Nancy Goldenberg
- Listed as
- architect, engineer
- Firm
- Treanorhl
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jul 2024
27 permits since 2000 (architect on 25 permits, engineer on 2 permits): 11 completed, 9 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2024 | In progress issued Sep 2024 | 1960 Jackson St | all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot weater return piping from water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098993.Details
all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot weater return piping from water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098993. | $15,000 | |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 1960 Jackson St | revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures.Details
revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures. | $20,000 | |
| Jul 11, 2024 | In progress issued Sep 2024 | 1950 Jackson St | Skanska Usa Building Inc | all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot water return piping water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098990.Details
all hydronic piping is being replaced in stage 1 residence. cold, hot, and hot water return piping water heater and water meter is being replaced in stage 1 residence. sewer/vent piping is being replaced with the equivalent size. revision to bpa# 201912098990. | $15,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 1950 Jackson St | revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures.Details
revision of mech elements & of complete plumbing system within bldg. oressure test domestic water piping to verify if any (e) pipes need to be upgrade or replaced. extend (e) domestic plumbing lines @ all(n) or configured restrooms & kitchenette arear. provid & install all (n) plumbing fixtures. | $10,000 | |
| Apr 25, 2024 | In progress issued May 2024 | 1960 Jackson St | Skanska Usa Building Inc | ref 202404230581- remove above roof portion of western most chimney located om 1960 jackson st. patch and repair as needDetails
ref 202404230581- remove above roof portion of western most chimney located om 1960 jackson st. patch and repair as need | $5,000 |
| Apr 23, 2024 | In progress issued May 2024 | 1950 Jackson St | Skanska Usa Building Inc | remove non-operational chimney. patch and repair in kind as needed. entire chimney to be removed.Details
remove non-operational chimney. patch and repair in kind as needed. entire chimney to be removed. | $10,000 |
| Mar 12, 2024 | In progress issued Apr 2024 | 1950 Jackson St | Skanska Usa Building Inc | ref pa# 201912098990 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will match the (e) in detail and will improve secruity measures & provide seismic strengthingDetails
ref pa# 201912098990 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will match the (e) in detail and will improve secruity measures & provide seismic strengthing | $5,000 |
| Mar 12, 2024 | In progress issued Apr 2024 | 1960 Jackson St | Skanska Usa Building Inc | ref 201912098993 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will match the (e) in detail and will improve secruity measures & provide seismic strengthiDetails
ref 201912098993 protect & retain decorative brick & terra cotta piers at site entrance. replace in kind & increase the height of the brick wall between the piers. replacement wall section will match the (e) in detail and will improve secruity measures & provide seismic strengthi | $5,000 |
| Dec 27, 2022 | In progress issued May 2024 | 1135 Powell St | priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of goldDetails
priority process: renovation to listed historic library(1921). partial demo of int spaces of historic bldg & 1996 renovation work. new mech, elec, and fire protection sys will be provided throughout (e) bldg. project is designed to leadership in energy efficient design (leed) rating of gold | $19,000,000 | |
| Sep 2, 2022 | Never finaled issued Jan 2023, no final | 1950 Jackson St | Ground Control Inc | phase 3:will return building to a residence & will include the following scope of work:limited demolition,finishes,bathroom & kitchen work. sprinklers,seismic,major mep & security work will occur in an earlier phase,under a separage permit.this work will return the bldg to original r-3 occupancy.Details
phase 3:will return building to a residence & will include the following scope of work:limited demolition,finishes,bathroom & kitchen work. sprinklers,seismic,major mep & security work will occur in an earlier phase,under a separage permit.this work will return the bldg to original r-3 occupancy. | $1,000,000 |
| Dec 9, 2019 | Never finaled issued Jan 2023, no final | 1960 Jackson St | Azul Works, Inc. | to erect 1 story, no basement, type iii, guard house & restroom building. ** maher: n/a **Details
to erect 1 story, no basement, type iii, guard house & restroom building. ** maher: n/a ** | $100,000 |
| Dec 9, 2019 | Never finaled issued Jan 2023, no final | 1960 Jackson St | Azul Works, Inc., Skanska Usa Building Inc | seismic upgrade. security upgrades. mep including new wiring, accessiblility, sprinklers, programmatic modifications. removal of a portion of front wall for guard house, raising of a portion of the brick wall for security. ** maher: n/a **Details
seismic upgrade. security upgrades. mep including new wiring, accessiblility, sprinklers, programmatic modifications. removal of a portion of front wall for guard house, raising of a portion of the brick wall for security. ** maher: n/a ** | $7,900,000 |
| Dec 9, 2019 | Never finaled issued Jan 2023, no final | 1950 Jackson St | Ground Control Inc | temporary change of use to consulate and visa office. seismic, security, mep, & sprinkler upgrades. programatic modifications. building to return to residenical use during later phase. raising portion of brick wall.Details
temporary change of use to consulate and visa office. seismic, security, mep, & sprinkler upgrades. programatic modifications. building to return to residenical use during later phase. raising portion of brick wall. | $7,000,000 |
| Jun 21, 2017 | Completed final sign-off Feb 2018 | 572 07th St | Bevilacqua & Sons | street level - non-structural demo of storefront; install new storefront system, including glazing and entry doors. install new cement plaster details; exterior cleaning and painting. maher naDetails
street level - non-structural demo of storefront; install new storefront system, including glazing and entry doors. install new cement plaster details; exterior cleaning and painting. maher na | $98,500 |
| Jun 1, 2016 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a **Details
work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a ** | $5,050,000 |
| Nov 16, 2015 | Expired or cancelled cancelled Jan 2020 | 32 Terra Vista Av | R C Construction | unti #1 - new redwood deck extention from 240 sf to 471 sf.Details
unti #1 - new redwood deck extention from 240 sf to 471 sf. | $5,200 |
| Nov 16, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft.Details
unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft. | $4,800 |
| Nov 16, 2015 | Completed final sign-off Aug 2016 | 32 Terra Vista Av | R C Construction | unti #2 - new redwood roof deck 220 sf. no added square footage.Details
unti #2 - new redwood roof deck 220 sf. no added square footage. | $4,600 |
| Jul 31, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | common area- revise pa#201503171134, revise guard and structural revisionDetails
common area- revise pa#201503171134, revise guard and structural revision | |
| Jun 3, 2015 | Never finaled issued Apr 2016, no final | 321 Divisadero St | change of use. determining appropriateness for formula retail for arthur murray dance studio on 2nd floor.Details
change of use. determining appropriateness for formula retail for arthur murray dance studio on 2nd floor. | ||
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 32 Terra Vista Av | R C Construction | unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like.Details
unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like. | $20,000 |
| Mar 17, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | dry-rot repair at cantilevered entry porches, including replacement/reinforcement of rotted joists and railings.Details
dry-rot repair at cantilevered entry porches, including replacement/reinforcement of rotted joists and railings. | $15,000 |
| Feb 27, 2015 | Completed final sign-off Jul 2015 | 321 Divisadero St | Arch Construction | change of use from retail to exercise studio/gym. install hvac unit. build new ada bathroom & shower per plans.Details
change of use from retail to exercise studio/gym. install hvac unit. build new ada bathroom & shower per plans. | $30,000 |
| Nov 2, 2012 | Never finaled issued Sep 2014, no final | 946 Rhode Island St | Cullinane Plastering | demolish 1-story, single family dwelling unitDetails
demolish 1-story, single family dwelling unit | $15,000 |
| Sep 17, 2009 | Completed final sign-off Mar 2011 | 706 Wisconsin St | convert part of (e) 1st flr to garage.remove (e) bay window from 1st flr (ground) & install new garage door. add (e) storage to 1st flr & upgrade unit & new bath. upgrade 2nd flr (main level)unit. lower (e) ceiling of 2nd flr by 16" & upgrade attic to provide 2 baths & 2 br.new dormers on roof.Details
convert part of (e) 1st flr to garage.remove (e) bay window from 1st flr (ground) & install new garage door. add (e) storage to 1st flr & upgrade unit & new bath. upgrade 2nd flr (main level)unit. lower (e) ceiling of 2nd flr by 16" & upgrade attic to provide 2 baths & 2 br.new dormers on roof. | $200,000 | |
| May 1, 2008 | Completed final sign-off Apr 2009 | 1199 09th Av | roofing & securing of exteior architectural elements. repair of boaardshell cornice and waterproofing systems of the spreckels temple of music in golden gate park. mep & life safety work under seperate permits.Details
roofing & securing of exteior architectural elements. repair of boaardshell cornice and waterproofing systems of the spreckels temple of music in golden gate park. mep & life safety work under seperate permits. | $400,000 | |
| May 7, 2007 | Completed final sign-off Mar 2008 | 1187 Franklin St | Hathaway Dinwiddie Co. | install new schindler model 330 a, 2 stop elevator includes new concrete work, electrical, plumbing (fire suppression is design build)Details
install new schindler model 330 a, 2 stop elevator includes new concrete work, electrical, plumbing (fire suppression is design build) | $346,000 |