459 permits since 2000 (engineer on 452 permits, architect on 3 permits, authorized agent-others on 3 permits, designer on 1 permit): 310 completed, 80 in progress, 61 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 459.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 301 Howard St | 22nd and 23rd floor - deferred mep permit application #: 202608066150Details
22nd and 23rd floor - deferred mep permit application #: 202608066150 | $299,415 | |
| Sep 16, 2026 | In progress issued Sep 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mechancial + electrical for pa# 202606183556.Details
deferred mechancial + electrical for pa# 202606183556. | $339,411 |
| Sep 9, 2026 | In progress issued Sep 2026 | 55 Green St | Corish Commercial Electric Inc | 5th floor: office t.i. office outlets, lighting, controls, data, fire alarm. ref#: 202602236322Details
5th floor: office t.i. office outlets, lighting, controls, data, fire alarm. ref#: 202602236322 | $70,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | Metcon Ti, Inc | mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n)Details
mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n) | $125,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | Metcon Ti, Inc | mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women'sDetails
mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women's | $150,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 444 De Haro St | Gci, Inc | 2/f: electrical only permit to support pa# 202606082742. new lighting & controls and new power & signal devices throughout the space.Details
2/f: electrical only permit to support pa# 202606082742. new lighting & controls and new power & signal devices throughout the space. | $10,000 |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | Field Construction Inc. | deferred mep for pa 202608196849Details
deferred mep for pa 202608196849 | $450,000 |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | Sc Builders, Inc | 4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers.Details
4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers. | $40,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 201 Post St | Northern Sun Associates | 6/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting.Details
6/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting. | $150,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 201 Post St | Northern Sun Associates | 7/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting.Details
7/f: office tenant improvement. construction of new non-structural partitions, doors, and sidelite, new finish, millwork, accessibility upgrade and new ceiling work and lighting. | $150,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 655 Beach St | Cmd Electric Inc | electrical permit add to permit ew202604274538 to add a 100amp load centerDetails
electrical permit add to permit ew202604274538 to add a 100amp load center | $2,500 |
| Aug 13, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mep for 202512111568Details
deferred mep for 202512111568 | $160,000 |
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 120 Kearny St | Hp Build | 23rd floor/suite 2350 - mechanical and electrical for project 202605121089Details
23rd floor/suite 2350 - mechanical and electrical for project 202605121089 | $180,000 |
| Jul 31, 2026 | In progress filed Jul 2026, not yet issued | 451 Pacific Av | 3rd fl, mep for pa 202602125890Details
3rd fl, mep for pa 202602125890 | $1,000 | |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 4th floor: electrical work for ti 202604219766. new power and signal dev.Details
4th floor: electrical work for ti 202604219766. new power and signal dev. | $25,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807Details
5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807 | $35,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.Details
roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f. | $1,193,158 |
| Jul 21, 2026 | In progress issued Aug 2026 | 680 Folsom St | M C S Construction Services | deferred mech+ elec permit. ref 202604028744 - mech furn+ install new reheat vav box, new cooling only vav boxes , new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control.Details
deferred mech+ elec permit. ref 202604028744 - mech furn+ install new reheat vav box, new cooling only vav boxes , new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control. | $1,200,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 1960 Folsom St | Gci, Inc | deferred electrical for pa# 202512010636Details
deferred electrical for pa# 202512010636 | $37,400 |
| Jul 10, 2026 | In progress issued Jul 2026 | 2101 Mission St | Diablo Electric Inc. | #108b. ref to pa# 202603207998. deferred electrical for 108b bike room. new lights and outlets.Details
#108b. ref to pa# 202603207998. deferred electrical for 108b bike room. new lights and outlets. | $42,376 |
| Jul 9, 2026 | In progress issued Jul 2026 | 1 Market St | Gci, Inc | 28th floor: electrical-new power, lighting and signal. ref pa #202604149423.Details
28th floor: electrical-new power, lighting and signal. ref pa #202604149423. | $27,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 2101 Mission St | Buildtech West | suite 100 and 210: deferred electrical for permit 202602266554Details
suite 100 and 210: deferred electrical for permit 202602266554 | $100,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 180 Howard St | Metcon Ti, Inc | 9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531Details
9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531 | $250,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f).Details
3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f). | $120,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 1 California St | Hathaway Dinwiddie Co. | 22/fl- ref 202604229900- mep workDetails
22/fl- ref 202604229900- mep work | $750,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 221 Main St | Richlen Construction | deferred electrical for 4th floor suite 400 office ti under permit 202604028757.Details
deferred electrical for 4th floor suite 400 office ti under permit 202604028757. | $175,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 799 Market St | Dpr Construction A | 6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical.Details
6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical. | $325,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 2545 16th St | Principal Builders Inc. | new power and signal devices. deferred under pa# 202606032472Details
new power and signal devices. deferred under pa# 202606032472 | |
| Jun 9, 2026 | In progress issued Jun 2026 | 550 Kearny St | Source Planning And Construction Inc | 5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.Details
5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141. | $75,000 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 33 New Montgomery St | Metcon Ti, Inc | 9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and 202606012267.Details
9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and 202606012267. | $190,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 33 New Montgomery St | Metcon Ti, Inc | ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators.Details
ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators. | $175,000 |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 475 Sansome St | Principal Builders Inc. | 6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space.Details
6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space. | $162,000 |
| May 28, 2026 | In progress issued Jul 2026 | 343 Sansome St | Skyline Construction | 5th floor: electrical work for tenant improvement. ref arch. 202604230007Details
5th floor: electrical work for tenant improvement. ref arch. 202604230007 | $20,000 |
| May 26, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | l1-3: deferred mep for pa# 202603187875Details
l1-3: deferred mep for pa# 202603187875 | $713,232 |
| May 22, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | Peacock Construction | b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls.Details
b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls. | $239,000 |
| May 21, 2026 | In progress issued Jun 2026 | 1800 Owens St | Principal Builders Inc. | installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers.Details
installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers. | $150,000 |
| May 20, 2026 | In progress issued Jul 2026 | 500 Sansome St | Centric Construction Inc | 6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f.Details
6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f. | $1,300,000 |
| May 19, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | C B F Inc | new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357Details
new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357 | $109,860 |
| May 18, 2026 | In progress issued May 2026 | 101 02nd St | Source Planning And Construction Inc | suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312Details
suite: 350 - new power and signal throught the space, new 2025 t24 lighting and controls. ref bpa: 202603268312 | $70,000 |
| May 12, 2026 | In progress issued Jul 2026 | 300 California St | Gci, Inc | renovation of building g/f lobby finishes and the adjacent tenant fit out. this includes demo of exterior store front, non-structural interior partitions, and new construction of interior partitions, ceilings, millwork and finishes. no increase in area. no change in occupancy or useDetails
renovation of building g/f lobby finishes and the adjacent tenant fit out. this includes demo of exterior store front, non-structural interior partitions, and new construction of interior partitions, ceilings, millwork and finishes. no increase in area. no change in occupancy or use | $1,270,000 |
| May 7, 2026 | In progress issued May 2026 | 1 Embarcadero Center | Gci, Inc | electrical power, lighting, and signal ref 202603238043Details
electrical power, lighting, and signal ref 202603238043 | $50,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 595 Pacific Av | Principal Builders Inc. | level 2; revision to pa#: 202602246389 and deferred mep. revised existing wall layouts to mof 256 and conference room 257. revised room function 210 with new supporting power and data layout.Details
level 2; revision to pa#: 202602246389 and deferred mep. revised existing wall layouts to mof 256 and conference room 257. revised room function 210 with new supporting power and data layout. | $849,601 |
| May 5, 2026 | Completed final sign-off Jul 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mep for 202603177710 for new cafe at ground flDetails
deferred mep for 202603177710 for new cafe at ground fl | $186,900 |
| May 1, 2026 | In progress issued Jun 2026 | 2225 Jerrold Av | C B F Inc | ref 202506178846. new power for ev chargers (using load management software) install equipment for 12 ev chargers. deferred anchorage for equipmentDetails
ref 202506178846. new power for ev chargers (using load management software) install equipment for 12 ev chargers. deferred anchorage for equipment | |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996.Details
1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996. | $15,000 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 1800 Owens St | Principal Builders Inc. | installation of phone booths in sector 2 fl, 4 & 5 & sector 3 fls, 5,7Details
installation of phone booths in sector 2 fl, 4 & 5 & sector 3 fls, 5,7 | $150,000 |
| Apr 28, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | electrical work for tenant improvement at the 6th and 7th floor. ref arch# 202602065450Details
electrical work for tenant improvement at the 6th and 7th floor. ref arch# 202602065450 | $140,000 |
| Apr 23, 2026 | In progress issued May 2026 | 575 Market St | Field Construction Inc. | suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517Details
suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517 | $250,000 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042.Details
38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042. | $179,000 |
| Apr 20, 2026 | In progress issued Jul 2026 | 149 New Montgomery St | Principal Builders Inc. | commercial tenant improvement of (e) floors 5 & 6.Details
commercial tenant improvement of (e) floors 5 & 6. | $5,670,000 |
| Apr 2, 2026 | In progress issued Jun 2026 | 345 California St | Skyline Construction | deferred mep for 27th floor office ti under permit 202512182090.Details
deferred mep for 27th floor office ti under permit 202512182090. | $295,000 |
| Apr 2, 2026 | Completed final sign-off Aug 2026 | 631 Howard St | Richlen Construction | basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)Details
basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets) | $197,607 |
| Apr 1, 2026 | Completed final sign-off Aug 2026 | 255 California St | Novo Construction Inc | electrical work for t.i. on the 11th floor. ref 202603248142Details
electrical work for t.i. on the 11th floor. ref 202603248142 | $7,000 |
| Mar 31, 2026 | In progress issued Apr 2026 | 1 Sansome St | Skyline Construction | 29th/f: deferred mep for t.i. 202512101397Details
29th/f: deferred mep for t.i. 202512101397 | $1,157,328 |
| Mar 27, 2026 | Completed final sign-off Sep 2026 | 101 Mission St | Gci, Inc | 21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical.Details
21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical. | $55,000 |
| Mar 27, 2026 | In progress issued May 2026 | 1212 Maryland St | Swinerton Builders | deferred mep for permit 202601304958.Details
deferred mep for permit 202601304958. | |
| Mar 26, 2026 | In progress issued Mar 2026 | 300 Mission St | M C S Construction Services | 11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control.Details
11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control. | $45,250 |
| Mar 26, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | deferred mecha and electrical permit. ref 202511058945. mech selective demo and cap of med to low pressure ductwork. new dist for vav bxes, new hot water reheat dist piping. air balance. elec new power and signal devices throughout space, new 2022 t24 compliant lighting and controlsDetails
deferred mecha and electrical permit. ref 202511058945. mech selective demo and cap of med to low pressure ductwork. new dist for vav bxes, new hot water reheat dist piping. air balance. elec new power and signal devices throughout space, new 2022 t24 compliant lighting and controls | $253,892 | |
| Mar 25, 2026 | Completed final sign-off Jul 2026 | 100 California St | Gci, Inc | 10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614Details
10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614 | $20,000 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | deferred mech and elec permit. ref pa# 202511058944. mech: select demo and cap of mep to low pressured ducktwork.new dist for vav boxes, new hot water reheat distrubtion piping. air balance elec and new power and signal devices througout. new 2022 t 24 compliant lighting and controls.Details
deferred mech and elec permit. ref pa# 202511058944. mech: select demo and cap of mep to low pressured ducktwork.new dist for vav boxes, new hot water reheat distrubtion piping. air balance elec and new power and signal devices througout. new 2022 t 24 compliant lighting and controls. | $275,277 |
| Mar 19, 2026 | In progress issued Mar 2026 | 450 Sansome St | M C S Construction Services | 11th fl - deferred mech & elec permit. permit ref pa 202510238040 mech selective demo & cap of med & low pressure duct work, ew dist for vav boxes, new hot water. reheat dis piping wshp & assoc ductwork & piping, air balance. elec, new power & signal devices throughout. new 2022 t24 ltg & controlsDetails
11th fl - deferred mech & elec permit. permit ref pa 202510238040 mech selective demo & cap of med & low pressure duct work, ew dist for vav boxes, new hot water. reheat dis piping wshp & assoc ductwork & piping, air balance. elec, new power & signal devices throughout. new 2022 t24 ltg & controls | $306,377 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 12th floor: deferred mech + elec permit. permit ref # 202511058940. mech selective demo + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. elec new power + signal devices throughout. new 2022 t24 complaint lighting + controls.Details
12th floor: deferred mech + elec permit. permit ref # 202511058940. mech selective demo + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. elec new power + signal devices throughout. new 2022 t24 complaint lighting + controls. | $254,763 |
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | ste 750: deferred mech + elec permit. ref # 202510237987. mech select demo + cap of mep to low pressure duct work. new dist for vav boxes, new hot water reheat dist piping. ohr balance. elec new power + signal devices throughout, new 2022 t24 complaint. lighting + controls.Details
ste 750: deferred mech + elec permit. ref # 202510237987. mech select demo + cap of mep to low pressure duct work. new dist for vav boxes, new hot water reheat dist piping. ohr balance. elec new power + signal devices throughout, new 2022 t24 complaint. lighting + controls. | $207,497 |
| Mar 13, 2026 | In progress issued Apr 2026 | 114 Sansome St | Skyline Construction | office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.Details
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system. | $1,400,000 |
| Mar 11, 2026 | Completed final sign-off Jul 2026 | 101 California St | Hp Build | 9th flr: suite 925: mech + electrical for 202512051085Details
9th flr: suite 925: mech + electrical for 202512051085 | $750,000 |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 180 Howard St | Metcon Ti, Inc | 8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286Details
8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286 | $150,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 410 Townsend St | C B F Inc | 3/f: new power and signal devices throughout the space. new 2022 title 24 compliant lighting and controls. ref permit 202508042220Details
3/f: new power and signal devices throughout the space. new 2022 title 24 compliant lighting and controls. ref permit 202508042220 | $10,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 410 Townsend St | C B F Inc | 2nd fl: new power + signal devises throughout the space. new 2022 title 24 complaint lighting + controls. ref # 202507221314.Details
2nd fl: new power + signal devises throughout the space. new 2022 title 24 complaint lighting + controls. ref # 202507221314. | $10,000 |
| Feb 26, 2026 | In progress issued Mar 2026 | 33 08th St | Northern Sun Associates | tenant improvement including non-structural wall partitions, plumbing, lighting, mechanical, and finishes.Details
tenant improvement including non-structural wall partitions, plumbing, lighting, mechanical, and finishes. | $190,000 |
| Feb 12, 2026 | In progress issued Mar 2026 | 201 03rd St | Skyline Construction | 5th/f - revison to approved permit# 2025-1126-0530. demo of moveable wall. construct new wall, new door and upgrade to mechanical electrical equipement due to new room.Details
5th/f - revison to approved permit# 2025-1126-0530. demo of moveable wall. construct new wall, new door and upgrade to mechanical electrical equipement due to new room. | $50,000 |
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 1 Sansome St | Principal Builders Inc. | 37th floor ti renovation of (e) breakroom: occ load from 23 to 32.Details
37th floor ti renovation of (e) breakroom: occ load from 23 to 32. | $109,000 |
| Feb 5, 2026 | In progress issued Mar 2026 | 300 Clay St | Skyline Construction | 19th fl - deferred mep for bpa 202509044565Details
19th fl - deferred mep for bpa 202509044565 | $523,080 |
| Feb 5, 2026 | In progress issued Mar 2026 | 300 Clay St | Skyline Construction | 18th fl - deferred mep for bpa 202508153152Details
18th fl - deferred mep for bpa 202508153152 | $1,264,360 |
| Feb 5, 2026 | In progress issued Mar 2026 | 300 Clay St | Skyline Construction | 17th fl - deferred mep for bpa 202508153152Details
17th fl - deferred mep for bpa 202508153152 | $1,264,680 |
| Feb 4, 2026 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 38/f: deferred mep for permit 202512101393.Details
38/f: deferred mep for permit 202512101393. | $1,158,696 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 220 Montgomery St | Gci, Inc | 3rd fl- deferred electrical for pa #2025-1106-9032 & 2026-0127-4594Details
3rd fl- deferred electrical for pa #2025-1106-9032 & 2026-0127-4594 | $130,000 |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952Details
37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952 | $15,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642.Details
37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642. | $15,000 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | l30-31 deferred mep for 202511129399Details
l30-31 deferred mep for 202511129399 | $2,347,776 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | level 33,35 deferred mep for 202511129396Details
level 33,35 deferred mep for 202511129396 | $2,333,160 |
| Jan 7, 2026 | Completed final sign-off May 2026 | 1 Post St | Peacock Construction | mechanical minor duct modifications, 2 new vav terminal units. electrical power lighting and signal, title 24. ref: 202507160873Details
mechanical minor duct modifications, 2 new vav terminal units. electrical power lighting and signal, title 24. ref: 202507160873 | $15,000 |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | 34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096Details
34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096 | $15,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 300 Mission St | Skyline Construction | tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included.Details
tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included. | $160,000 |
| Dec 23, 2025 | In progress issued Apr 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | l1 - l4. electrical only revision to approved pa# 202503172334.Details
l1 - l4. electrical only revision to approved pa# 202503172334. | |
| Dec 23, 2025 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space.Details
deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space. | $75,000 |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080.Details
10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080. | $3,900,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 655 Beach St | W.E. O'neil Construction Co. Of Norcal | 2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant.Details
2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant. | $962,880 |
| Dec 15, 2025 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafeDetails
11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe | $4,000,000 |
| Dec 12, 2025 | In progress issued Feb 2026 | 201 03rd St | Skyline Construction | 7th fl - interior ti demo includes of non-structural partitions construction includes millwork, finishes, ceiling, mech & elec upgradesDetails
7th fl - interior ti demo includes of non-structural partitions construction includes millwork, finishes, ceiling, mech & elec upgrades | $425,000 |
| Dec 9, 2025 | In progress issued Apr 2026 | 221 Main St | Gci, Inc | 6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new ductDetails
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct | $6,158,186 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop.Details
revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop. | |
| Nov 26, 2025 | In progress issued Dec 2025 | 201 03rd St | Skyline Construction | 5/f: office tenant improvement. removal of non-structural walls, finishes, and lighting. new construction of non-structural walls, finishes, millwork, ceiling. mechanical and electrical upgradesDetails
5/f: office tenant improvement. removal of non-structural walls, finishes, and lighting. new construction of non-structural walls, finishes, millwork, ceiling. mechanical and electrical upgrades | $725,000 |
| Nov 20, 2025 | In progress issued Nov 2025 | 255 California St | Novo Construction Inc | mechanical and electrical work for tenant improvement at suite 1125. arch ref#: 202510298346.Details
mechanical and electrical work for tenant improvement at suite 1125. arch ref#: 202510298346. | $125,000 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 1 Embarcadero Center | M C S Construction Services | 20th fl, ste 2020 deferred electrical permit ref pa 202509054626 new power & signal devices throughout space; new 2022 title 24 compliant light & controls in new phone roomDetails
20th fl, ste 2020 deferred electrical permit ref pa 202509054626 new power & signal devices throughout space; new 2022 title 24 compliant light & controls in new phone room | $20,000 |
| Nov 13, 2025 | Completed final sign-off Aug 2026 | 1 Post St | Peacock Construction | electrical work (title 24) for pa 202509115099Details
electrical work (title 24) for pa 202509115099 | $15,000 |
| Nov 12, 2025 | In progress issued Jan 2026 | 451 Pacific Av | Build Group Inc. | core and shell mep. work includes osa supply unit, restroom exhaust and a riser for future ti permits. ref arch permit #202505126265.Details
core and shell mep. work includes osa supply unit, restroom exhaust and a riser for future ti permits. ref arch permit #202505126265. | $120,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514Details
15/fl: new lighting and controls for whit ebox space reference arch permit#2025-1001-6514 | $10,000 |
| Nov 5, 2025 | Completed final sign-off Dec 2025 | 101 California St | Hp Build | g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835Details
g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835 | $3,000 |
| Nov 4, 2025 | Completed final sign-off Feb 2026 | 430 California St | Novo Construction Inc | 11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes.Details
11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes. | $193,000 |
| Oct 31, 2025 | Completed final sign-off Mar 2026 | 1 Post St | Peacock Construction | ref pa# 202510036712 - 25th floor - ste# 2550: mep: new power, lighting, signal, and title 24 mechanical.Details
ref pa# 202510036712 - 25th floor - ste# 2550: mep: new power, lighting, signal, and title 24 mechanical. |