Mehran Khazra
- Listed as
- engineer
- Firm
- Guttman & Blaevoet
- On San Francisco permits
- May 2006 to May 2007
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2007 | Completed final sign-off Mar 2008 | 1187 Franklin St | Hathaway Dinwiddie Co. | install new schindler model 330 a, 2 stop elevator includes new concrete work, electrical, plumbing (fire suppression is design build)Details
install new schindler model 330 a, 2 stop elevator includes new concrete work, electrical, plumbing (fire suppression is design build) | $346,000 |
| May 16, 2006 | Never finaled issued Jun 2006, no final | 1625 Van Ness Av | Climate Mechanical | replace 30 ton ac unit with new 27.5 ton unit.Details
replace 30 ton ac unit with new 27.5 ton unit. | $56,200 |