Block 6972, lot 036
2301 San Jose Ave
- City’s use
- Commercial Retail
- Lot
- 118,986 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 2301 San Jose Av | Siemens Industry, Inc. | fire only work to obtain as-built permit #2 for the voluntary replacement of the fire alarm system. as-built permit#1 bpa#202606112971 indicated 9 heat detectors when only 2 were existing/replaced. ref bpa#202512161848.Details
fire only work to obtain as-built permit #2 for the voluntary replacement of the fire alarm system. as-built permit#1 bpa#202606112971 indicated 9 heat detectors when only 2 were existing/replaced. ref bpa#202512161848. | |
| Jun 11, 2026 | In progress issued Jun 2026 | 2301 San Jose Av | Siemens Industry, Inc. | fire only work to be obtain as as-built permit for the voluntary replacment of the fire alarm system, initial fire alarm pa#: 202512161848 and these drawings adds 1 smoke detector correctionDetails
fire only work to be obtain as as-built permit for the voluntary replacment of the fire alarm system, initial fire alarm pa#: 202512161848 and these drawings adds 1 smoke detector correction | $720 |
| Dec 16, 2025 | In progress issued Jan 2026 | 2301 San Jose Av | Siemens Industry, Inc. | se building: voluntary replacement of the fires alarm syste including a cellular dialer, replace of 38 initiating devices and 5 notification devices and 2 new modules.Details
se building: voluntary replacement of the fires alarm syste including a cellular dialer, replace of 38 initiating devices and 5 notification devices and 2 new modules. | $45,290 |
| Sep 19, 2025 | Completed final sign-off Apr 2026 | 2301 San Jose Av | cleaning, selective replacement and patching of bricks on the san jose and geneva ave facades. installation of new gutters and downspouts around the entire building to match existing. in kind repair of four bay windows along san jose ave facade to be protected with a plywood systemDetails
cleaning, selective replacement and patching of bricks on the san jose and geneva ave facades. installation of new gutters and downspouts around the entire building to match existing. in kind repair of four bay windows along san jose ave facade to be protected with a plywood system | $50,000 | |
| Nov 12, 2020 | Completed final sign-off May 2021 | 2301 San Jose Av | interior improvement: upgrade of railing around perimeter of existing equipment platform; capless glass balustrade.Details
interior improvement: upgrade of railing around perimeter of existing equipment platform; capless glass balustrade. | $25,000 | |
| Sep 5, 2019 | Completed final sign-off Apr 2020 | 2301 San Jose Av | Roebuck Construction | deferred submittal 3 to 201606018886 fire protection system underground piping, overhead piping approved and installed under 201905173654Details
deferred submittal 3 to 201606018886 fire protection system underground piping, overhead piping approved and installed under 201905173654 | |
| Aug 7, 2019 | Expired or cancelled cancelled Jan 2026 | 2301 San Jose Av | fire line install ref pa pp20190308817Details
fire line install ref pa pp20190308817 | $100,000 | |
| Jul 12, 2019 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | revision to 201606018886 engineering calcs for structural glass floorDetails
revision to 201606018886 engineering calcs for structural glass floor | |
| Jun 17, 2019 | Completed final sign-off Apr 2020 | 2301 San Jose Av | Value Fire Protection Inc | ref pa# 201606018886; install overhead sprinkler 81 headsDetails
ref pa# 201606018886; install overhead sprinkler 81 heads | $37,800 |
| Jun 13, 2019 | Completed final sign-off Apr 2020 | 2301 San Jose Av | Red Hawk Fire & Security Ca Llc | install new fa system - include new facu, 1 remote annunciator, 1 cell comm, 1 document box, 1 dual monitoring module for fire sprink system, 1 relay module, 1 monitoring module for emergency power invertor, 1 monitoring module for cell comm, 1 pull station, 1 smoke det, 16 horn strobes & 2 strobes.Details
install new fa system - include new facu, 1 remote annunciator, 1 cell comm, 1 document box, 1 dual monitoring module for fire sprink system, 1 relay module, 1 monitoring module for emergency power invertor, 1 monitoring module for cell comm, 1 pull station, 1 smoke det, 16 horn strobes & 2 strobes. | $20,000 |
| Jun 7, 2019 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | revision to app#201606018886. technical infeasibility request for door in historic openings. n/a for maherDetails
revision to app#201606018886. technical infeasibility request for door in historic openings. n/a for maher | |
| Nov 30, 2018 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | revision to pa 201606018886. t.i to building interior. adjust swing doors, expand electrical rm, convert storage to expanded pantry, addition of 218 sq ft office rmDetails
revision to pa 201606018886. t.i to building interior. adjust swing doors, expand electrical rm, convert storage to expanded pantry, addition of 218 sq ft office rm | $100,000 |
| May 11, 2018 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | ref to pa# 201606018886:foundation for temporary modular/remanufactured restroom facility and access platform to service bldg owned by city. modular structure certified by state of ca will be filed under separate permitDetails
ref to pa# 201606018886:foundation for temporary modular/remanufactured restroom facility and access platform to service bldg owned by city. modular structure certified by state of ca will be filed under separate permit | $140,000 |
| Aug 22, 2016 | Never finaled issued Jul 2017, no final | 500 Geneva Av | Cal State Constructors Inc | install steel frames with gates to provide fall protection system for muni maintenance workersDetails
install steel frames with gates to provide fall protection system for muni maintenance workers | $1,100,000 |
| Jun 1, 2016 | Completed final sign-off Aug 2020 | 2301 San Jose Av | Roebuck Construction | work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a **Details
work on "power house" part of building only. work includes: rehabilitation, & restoration of exterior facade, seismic upgrade, new mep systems, interior renovations, site improvements, pre-manufactured toilet facility & ramp under separate permit. ** maher: n/a ** | $5,050,000 |
| Jul 31, 2015 | Completed final sign-off Apr 2016 | 500 Geneva Av | Champion Telecom Inc | install circuit from existing elec panel to new 4 gang receptacvle. install dis server. install 2 antennas on building wall. install radio unit. install cables, hyperflex, cat 5 fiber opticDetails
install circuit from existing elec panel to new 4 gang receptacvle. install dis server. install 2 antennas on building wall. install radio unit. install cables, hyperflex, cat 5 fiber optic | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Roebuck Construction (6), Siemens Industry, Inc. (3), Cal State Constructors Inc, Champion Telecom Inc, Red Hawk Fire & Security Ca Llc, Value Fire Protection Inc
- Architects
- Joshua Aidlin (2), Nancy Goldenberg
- Engineers
- Daniel Eilbeck, Gregory P. Wallace, Joshua Aidlin, Richard Rhee
- Authorized agent-otherss
- Ronald Demartini (2)
- Designers
- David Michael Young (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.