,300,000 |
| Feb 4, 2021 | Completed final sign-off Jan 2024 | 500 Sansome St | Centric Construction Inc | demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction.Details
demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction. | $30,000 |
| Jan 30, 2021 | Never finaled issued Sep 2022, no final | 2285 Jerrold Av | erect 6 stories commerical and self storage buildingDetails
erect 6 stories commerical and self storage building | $3,000,000 | |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 500 Sansome St | Centric Construction Inc | demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.Details
demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1. | $150,000 |
| Aug 8, 2020 | Completed final sign-off May 2023 | 3035 Baker St | Doherty Restoration, Inc. | the scope of work is to add 3 adu's to level 1 per ordinance 162-16Details
the scope of work is to add 3 adu's to level 1 per ordinance 162-16 | $300,000 |
| Jul 30, 2020 | Completed final sign-off Feb 2021 | 3035 Baker St | Wickman Development And Construction | revision to pa# 201709158412. to match as-built conditions observed on site during constructionDetails
revision to pa# 201709158412. to match as-built conditions observed on site during construction | $2,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2022 | 361 Turk St | Centric Construction Inc | revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditionsDetails
revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions | $50,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2021 | 1184 Harrison St | Achill Beg Construction Inc | permeation & grouting along eastern property line.Details
permeation & grouting along eastern property line. | |
| Oct 17, 2019 | Completed final sign-off Jan 2022 | 345 California St | Gci, Inc | 18/f: rev to pa#201906102935: minor structural revisions. maher n/a.Details
18/f: rev to pa#201906102935: minor structural revisions. maher n/a. | |
| Sep 19, 2019 | Completed final sign-off Oct 2022 | 361 Turk St | Drill Tech Drilling & Shoring Inc | revision to app#201907267068: 1)add new lean concrete underpinning below new elevator pit to prevent surcharge on extg 351 turk foundation. 2)additional "i" beams along west side because of neighbors request. n/a for maher.Details
revision to app#201907267068: 1)add new lean concrete underpinning below new elevator pit to prevent surcharge on extg 351 turk foundation. 2)additional "i" beams along west side because of neighbors request. n/a for maher. | $60,000 |
| May 30, 2019 | Completed final sign-off Jul 2022 | 1170 Harrison St | Achill Beg Construction Inc, Excel Site Services Inc | demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural workDetails
demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural work | $500,000 |
| May 28, 2019 | Completed final sign-off Dec 2021 | 1335 Grant Av | Bevilacqua & Sons | change of use to cannabis dispensary. restore exterior facade & remove wood signage band for (n) clerestory. recess entry doors @ both commercial suites & install ramp and power assited door openers. revise demising wall location. new finishes & ada restroom.Details
change of use to cannabis dispensary. restore exterior facade & remove wood signage band for (n) clerestory. recess entry doors @ both commercial suites & install ramp and power assited door openers. revise demising wall location. new finishes & ada restroom. | $200,000 |
| May 28, 2019 | Completed final sign-off Feb 2020 | 221 Main St | Source Planning And Construction Inc | 2nd fl - structural work for moveable partitions ref pa 2019-0513-0444Details
2nd fl - structural work for moveable partitions ref pa 2019-0513-0444 | |
| Mar 15, 2018 | Expired or cancelled expired Jun 2022 | 405 Taylor St | install electric sign "hotel spero"Details
install electric sign "hotel spero" | $1,500 | |
| Oct 16, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 7/f #7 & 7a- revision to arch. pa#201705247575 & 201708043960 to remove wall/door at office 7-409, add structural details for video wall. n/a ordinance #155-13Details
7/f #7 & 7a- revision to arch. pa#201705247575 & 201708043960 to remove wall/door at office 7-409, add structural details for video wall. n/a ordinance #155-13 | |
| Sep 28, 2017 | Never finaled issued Sep 2017, no final | 601 Montgomery St | Structural & Refrigeration Mechanicalref | roof: change out old cooling towers - install new heat exchange & 2 pumps. maher naDetails
roof: change out old cooling towers - install new heat exchange & 2 pumps. maher na | $899,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2021 | 3035 Baker St | Wickman Development And Construction | soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 | $75,000 |
| Sep 1, 2017 | Completed final sign-off Jun 2019 | 122 29th St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 for the target lower level.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 for the target lower level. | $60,000 | |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 211 Main St | Swinerton Builders | tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinanceDetails
tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinance | $1,200,000 |
| May 23, 2017 | Never finaled issued May 2017, no final | 501 Stanyan St | Arg Conservation Services | seismic upgrade to existing monument and maintenance to existing masonry and bronze statueDetails
seismic upgrade to existing monument and maintenance to existing masonry and bronze statue | $328,156 |
| May 11, 2017 | Never finaled issued Aug 2017, no final | 225 Powell St | Trainor Commercial Construction Inc. | basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permitDetails
basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permit | $22,500 |
| May 3, 2017 | Completed final sign-off Jun 2018 | 215 Fremont St | Skyline Construction | 6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep.Details
6/f- interior demolition of non-structural elements including but not limited to partition, doors, lighting and ceiling. construct of new offices, conference, break area and new finish. life safety, fire alarm and sprinkler are under separate permit. n/a ordinance #155-13 incuding mep. | $3,000,000 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 660 Clipper St | Wickman Development And Construction | new fire escape guardrail (min. 42"/ max. 43") @ 660 clipper st., at rear. not visible from streetDetails
new fire escape guardrail (min. 42"/ max. 43") @ 660 clipper st., at rear. not visible from street | $35,000 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 610 Clipper St | Wickman Development And Construction | retrofit of (e) fire escape guardrail (min 42"/ max.43") @ 610 clipper st. at rear, not visible from streetDetails
retrofit of (e) fire escape guardrail (min 42"/ max.43") @ 610 clipper st. at rear, not visible from street | $35,500 |
| Nov 15, 2016 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permitDetails
comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permit | $5,500,000 |
| Nov 2, 2016 | Never finaled issued Mar 2018, no final | 140 Mason St | J M L Engineering & Construction | replacement of (e) sidewalk and installation of new pge electric vault in franchise space. sidewalk improvement includes installation of accessible level landings at all doorsDetails
replacement of (e) sidewalk and installation of new pge electric vault in franchise space. sidewalk improvement includes installation of accessible level landings at all doors | $650,000 |
| Mar 18, 2016 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | floor 19 thru 24 - project involves demo & removal of existing dumbwaiter shaft & equipment & structural slab infill. n/a maher ordinanceDetails
floor 19 thru 24 - project involves demo & removal of existing dumbwaiter shaft & equipment & structural slab infill. n/a maher ordinance | $17,500 |
| Jan 28, 2016 | Completed final sign-off Jan 2017 | 33 Sutter St | Bevilacqua & Sons | sidewalk and freight elevator door replacementDetails
sidewalk and freight elevator door replacement | $50,000 |
| Dec 29, 2015 | Completed final sign-off Jun 2020 | 777 Tennessee St | Fisher Development Inc | excavation, shoring & tieback for new construction pa# 2015/07/14/1485. ** maher: yes! route to dph **Details
excavation, shoring & tieback for new construction pa# 2015/07/14/1485. ** maher: yes! route to dph ** | $300,000 |
| Aug 10, 2015 | Completed final sign-off Nov 2015 | 2575 Marin St | Centric Construction Inc | demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13Details
demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13 | $400,000 |
| Jun 25, 2015 | Completed final sign-off Dec 2015 | 222 Sutter St | Field Construction Inc. | t.i. 3/f: new men and women's restrooms, non-structural partitions, mill work, ceiling finishes, mep. distribution, alter elevator lobby/exit enclosure, floor infill at demolished escalator opening. n/a ordinance #155-13Details
t.i. 3/f: new men and women's restrooms, non-structural partitions, mill work, ceiling finishes, mep. distribution, alter elevator lobby/exit enclosure, floor infill at demolished escalator opening. n/a ordinance #155-13 | $750,000 |
| Jun 9, 2015 | Expired or cancelled cancelled Aug 2022 | 191 Sutter St | barrier removal to provide accessible path to adjacent roof deck and opening in property line wall with ab-010. n/a ordinance #155-13Details
barrier removal to provide accessible path to adjacent roof deck and opening in property line wall with ab-010. n/a ordinance #155-13 | $50,000 | |
| May 6, 2015 | Completed final sign-off Dec 2018 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | revision to s1. revised foundation pile plans based on revised test pile layout & calcs; added sand/oil & grease interceptors in level 1; added cable thru in transformer rooms; revised area separation wall details; added leasing entry canopy & eliminated concrete column. ref #201309045886-s1.Details
revision to s1. revised foundation pile plans based on revised test pile layout & calcs; added sand/oil & grease interceptors in level 1; added cable thru in transformer rooms; revised area separation wall details; added leasing entry canopy & eliminated concrete column. ref #201309045886-s1. | $150,000 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 1301 Illinois St | Centric Construction Inc | to erect new storage shedDetails
to erect new storage shed | $25,000 |
| Sep 11, 2014 | Completed final sign-off Jun 2015 | 1301 Illinois St | Centric Construction Inc | temporary foundation for the exhibition structure.; maher n/aDetails
temporary foundation for the exhibition structure.; maher n/a | $88,000 |
| Jun 6, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | Mc Cutcheon Construction Co. | revision to pa# 201305207347. foundation section revisions. allow shotcrete per engineer.Details
revision to pa# 201305207347. foundation section revisions. allow shotcrete per engineer. | |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 300 Montgomery St | Giampolini & Co Dba Giampolini/Courtney | replace 76 window heads with gfrc window headsDetails
replace 76 window heads with gfrc window heads | $68,000 |
| Feb 8, 2013 | Completed final sign-off Aug 2014 | 444 De Haro St | Skyline Construction | interior renovation of restrooms, common corridor and lobby finishes. fire alarm, elec, plumbing under separate permitDetails
interior renovation of restrooms, common corridor and lobby finishes. fire alarm, elec, plumbing under separate permit | $375,000 |
| Dec 19, 2012 | Never finaled issued Aug 2013, no final | 474 Ofarrell St | Centric Construction Inc | umb seismic retrofit, ada bathroom.Details
umb seismic retrofit, ada bathroom. | $250,000 |
| Nov 21, 2012 | Never finaled issued Sep 2013, no final | 246 02nd St | Arnolds Kitchens & Baths | purchase the 2br condo next door to our current 2br condo, and merge the two units into one family size condo. entail knocking down two non-structural walls, and removing the stove and oven from one of the two kitchensDetails
purchase the 2br condo next door to our current 2br condo, and merge the two units into one family size condo. entail knocking down two non-structural walls, and removing the stove and oven from one of the two kitchens | $5,000 |
| Nov 13, 2012 | Completed final sign-off May 2014 | 930 Chestnut St | Ggd Inc. | seismic upgrade the basement. work inlcudles excavation of e crawl space by +/- 2' on east side and +/- 6' on west side. new retaining wall. new footings, new stem wal, new posts, new slab to be constructed. e wlevator to be enlargedDetails
seismic upgrade the basement. work inlcudles excavation of e crawl space by +/- 2' on east side and +/- 6' on west side. new retaining wall. new footings, new stem wal, new posts, new slab to be constructed. e wlevator to be enlarged | $275,000 |
| Jun 1, 2012 | Completed final sign-off Oct 2014 | 1155 04th St | Nibbi Bros Assoc Inc. | temporary shoring. new construction under separate permit #201108041792.Details
temporary shoring. new construction under separate permit #201108041792. | $50,000 |
| Mar 29, 2012 | Completed final sign-off Dec 2013 | 465 Grove St | Dees-Hennessey Inc | underpinning for work on adjacent property (401 grove) reference approved 201101289274Details
underpinning for work on adjacent property (401 grove) reference approved 201101289274 | $310,000 |
| Mar 2, 2012 | Completed final sign-off Oct 2012 | 345 California St | Bcci Construction Company | tenant improvement consists of demolition of non structural partitions. provide new non structural partitions, doors, glazing, and finishes. install new power/tele/data. rework existing and lighting. add moveable partition.Details
tenant improvement consists of demolition of non structural partitions. provide new non structural partitions, doors, glazing, and finishes. install new power/tele/data. rework existing and lighting. add moveable partition. | $1,700,000 |
| Mar 18, 2010 | Completed final sign-off May 2011 | 211 Sutter St | D A Pope Inc | 6th floor - to comply with bid nov 200456096 and installation of a moveable partition, str. details & calculations only. ref ap# 2009/1118/1521 for arch and (see pa #200911181521) no fire insp req.Details
6th floor - to comply with bid nov 200456096 and installation of a moveable partition, str. details & calculations only. ref ap# 2009/1118/1521 for arch and (see pa #200911181521) no fire insp req. | |
| Dec 24, 2009 | Completed final sign-off Oct 2011 | 3512 Clay St | addition to rear of house at basement and first floor. remove pantry at first floor. remodel kitchen & pantry.Details
addition to rear of house at basement and first floor. remove pantry at first floor. remodel kitchen & pantry. | $200,000 | |
| Dec 23, 2009 | Completed final sign-off Sep 2011 | 35 Woodward St | remodel building w/ existhing sro units, reduce units to 53, multi purpose room, offices for social services, common bathrooms, restrooms, common kitchens, laundry, trash, storage, mechanical roomsDetails
remodel building w/ existhing sro units, reduce units to 53, multi purpose room, offices for social services, common bathrooms, restrooms, common kitchens, laundry, trash, storage, mechanical rooms | $2,200,000 | |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 211 Main St | demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan.Details
demo of existing concrete window washing runway and installation of 22 new davit bases. new roof will be permitted separately (under separate permit) per plan. | $70,000 | |
| Oct 2, 2008 | Completed final sign-off Apr 2009 | 211 Main St | Bcci Construction Company | revision to pa #200807015781, demolition of mezzanine & revision of structural beam from w 36" to 24" @ colum line e between 3 & 2.Details
revision to pa #200807015781, demolition of mezzanine & revision of structural beam from w 36" to 24" @ colum line e between 3 & 2. | $30,000 |
| Sep 8, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit.Details
installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit. | $15,000 | |
| Jul 1, 2008 | Completed final sign-off May 2009 | 211 Main St | Bcci Construction Company | g/f lecture hall, without fixed seating & accessory back of house/service use, m.e.p & finishes upgrade restroom for min plumbing fixtures. structural work to be performed under this permit.Details
g/f lecture hall, without fixed seating & accessory back of house/service use, m.e.p & finishes upgrade restroom for min plumbing fixtures. structural work to be performed under this permit. | $1,150,000 |
| Jun 17, 2008 | Expired or cancelled withdrawn Jun 2008 | 211 Main St | Bcci Construction Company | demolition of mezzanine & build out of new ground floor lecture hall without fixed seating including accessory backstage/service use & restroom remodel for min fixture required. structural work performedDetails
demolition of mezzanine & build out of new ground floor lecture hall without fixed seating including accessory backstage/service use & restroom remodel for min fixture required. structural work performed | $1,000,000 |
| Aug 16, 2006 | Expired or cancelled expired Mar 2007 | 223 28th St | replace rotted wood rear stairs and deck. relocate 1 interior non-bearing partition. relocate water heaters, washer & dryer. enclose space below porch deck.Details
replace rotted wood rear stairs and deck. relocate 1 interior non-bearing partition. relocate water heaters, washer & dryer. enclose space below porch deck. | $8,500 | |
| Feb 25, 2005 | Expired or cancelled expired Mar 2007 | 609 Sutter St | Western Allied Mechanical Inc. | add air conditioning (cooling only) to select rooms on 10th & 11th floors.Details
add air conditioning (cooling only) to select rooms on 10th & 11th floors. | $425,000 |