Block 3725, lot 078
973 Mission St
- City’s use
- Commercial Retail
- Built
- 1918
- Stories
- 1
- Rooms
- 4 bathrooms
- Building
- 19,075 sq ft
- Lot
- 15,200 sq ft
- Zoning
- C3S
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
58 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2022 | Completed final sign-off Feb 2023 | 973 Mission St | Rinaldi Construction | renewal of pa 2016-0520-7999 for final inspection only. all work is completeDetails
renewal of pa 2016-0520-7999 for final inspection only. all work is complete | |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 981 Mission St | United California Glass And Door | remove old scissor gate and install new gmi security shutter rollup on (e) opening to main double doors.Details
remove old scissor gate and install new gmi security shutter rollup on (e) opening to main double doors. | $9,832 |
| Feb 20, 2019 | Completed final sign-off Jul 2019 | 973 Mission St | Pyro-Comm Systems, Inc. | fire alarm ti - 1 monitor module, 1 duct detector, 5 carbon monoxide detectors. ref 201803194050Details
fire alarm ti - 1 monitor module, 1 duct detector, 5 carbon monoxide detectors. ref 201803194050 | $3,500 |
| Dec 10, 2018 | Completed final sign-off Mar 2019 | 973 Mission St | Priority Architectural Graphics Dba Prio | 5 evacuation maps for sffd only. floors b, 1, mezzanine.Details
5 evacuation maps for sffd only. floors b, 1, mezzanine. | $2,000 |
| Dec 4, 2018 | Completed final sign-off Aug 2019 | 973 Mission St | Guzman Construction Group Inc. | revision to pa #201803194050. mechanical work only. add 2 fsds #4 & #5. installation of methane detectors at basement level for wet lab. installation of interlock gas supply solenoid valve with exhaust fan.Details
revision to pa #201803194050. mechanical work only. add 2 fsds #4 & #5. installation of methane detectors at basement level for wet lab. installation of interlock gas supply solenoid valve with exhaust fan. | |
| Oct 12, 2018 | Completed final sign-off Aug 2019 | 973 Mission St | Guzman Construction Group Inc. | revision to pa #201803194050. installation of gfi's in "wet lab" at basement level.Details
revision to pa #201803194050. installation of gfi's in "wet lab" at basement level. | |
| Sep 21, 2018 | Completed final sign-off Aug 2019 | 973 Mission St | Guzman Construction Group Inc. | reference app#201803194050. assembly space a-2 within the proposed activity space at ground level.Details
reference app#201803194050. assembly space a-2 within the proposed activity space at ground level. | |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 973 Mission St | Rinaldi Construction | ref pa 2016-0516-7545 & 2017-0215-9434 (n) extended concrete landing, 4" min above adjacent grade, dowel into (e) concrete landing as requiredDetails
ref pa 2016-0516-7545 & 2017-0215-9434 (n) extended concrete landing, 4" min above adjacent grade, dowel into (e) concrete landing as required | |
| Aug 24, 2018 | Completed final sign-off Aug 2018 | 973 Mission St | Fire Technologies | ref pa# 201709290003; single 3" fdc to rear of building on minna st.Details
ref pa# 201709290003; single 3" fdc to rear of building on minna st. | $700 |
| May 31, 2018 | Completed final sign-off Aug 2018 | 973 Mission St | Guzman Construction Group Inc. | revision to app#201703272457. update arch backgrounds.Details
revision to app#201703272457. update arch backgrounds. | |
| May 1, 2018 | Completed final sign-off Aug 2018 | 973 Mission St | Guzman Construction Group Inc. | revision to pa #201703272457 & 2018-05-31-0678. amended mechanical.Details
revision to pa #201703272457 & 2018-05-31-0678. amended mechanical. | |
| Apr 17, 2018 | Completed final sign-off May 2018 | 973 Mission St | Rinaldi Construction | to obtain final inspection for work approved under pa #201512034061 & 201605207999. all work is complete.Details
to obtain final inspection for work approved under pa #201512034061 & 201605207999. all work is complete. | |
| Apr 17, 2018 | Completed final sign-off Aug 2018 | 973 Mission St | Rinaldi Construction | to obtain final inspection for work approved under pa #201612205479 & 201702159433. all work is complete.Details
to obtain final inspection for work approved under pa #201612205479 & 201702159433. all work is complete. | |
| Mar 19, 2018 | Completed final sign-off Aug 2019 | 973 Mission St | Guzman Construction Group Inc. | ref 201703272457 revision permit to revise occupancy type at 973 mission st. from 'a' to 'b' to an 'e' all contruction to meet 'e' occupancy design under tenant improvement, change of occupancy and use from (e) office (ref case #2015-013731cva) to school (e) institutional use.maher no.Details
ref 201703272457 revision permit to revise occupancy type at 973 mission st. from 'a' to 'b' to an 'e' all contruction to meet 'e' occupancy design under tenant improvement, change of occupancy and use from (e) office (ref case #2015-013731cva) to school (e) institutional use.maher no. | |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 973 Mission St | Fire Technologies | revision to sprinkler pa #201709290003, install 4 additional sprinkler to accomodate new office ceiling on main floor.Details
revision to sprinkler pa #201709290003, install 4 additional sprinkler to accomodate new office ceiling on main floor. | $600 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 973 Mission St | street space in addition to m858547Details
street space in addition to m858547 | ||
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 973 Mission St | street spaceDetails
street space | ||
| Nov 15, 2017 | Completed final sign-off Aug 2018 | 973 Mission St | Pyro-Comm Systems, Inc. | install fire alarm voice communication system include speaker & strobes throughout, sprinkler & water flow & tamper switch supervision. ref pa# 2017/09/29/0003.Details
install fire alarm voice communication system include speaker & strobes throughout, sprinkler & water flow & tamper switch supervision. ref pa# 2017/09/29/0003. | $25,000 |
| Sep 29, 2017 | Completed final sign-off Aug 2018 | 973 Mission St | Fire Technologies | new overhead nfpa-13 fire sprinkler system with new 4" dedicated fire service and underground ref 2017-0327-2457. 180 heads. alarm by others.Details
new overhead nfpa-13 fire sprinkler system with new 4" dedicated fire service and underground ref 2017-0327-2457. 180 heads. alarm by others. | $60,000 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 973 Mission St | street spaceDetails
street space | ||
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 973 Mission St | street spaceDetails
street space | ||
| Jun 21, 2017 | Completed final sign-off Aug 2018 | 973 Mission St | administrative permit to correct scope of work from bpa# 201605167545. include verbiage: "provide new disabled access lift between 1st floor & basement.Details
administrative permit to correct scope of work from bpa# 201605167545. include verbiage: "provide new disabled access lift between 1st floor & basement. | ||
| May 8, 2017 | Never finaled issued May 2017, no final | 973 Mission St | street space permit and mta permitDetails
street space permit and mta permit | ||
| Mar 27, 2017 | Completed final sign-off Aug 2018 | 973 Mission St | Guzman Construction Group Inc. | t.i. of office space for proof. new finishes, partitions, electrical and mech distributionDetails
t.i. of office space for proof. new finishes, partitions, electrical and mech distribution | $750,000 |
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 973 Mission St | street spaceDetails
street space | ||
| Feb 15, 2017 | Never finaled issued Apr 2017, no final | 973 Mission St | Rinaldi Construction | rework bldg exterior of 973 mission along minna st to provide a gas meter alcoveDetails
rework bldg exterior of 973 mission along minna st to provide a gas meter alcove | $5,000 |
| Feb 15, 2017 | Completed final sign-off Aug 2018 | 973 Mission St | Rinaldi Construction | install 3 full height concrete shear walls from basement to other side of roof sheathing. install series of tube steel columns along gridlines a to c to reinforce extg masonary walls. voluntary structural strengtheningDetails
install 3 full height concrete shear walls from basement to other side of roof sheathing. install series of tube steel columns along gridlines a to c to reinforce extg masonary walls. voluntary structural strengthening | $200,000 |
| Dec 22, 2016 | Expired or cancelled withdrawn Aug 2018 | 973 Mission St | Ting Kun Chow | mechanical (hvac) permit, shell improvement pa#201605167545Details
mechanical (hvac) permit, shell improvement pa#201605167545 | $160,000 |
| Dec 20, 2016 | Expired or cancelled withdrawn Aug 2018 | 973 Mission St | revision 201605207999 rework exterior window wall on mission st to relocate bldg. entrance to the wall area between grid lines b and c. relocate fire dept connection to the wall area near grid line aDetails
revision 201605207999 rework exterior window wall on mission st to relocate bldg. entrance to the wall area between grid lines b and c. relocate fire dept connection to the wall area near grid line a | ||
| Dec 20, 2016 | Completed final sign-off Aug 2018 | 973 Mission St | Rinaldi Construction | revision to 201605167545 add 1 toilet and urinal in mens restroom on 1st fl. relocate mech shaft to near handicap lift. reverse direction of stair 1. remove partition enclosure at hatch to roof on mezzanine. add mechanicalDetails
revision to 201605167545 add 1 toilet and urinal in mens restroom on 1st fl. relocate mech shaft to near handicap lift. reverse direction of stair 1. remove partition enclosure at hatch to roof on mezzanine. add mechanical | |
| Sep 1, 2016 | Completed final sign-off Sep 2016 | 981 Mission St | Bay Alarm Company | g/f, lower level & mezzanine: add notification devices, dedicated function sprinkler monitoring. t.i.pa#201603232866Details
g/f, lower level & mezzanine: add notification devices, dedicated function sprinkler monitoring. t.i.pa#201603232866 | $5,110 |
| Aug 9, 2016 | Never finaled issued Aug 2016, no final | 973 Mission St | street spaceDetails
street space | ||
| Jul 22, 2016 | Completed final sign-off Oct 2016 | 981 Mission St | Incom Mechanical Inc | revision to pa 2016-0323-2866, coversheet clarification to correctly identify a-2 occupancyDetails
revision to pa 2016-0323-2866, coversheet clarification to correctly identify a-2 occupancy | |
| May 20, 2016 | Expired or cancelled expired Feb 2023 | 973 Mission St | demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545Details
demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545 | $10,000 | |
| May 16, 2016 | Completed final sign-off Aug 2018 | 973 Mission St | shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels.Details
shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels. | $500,000 | |
| May 6, 2016 | Never finaled issued Jun 2016, no final | 981 Mission St | Incom Mechanical Inc | 1st, 2nd & mezz floors: adjusting (e) fire sprinkler system to accomodate new office. new pendents 14. relocated pendents - 29. relocated uprights - 6. ref t.i. pa#201603232866Details
1st, 2nd & mezz floors: adjusting (e) fire sprinkler system to accomodate new office. new pendents 14. relocated pendents - 29. relocated uprights - 6. ref t.i. pa#201603232866 | $10,000 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 981 Mission St | street spaceDetails
street space | ||
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 981 Mission St | Meylan Construction | ti- for ground floor, basement, mezzanie work includes new partitions, doors, new enclosed cafe, reception counter, mep. exterior work consists of one (n) window along minna st.Details
ti- for ground floor, basement, mezzanie work includes new partitions, doors, new enclosed cafe, reception counter, mep. exterior work consists of one (n) window along minna st. | $320,000 |
| Feb 9, 2016 | Completed final sign-off Oct 2016 | 981 Mission St | change of use from vacant retail to retail remaining on ground floor, office use for only for mezzanine and basement. change of use only with addition of class 1 and 2 bicycle parking spaces and baby diaper changing stations only. ab-017 applies.Details
change of use from vacant retail to retail remaining on ground floor, office use for only for mezzanine and basement. change of use only with addition of class 1 and 2 bicycle parking spaces and baby diaper changing stations only. ab-017 applies. | ||
| Dec 3, 2015 | Never finaled issued Dec 2015, no final | 973 Mission St | Rinaldi Construction | ab-017 applies to this permit.interior demo(e)interior features(e)stairs,struc,windows&bldg exterior to remain.(e)elec be removed back to all panels&sub-panels.(e)mech.equip for ventiln,heating&cooling to be removed.remove(e)flr finish to sub-floor,wall finishes.Details
ab-017 applies to this permit.interior demo(e)interior features(e)stairs,struc,windows&bldg exterior to remain.(e)elec be removed back to all panels&sub-panels.(e)mech.equip for ventiln,heating&cooling to be removed.remove(e)flr finish to sub-floor,wall finishes. | $12,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 981 Mission St | Bay Alarm Company | install dedicated function fire sprinkler waterflow and supervisory system work done on 1st floor and basement. all voluntary work. outside bell to be installed by others.Details
install dedicated function fire sprinkler waterflow and supervisory system work done on 1st floor and basement. all voluntary work. outside bell to be installed by others. | $1,940 |
| Feb 19, 2014 | Never finaled issued Feb 2014, no final | 981 Mission St | street space & mta.Details
street space & mta. | ||
| Dec 11, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Fire Technologies | install fire sprinkler throughout building with a new 4" fire serviceDetails
install fire sprinkler throughout building with a new 4" fire service | $47,000 |
| Oct 29, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Ting Kun Chow | install hvac syste, 4 sets of roof top unitsDetails
install hvac syste, 4 sets of roof top units | $130,000 |
| Oct 8, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Rinaldi Construction | revision to pa 201305076359 - intall restroom at mezzanine floor new mech. shaft from ground floor to roof;Details
revision to pa 201305076359 - intall restroom at mezzanine floor new mech. shaft from ground floor to roof; | $5,000 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 981 Mission St | street spaceDetails
street space | ||
| May 7, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Rinaldi Construction | repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations.Details
repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations. | $200,000 |
| Apr 29, 2004 | Completed final sign-off May 2004 | 973 Mission St | relocate rooms of approved appl#200309094234Details
relocate rooms of approved appl#200309094234 | ||
| Apr 29, 2004 | Completed final sign-off May 2004 | 973 Mission St | Ting Kun Chow | hvac duct works, supply & return air duct connect to (e) system vent fan duct up to roofDetails
hvac duct works, supply & return air duct connect to (e) system vent fan duct up to roof | $2,500 |
| Mar 11, 2004 | Completed final sign-off May 2004 | 973 Mission St | International Commercial Awning, Inc. | install new canvas awning near store front/see plan.Details
install new canvas awning near store front/see plan. | $1,800 |
| Jan 5, 2004 | Never finaled issued Jan 2004, no final | 973 Mission St | street spaceDetails
street space | ||
| Sep 9, 2003 | Completed final sign-off May 2004 | 973 Mission St | install new massage rooms & offices as p er planDetails
install new massage rooms & offices as p er plan | $40,000 | |
| Mar 11, 2003 | Expired or cancelled expired Mar 2004 | 981 Mission St | Matrix Seismic Corp | changing the two regular bath room lay out of plan app#200302217984 & applying for the hardship forDetails
changing the two regular bath room lay out of plan app#200302217984 & applying for the hardship for | |
| Feb 21, 2003 | Completed final sign-off Mar 2003 | 981 Mission St | Matrix Seismic Corp | add automatic door opener per app#200102152272Details
add automatic door opener per app#200102152272 | $3,200 |
| Nov 19, 2002 | Completed final sign-off Mar 2003 | 981 Mission St | Matrix Seismic Corp | add 2 more bathrms part of umb,200102152272 on first flrDetails
add 2 more bathrms part of umb,200102152272 on first flr | $10,000 |
| Sep 24, 2002 | Never finaled issued Sep 2002, no final | 981 Mission St | street spaceDetails
street space | ||
| Sep 12, 2002 | Expired or cancelled expired Dec 2003 | 981 Mission St | Associated Builders | reroofingDetails
reroofing | $47,300 |
| Feb 15, 2001 | Completed final sign-off Mar 2003 | 981 Mission St | umb retrofit siesmic upgrade and associated accessibility required upgrades.Details
umb retrofit siesmic upgrade and associated accessibility required upgrades. | $78,500 |