Block 0240, lot 016
550 Kearny St
- City’s use
- Commercial Office
- Built
- 1975
- Stories
- 10
- Units
- 1
- Rooms
- 14 bathrooms
- Building
- 193,172 sq ft
- Lot
- 18,732 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
189 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | In progress issued Jun 2026 | 550 Kearny St | Source Planning And Construction Inc | 5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.Details
5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141. | $75,000 |
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 550 Kearny St | Source Planning And Construction Inc | 5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.Details
5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528. | |
| Apr 9, 2026 | In progress issued Apr 2026 | 550 Kearny St | Source Planning And Construction Inc | selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.Details
selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes. | $135,000 |
| Mar 12, 2026 | In progress filed Mar 2026, not yet issued | 550 Kearny St | addition of penthouse roof terrace: new elevator/lobby, restrooms, landscaped area, exterior paver system, outdoor furniture & amenity casework, perimeter fencing, & upgrades to (e) exterior stairs & wall finishes. selective demo of non-structural/structural partitions, floors, doors, ceilings.Details
addition of penthouse roof terrace: new elevator/lobby, restrooms, landscaped area, exterior paver system, outdoor furniture & amenity casework, perimeter fencing, & upgrades to (e) exterior stairs & wall finishes. selective demo of non-structural/structural partitions, floors, doors, ceilings. | $2,725,800 | |
| Jun 12, 2025 | In progress filed Jun 2025, not yet issued | 550 Kearny St | level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.Details
level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes. | $2,725,800 | |
| Mar 25, 2021 | Never finaled issued Aug 2021, no final | 550 Kearny St | Acco Engineered Systems Inc. Dba Acco En | direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse.Details
direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse. | $450,000 |
| Mar 9, 2020 | Never finaled issued Feb 2021, no final | 550 Kearny St | Novo Construction Inc | 7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep includedDetails
7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep included | $900,000 |
| Jan 27, 2020 | Completed final sign-off Oct 2020 | 550 Kearny St | Novo Construction Inc | demo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698Details
demo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698 | $10,000 |
| Jan 24, 2020 | Completed final sign-off Sep 2020 | 550 Kearny St | Pioneer Fire Inc. | return to warm shell fire sprinklerDetails
return to warm shell fire sprinkler | $47,447 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 550 Kearny St | C B F Inc | 2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical onlyDetails
2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical only | $500,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 550 Kearny St | Bilcor Inc | 2nd fl - fire relocate 3 ceiling mount speaker strobes to accommodate revised floor layout. as built permit 2019-1004-3538Details
2nd fl - fire relocate 3 ceiling mount speaker strobes to accommodate revised floor layout. as built permit 2019-1004-3538 | $1,980 |
| Dec 4, 2019 | Completed final sign-off Feb 2020 | 550 Kearny St | Red Hawk Fire & Security Ca Llc | fire alarm as built drawing 201910023334Details
fire alarm as built drawing 201910023334 | |
| Nov 20, 2019 | Completed final sign-off Jul 2021 | 550 Kearny St | Wework Construction Llc Dba Wework Const | revision to 201905211190 install 4th flr storefronts and interior entry door with fail safeDetails
revision to 201905211190 install 4th flr storefronts and interior entry door with fail safe | |
| Oct 15, 2019 | Completed final sign-off Nov 2019 | 550 Kearny St | Bilcor Inc | 4/f: install 2-way comm; install 1 call station, install 1 braille signage. ref pa201905211190. maher n/a.Details
4/f: install 2-way comm; install 1 call station, install 1 braille signage. ref pa201905211190. maher n/a. | $1,320 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 550 Kearny St | Bilcor Inc | fire alarm install 28 ceiling speaker strobes, 1 booster panel, 1 smoke det, 3 control relays, 3 duct detectors ref 201907226477Details
fire alarm install 28 ceiling speaker strobes, 1 booster panel, 1 smoke det, 3 control relays, 3 duct detectors ref 201907226477 | $14,000 |
| Oct 2, 2019 | Completed final sign-off Mar 2020 | 550 Kearny St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 3rd & 4th fl - add 2 power supply w/sync modules, 2 control rela for door holder release, 1 control relay for security interface, 6 duct detectors with control for fans, 1 duct detector with control for fsd, 7 smoke detectors, & 14 speaker/strobes. ref pa #201905211190. maher naDetails
fire alarm ti on 3rd & 4th fl - add 2 power supply w/sync modules, 2 control rela for door holder release, 1 control relay for security interface, 6 duct detectors with control for fans, 1 duct detector with control for fsd, 7 smoke detectors, & 14 speaker/strobes. ref pa #201905211190. maher na | $20,000 |
| Sep 19, 2019 | Completed final sign-off Jan 2021 | 550 Kearny St | Novo Construction Inc | mechanical work to tenant improvement on the 2nd ref 201907226477Details
mechanical work to tenant improvement on the 2nd ref 201907226477 | $85,000 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 550 Kearny St | Pioneer Fire Inc. | 2nd floor: relocate 23 pendents, add 1 pendent, and remove 14. n/a for maher. t.i. app#201905140530Details
2nd floor: relocate 23 pendents, add 1 pendent, and remove 14. n/a for maher. t.i. app#201905140530 | $15,250 |
| Aug 29, 2019 | Never finaled issued Sep 2019, no final | 550 Kearny St | Novo Construction Inc | revision to app#201906244205. provide revised technical infeasibility/equivalent facilitation sheetr 2a-0.1.o per request. n/a for maher.Details
revision to app#201906244205. provide revised technical infeasibility/equivalent facilitation sheetr 2a-0.1.o per request. n/a for maher. | |
| Aug 14, 2019 | Completed final sign-off Oct 2019 | 550 Kearny St | R L H Fire Protection Inc | 3rd fl- ti upgrade of (e) fire sprinkler system - 7 relocate pendent sprinkler, 2 additional pendent sprinkler, 45 relocate upright sprinkler, 9 additional upright sprinkler. ref pa 2019-0521-1190Details
3rd fl- ti upgrade of (e) fire sprinkler system - 7 relocate pendent sprinkler, 2 additional pendent sprinkler, 45 relocate upright sprinkler, 9 additional upright sprinkler. ref pa 2019-0521-1190 | $13,700 |
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 550 Kearny St | Bilcor Inc | fire alarm install 1 main control panel, 4 call stations, 2 expansion switches, 2 power supplies, 2 dual monitor modulesDetails
fire alarm install 1 main control panel, 4 call stations, 2 expansion switches, 2 power supplies, 2 dual monitor modules | $4,600 |
| Jul 22, 2019 | Completed final sign-off Jan 2020 | 550 Kearny St | Novo Construction Inc | tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permitDetails
tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permit | $850,000 |
| Jul 5, 2019 | Never finaled issued Jul 2019, no final | 550 Kearny St | Bilcor Inc | ref t.i # 2019-0603-2247: fire alarm ti on 9th fl: install 39 ceiling speaker strobes, install 1 smoke detector, install 1 booster panel, install 4 duct detectors, in stall 4 control relays, install 1 call station, install 1 fault line monitor module, install 1 dual monitor moduel.Details
ref t.i # 2019-0603-2247: fire alarm ti on 9th fl: install 39 ceiling speaker strobes, install 1 smoke detector, install 1 booster panel, install 4 duct detectors, in stall 4 control relays, install 1 call station, install 1 fault line monitor module, install 1 dual monitor moduel. | $34,320 |
| Jun 24, 2019 | Completed final sign-off Dec 2020 | 550 Kearny St | Novo Construction Inc | non-struct demo (n) toilet partitions & structural door. barrier removal only. no change in occupancy use or area. mep, life safety & sprinklers under separate permitDetails
non-struct demo (n) toilet partitions & structural door. barrier removal only. no change in occupancy use or area. mep, life safety & sprinklers under separate permit | $31,347 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 550 Kearny St | Novo Construction Inc | revision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision.Details
revision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision. | |
| May 21, 2019 | Completed final sign-off Jul 2021 | 550 Kearny St | Wework Construction Llc Dba Wework Const | 3rd and 4th floors - remove selected non-load bearing partitions, ceiling & assoc framing. installation of (n) partition, gyp board ceiling, (n) millwork & appliances. (n) paint & flooring in selected areas (n) light fixtures & mep equipmentsDetails
3rd and 4th floors - remove selected non-load bearing partitions, ceiling & assoc framing. installation of (n) partition, gyp board ceiling, (n) millwork & appliances. (n) paint & flooring in selected areas (n) light fixtures & mep equipments | $2,774,532 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 550 Kearny St | Pioneer Fire Inc. | 9th fl - relocate 33 pendents and remove 11 pendents. ref pa 2019-0426-9050Details
9th fl - relocate 33 pendents and remove 11 pendents. ref pa 2019-0426-9050 | $19,250 |
| May 14, 2019 | Completed final sign-off Feb 2020 | 550 Kearny St | Pioneer Fire Inc. | 2nd fl - return shell conditionDetails
2nd fl - return shell condition | $7,600 |
| May 8, 2019 | Completed final sign-off Jan 2020 | 550 Kearny St | Novo Construction Inc | 6th fl: ti to include demolition of non-structural partitions, new non-load bearing partitions, ceiling tiles, and grids. mep & fire life safety under separate permit.Details
6th fl: ti to include demolition of non-structural partitions, new non-load bearing partitions, ceiling tiles, and grids. mep & fire life safety under separate permit. | $400,000 |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 550 Kearny St | Novo Construction Inc | 9th flr ti- non structural partitions, ceiling tiles and grids, mep includedDetails
9th flr ti- non structural partitions, ceiling tiles and grids, mep included | $1,600,000 |
| Apr 24, 2019 | Completed final sign-off Jan 2020 | 550 Kearny St | Novo Construction Inc | interior demolition on the 2nd floor per ab-017.Details
interior demolition on the 2nd floor per ab-017. | $20,000 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 550 Kearny St | Skyline Construction | 9/f: demo of non structural partitions and finishes on the 9th flr. no ceiling demo. ab0.17Details
9/f: demo of non structural partitions and finishes on the 9th flr. no ceiling demo. ab0.17 | $10,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 550 Kearny St | street spaceDetails
street space | ||
| Apr 6, 2018 | Completed final sign-off Dec 2019 | 550 Kearny St | Skyline Construction | interior demolition on the 9th floor. per ab-017 ada deferred.Details
interior demolition on the 9th floor. per ab-017 ada deferred. | $15,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 550 Kearny St | street space/mta metersDetails
street space/mta meters | ||
| Dec 20, 2017 | Never finaled issued Dec 2017, no final | 550 Kearny St | street space/mta metersDetails
street space/mta meters | ||
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 550 Kearny St | Skender Construction Llc | demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lightingDetails
demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting | $220,000 |
| Nov 13, 2017 | Completed final sign-off Dec 2017 | 550 Kearny St | Golden Gate Fire Protection Inc | 7th floor - fire sprinklers relocate (5) pendent sprinklers. relocate (31) upright sprinklers. ref ti #2017-10-06-0607.Details
7th floor - fire sprinklers relocate (5) pendent sprinklers. relocate (31) upright sprinklers. ref ti #2017-10-06-0607. | $9,000 |
| Oct 11, 2017 | Completed final sign-off Dec 2017 | 550 Kearny St | Bilcor Inc | 7/f- fire alarm t.i., remove (1) ceiling mount strobe & (1) ceiling mount speaker-strobe, relocate (2) ceiling mount speaker-strobes, install (2) ceiling mount speaker-strobes.t.i. pa#201710060607. n/a ordinance #155-13Details
7/f- fire alarm t.i., remove (1) ceiling mount strobe & (1) ceiling mount speaker-strobe, relocate (2) ceiling mount speaker-strobes, install (2) ceiling mount speaker-strobes.t.i. pa#201710060607. n/a ordinance #155-13 | $2,000 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 550 Kearny St | street spaceDetails
street space | ||
| Oct 6, 2017 | Completed final sign-off Jan 2018 | 550 Kearny St | Skender Construction Llc | 7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a.Details
7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a. | $260,520 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 550 Kearny St | street spaceDetails
street space | ||
| Jun 7, 2017 | Completed final sign-off Jun 2017 | 550 Kearny St | Skyline Construction | suite 100 - revision to pa 2016-1130-3770 ti to existing office space - add door to open office areaDetails
suite 100 - revision to pa 2016-1130-3770 ti to existing office space - add door to open office area | $7,500 |
| May 3, 2017 | Completed final sign-off May 2017 | 550 Kearny St | Bilcor Inc | fire alarm ti install 22 ceiling mount speaker/strobes, install 6 duct detector, install 6 control relays. ref pa 2016-1130-3770 n/a for maher.Details
fire alarm ti install 22 ceiling mount speaker/strobes, install 6 duct detector, install 6 control relays. ref pa 2016-1130-3770 n/a for maher. | $17,000 |
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 550 Kearny St | street spaceDetails
street space | ||
| Jan 23, 2017 | Completed final sign-off May 2017 | 550 Kearny St | R L H Fire Protection Inc | #100- fire sprinkler t.i., upgrade existing system, relocate 20 & add 15 fire sprinklers. t.i. pa#201611303770. n/a ordinance #155-13Details
#100- fire sprinkler t.i., upgrade existing system, relocate 20 & add 15 fire sprinklers. t.i. pa#201611303770. n/a ordinance #155-13 | $10,336 |
| Nov 30, 2016 | Completed final sign-off Jun 2017 | 550 Kearny St | Skyline Construction | suite #100, ground floor - ti to (e) office space demolition of non-structural partitions/non-rated partitions. construction of -nonstructural/non rated partitions. installation of new power/data/security outlets. new lights, new finishesDetails
suite #100, ground floor - ti to (e) office space demolition of non-structural partitions/non-rated partitions. construction of -nonstructural/non rated partitions. installation of new power/data/security outlets. new lights, new finishes | $584,353 |
| Sep 23, 2016 | Never finaled issued May 2017, no final | 550 Kearny St | street spaceDetails
street space | ||
| Aug 31, 2016 | Completed final sign-off Nov 2016 | 550 Kearny St | R.M.R. Construction Company | deferred submittal ref pa 201606301279 lighting & branch circuit. additional branch circuit & raceway system, title 24 maher naDetails
deferred submittal ref pa 201606301279 lighting & branch circuit. additional branch circuit & raceway system, title 24 maher na | $12,800 |
| Aug 16, 2016 | Completed final sign-off Nov 2016 | 550 Kearny St | R.M.R. Construction Company | #710- hvac work under arch. t.i. pa#201606301279, install (1) new fcu, install low pressure ductwork. n/a ordinance #155-13Details
#710- hvac work under arch. t.i. pa#201606301279, install (1) new fcu, install low pressure ductwork. n/a ordinance #155-13 | $21,000 |
| Jul 20, 2016 | Completed final sign-off Aug 2016 | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | 7th floor (e) fire sprinler system - ti- 1 relocated sprinkler, 5 added sprinklers. ref pa 2016-0630-1279. maher naDetails
7th floor (e) fire sprinler system - ti- 1 relocated sprinkler, 5 added sprinklers. ref pa 2016-0630-1279. maher na | $3,000 |
| Jun 30, 2016 | Completed final sign-off Nov 2016 | 550 Kearny St | R.M.R. Construction Company | 7/f #710- t.i. to (e) office space, new non-structural partitions, power and data outlets, reconfiguration of (e) mechanical and electrical systems within tenant space. n/a ordinance #155-13Details
7/f #710- t.i. to (e) office space, new non-structural partitions, power and data outlets, reconfiguration of (e) mechanical and electrical systems within tenant space. n/a ordinance #155-13 | $69,454 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 550 Kearny St | street space and mta parkingDetails
street space and mta parking | ||
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 550 Kearny St | Skyline Construction | renewal of pa# 201311081520 for final inspection only. all work is complete.Details
renewal of pa# 201311081520 for final inspection only. all work is complete. | |
| Apr 28, 2015 | Completed final sign-off May 2015 | 550 Kearny St | Bilcor Inc | 7th flr: fire alarm system tenant improvement. install 11 ceiling mount speaker-strobes. install 1 smoke detector. maher na ref #2015 03 03 9780Details
7th flr: fire alarm system tenant improvement. install 11 ceiling mount speaker-strobes. install 1 smoke detector. maher na ref #2015 03 03 9780 | $4,800 |
| Apr 1, 2015 | Completed final sign-off Apr 2015 | 550 Kearny St | Golden Gate Fire Protection Inc | 7th flr: add 23 fire sprinklers pendents for new offices for suite 710. maher - not req'dDetails
7th flr: add 23 fire sprinklers pendents for new offices for suite 710. maher - not req'd | $11,500 |
| Mar 3, 2015 | Completed final sign-off Sep 2015 | 550 Kearny St | Skyline Construction | new non-structural interior office partitios, power and comm, reconfiguration of mechanical and electrical systems with suite. maher - not req'dDetails
new non-structural interior office partitios, power and comm, reconfiguration of mechanical and electrical systems with suite. maher - not req'd | $572,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 550 Kearny St | Corporate Sign Systems | erect an electric double faced projecting sign. n/a maher ordinanceDetails
erect an electric double faced projecting sign. n/a maher ordinance | $10,000 |
| Feb 5, 2015 | Completed final sign-off Jan 2016 | 550 Kearny St | R.M.R. Construction Company | mechanical demo, retrofit extg vav box and replace extg hot water control valves. new duct and supply grills. new runouts and 2x2 supply grilles, sound boots, new exhaust fan, air & water balance. n/a for the maher.Details
mechanical demo, retrofit extg vav box and replace extg hot water control valves. new duct and supply grills. new runouts and 2x2 supply grilles, sound boots, new exhaust fan, air & water balance. n/a for the maher. | $38,000 |
| Feb 3, 2015 | Completed final sign-off Aug 2015 | 550 Kearny St | Bilcor Inc | penthouse: fire alarm t.i. includes to install 7 smoke detectors and install 3 control relays. n/a for the maher.Details
penthouse: fire alarm t.i. includes to install 7 smoke detectors and install 3 control relays. n/a for the maher. | $4,000 |
| Jan 23, 2015 | Completed final sign-off Feb 2015 | 550 Kearny St | Ayoob & Peery Plumbing Co Inc | sprinklers 1st floor: add and relocate and removed fire sprinkler per t.i. 7 add and 39 relocated and 8 removed. ref app#201501095325. seismic bracing. n/a for the maherDetails
sprinklers 1st floor: add and relocate and removed fire sprinkler per t.i. 7 add and 39 relocated and 8 removed. ref app#201501095325. seismic bracing. n/a for the maher | $23,130 |
| Jan 9, 2015 | Completed final sign-off Dec 2015 | 550 Kearny St | R.M.R. Construction Company | suite #10 lower level: t.i. to (e) office space, new non-structural partitions, power and communication outlets, accessible upgrades to elevator lobby doors, tenant entry doors. maher n/a.Details
suite #10 lower level: t.i. to (e) office space, new non-structural partitions, power and communication outlets, accessible upgrades to elevator lobby doors, tenant entry doors. maher n/a. | $120,000 |
| Dec 23, 2014 | Completed final sign-off Feb 2015 | 550 Kearny St | R L H Fire Protection Inc | sprinklers- remove existing heads in elevator machine room and hoistsways relocate 1 at bottom of shaft per letter dated dec 12, 2014Details
sprinklers- remove existing heads in elevator machine room and hoistsways relocate 1 at bottom of shaft per letter dated dec 12, 2014 | $1,000 |
| Jul 22, 2014 | Completed final sign-off Oct 2014 | 550 Kearny St | Westower Communications | removal of cabinet, antennas, cable tray, coax mounts, radio equipment for nextel. maher 155-13 not requiredDetails
removal of cabinet, antennas, cable tray, coax mounts, radio equipment for nextel. maher 155-13 not required | $10,000 |
| Jun 5, 2014 | Completed final sign-off Aug 2014 | 550 Kearny St | Bilcor Inc | 5/f: install 18 ceiling mount speaker and relocate 2 ceiling mount speaker-strokes. install 5 duct detectors & 3 control relay modules. t.i. ref #2014.0515.5916. compliance with ordinance #155-13 not required.Details
5/f: install 18 ceiling mount speaker and relocate 2 ceiling mount speaker-strokes. install 5 duct detectors & 3 control relay modules. t.i. ref #2014.0515.5916. compliance with ordinance #155-13 not required. | $8,000 |
| May 20, 2014 | Never finaled issued May 2014, no final | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | 5th floor expansion & tenant improvement existing fire sprinkler sytem, 115 sprinklers. ref pa #2013.0909.6268. n/a maher ordinance 155-13.Details
5th floor expansion & tenant improvement existing fire sprinkler sytem, 115 sprinklers. ref pa #2013.0909.6268. n/a maher ordinance 155-13. | $57,500 |
| May 15, 2014 | Completed final sign-off Sep 2014 | 550 Kearny St | R.M.R. Construction Company | 5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13.Details
5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13. | $682,000 |
| Mar 19, 2014 | Completed final sign-off Jan 2015 | 550 Kearny St | R.M.R. Construction Company | provide electrical outlets & wall protection for coffee cart in existing ground floor building lobby. provide fire extinguisher per sffd. compliance with ordinance #155-13 not requiredDetails
provide electrical outlets & wall protection for coffee cart in existing ground floor building lobby. provide fire extinguisher per sffd. compliance with ordinance #155-13 not required | $10,000 |
| Mar 13, 2014 | Completed final sign-off Dec 2014 | 550 Kearny St | R.M.R. Construction Company | addition of an auto door opener at building entrance. compliance with ordinance no 155-13 not required.Details
addition of an auto door opener at building entrance. compliance with ordinance no 155-13 not required. | $10,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 550 Kearny St | Bilcor Inc | install 4 smoke detectors and relocate 4 existing smoke detectors.Details
install 4 smoke detectors and relocate 4 existing smoke detectors. | $3,200 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 550 Kearny St | Skyline Construction | 3rd floor suite 330 - new lighting. ref pa #2013.0909.6265.Details
3rd floor suite 330 - new lighting. ref pa #2013.0909.6265. | $500 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 550 Kearny St | Skyline Construction | 10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit.Details
10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit. | $7,000 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 550 Kearny St | Skyline Construction | 5th floor suite 500 - new electrical work for tenant improvement to include new lighting. ref pa #2013.0909.6268.Details
5th floor suite 500 - new electrical work for tenant improvement to include new lighting. ref pa #2013.0909.6268. | $1,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 550 Kearny St | Golden Gate Fire Protection Inc | 3rd & 5th floors-relocate 18 upright sprinklers on the 3rd fl. relocate 15 upright sprinklersDetails
3rd & 5th floors-relocate 18 upright sprinklers on the 3rd fl. relocate 15 upright sprinklers | $16,995 |
| Oct 15, 2013 | Never finaled issued Oct 2013, no final | 550 Kearny St | Bilcor Inc | install 4 speaker strobes ti 201309096228. 201309096265Details
install 4 speaker strobes ti 201309096228. 201309096265 | $2,000 |
| Sep 9, 2013 | Never finaled issued Oct 2013, no final | 550 Kearny St | Skyline Construction | 3r floor:minor demolition of partions and ceiling, capping /termination of electrical outlet, lighting, finishes, patching or affected areas.Details
3r floor:minor demolition of partions and ceiling, capping /termination of electrical outlet, lighting, finishes, patching or affected areas. | $12,000 |
| Sep 9, 2013 | Never finaled issued Oct 2013, no final | 550 Kearny St | Skyline Construction | 5th floor:commercial t.i. for market ready space.minor demolition of partions, doors & frames, lighting, and finishes. restroom upgrade. no mech and no structural work.Details
5th floor:commercial t.i. for market ready space.minor demolition of partions, doors & frames, lighting, and finishes. restroom upgrade. no mech and no structural work. | $48,000 |
| Jun 4, 2013 | Completed final sign-off Jul 2013 | 550 Kearny St | Bilcor Inc | install 16 control relays for new actuators installed under separate electrical permit.Details
install 16 control relays for new actuators installed under separate electrical permit. | $6,000 |
| May 24, 2013 | Never finaled issued May 2013, no final | 550 Kearny St | Bilcor Inc | fire alarm: install 1 booster panel, 35 ceiling mount speaker strobes, 4 wall mount speaker strobes, relocate 2 smoke detectors, 6 smoke detectorsDetails
fire alarm: install 1 booster panel, 35 ceiling mount speaker strobes, 4 wall mount speaker strobes, relocate 2 smoke detectors, 6 smoke detectors | $20,000 |
| May 20, 2013 | Completed final sign-off Jul 2013 | 550 Kearny St | Pribuss Engineering Inc | 6th floor fiew sprinkler t.i. - 300 fire sprinkler heads, ref pa #2012.03.05.5351Details
6th floor fiew sprinkler t.i. - 300 fire sprinkler heads, ref pa #2012.03.05.5351 | $154,386 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 550 Kearny St | Dpr Construction | clarify lobby walls & glass enclosure as complying with section 708.14.1 exception #5, per building inspector request via ab-005. revision to pa# 2013-0314-2182Details
clarify lobby walls & glass enclosure as complying with section 708.14.1 exception #5, per building inspector request via ab-005. revision to pa# 2013-0314-2182 | |
| Mar 14, 2013 | Completed final sign-off Aug 2013 | 550 Kearny St | Dpr Construction | revision to approved pa# 201203055351; revise partition layout, ceiling layout, casework and finishes; revise mech and electrical, fire alarm & sprinkler under separate permit.Details
revision to approved pa# 201203055351; revise partition layout, ceiling layout, casework and finishes; revise mech and electrical, fire alarm & sprinkler under separate permit. | |
| Mar 5, 2013 | Expired or cancelled cancelled Jan 2026 | 550 Kearny St | revision to pa# 2012-0305-5351-remove (e) monocote fireproofing on a selection of steel structural members & replacing with intunescent fireproofing.Details
revision to pa# 2012-0305-5351-remove (e) monocote fireproofing on a selection of steel structural members & replacing with intunescent fireproofing. | $24,000 | |
| Feb 21, 2013 | Completed final sign-off May 2013 | 550 Kearny St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 147 pendent sprinklers heads on the 10th fl. relocate 29 pendents on the 2nd flr & relocate 24 pendents on the 1st floor- new bracing clac's and locationsDetails
fire sprinkler system upgrade, relocate 147 pendent sprinklers heads on the 10th fl. relocate 29 pendents on the 2nd flr & relocate 24 pendents on the 1st floor- new bracing clac's and locations | $103,000 |
| Feb 8, 2013 | Completed final sign-off Mar 2013 | 550 Kearny St | C B F Inc | 2nd floor-install 6 ceiling mount speaker/strobes, replace 3 speaker with speaker/strobes, remove 1 speaker, remove 5 strobes & remove 1 speaker/strobe. ti pa# 2013-0131-9240Details
2nd floor-install 6 ceiling mount speaker/strobes, replace 3 speaker with speaker/strobes, remove 1 speaker, remove 5 strobes & remove 1 speaker/strobe. ti pa# 2013-0131-9240 | $3,600 |
| Feb 8, 2013 | Completed final sign-off Mar 2013 | 550 Kearny St | C B F Inc | 10th floor-install 30 ceiling mount speaker/strobes, install 3 ceiling speakers, install 4 smoke detectors with base & install 2 control relays. ti pa# 2013-0131-9240Details
10th floor-install 30 ceiling mount speaker/strobes, install 3 ceiling speakers, install 4 smoke detectors with base & install 2 control relays. ti pa# 2013-0131-9240 | $15,000 |
| Jan 31, 2013 | Completed final sign-off Mar 2013 | 550 Kearny St | C B F Inc | ground floor -install 2 duct detectors, 1 control relay, 2 speaker/strobes, replace 2 strobes with speaker/strobe, relocate 1 pull station.Details
ground floor -install 2 duct detectors, 1 control relay, 2 speaker/strobes, replace 2 strobes with speaker/strobe, relocate 1 pull station. | $3,500 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 550 Kearny St | R.M.R. Construction Company | 6th floor:barrier removal work only. new drywall partition, replace accessible stall partition, replace countertop and sinks.Details
6th floor:barrier removal work only. new drywall partition, replace accessible stall partition, replace countertop and sinks. | $5,000 |
| Nov 26, 2012 | Completed final sign-off May 2013 | 550 Kearny St | Skyline Construction | 2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit).Details
2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit). | $175,000 |
| Nov 19, 2012 | Completed final sign-off May 2013 | 550 Kearny St | 10th floor-minor demolition, new construction-partitions, doors & frames, ceiling, casework, finishes, electrical & mechanical. fire alarm under seperate permit.Details
10th floor-minor demolition, new construction-partitions, doors & frames, ceiling, casework, finishes, electrical & mechanical. fire alarm under seperate permit. | $940,000 | |
| Nov 19, 2012 | Never finaled issued Dec 2012, no final | 550 Kearny St | ground floor-electrical & mechanical-new fan coil units, new outside air, exhaust air. new lighting & power/data. ti pa# 2012-1002-1124Details
ground floor-electrical & mechanical-new fan coil units, new outside air, exhaust air. new lighting & power/data. ti pa# 2012-1002-1124 | $50,000 | |
| Nov 16, 2012 | Completed final sign-off Apr 2013 | 550 Kearny St | Maguire Inc Dba Lahue And Associates | ground floor. evacuation sign (1)Details
ground floor. evacuation sign (1) | $300 |
| Oct 2, 2012 | Completed final sign-off May 2013 | 550 Kearny St | Skyline Construction | ground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permitDetails
ground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permit | $250,000 |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 550 Kearny St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 146 pendant sprinkler heads. delete 10 heads. upgrade earthquake bracing.Details
fire sprinkler system upgrade; relocate 146 pendant sprinkler heads. delete 10 heads. upgrade earthquake bracing. | $75,190 |
| Jul 24, 2012 | Completed final sign-off Jun 2013 | 550 Kearny St | Golden Gate Fire Protection Inc | 7th floor-fire sprinkler system upgrade-relocate 67 pendent sprinkler headsDetails
7th floor-fire sprinkler system upgrade-relocate 67 pendent sprinkler heads | $34,505 |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 550 Kearny St | C B F Inc | 8th floor: install 32 speaker strobes, 1 booser panel, 1 smoke detector, 1 control relay, 2 duct detectors, 1 signal module, 1 pan relayDetails
8th floor: install 32 speaker strobes, 1 booser panel, 1 smoke detector, 1 control relay, 2 duct detectors, 1 signal module, 1 pan relay | $20,000 |
| Jul 10, 2012 | Expired or cancelled cancelled Jan 2026 | 550 Kearny St | intall 32 speaker-strobes, 1 booster panel, 1 signal module, intaall 2 duct detectors, 1 smoke detector, install 2 control relay, 2 emergency release pull stations, install 1 pam relay.Details
intall 32 speaker-strobes, 1 booster panel, 1 signal module, intaall 2 duct detectors, 1 smoke detector, install 2 control relay, 2 emergency release pull stations, install 1 pam relay. | $20,000 | |
| Jul 10, 2012 | Completed final sign-off Mar 2013 | 550 Kearny St | C B F Inc | install 11 speaker-strobes on ground floorDetails
install 11 speaker-strobes on ground floor | $3,500 |
| Jul 9, 2012 | Expired or cancelled cancelled Sep 2023 | 550 Kearny St | C B F Inc | install 11 speaker-strobesDetails
install 11 speaker-strobes | $3,500 |
| Jul 9, 2012 | Expired or cancelled cancelled Sep 2023 | 550 Kearny St | C B F Inc | install 32 speaker strobes, 1 booster panel. install 2 duct detectors, 1 smoke detector, install 2 control realy, 1 signal module. install 2 emergency release pull stations. install 1 pan relay.Details
install 32 speaker strobes, 1 booster panel. install 2 duct detectors, 1 smoke detector, install 2 control realy, 1 signal module. install 2 emergency release pull stations. install 1 pan relay. | $20,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 550 Kearny St | Skyline Construction | tenant improvement in the 7th floor, ste. 700; 7th floor restroom upgrade; minor demolition & new construction; new work includes partitions, doors and frames, finishes, lighting, ceiling, electrical & mechanical. sprinkler & fa under separate permit.Details
tenant improvement in the 7th floor, ste. 700; 7th floor restroom upgrade; minor demolition & new construction; new work includes partitions, doors and frames, finishes, lighting, ceiling, electrical & mechanical. sprinkler & fa under separate permit. | $500,000 |
| Jun 21, 2012 | Completed final sign-off Aug 2012 | 550 Kearny St | C B F Inc | 7th floor-install 13 speaker/strobes & install 1 strobeDetails
7th floor-install 13 speaker/strobes & install 1 strobe | $6,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Carter Brothers Fire & Life Safety | 3rd & 4th floors-as builts for pa# 2012-0208-3791Details
3rd & 4th floors-as builts for pa# 2012-0208-3791 | |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Carter Brothers Fire & Life Safety | 4th floor-install new devices in a new t.i space-this will be added to an (e) fire alarm system (t.i pa# 2012-0405-9805). 31 speaker/strobes, 6 control relays, 3 smoke detectors, 4 duct detectors, 1 new fsd to be installed by others.Details
4th floor-install new devices in a new t.i space-this will be added to an (e) fire alarm system (t.i pa# 2012-0405-9805). 31 speaker/strobes, 6 control relays, 3 smoke detectors, 4 duct detectors, 1 new fsd to be installed by others. | $27,000 |
| Jun 6, 2012 | Completed final sign-off Oct 2012 | 550 Kearny St | Skyline Construction | interior tenant improvement on 2 floors, minor demo, new partitions, doors, frames, ceiling, finishes, electrical and mechanical. fire alarm and sprinkler under separate permitDetails
interior tenant improvement on 2 floors, minor demo, new partitions, doors, frames, ceiling, finishes, electrical and mechanical. fire alarm and sprinkler under separate permit | $925,000 |
| May 18, 2012 | Expired or cancelled cancelled Jan 2026 | 550 Kearny St | ground floor-tenant improvement on ground floor/add retail space-work includes partitions, doors, frames, ceiling, lighting & finishes. mechanical & electrical deferred submittal. sprinkler & fire alarm under seperate permitDetails
ground floor-tenant improvement on ground floor/add retail space-work includes partitions, doors, frames, ceiling, lighting & finishes. mechanical & electrical deferred submittal. sprinkler & fire alarm under seperate permit | $252,000 | |
| May 4, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Skyline Construction | 4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit.Details
4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit. | |
| Mar 20, 2012 | Expired or cancelled cancelled Jul 2013 | 550 Kearny St | Carter Brothers Fire & Life Safety | 6th floor-add new fire alarm devices to an (e) fire alarm system in a new tenant space-1 smoke detector & 3 duct detector, 26 speaker strobes & 2 strobes.Details
6th floor-add new fire alarm devices to an (e) fire alarm system in a new tenant space-1 smoke detector & 3 duct detector, 26 speaker strobes & 2 strobes. | $7,900 |
| Mar 8, 2012 | Completed final sign-off Jun 2012 | 550 Kearny St | Golden Gate Fire Protection Inc | 3rd & 4th floors-fire sprinkler system upgrade, relocate 24 pendent sprinkler heads & 30 upright heads on 3rd floor. relocate 55 pendent sprinkler heads on 4th floorDetails
3rd & 4th floors-fire sprinkler system upgrade, relocate 24 pendent sprinkler heads & 30 upright heads on 3rd floor. relocate 55 pendent sprinkler heads on 4th floor | $60,000 |
| Mar 5, 2012 | Completed final sign-off Aug 2013 | 550 Kearny St | 6th floor-demolition of non-load bearing walls, new construction partitions, frames, ceiling, doors, casework, finishes, electrical & mechanical work. fire alarm, sprinkler under seperate permitDetails
6th floor-demolition of non-load bearing walls, new construction partitions, frames, ceiling, doors, casework, finishes, electrical & mechanical work. fire alarm, sprinkler under seperate permit | $725,000 | |
| Feb 8, 2012 | Never finaled issued Feb 2012, no final | 550 Kearny St | Carter Brothers Fire & Life Safety | add new fire alarm devices to existing fa system in a new ti space. (ti201201182433) this includes 39 speaker strobes, 2 strobes, 1 smoke detector, 4 duct detectors, 5 control modulesDetails
add new fire alarm devices to existing fa system in a new ti space. (ti201201182433) this includes 39 speaker strobes, 2 strobes, 1 smoke detector, 4 duct detectors, 5 control modules | $11,785 |
| Jan 23, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Skyline Construction | mechanical, electrical & plumbing work as deferrred submittal to pa#201201182433. fire alarm & sprinkler under seperate permitDetails
mechanical, electrical & plumbing work as deferrred submittal to pa#201201182433. fire alarm & sprinkler under seperate permit | $400,000 |
| Jan 18, 2012 | Completed final sign-off Jul 2012 | 550 Kearny St | Skyline Construction | commercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit.Details
commercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit. | $695,000 |
| Dec 7, 2011 | Completed final sign-off May 2013 | 550 Kearny St | Giampolini & Co Dba Giampolini/Courtney | install new steel frame trellis over main entry & east half of front elevation exterior work onlyDetails
install new steel frame trellis over main entry & east half of front elevation exterior work only | $85,000 |
| Nov 30, 2011 | Never finaled issued Dec 2011, no final | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | 1st floor-fire sprinkler system, 158 sprinklersDetails
1st floor-fire sprinkler system, 158 sprinklers | $79,000 |
| Oct 21, 2011 | Completed final sign-off Apr 2012 | 550 Kearny St | Peacock Construction Inc | office ti at ground fl. voluntary accessibility upgrades. (n) entry door operators, (n) accessibility lift, relocation of door, no increase in area, no change in occup or use. mep under separate permitDetails
office ti at ground fl. voluntary accessibility upgrades. (n) entry door operators, (n) accessibility lift, relocation of door, no increase in area, no change in occup or use. mep under separate permit | $47,000 |
| Sep 14, 2011 | Never finaled issued Sep 2011, no final | 550 Kearny St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 13, 2011 | Never finaled filed Sep 2011, never issued | 550 Kearny St | Details
| $93,000,000 | |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | 10th floor:fire sprinklers .sprinkler system. 266 sprinklers and new piping with calculations- including window protection windows- space has no ceilingDetails
10th floor:fire sprinklers .sprinkler system. 266 sprinklers and new piping with calculations- including window protection windows- space has no ceiling | $12,500 |
| Jul 28, 2011 | Completed final sign-off Apr 2013 | 550 Kearny St | Giampolini & Co Dba Giampolini/Courtney | remodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit)Details
remodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit) | $250,000 |
| Jun 9, 2011 | Never finaled issued Jun 2011, no final | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system 267 upright sprinklers and 6 pendent sprinklers at 4th floorDetails
fire sprinkler system 267 upright sprinklers and 6 pendent sprinklers at 4th floor | $86,000 |
| Jun 9, 2011 | Completed final sign-off Aug 2011 | 550 Kearny St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system 127 upright sprinklers and 6 pendent sprinklers at 5th floor- using 4th floor claculations- new seismic bracing. hydro requiredDetails
fire sprinkler system 127 upright sprinklers and 6 pendent sprinklers at 5th floor- using 4th floor claculations- new seismic bracing. hydro required | $16,400 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.Details
5th floor - demolition backc to core & shell - south side of floor, ref to ab-017. | $50,000 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.Details
5th floor - demolition backc to core & shell - south side of floor, ref to ab-017. | $50,000 |
| Apr 29, 2011 | Completed final sign-off Nov 2011 | 550 Kearny St | R.M.R. Construction Company | 10th floor - demolition back to core & shell - full floor, ref to ab-017.Details
10th floor - demolition back to core & shell - full floor, ref to ab-017. | $50,000 |
| Mar 15, 2011 | Never finaled issued Mar 2011, no final | 550 Kearny St | R.M.R. Construction Company | demolition only of part of ground floor per ab-017.Details
demolition only of part of ground floor per ab-017. | $50,000 |
| Jul 20, 2010 | Never finaled issued Aug 2010, no final | 550 Kearny St | Carter Brothers Fire & Life Safety | fire alarm system upgrade. replace the old edwards fa system with a new edwards est 3 system. bring all core areas up to code. a cap has been approved for tenant areas.Details
fire alarm system upgrade. replace the old edwards fa system with a new edwards est 3 system. bring all core areas up to code. a cap has been approved for tenant areas. | $82,000 |
| Jun 17, 2009 | Never finaled issued Oct 2009, no final | 550 Kearny St | Donnelly Kerley Builders Inc. | elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements.Details
elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements. | $105,000 |
| May 15, 2009 | Expired or cancelled cancelled Jun 2010 | 550 Kearny St | Carter Brothers Fire & Life Safety | fire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the sameDetails
fire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the same | $74,000 |
| Mar 23, 2009 | Completed final sign-off Jul 2009 | 550 Kearny St | Artsigns | erect new projecting electric single faced sign.Details
erect new projecting electric single faced sign. | $8,750 |
| Jan 16, 2009 | Completed final sign-off Feb 2009 | 550 Kearny St | show as built conditions of existing restroom. correct door swing in mens room accessible stall. original appl. 200810144055.Details
show as built conditions of existing restroom. correct door swing in mens room accessible stall. original appl. 200810144055. | ||
| Nov 21, 2008 | Completed final sign-off Feb 2009 | 550 Kearny St | C B F Inc | basement-life safety work-add 7 new strobes, 3 new speakersDetails
basement-life safety work-add 7 new strobes, 3 new speakers | $4,500 |
| Nov 10, 2008 | Completed final sign-off Feb 2009 | 550 Kearny St | electrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055Details
electrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055 | $50,000 | |
| Oct 14, 2008 | Completed final sign-off Feb 2009 | 550 Kearny St | includes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit.Details
includes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit. | $175,000 | |
| Oct 3, 2008 | Never finaled issued Oct 2008, no final | 550 Kearny St | street space onlyDetails
street space only | ||
| Jul 7, 2008 | Never finaled issued Jul 2008, no final | 550 Kearny St | R L H Fire Protection Inc | umbrella permit - compliance with high-rise sprinkler ordinance #377-93.Details
umbrella permit - compliance with high-rise sprinkler ordinance #377-93. | $400 |
| Jun 10, 2008 | Completed final sign-off Jul 2008 | 550 Kearny St | C B F Inc | 1st floor - life safety system modifications @ social security admin., furnish & install approx 10 devices. install new & replace (e) devices with code complaint devices.Details
1st floor - life safety system modifications @ social security admin., furnish & install approx 10 devices. install new & replace (e) devices with code complaint devices. | $5,500 |
| Jun 5, 2008 | Never finaled issued Jun 2008, no final | 550 Kearny St | street space permit only.Details
street space permit only. | ||
| May 14, 2008 | Expired or cancelled cancelled Jan 2026 | 550 Kearny St | 1st floor: life safety system- furnish, install new and replace existing devices with code compliance devices.Details
1st floor: life safety system- furnish, install new and replace existing devices with code compliance devices. | $5,500 | |
| Apr 30, 2008 | Expired or cancelled expired Jul 2009 | 550 Kearny St | R L H Fire Protection Inc | ti upgrade on ex. sprinkler system. add 16 head and relocate 13 heads at various locations in the bldgDetails
ti upgrade on ex. sprinkler system. add 16 head and relocate 13 heads at various locations in the bldg | $6,400 |
| Feb 22, 2008 | Completed final sign-off Jul 2008 | 550 Kearny St | Matrix Hg Inc | modify e hvac systems duct layout, add n 2/2 serving interview room, including assoc d/w and refer piping. ref oti 200704178937Details
modify e hvac systems duct layout, add n 2/2 serving interview room, including assoc d/w and refer piping. ref oti 200704178937 | $30,341 |
| Feb 21, 2008 | Completed final sign-off Jul 2008 | 550 Kearny St | Bcci Construction Company | revision to pa# 200710155412-fabricate and install new eyebrow feature and dental elements on building faceDetails
revision to pa# 200710155412-fabricate and install new eyebrow feature and dental elements on building face | $5,000 |
| Feb 19, 2008 | Never finaled issued Feb 2008, no final | 550 Kearny St | street space onlyDetails
street space only | ||
| Feb 19, 2008 | Completed final sign-off Jul 2008 | 550 Kearny St | Thomas Swan Sign Co Inc | non-electric, projecting & single faced address sign.Details
non-electric, projecting & single faced address sign. | $2,000 |
| Jan 29, 2008 | Completed final sign-off Jun 2008 | 550 Kearny St | C B F Inc | 3rd floor - provide receptacles and lighting for the office space, also provide title 24 calculations. ref. appl.# 2007-1024-6273Details
3rd floor - provide receptacles and lighting for the office space, also provide title 24 calculations. ref. appl.# 2007-1024-6273 | $13,000 |
| Jan 24, 2008 | Completed final sign-off Jun 2008 | 550 Kearny St | C B F Inc | install total 13 new strobes on 3rd floor. 1 new smoke detector, 10 speaker/strobe, 3 strobes.Details
install total 13 new strobes on 3rd floor. 1 new smoke detector, 10 speaker/strobe, 3 strobes. | $6,000 |
| Jan 7, 2008 | Completed final sign-off Jun 2008 | 550 Kearny St | Ayoob & Peery Plumbing Co Inc | relocate 34 sprinkler heads for ti on the 3rd floor.Details
relocate 34 sprinkler heads for ti on the 3rd floor. | $3,300 |
| Nov 30, 2007 | Completed final sign-off Mar 2008 | 550 Kearny St | C B F Inc | 2nd floor ste #250: life safety system verifications, furnish & install 1 speaker strobe light, 3 strobes, & 2 speakers.Details
2nd floor ste #250: life safety system verifications, furnish & install 1 speaker strobe light, 3 strobes, & 2 speakers. | $2,500 |
| Nov 20, 2007 | Completed final sign-off Mar 2008 | 550 Kearny St | Allied Fire Protection | 2nd floor: relocate 7 fire sprinklersDetails
2nd floor: relocate 7 fire sprinklers | $3,100 |
| Oct 24, 2007 | Completed final sign-off Jun 2008 | 550 Kearny St | Bcci Construction Company | t/i suite 300 a&b, restrooms: new walls & doors ,relocate restroom fixtures. mep under separate applicationDetails
t/i suite 300 a&b, restrooms: new walls & doors ,relocate restroom fixtures. mep under separate application | $180,000 |
| Oct 24, 2007 | Completed final sign-off Mar 2008 | 550 Kearny St | Bcci Construction Company | t/i suite 200: new conference room, office and open office, millwork . mep under sep. application.Details
t/i suite 200: new conference room, office and open office, millwork . mep under sep. application. | $70,000 |
| Oct 15, 2007 | Completed final sign-off Jul 2008 | 550 Kearny St | Bcci Construction Company | limited replacement of exterior finish panels cladding and awnings, including rain leaders and lightingDetails
limited replacement of exterior finish panels cladding and awnings, including rain leaders and lighting | $480,000 |
| Sep 4, 2007 | Never finaled issued Sep 2007, no final | 550 Kearny St | street spaceDetails
street space | ||
| Aug 24, 2007 | Never finaled issued Aug 2007, no final | 550 Kearny St | street space permit only.Details
street space permit only. | ||
| Aug 23, 2007 | Never finaled issued Aug 2007, no final | 550 Kearny St | Bcci Construction Company | demo only - b/1/3/4/7/8/10 floors only - ls and sp to remain functional. - areas to remain unoccupied per ab-017Details
demo only - b/1/3/4/7/8/10 floors only - ls and sp to remain functional. - areas to remain unoccupied per ab-017 | $50,000 |
| May 16, 2007 | Completed final sign-off Jun 2007 | 550 Kearny St | Almer Corp. | rev. to 2007/03/26/7251: install single low drinking fountain in (e) alcove per inspector's request. administrative paper change only. approved & priced on previous aopplic. #2007/02/08/3668.Details
rev. to 2007/03/26/7251: install single low drinking fountain in (e) alcove per inspector's request. administrative paper change only. approved & priced on previous aopplic. #2007/02/08/3668. | |
| Apr 17, 2007 | Completed final sign-off Jul 2008 | 550 Kearny St | beth hanson, oti-1, 1st floor.Details
beth hanson, oti-1, 1st floor. | $31,000 | |
| Mar 26, 2007 | Completed final sign-off Jun 2007 | 550 Kearny St | Almer Corp. | administrative permit revision. remove drinking fountain per original app #200702083668/new hi low fountain under separate permit at a later date.Details
administrative permit revision. remove drinking fountain per original app #200702083668/new hi low fountain under separate permit at a later date. | |
| Feb 8, 2007 | Completed final sign-off Jun 2007 | 550 Kearny St | Almer Corp. | administrative permit based on appl#200611178003 to perform plumbing & electrical for purpose of acquiring a plumbing & electrical permits to perform all trades. all work remains the same. no change to appl#200611178003. all work to be performed on 9/fDetails
administrative permit based on appl#200611178003 to perform plumbing & electrical for purpose of acquiring a plumbing & electrical permits to perform all trades. all work remains the same. no change to appl#200611178003. all work to be performed on 9/f | $13,500 |
| Jan 16, 2007 | Completed final sign-off Mar 2007 | 550 Kearny St | C B F Inc | life safety system modifications at 550 kearny 9th fl installing 1 power supply, 1 dual sq module 15 wall mounted stocks , 1 ceiling mounted strobe, 15 speakers, 1manual pull station, 2 smoke detectors, 2 boxesDetails
life safety system modifications at 550 kearny 9th fl installing 1 power supply, 1 dual sq module 15 wall mounted stocks , 1 ceiling mounted strobe, 15 speakers, 1manual pull station, 2 smoke detectors, 2 boxes | $18,000 |
| Jan 9, 2007 | Completed final sign-off Mar 2007 | 550 Kearny St | R L H Fire Protection Inc | t.i upgrade on fire spkr sys. dwa 9th flr (#3334) reloc-32, add-2, delete-2.Details
t.i upgrade on fire spkr sys. dwa 9th flr (#3334) reloc-32, add-2, delete-2. | $6,800 |
| Jan 9, 2007 | Completed final sign-off Mar 2007 | 550 Kearny St | Pankow Special Projects Lp | oti-2 lt me floor 9Details
oti-2 lt me floor 9 | $95,000 |
| Nov 27, 2006 | Never finaled issued Nov 2006, no final | 550 Kearny St | demolish interior non bearing walls and suspended ceiling at portion of floors.Details
demolish interior non bearing walls and suspended ceiling at portion of floors. | $24,000 | |
| Nov 17, 2006 | Completed final sign-off Mar 2007 | 550 Kearny St | Pankow Special Projects Lp | oti-1 9th/fl-el, me,ls,sp.Details
oti-1 9th/fl-el, me,ls,sp. | $250,000 |
| Nov 7, 2006 | Never finaled issued Nov 2006, no final | 550 Kearny St | demo interior non bearing walls and portiion suspended ceiling at north suite on 3rd floorDetails
demo interior non bearing walls and portiion suspended ceiling at north suite on 3rd floor | $12,500 | |
| Nov 2, 2006 | Never finaled issued Nov 2006, no final | 550 Kearny St | Pankow Special Projects Lp | 9th floor-non structural demolition within the t.i. space, 950 & 980.Details
9th floor-non structural demolition within the t.i. space, 950 & 980. | $25,000 |
| Apr 14, 2004 | Never finaled issued Apr 2004, no final | 550 Kearny St | Signs America Inc Dba Sign A Rama | erect electric projecting multi faced signDetails
erect electric projecting multi faced sign | |
| Nov 4, 2003 | Completed final sign-off Nov 2004 | 550 Kearny St | L.D. Strobel Co Ltd | installation of an unoccupied telecommunications facility & antenna on the roofDetails
installation of an unoccupied telecommunications facility & antenna on the roof | $50,000 |
| May 20, 2003 | Expired or cancelled cancelled Apr 2004 | 550 Kearny St | Cahill Const Service Inc | oti-4 3rd fl. elDetails
oti-4 3rd fl. el | $16,000 |
| May 16, 2003 | Completed final sign-off Nov 2003 | 550 Kearny St | Cahill Const Service Inc | oti-3 = l/s (3rd fl only)Details
oti-3 = l/s (3rd fl only) | $16,000 |
| May 9, 2003 | Completed final sign-off Nov 2003 | 550 Kearny St | Cahill Const Service Inc | oti-2, 3rd floor, me, spDetails
oti-2, 3rd floor, me, sp | $52,000 |
| Mar 26, 2003 | Never finaled issued Apr 2003, no final | 550 Kearny St | Cahill Const Service Inc | oti-2, 9th fl, le, me, ls, spDetails
oti-2, 9th fl, le, me, ls, sp | $21,500 |
| Mar 10, 2003 | Completed final sign-off Nov 2003 | 550 Kearny St | Cahill Const Service Inc | oti-1 3rd fl. el, me, lsDetails
oti-1 3rd fl. el, me, ls | $225,000 |
| Mar 4, 2003 | Never finaled issued Mar 2003, no final | 550 Kearny St | Cahill Const Service Inc | oti-1 9th fl el,me, ls, spDetails
oti-1 9th fl el,me, ls, sp | $68,000 |
| Oct 18, 2002 | Expired or cancelled cancelled Jun 2003 | 550 Kearny St | Cahill Const Service Inc | oti- 6th floor l/sDetails
oti- 6th floor l/s | $52,000 |
| Sep 27, 2002 | Completed final sign-off Feb 2003 | 550 Kearny St | Cahill Const Service Inc | oti-3 6th floor, me, spDetails
oti-3 6th floor, me, sp | $12,000 |
| Sep 23, 2002 | Completed final sign-off Feb 2003 | 550 Kearny St | Cahill Const Service Inc | oti-2, 6th floor, el, lsDetails
oti-2, 6th floor, el, ls | $16,000 |
| Sep 6, 2002 | Completed final sign-off Feb 2003 | 550 Kearny St | Cahill Const Service Inc | oti-1 6th floor, el, me, lsDetails
oti-1 6th floor, el, me, ls | $25,000 |
| Apr 10, 2002 | Completed final sign-off Jul 2002 | 550 Kearny St | Cahill Const Service Inc | renew expired permit 200007135038 for final inspectionDetails
renew expired permit 200007135038 for final inspection | |
| Feb 8, 2002 | Completed final sign-off Apr 2002 | 550 Kearny St | Cahill Const Service Inc | revision to app #200201096510 and 200009140556 permit for verification purposes onlyDetails
revision to app #200201096510 and 200009140556 permit for verification purposes only | |
| Jan 25, 2002 | Completed final sign-off Apr 2002 | 550 Kearny St | Cahill Const Service Inc | oti-2 - 1st floor el, me, l/ss, spDetails
oti-2 - 1st floor el, me, l/ss, sp | $49,500 |
| Jan 9, 2002 | Completed final sign-off Apr 2002 | 550 Kearny St | Cahill Const Service Inc | oti-1 gr fl el, me,sp,lsDetails
oti-1 gr fl el, me,sp,ls | $85,000 |
| Oct 11, 2001 | Completed final sign-off Dec 2001 | 540 Kearny St | Cahill Const Service Inc | oti-2,grd flr,ls,sprDetails
oti-2,grd flr,ls,spr | $12,000 |
| Aug 16, 2001 | Completed final sign-off Dec 2001 | 540 Kearny St | Cahill Const Service Inc | oti-1 ground floor, ltg, mechDetails
oti-1 ground floor, ltg, mech | $39,000 |
| Jan 23, 2001 | Expired or cancelled expired Jul 2001 | 550 Kearny St | street space permitDetails
street space permit | ||
| Sep 14, 2000 | Completed final sign-off Apr 2002 | 550 Kearny St | Cahill Const Service Inc | interior non-structural demolition only under this permit. demolition of approx. 480 lf of drywallDetails
interior non-structural demolition only under this permit. demolition of approx. 480 lf of drywall | $18,500 |
| Sep 14, 2000 | Completed final sign-off Dec 2001 | 550 Kearny St | Cahill Const Service Inc | oti 2 ground fl, ltg, mech, spr, ls.Details
oti 2 ground fl, ltg, mech, spr, ls. | $21,000 |
| Jul 13, 2000 | Completed final sign-off Jul 2002 | 550 Kearny St | Cahill Const Service Inc | work to be completed on the 9th floor, demolition of 300 lf ot drywall partitionsDetails
work to be completed on the 9th floor, demolition of 300 lf ot drywall partitions | $3,000 |
| May 11, 2000 | Completed final sign-off Dec 2001 | 550 Kearny St | Cahill Const Service Inc | oti-1 el, me, l/s, sp 1st floorDetails
oti-1 el, me, l/s, sp 1st floor | $61,500 |