Rajendra Sahai
- Listed as
- engineer
- Firm
- Structural Design Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Aug 2016
15 permits since 2000 (engineer on 15 permits): 12 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2016 | Completed final sign-off Dec 2017 | 427 Brannan St | Dlw Construction Inc. | 2nd flr: full flr interior t.i.,commercial office space for single tetnant on 2nd story of 2 story building,scope of work includes addition of new restrooms,non load bearing partitions & arch casework,(e)structures & stairs to remain,no work a@(e)fascade;maher n/aDetails
2nd flr: full flr interior t.i.,commercial office space for single tetnant on 2nd story of 2 story building,scope of work includes addition of new restrooms,non load bearing partitions & arch casework,(e)structures & stairs to remain,no work a@(e)fascade;maher n/a | $495,000 |
| May 16, 2016 | Completed final sign-off Aug 2018 | 973 Mission St | shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels.Details
shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels. | $500,000 | |
| Sep 17, 2015 | Completed final sign-off Mar 2017 | 675 Dolores St | Patrick Uniacke | soft story retrofit per sfbc chapter 34b engineering criteria fema p-807.Details
soft story retrofit per sfbc chapter 34b engineering criteria fema p-807. | $30,000 |
| May 28, 2015 | Completed final sign-off Oct 2016 | 26 Hodges Al | Soil Engineering Construction | structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735Details
structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735 | $70,000 |
| Mar 4, 2014 | Completed final sign-off Dec 2015 | 1600 Owens St | The Whiting-Turner Contracting Company | structural work only. revision to pa#200711097802 s-2. altered site permit approved under pa#201308083838. compliance with ordinance no.155-13 not required.Details
structural work only. revision to pa#200711097802 s-2. altered site permit approved under pa#201308083838. compliance with ordinance no.155-13 not required. | |
| Mar 26, 2013 | Never finaled issued Jul 2014, no final | 55 Innes Ct | erect concrete deck (over look) walls, grade beams and top slab for amusement center. (park)Details
erect concrete deck (over look) walls, grade beams and top slab for amusement center. (park) | $300,000 | |
| Apr 27, 2012 | Never finaled issued Apr 2012, no final | 1357 Eddy St | 1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required.Details
1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required. | $16,500 | |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 1361 Eddy St | 1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required.Details
1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required. | $16,500 | |
| Jan 27, 2011 | Completed final sign-off Apr 2014 | 1 Cashmere St | construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access.Details
construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access. | $50,000 | |
| Jan 27, 2011 | Completed final sign-off Apr 2014 | 1 Cashmere St | construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access.Details
construction of a concrete wallway (to connect the new hunters view development to cashmere street) on three parcels-to provide handicap accessble pedestrian access. | $50,000 | |
| Nov 12, 2010 | Completed final sign-off Mar 2011 | 281 Chestnut St | Rise Construction | install new beam to support existing roof framing.Details
install new beam to support existing roof framing. | $750 |
| May 1, 2008 | Completed final sign-off Apr 2009 | 1199 09th Av | roofing & securing of exteior architectural elements. repair of boaardshell cornice and waterproofing systems of the spreckels temple of music in golden gate park. mep & life safety work under seperate permits.Details
roofing & securing of exteior architectural elements. repair of boaardshell cornice and waterproofing systems of the spreckels temple of music in golden gate park. mep & life safety work under seperate permits. | $400,000 | |
| Apr 23, 2008 | Completed final sign-off Jan 2016 | 1600 Owens St | drive 10 indicator test piles on vacant lot, reference pa# 2007-1109-7802 for new constructionDetails
drive 10 indicator test piles on vacant lot, reference pa# 2007-1109-7802 for new construction | $22,000 | |
| Nov 20, 2007 | Completed final sign-off Dec 2007 | 725 Florida St | The Pelgen Company | unit # 15 - remove and replace 8' section of rotted 5x14 glulam beam. install 1 3/4x14 lvl wood on both sides of existing beam. both trough w/3/4" bolts.Details
unit # 15 - remove and replace 8' section of rotted 5x14 glulam beam. install 1 3/4x14 lvl wood on both sides of existing beam. both trough w/3/4" bolts. | $15,000 |
| Jan 3, 2005 | Completed final sign-off Feb 2005 | 112 Commonwealth Av | Quinlan Construction | revise to app #2002/06/27/0132 revise scope of work not doing horizontal addition clarify existingDetails
revise to app #2002/06/27/0132 revise scope of work not doing horizontal addition clarify existing |