Permit GraphShortlistSan Francisco building permits since 2000

Block 0240, lot 016

550 Kearny St

City’s use
Commercial Office
Built
1975
Stories
10
Units
1
Rooms
14 bathrooms
Building
193,172 sq ft
Lot
18,732 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

189 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 9, 2026In progress
issued Jun 2026
550 Kearny StSource Planning And Construction Inc5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.
Details
Permit
202606092869
Status
issued
Filed
Jun 9, 2026
Permit issued
Jun 10, 2026
Declared cost
$75,000
Address
550 Kearny St

5/f suite 500: mechanical modifications to accommodate layout changes. new vav box, ductwork, and hot water piping with insulation as needed. new power and signal devices throughout. title 24 compliant lighting and controls. ref permit 202604099141.

Open the permit page

$75,000
Jun 5, 2026In progress
filed Jun 2026, not yet issued
550 Kearny StSource Planning And Construction Inc5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.
Details
Permit
202606052686
Status
filed
Filed
Jun 5, 2026
Address
550 Kearny St

5/f (ste 500) revision to pa# 202604099141: removal of path of travel and restroom scope that will not be upgraded because of the project valuations less than the 2026 evaluation threshold. removal of hard lid ceiling and change of wall type from rated to non rated at corridor 528.

Open the permit page

Apr 9, 2026In progress
issued Apr 2026
550 Kearny StSource Planning And Construction Incselective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.
Details
Permit
202604099141
Status
issued
Filed
Apr 9, 2026
Permit issued
Apr 28, 2026
Declared cost
$135,000
Address
550 Kearny St

selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.

Open the permit page

$135,000
Mar 12, 2026In progress
filed Mar 2026, not yet issued
550 Kearny Staddition of penthouse roof terrace: new elevator/lobby, restrooms, landscaped area, exterior paver system, outdoor furniture & amenity casework, perimeter fencing, & upgrades to (e) exterior stairs & wall finishes. selective demo of non-structural/structural partitions, floors, doors, ceilings.
Details
Permit
202512222379
Status
filed
Filed
Mar 12, 2026
Declared cost
$2,725,800
Address
550 Kearny St

addition of penthouse roof terrace: new elevator/lobby, restrooms, landscaped area, exterior paver system, outdoor furniture & amenity casework, perimeter fencing, & upgrades to (e) exterior stairs & wall finishes. selective demo of non-structural/structural partitions, floors, doors, ceilings.

Open the permit page

$2,725,800
Jun 12, 2025In progress
filed Jun 2025, not yet issued
550 Kearny Stlevel 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.
Details
Permit
202506128606
Status
filed
Filed
Jun 12, 2025
Declared cost
$2,725,800
Address
550 Kearny St

level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.

Open the permit page

$2,725,800
Mar 25, 2021Never finaled
issued Aug 2021, no final
550 Kearny StAcco Engineered Systems Inc. Dba Acco Endirect replacement of 1 cooling tower located on roof & 2 pumps in the penthouse.
Details
Permit
202103257297
Status
issued
Filed
Mar 25, 2021
Permit issued
Aug 31, 2021
Declared cost
$450,000
Address
550 Kearny St

direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse.

Open the permit page

$450,000
Mar 9, 2020Never finaled
issued Feb 2021, no final
550 Kearny StNovo Construction Inc7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep included
Details
Permit
202003096519
Status
issued
Filed
Mar 9, 2020
Permit issued
Feb 9, 2021
Declared cost
$900,000
Address
550 Kearny St

7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep included

Open the permit page

$900,000
Jan 27, 2020Completed
final sign-off Oct 2020
550 Kearny StNovo Construction Incdemo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698
Details
Permit
202001272804
Status
complete
Filed
Jan 27, 2020
Permit issued
Jan 28, 2020
Final sign-off
Oct 1, 2020
Declared cost
$10,000
Address
550 Kearny St

demo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698

Open the permit page

$10,000
Jan 24, 2020Completed
final sign-off Sep 2020
550 Kearny StPioneer Fire Inc.return to warm shell fire sprinkler
Details
Permit
202001242698
Status
complete
Filed
Jan 24, 2020
Permit issued
Jan 24, 2020
Final sign-off
Sep 30, 2020
Declared cost
$47,447
Address
550 Kearny St

return to warm shell fire sprinkler

Open the permit page

$47,447
Jan 7, 2020Never finaled
issued Jan 2020, no final
550 Kearny StC B F Inc2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical only
Details
Permit
202001071322
Status
issued
Filed
Jan 7, 2020
Permit issued
Jan 7, 2020
Declared cost
$500,000
Address
550 Kearny St

2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical only

Open the permit page

$500,000
Dec 10, 2019Never finaled
issued Dec 2019, no final
550 Kearny StBilcor Inc2nd fl - fire relocate 3 ceiling mount speaker strobes to accommodate revised floor layout. as built permit 2019-1004-3538
Details
Permit
201912109072
Status
issued
Filed
Dec 10, 2019
Permit issued
Dec 10, 2019
Declared cost
$1,980
Address
550 Kearny St

2nd fl - fire relocate 3 ceiling mount speaker strobes to accommodate revised floor layout. as built permit 2019-1004-3538

Open the permit page

$1,980
Dec 4, 2019Completed
final sign-off Feb 2020
550 Kearny StRed Hawk Fire & Security Ca Llcfire alarm as built drawing 201910023334
Details
Permit
201912048668
Status
complete
Filed
Dec 4, 2019
Permit issued
Dec 4, 2019
Final sign-off
Feb 1, 2020
Address
550 Kearny St

fire alarm as built drawing 201910023334

Open the permit page

Nov 20, 2019Completed
final sign-off Jul 2021
550 Kearny StWework Construction Llc Dba Wework Constrevision to 201905211190 install 4th flr storefronts and interior entry door with fail safe
Details
Permit
201911207778
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 26, 2019
Final sign-off
Jul 6, 2021
Address
550 Kearny St

revision to 201905211190 install 4th flr storefronts and interior entry door with fail safe

Open the permit page

Oct 15, 2019Completed
final sign-off Nov 2019
550 Kearny StBilcor Inc4/f: install 2-way comm; install 1 call station, install 1 braille signage. ref pa201905211190. maher n/a.
Details
Permit
201910154350
Status
complete
Filed
Oct 15, 2019
Permit issued
Oct 17, 2019
Final sign-off
Nov 7, 2019
Declared cost
$1,320
Address
550 Kearny St

4/f: install 2-way comm; install 1 call station, install 1 braille signage. ref pa201905211190. maher n/a.

Open the permit page

$1,320
Oct 4, 2019Never finaled
issued Oct 2019, no final
550 Kearny StBilcor Incfire alarm install 28 ceiling speaker strobes, 1 booster panel, 1 smoke det, 3 control relays, 3 duct detectors ref 201907226477
Details
Permit
201910043538
Status
issued
Filed
Oct 4, 2019
Permit issued
Oct 4, 2019
Declared cost
$14,000
Address
550 Kearny St

fire alarm install 28 ceiling speaker strobes, 1 booster panel, 1 smoke det, 3 control relays, 3 duct detectors ref 201907226477

Open the permit page

$14,000
Oct 2, 2019Completed
final sign-off Mar 2020
550 Kearny StRed Hawk Fire & Security Ca Llcfire alarm ti on 3rd & 4th fl - add 2 power supply w/sync modules, 2 control rela for door holder release, 1 control relay for security interface, 6 duct detectors with control for fans, 1 duct detector with control for fsd, 7 smoke detectors, & 14 speaker/strobes. ref pa #201905211190. maher na
Details
Permit
201910023334
Status
complete
Filed
Oct 2, 2019
Permit issued
Oct 2, 2019
Final sign-off
Mar 18, 2020
Declared cost
$20,000
Address
550 Kearny St

fire alarm ti on 3rd & 4th fl - add 2 power supply w/sync modules, 2 control rela for door holder release, 1 control relay for security interface, 6 duct detectors with control for fans, 1 duct detector with control for fsd, 7 smoke detectors, & 14 speaker/strobes. ref pa #201905211190. maher na

Open the permit page

$20,000
Sep 19, 2019Completed
final sign-off Jan 2021
550 Kearny StNovo Construction Incmechanical work to tenant improvement on the 2nd ref 201907226477
Details
Permit
201909192070
Status
complete
Filed
Sep 19, 2019
Permit issued
Sep 19, 2019
Final sign-off
Jan 27, 2021
Declared cost
$85,000
Address
550 Kearny St

mechanical work to tenant improvement on the 2nd ref 201907226477

Open the permit page

$85,000
Sep 4, 2019Never finaled
issued Sep 2019, no final
550 Kearny StPioneer Fire Inc.2nd floor: relocate 23 pendents, add 1 pendent, and remove 14. n/a for maher. t.i. app#201905140530
Details
Permit
201909040600
Status
issued
Filed
Sep 4, 2019
Permit issued
Sep 4, 2019
Declared cost
$15,250
Address
550 Kearny St

2nd floor: relocate 23 pendents, add 1 pendent, and remove 14. n/a for maher. t.i. app#201905140530

Open the permit page

$15,250
Aug 29, 2019Never finaled
issued Sep 2019, no final
550 Kearny StNovo Construction Increvision to app#201906244205. provide revised technical infeasibility/equivalent facilitation sheetr 2a-0.1.o per request. n/a for maher.
Details
Permit
201908290206
Status
issued
Filed
Aug 29, 2019
Permit issued
Sep 6, 2019
Address
550 Kearny St

revision to app#201906244205. provide revised technical infeasibility/equivalent facilitation sheetr 2a-0.1.o per request. n/a for maher.

Open the permit page

Aug 14, 2019Completed
final sign-off Oct 2019
550 Kearny StR L H Fire Protection Inc3rd fl- ti upgrade of (e) fire sprinkler system - 7 relocate pendent sprinkler, 2 additional pendent sprinkler, 45 relocate upright sprinkler, 9 additional upright sprinkler. ref pa 2019-0521-1190
Details
Permit
201908148729
Status
complete
Filed
Aug 14, 2019
Permit issued
Aug 16, 2019
Final sign-off
Oct 25, 2019
Declared cost
$13,700
Address
550 Kearny St

3rd fl- ti upgrade of (e) fire sprinkler system - 7 relocate pendent sprinkler, 2 additional pendent sprinkler, 45 relocate upright sprinkler, 9 additional upright sprinkler. ref pa 2019-0521-1190

Open the permit page

$13,700
Aug 6, 2019Never finaled
issued Aug 2019, no final
550 Kearny StBilcor Incfire alarm install 1 main control panel, 4 call stations, 2 expansion switches, 2 power supplies, 2 dual monitor modules
Details
Permit
201908067955
Status
issued
Filed
Aug 6, 2019
Permit issued
Aug 6, 2019
Declared cost
$4,600
Address
550 Kearny St

fire alarm install 1 main control panel, 4 call stations, 2 expansion switches, 2 power supplies, 2 dual monitor modules

Open the permit page

$4,600
Jul 22, 2019Completed
final sign-off Jan 2020
550 Kearny StNovo Construction Inctenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permit
Details
Permit
201907226477
Status
complete
Filed
Jul 22, 2019
Permit issued
Sep 6, 2019
Final sign-off
Jan 21, 2020
Declared cost
$850,000
Address
550 Kearny St

tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permit

Open the permit page

$850,000
Jul 5, 2019Never finaled
issued Jul 2019, no final
550 Kearny StBilcor Incref t.i # 2019-0603-2247: fire alarm ti on 9th fl: install 39 ceiling speaker strobes, install 1 smoke detector, install 1 booster panel, install 4 duct detectors, in stall 4 control relays, install 1 call station, install 1 fault line monitor module, install 1 dual monitor moduel.
Details
Permit
201907055173
Status
issued
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Declared cost
$34,320
Address
550 Kearny St

ref t.i # 2019-0603-2247: fire alarm ti on 9th fl: install 39 ceiling speaker strobes, install 1 smoke detector, install 1 booster panel, install 4 duct detectors, in stall 4 control relays, install 1 call station, install 1 fault line monitor module, install 1 dual monitor moduel.

Open the permit page

$34,320
Jun 24, 2019Completed
final sign-off Dec 2020
550 Kearny StNovo Construction Incnon-struct demo (n) toilet partitions & structural door. barrier removal only. no change in occupancy use or area. mep, life safety & sprinklers under separate permit
Details
Permit
201906244205
Status
complete
Filed
Jun 24, 2019
Permit issued
Jul 1, 2019
Final sign-off
Dec 22, 2020
Declared cost
$31,347
Address
550 Kearny St

non-struct demo (n) toilet partitions & structural door. barrier removal only. no change in occupancy use or area. mep, life safety & sprinklers under separate permit

Open the permit page

$31,347
Jun 3, 2019Never finaled
issued Jun 2019, no final
550 Kearny StNovo Construction Increvision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision.
Details
Permit
201906032247
Status
issued
Filed
Jun 3, 2019
Permit issued
Jun 4, 2019
Address
550 Kearny St

revision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision.

Open the permit page

May 21, 2019Completed
final sign-off Jul 2021
550 Kearny StWework Construction Llc Dba Wework Const3rd and 4th floors - remove selected non-load bearing partitions, ceiling & assoc framing. installation of (n) partition, gyp board ceiling, (n) millwork & appliances. (n) paint & flooring in selected areas (n) light fixtures & mep equipments
Details
Permit
201905211190
Status
complete
Filed
May 21, 2019
Permit issued
Jul 25, 2019
Final sign-off
Jul 6, 2021
Declared cost
$2,774,532
Address
550 Kearny St

3rd and 4th floors - remove selected non-load bearing partitions, ceiling & assoc framing. installation of (n) partition, gyp board ceiling, (n) millwork & appliances. (n) paint & flooring in selected areas (n) light fixtures & mep equipments

Open the permit page

$2,774,532
May 14, 2019Completed
final sign-off Jul 2019
550 Kearny StPioneer Fire Inc.9th fl - relocate 33 pendents and remove 11 pendents. ref pa 2019-0426-9050
Details
Permit
201905140532
Status
complete
Filed
May 14, 2019
Permit issued
May 16, 2019
Final sign-off
Jul 3, 2019
Declared cost
$19,250
Address
550 Kearny St

9th fl - relocate 33 pendents and remove 11 pendents. ref pa 2019-0426-9050

Open the permit page

$19,250
May 14, 2019Completed
final sign-off Feb 2020
550 Kearny StPioneer Fire Inc.2nd fl - return shell condition
Details
Permit
201905140530
Status
complete
Filed
May 14, 2019
Permit issued
May 16, 2019
Final sign-off
Feb 6, 2020
Declared cost
$7,600
Address
550 Kearny St

2nd fl - return shell condition

Open the permit page

$7,600
May 8, 2019Completed
final sign-off Jan 2020
550 Kearny StNovo Construction Inc6th fl: ti to include demolition of non-structural partitions, new non-load bearing partitions, ceiling tiles, and grids. mep & fire life safety under separate permit.
Details
Permit
201905080070
Status
complete
Filed
May 8, 2019
Permit issued
May 10, 2019
Final sign-off
Jan 16, 2020
Declared cost
$400,000
Address
550 Kearny St

6th fl: ti to include demolition of non-structural partitions, new non-load bearing partitions, ceiling tiles, and grids. mep & fire life safety under separate permit.

Open the permit page

$400,000
Apr 26, 2019Completed
final sign-off Feb 2020
550 Kearny StNovo Construction Inc9th flr ti- non structural partitions, ceiling tiles and grids, mep included
Details
Permit
201904269050
Status
complete
Filed
Apr 26, 2019
Permit issued
May 7, 2019
Final sign-off
Feb 24, 2020
Declared cost
$1,600,000
Address
550 Kearny St

9th flr ti- non structural partitions, ceiling tiles and grids, mep included

Open the permit page

$1,600,000
Apr 24, 2019Completed
final sign-off Jan 2020
550 Kearny StNovo Construction Incinterior demolition on the 2nd floor per ab-017.
Details
Permit
201904248795
Status
complete
Filed
Apr 24, 2019
Permit issued
May 20, 2019
Final sign-off
Jan 22, 2020
Declared cost
$20,000
Address
550 Kearny St

interior demolition on the 2nd floor per ab-017.

Open the permit page

$20,000
Apr 3, 2019Never finaled
issued Apr 2019, no final
550 Kearny StSkyline Construction9/f: demo of non structural partitions and finishes on the 9th flr. no ceiling demo. ab0.17
Details
Permit
201904036958
Status
issued
Filed
Apr 3, 2019
Permit issued
Apr 3, 2019
Declared cost
$10,000
Address
550 Kearny St

9/f: demo of non structural partitions and finishes on the 9th flr. no ceiling demo. ab0.17

Open the permit page

$10,000
May 16, 2018Never finaled
issued May 2018, no final
550 Kearny Ststreet space
Details
Permit
M927347
Status
issued
Filed
May 16, 2018
Permit issued
May 16, 2018
Address
550 Kearny St

street space

Open the permit page

Apr 6, 2018Completed
final sign-off Dec 2019
550 Kearny StSkyline Constructioninterior demolition on the 9th floor. per ab-017 ada deferred.
Details
Permit
201804065686
Status
complete
Filed
Apr 6, 2018
Permit issued
Apr 6, 2018
Final sign-off
Dec 12, 2019
Declared cost
$15,000
Address
550 Kearny St

interior demolition on the 9th floor. per ab-017 ada deferred.

Open the permit page

$15,000
Mar 8, 2018Never finaled
issued Mar 2018, no final
550 Kearny Ststreet space/mta meters
Details
Permit
M897527
Status
issued
Filed
Mar 8, 2018
Permit issued
Mar 8, 2018
Address
550 Kearny St

street space/mta meters

Open the permit page

Dec 20, 2017Never finaled
issued Dec 2017, no final
550 Kearny Ststreet space/mta meters
Details
Permit
M868888
Status
issued
Filed
Dec 20, 2017
Permit issued
Dec 20, 2017
Address
550 Kearny St

street space/mta meters

Open the permit page

Nov 13, 2017Completed
final sign-off Jan 2018
550 Kearny StSkender Construction Llcdemo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting
Details
Permit
201711133852
Status
complete
Filed
Nov 13, 2017
Permit issued
Nov 15, 2017
Final sign-off
Jan 12, 2018
Declared cost
$220,000
Address
550 Kearny St

demo and install ductwork in new open office space. demo 9 existing vav boxes and install 7 new vav boxes. relocate (e) grille and 2 thermostats. install transfer boots for return for air path. provide air balance for newly installed vav's and ductwork. partial scope office tenant retrofit. lighting

Open the permit page

$220,000
Nov 13, 2017Completed
final sign-off Dec 2017
550 Kearny StGolden Gate Fire Protection Inc7th floor - fire sprinklers relocate (5) pendent sprinklers. relocate (31) upright sprinklers. ref ti #2017-10-06-0607.
Details
Permit
201711133809
Status
complete
Filed
Nov 13, 2017
Permit issued
Nov 14, 2017
Final sign-off
Dec 8, 2017
Declared cost
$9,000
Address
550 Kearny St

7th floor - fire sprinklers relocate (5) pendent sprinklers. relocate (31) upright sprinklers. ref ti #2017-10-06-0607.

Open the permit page

$9,000
Oct 11, 2017Completed
final sign-off Dec 2017
550 Kearny StBilcor Inc7/f- fire alarm t.i., remove (1) ceiling mount strobe & (1) ceiling mount speaker-strobe, relocate (2) ceiling mount speaker-strobes, install (2) ceiling mount speaker-strobes.t.i. pa#201710060607. n/a ordinance #155-13
Details
Permit
201710110946
Status
complete
Filed
Oct 11, 2017
Permit issued
Oct 11, 2017
Final sign-off
Dec 20, 2017
Declared cost
$2,000
Address
550 Kearny St

7/f- fire alarm t.i., remove (1) ceiling mount strobe & (1) ceiling mount speaker-strobe, relocate (2) ceiling mount speaker-strobes, install (2) ceiling mount speaker-strobes.t.i. pa#201710060607. n/a ordinance #155-13

Open the permit page

$2,000
Oct 10, 2017Never finaled
issued Oct 2017, no final
550 Kearny Ststreet space
Details
Permit
M841088
Status
issued
Filed
Oct 10, 2017
Permit issued
Oct 10, 2017
Address
550 Kearny St

street space

Open the permit page

Oct 6, 2017Completed
final sign-off Jan 2018
550 Kearny StSkender Construction Llc7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a.
Details
Permit
201710060607
Status
complete
Filed
Oct 6, 2017
Permit issued
Oct 10, 2017
Final sign-off
Jan 12, 2018
Declared cost
$260,520
Address
550 Kearny St

7th fl: non structural, demo new non structural partitions, glazing outlets, finishes. no change in occupancy, use or area. mep, l/s, sprinkler under sep permit. maher n/a.

Open the permit page

$260,520
Aug 18, 2017Never finaled
issued Aug 2017, no final
550 Kearny Ststreet space
Details
Permit
M820931
Status
issued
Filed
Aug 18, 2017
Permit issued
Aug 18, 2017
Address
550 Kearny St

street space

Open the permit page

Jun 7, 2017Completed
final sign-off Jun 2017
550 Kearny StSkyline Constructionsuite 100 - revision to pa 2016-1130-3770 ti to existing office space - add door to open office area
Details
Permit
201706078679
Status
complete
Filed
Jun 7, 2017
Permit issued
Jun 12, 2017
Final sign-off
Jun 15, 2017
Declared cost
$7,500
Address
550 Kearny St

suite 100 - revision to pa 2016-1130-3770 ti to existing office space - add door to open office area

Open the permit page

$7,500
May 3, 2017Completed
final sign-off May 2017
550 Kearny StBilcor Incfire alarm ti install 22 ceiling mount speaker/strobes, install 6 duct detector, install 6 control relays. ref pa 2016-1130-3770 n/a for maher.
Details
Permit
201705035609
Status
complete
Filed
May 3, 2017
Permit issued
May 3, 2017
Final sign-off
May 11, 2017
Declared cost
$17,000
Address
550 Kearny St

fire alarm ti install 22 ceiling mount speaker/strobes, install 6 duct detector, install 6 control relays. ref pa 2016-1130-3770 n/a for maher.

Open the permit page

$17,000
Mar 10, 2017Never finaled
issued Jun 2017, no final
550 Kearny Ststreet space
Details
Permit
M767527
Status
issued
Filed
Mar 10, 2017
Permit issued
Jun 8, 2017
Address
550 Kearny St

street space

Open the permit page

Jan 23, 2017Completed
final sign-off May 2017
550 Kearny StR L H Fire Protection Inc#100- fire sprinkler t.i., upgrade existing system, relocate 20 & add 15 fire sprinklers. t.i. pa#201611303770. n/a ordinance #155-13
Details
Permit
201701237646
Status
complete
Filed
Jan 23, 2017
Permit issued
Jan 23, 2017
Final sign-off
May 8, 2017
Declared cost
$10,336
Address
550 Kearny St

#100- fire sprinkler t.i., upgrade existing system, relocate 20 & add 15 fire sprinklers. t.i. pa#201611303770. n/a ordinance #155-13

Open the permit page

$10,336
Nov 30, 2016Completed
final sign-off Jun 2017
550 Kearny StSkyline Constructionsuite #100, ground floor - ti to (e) office space demolition of non-structural partitions/non-rated partitions. construction of -nonstructural/non rated partitions. installation of new power/data/security outlets. new lights, new finishes
Details
Permit
201611303770
Status
complete
Filed
Nov 30, 2016
Permit issued
Dec 19, 2016
Final sign-off
Jun 15, 2017
Declared cost
$584,353
Address
550 Kearny St

suite #100, ground floor - ti to (e) office space demolition of non-structural partitions/non-rated partitions. construction of -nonstructural/non rated partitions. installation of new power/data/security outlets. new lights, new finishes

Open the permit page

$584,353
Sep 23, 2016Never finaled
issued May 2017, no final
550 Kearny Ststreet space
Details
Permit
M724987
Status
issued
Filed
Sep 23, 2016
Permit issued
May 17, 2017
Address
550 Kearny St

street space

Open the permit page

Aug 31, 2016Completed
final sign-off Nov 2016
550 Kearny StR.M.R. Construction Companydeferred submittal ref pa 201606301279 lighting & branch circuit. additional branch circuit & raceway system, title 24 maher na
Details
Permit
201608316441
Status
complete
Filed
Aug 31, 2016
Permit issued
Sep 19, 2016
Final sign-off
Nov 29, 2016
Declared cost
$12,800
Address
550 Kearny St

deferred submittal ref pa 201606301279 lighting & branch circuit. additional branch circuit & raceway system, title 24 maher na

Open the permit page

$12,800
Aug 16, 2016Completed
final sign-off Nov 2016
550 Kearny StR.M.R. Construction Company#710- hvac work under arch. t.i. pa#201606301279, install (1) new fcu, install low pressure ductwork. n/a ordinance #155-13
Details
Permit
201608165089
Status
complete
Filed
Aug 16, 2016
Permit issued
Sep 19, 2016
Final sign-off
Nov 29, 2016
Declared cost
$21,000
Address
550 Kearny St

#710- hvac work under arch. t.i. pa#201606301279, install (1) new fcu, install low pressure ductwork. n/a ordinance #155-13

Open the permit page

$21,000
Jul 20, 2016Completed
final sign-off Aug 2016
550 Kearny StAnderson, Rowe & Buckley, Inc.7th floor (e) fire sprinler system - ti- 1 relocated sprinkler, 5 added sprinklers. ref pa 2016-0630-1279. maher na
Details
Permit
201607202812
Status
complete
Filed
Jul 20, 2016
Permit issued
Jul 20, 2016
Final sign-off
Aug 2, 2016
Declared cost
$3,000
Address
550 Kearny St

7th floor (e) fire sprinler system - ti- 1 relocated sprinkler, 5 added sprinklers. ref pa 2016-0630-1279. maher na

Open the permit page

$3,000
Jun 30, 2016Completed
final sign-off Nov 2016
550 Kearny StR.M.R. Construction Company7/f #710- t.i. to (e) office space, new non-structural partitions, power and data outlets, reconfiguration of (e) mechanical and electrical systems within tenant space. n/a ordinance #155-13
Details
Permit
201606301279
Status
complete
Filed
Jun 30, 2016
Permit issued
Jul 8, 2016
Final sign-off
Nov 29, 2016
Declared cost
$69,454
Address
550 Kearny St

7/f #710- t.i. to (e) office space, new non-structural partitions, power and data outlets, reconfiguration of (e) mechanical and electrical systems within tenant space. n/a ordinance #155-13

Open the permit page

$69,454
Mar 1, 2016Never finaled
issued Mar 2016, no final
550 Kearny Ststreet space and mta parking
Details
Permit
M667847
Status
issued
Filed
Mar 1, 2016
Permit issued
Mar 1, 2016
Address
550 Kearny St

street space and mta parking

Open the permit page

Nov 13, 2015Never finaled
issued Nov 2015, no final
550 Kearny StSkyline Constructionrenewal of pa# 201311081520 for final inspection only. all work is complete.
Details
Permit
201511132551
Status
issued
Filed
Nov 13, 2015
Permit issued
Nov 13, 2015
Address
550 Kearny St

renewal of pa# 201311081520 for final inspection only. all work is complete.

Open the permit page

Apr 28, 2015Completed
final sign-off May 2015
550 Kearny StBilcor Inc7th flr: fire alarm system tenant improvement. install 11 ceiling mount speaker-strobes. install 1 smoke detector. maher na ref #2015 03 03 9780
Details
Permit
201504284832
Status
complete
Filed
Apr 28, 2015
Permit issued
Apr 28, 2015
Final sign-off
May 12, 2015
Declared cost
$4,800
Address
550 Kearny St

7th flr: fire alarm system tenant improvement. install 11 ceiling mount speaker-strobes. install 1 smoke detector. maher na ref #2015 03 03 9780

Open the permit page

$4,800
Apr 1, 2015Completed
final sign-off Apr 2015
550 Kearny StGolden Gate Fire Protection Inc7th flr: add 23 fire sprinklers pendents for new offices for suite 710. maher - not req'd
Details
Permit
201504012519
Status
complete
Filed
Apr 1, 2015
Permit issued
Apr 2, 2015
Final sign-off
Apr 30, 2015
Declared cost
$11,500
Address
550 Kearny St

7th flr: add 23 fire sprinklers pendents for new offices for suite 710. maher - not req'd

Open the permit page

$11,500
Mar 3, 2015Completed
final sign-off Sep 2015
550 Kearny StSkyline Constructionnew non-structural interior office partitios, power and comm, reconfiguration of mechanical and electrical systems with suite. maher - not req'd
Details
Permit
201503039780
Status
complete
Filed
Mar 3, 2015
Permit issued
Mar 9, 2015
Final sign-off
Sep 18, 2015
Declared cost
$572,000
Address
550 Kearny St

new non-structural interior office partitios, power and comm, reconfiguration of mechanical and electrical systems with suite. maher - not req'd

Open the permit page

$572,000
Feb 17, 2015Never finaled
issued Feb 2015, no final
550 Kearny StCorporate Sign Systemserect an electric double faced projecting sign. n/a maher ordinance
Details
Permit
201502178468
Status
issued
Filed
Feb 17, 2015
Permit issued
Feb 18, 2015
Declared cost
$10,000
Address
550 Kearny St

erect an electric double faced projecting sign. n/a maher ordinance

Open the permit page

$10,000
Feb 5, 2015Completed
final sign-off Jan 2016
550 Kearny StR.M.R. Construction Companymechanical demo, retrofit extg vav box and replace extg hot water control valves. new duct and supply grills. new runouts and 2x2 supply grilles, sound boots, new exhaust fan, air & water balance. n/a for the maher.
Details
Permit
201502057576
Status
complete
Filed
Feb 5, 2015
Permit issued
Mar 4, 2015
Final sign-off
Jan 11, 2016
Declared cost
$38,000
Address
550 Kearny St

mechanical demo, retrofit extg vav box and replace extg hot water control valves. new duct and supply grills. new runouts and 2x2 supply grilles, sound boots, new exhaust fan, air & water balance. n/a for the maher.

Open the permit page

$38,000
Feb 3, 2015Completed
final sign-off Aug 2015
550 Kearny StBilcor Incpenthouse: fire alarm t.i. includes to install 7 smoke detectors and install 3 control relays. n/a for the maher.
Details
Permit
201502037375
Status
complete
Filed
Feb 3, 2015
Permit issued
Feb 11, 2015
Final sign-off
Aug 20, 2015
Declared cost
$4,000
Address
550 Kearny St

penthouse: fire alarm t.i. includes to install 7 smoke detectors and install 3 control relays. n/a for the maher.

Open the permit page

$4,000
Jan 23, 2015Completed
final sign-off Feb 2015
550 Kearny StAyoob & Peery Plumbing Co Incsprinklers 1st floor: add and relocate and removed fire sprinkler per t.i. 7 add and 39 relocated and 8 removed. ref app#201501095325. seismic bracing. n/a for the maher
Details
Permit
201501236513
Status
complete
Filed
Jan 23, 2015
Permit issued
Jan 26, 2015
Final sign-off
Feb 12, 2015
Declared cost
$23,130
Address
550 Kearny St

sprinklers 1st floor: add and relocate and removed fire sprinkler per t.i. 7 add and 39 relocated and 8 removed. ref app#201501095325. seismic bracing. n/a for the maher

Open the permit page

$23,130
Jan 9, 2015Completed
final sign-off Dec 2015
550 Kearny StR.M.R. Construction Companysuite #10 lower level: t.i. to (e) office space, new non-structural partitions, power and communication outlets, accessible upgrades to elevator lobby doors, tenant entry doors. maher n/a.
Details
Permit
201501095325
Status
complete
Filed
Jan 9, 2015
Permit issued
Jan 12, 2015
Final sign-off
Dec 17, 2015
Declared cost
$120,000
Address
550 Kearny St

suite #10 lower level: t.i. to (e) office space, new non-structural partitions, power and communication outlets, accessible upgrades to elevator lobby doors, tenant entry doors. maher n/a.

Open the permit page

$120,000
Dec 23, 2014Completed
final sign-off Feb 2015
550 Kearny StR L H Fire Protection Incsprinklers- remove existing heads in elevator machine room and hoistsways relocate 1 at bottom of shaft per letter dated dec 12, 2014
Details
Permit
201412234442
Status
complete
Filed
Dec 23, 2014
Permit issued
Jan 30, 2015
Final sign-off
Feb 12, 2015
Declared cost
$1,000
Address
550 Kearny St

sprinklers- remove existing heads in elevator machine room and hoistsways relocate 1 at bottom of shaft per letter dated dec 12, 2014

Open the permit page

$1,000
Jul 22, 2014Completed
final sign-off Oct 2014
550 Kearny StWestower Communicationsremoval of cabinet, antennas, cable tray, coax mounts, radio equipment for nextel. maher 155-13 not required
Details
Permit
201407221842
Status
complete
Filed
Jul 22, 2014
Permit issued
Aug 12, 2014
Final sign-off
Oct 17, 2014
Declared cost
$10,000
Address
550 Kearny St

removal of cabinet, antennas, cable tray, coax mounts, radio equipment for nextel. maher 155-13 not required

Open the permit page

$10,000
Jun 5, 2014Completed
final sign-off Aug 2014
550 Kearny StBilcor Inc5/f: install 18 ceiling mount speaker and relocate 2 ceiling mount speaker-strokes. install 5 duct detectors & 3 control relay modules. t.i. ref #2014.0515.5916. compliance with ordinance #155-13 not required.
Details
Permit
201406057627
Status
complete
Filed
Jun 5, 2014
Permit issued
Jun 6, 2014
Final sign-off
Aug 5, 2014
Declared cost
$8,000
Address
550 Kearny St

5/f: install 18 ceiling mount speaker and relocate 2 ceiling mount speaker-strokes. install 5 duct detectors & 3 control relay modules. t.i. ref #2014.0515.5916. compliance with ordinance #155-13 not required.

Open the permit page

$8,000
May 20, 2014Never finaled
issued May 2014, no final
550 Kearny StAnderson, Rowe & Buckley, Inc.5th floor expansion & tenant improvement existing fire sprinkler sytem, 115 sprinklers. ref pa #2013.0909.6268. n/a maher ordinance 155-13.
Details
Permit
201405206259
Status
issued
Filed
May 20, 2014
Permit issued
May 20, 2014
Declared cost
$57,500
Address
550 Kearny St

5th floor expansion & tenant improvement existing fire sprinkler sytem, 115 sprinklers. ref pa #2013.0909.6268. n/a maher ordinance 155-13.

Open the permit page

$57,500
May 15, 2014Completed
final sign-off Sep 2014
550 Kearny StR.M.R. Construction Company5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13.
Details
Permit
201405155916
Status
complete
Filed
May 15, 2014
Permit issued
May 30, 2014
Final sign-off
Sep 30, 2014
Declared cost
$682,000
Address
550 Kearny St

5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13.

Open the permit page

$682,000
Mar 19, 2014Completed
final sign-off Jan 2015
550 Kearny StR.M.R. Construction Companyprovide electrical outlets & wall protection for coffee cart in existing ground floor building lobby. provide fire extinguisher per sffd. compliance with ordinance #155-13 not required
Details
Permit
201403191173
Status
complete
Filed
Mar 19, 2014
Permit issued
Jun 20, 2014
Final sign-off
Jan 9, 2015
Declared cost
$10,000
Address
550 Kearny St

provide electrical outlets & wall protection for coffee cart in existing ground floor building lobby. provide fire extinguisher per sffd. compliance with ordinance #155-13 not required

Open the permit page

$10,000
Mar 13, 2014Completed
final sign-off Dec 2014
550 Kearny StR.M.R. Construction Companyaddition of an auto door opener at building entrance. compliance with ordinance no 155-13 not required.
Details
Permit
201403130672
Status
complete
Filed
Mar 13, 2014
Permit issued
Mar 18, 2014
Final sign-off
Dec 30, 2014
Declared cost
$10,000
Address
550 Kearny St

addition of an auto door opener at building entrance. compliance with ordinance no 155-13 not required.

Open the permit page

$10,000
Nov 12, 2013Never finaled
issued Nov 2013, no final
550 Kearny StBilcor Incinstall 4 smoke detectors and relocate 4 existing smoke detectors.
Details
Permit
201311121707
Status
issued
Filed
Nov 12, 2013
Permit issued
Nov 19, 2013
Declared cost
$3,200
Address
550 Kearny St

install 4 smoke detectors and relocate 4 existing smoke detectors.

Open the permit page

$3,200
Nov 8, 2013Never finaled
issued Nov 2013, no final
550 Kearny StSkyline Construction3rd floor suite 330 - new lighting. ref pa #2013.0909.6265.
Details
Permit
201311081519
Status
issued
Filed
Nov 8, 2013
Permit issued
Nov 12, 2013
Declared cost
$500
Address
550 Kearny St

3rd floor suite 330 - new lighting. ref pa #2013.0909.6265.

Open the permit page

$500
Nov 8, 2013Never finaled
issued Nov 2013, no final
550 Kearny StSkyline Construction10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit.
Details
Permit
201311081520
Status
issued
Filed
Nov 8, 2013
Permit issued
Nov 12, 2013
Declared cost
$7,000
Address
550 Kearny St

10th floor tenant improvement to include the additoin of a glass door & sidelite to an existing room. mep & life safety under separate permit.

Open the permit page

$7,000
Nov 8, 2013Never finaled
issued Nov 2013, no final
550 Kearny StSkyline Construction5th floor suite 500 - new electrical work for tenant improvement to include new lighting. ref pa #2013.0909.6268.
Details
Permit
201311081516
Status
issued
Filed
Nov 8, 2013
Permit issued
Nov 12, 2013
Declared cost
$1,000
Address
550 Kearny St

5th floor suite 500 - new electrical work for tenant improvement to include new lighting. ref pa #2013.0909.6268.

Open the permit page

$1,000
Oct 17, 2013Never finaled
issued Oct 2013, no final
550 Kearny StGolden Gate Fire Protection Inc3rd & 5th floors-relocate 18 upright sprinklers on the 3rd fl. relocate 15 upright sprinklers
Details
Permit
201310179569
Status
issued
Filed
Oct 17, 2013
Permit issued
Oct 17, 2013
Declared cost
$16,995
Address
550 Kearny St

3rd & 5th floors-relocate 18 upright sprinklers on the 3rd fl. relocate 15 upright sprinklers

Open the permit page

$16,995
Oct 15, 2013Never finaled
issued Oct 2013, no final
550 Kearny StBilcor Incinstall 4 speaker strobes ti 201309096228. 201309096265
Details
Permit
201310159302
Status
issued
Filed
Oct 15, 2013
Permit issued
Oct 16, 2013
Declared cost
$2,000
Address
550 Kearny St

install 4 speaker strobes ti 201309096228. 201309096265

Open the permit page

$2,000
Sep 9, 2013Never finaled
issued Oct 2013, no final
550 Kearny StSkyline Construction3r floor:minor demolition of partions and ceiling, capping /termination of electrical outlet, lighting, finishes, patching or affected areas.
Details
Permit
201309096265
Status
issued
Filed
Sep 9, 2013
Permit issued
Oct 4, 2013
Declared cost
$12,000
Address
550 Kearny St

3r floor:minor demolition of partions and ceiling, capping /termination of electrical outlet, lighting, finishes, patching or affected areas.

Open the permit page

$12,000
Sep 9, 2013Never finaled
issued Oct 2013, no final
550 Kearny StSkyline Construction5th floor:commercial t.i. for market ready space.minor demolition of partions, doors & frames, lighting, and finishes. restroom upgrade. no mech and no structural work.
Details
Permit
201309096268
Status
issued
Filed
Sep 9, 2013
Permit issued
Oct 4, 2013
Declared cost
$48,000
Address
550 Kearny St

5th floor:commercial t.i. for market ready space.minor demolition of partions, doors & frames, lighting, and finishes. restroom upgrade. no mech and no structural work.

Open the permit page

$48,000
Jun 4, 2013Completed
final sign-off Jul 2013
550 Kearny StBilcor Incinstall 16 control relays for new actuators installed under separate electrical permit.
Details
Permit
201306048569
Status
complete
Filed
Jun 4, 2013
Permit issued
Jun 10, 2013
Final sign-off
Jul 5, 2013
Declared cost
$6,000
Address
550 Kearny St

install 16 control relays for new actuators installed under separate electrical permit.

Open the permit page

$6,000
May 24, 2013Never finaled
issued May 2013, no final
550 Kearny StBilcor Incfire alarm: install 1 booster panel, 35 ceiling mount speaker strobes, 4 wall mount speaker strobes, relocate 2 smoke detectors, 6 smoke detectors
Details
Permit
201305247887
Status
issued
Filed
May 24, 2013
Permit issued
May 28, 2013
Declared cost
$20,000
Address
550 Kearny St

fire alarm: install 1 booster panel, 35 ceiling mount speaker strobes, 4 wall mount speaker strobes, relocate 2 smoke detectors, 6 smoke detectors

Open the permit page

$20,000
May 20, 2013Completed
final sign-off Jul 2013
550 Kearny StPribuss Engineering Inc6th floor fiew sprinkler t.i. - 300 fire sprinkler heads, ref pa #2012.03.05.5351
Details
Permit
201305207322
Status
complete
Filed
May 20, 2013
Permit issued
May 20, 2013
Final sign-off
Jul 10, 2013
Declared cost
$154,386
Address
550 Kearny St

6th floor fiew sprinkler t.i. - 300 fire sprinkler heads, ref pa #2012.03.05.5351

Open the permit page

$154,386
May 15, 2013Completed
final sign-off Aug 2013
550 Kearny StDpr Constructionclarify lobby walls & glass enclosure as complying with section 708.14.1 exception #5, per building inspector request via ab-005. revision to pa# 2013-0314-2182
Details
Permit
201305156956
Status
complete
Filed
May 15, 2013
Permit issued
May 16, 2013
Final sign-off
Aug 5, 2013
Address
550 Kearny St

clarify lobby walls & glass enclosure as complying with section 708.14.1 exception #5, per building inspector request via ab-005. revision to pa# 2013-0314-2182

Open the permit page

Mar 14, 2013Completed
final sign-off Aug 2013
550 Kearny StDpr Constructionrevision to approved pa# 201203055351; revise partition layout, ceiling layout, casework and finishes; revise mech and electrical, fire alarm & sprinkler under separate permit.
Details
Permit
201303142182
Status
complete
Filed
Mar 14, 2013
Permit issued
Apr 17, 2013
Final sign-off
Aug 5, 2013
Address
550 Kearny St

revision to approved pa# 201203055351; revise partition layout, ceiling layout, casework and finishes; revise mech and electrical, fire alarm & sprinkler under separate permit.

Open the permit page

Mar 5, 2013Expired or cancelled
cancelled Jan 2026
550 Kearny Strevision to pa# 2012-0305-5351-remove (e) monocote fireproofing on a selection of steel structural members & replacing with intunescent fireproofing.
Details
Permit
201303051480
Status
cancelled
Filed
Mar 5, 2013
Declared cost
$24,000
Address
550 Kearny St

revision to pa# 2012-0305-5351-remove (e) monocote fireproofing on a selection of steel structural members & replacing with intunescent fireproofing.

Open the permit page

$24,000
Feb 21, 2013Completed
final sign-off May 2013
550 Kearny StGolden Gate Fire Protection Incfire sprinkler system upgrade, relocate 147 pendent sprinklers heads on the 10th fl. relocate 29 pendents on the 2nd flr & relocate 24 pendents on the 1st floor- new bracing clac's and locations
Details
Permit
201302210626
Status
complete
Filed
Feb 21, 2013
Permit issued
Feb 21, 2013
Final sign-off
May 6, 2013
Declared cost
$103,000
Address
550 Kearny St

fire sprinkler system upgrade, relocate 147 pendent sprinklers heads on the 10th fl. relocate 29 pendents on the 2nd flr & relocate 24 pendents on the 1st floor- new bracing clac's and locations

Open the permit page

$103,000
Feb 8, 2013Completed
final sign-off Mar 2013
550 Kearny StC B F Inc2nd floor-install 6 ceiling mount speaker/strobes, replace 3 speaker with speaker/strobes, remove 1 speaker, remove 5 strobes & remove 1 speaker/strobe. ti pa# 2013-0131-9240
Details
Permit
201302089839
Status
complete
Filed
Feb 8, 2013
Permit issued
Feb 8, 2013
Final sign-off
Mar 21, 2013
Declared cost
$3,600
Address
550 Kearny St

2nd floor-install 6 ceiling mount speaker/strobes, replace 3 speaker with speaker/strobes, remove 1 speaker, remove 5 strobes & remove 1 speaker/strobe. ti pa# 2013-0131-9240

Open the permit page

$3,600
Feb 8, 2013Completed
final sign-off Mar 2013
550 Kearny StC B F Inc10th floor-install 30 ceiling mount speaker/strobes, install 3 ceiling speakers, install 4 smoke detectors with base & install 2 control relays. ti pa# 2013-0131-9240
Details
Permit
201302089838
Status
complete
Filed
Feb 8, 2013
Permit issued
Feb 8, 2013
Final sign-off
Mar 21, 2013
Declared cost
$15,000
Address
550 Kearny St

10th floor-install 30 ceiling mount speaker/strobes, install 3 ceiling speakers, install 4 smoke detectors with base & install 2 control relays. ti pa# 2013-0131-9240

Open the permit page

$15,000
Jan 31, 2013Completed
final sign-off Mar 2013
550 Kearny StC B F Incground floor -install 2 duct detectors, 1 control relay, 2 speaker/strobes, replace 2 strobes with speaker/strobe, relocate 1 pull station.
Details
Permit
201301319240
Status
complete
Filed
Jan 31, 2013
Permit issued
Feb 1, 2013
Final sign-off
Mar 21, 2013
Declared cost
$3,500
Address
550 Kearny St

ground floor -install 2 duct detectors, 1 control relay, 2 speaker/strobes, replace 2 strobes with speaker/strobe, relocate 1 pull station.

Open the permit page

$3,500
Jan 28, 2013Completed
final sign-off May 2013
550 Kearny StR.M.R. Construction Company6th floor:barrier removal work only. new drywall partition, replace accessible stall partition, replace countertop and sinks.
Details
Permit
201301288920
Status
complete
Filed
Jan 28, 2013
Permit issued
Feb 15, 2013
Final sign-off
May 20, 2013
Declared cost
$5,000
Address
550 Kearny St

6th floor:barrier removal work only. new drywall partition, replace accessible stall partition, replace countertop and sinks.

Open the permit page

$5,000
Nov 26, 2012Completed
final sign-off May 2013
550 Kearny StSkyline Construction2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit).
Details
Permit
201211264812
Status
complete
Filed
Nov 26, 2012
Permit issued
Dec 11, 2012
Final sign-off
May 9, 2013
Declared cost
$175,000
Address
550 Kearny St

2nd floor tenant improvement: minor demolition & new construction, new work include doors & frames, ceiling, casework, finishes, electrical & mechanical. (sprinkler & fire alarm under separate permit).

Open the permit page

$175,000
Nov 19, 2012Completed
final sign-off May 2013
550 Kearny St10th floor-minor demolition, new construction-partitions, doors & frames, ceiling, casework, finishes, electrical & mechanical. fire alarm under seperate permit.
Details
Permit
201211194540
Status
complete
Filed
Nov 19, 2012
Permit issued
Dec 4, 2012
Final sign-off
May 9, 2013
Declared cost
$940,000
Address
550 Kearny St

10th floor-minor demolition, new construction-partitions, doors & frames, ceiling, casework, finishes, electrical & mechanical. fire alarm under seperate permit.

Open the permit page

$940,000
Nov 19, 2012Never finaled
issued Dec 2012, no final
550 Kearny Stground floor-electrical & mechanical-new fan coil units, new outside air, exhaust air. new lighting & power/data. ti pa# 2012-1002-1124
Details
Permit
201211194539
Status
issued
Filed
Nov 19, 2012
Permit issued
Dec 6, 2012
Declared cost
$50,000
Address
550 Kearny St

ground floor-electrical & mechanical-new fan coil units, new outside air, exhaust air. new lighting & power/data. ti pa# 2012-1002-1124

Open the permit page

$50,000
Nov 16, 2012Completed
final sign-off Apr 2013
550 Kearny StMaguire Inc Dba Lahue And Associatesground floor. evacuation sign (1)
Details
Permit
201211164391
Status
complete
Filed
Nov 16, 2012
Permit issued
Nov 16, 2012
Final sign-off
Apr 24, 2013
Declared cost
$300
Address
550 Kearny St

ground floor. evacuation sign (1)

Open the permit page

$300
Oct 2, 2012Completed
final sign-off May 2013
550 Kearny StSkyline Constructionground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permit
Details
Permit
201210021124
Status
complete
Filed
Oct 2, 2012
Permit issued
Oct 26, 2012
Final sign-off
May 22, 2013
Declared cost
$250,000
Address
550 Kearny St

ground floor -assembly occupancy (conference rooms) being added in old office space- demo, new paritions, doors, frames, ceiling, lighting, casework, finishes, common area restroom remodel, mech and elec sep permit. sprinkler under separate permit

Open the permit page

$250,000
Aug 3, 2012Never finaled
issued Aug 2012, no final
550 Kearny StGolden Gate Fire Protection Incfire sprinkler system upgrade; relocate 146 pendant sprinkler heads. delete 10 heads. upgrade earthquake bracing.
Details
Permit
201208036503
Status
issued
Filed
Aug 3, 2012
Permit issued
Aug 7, 2012
Declared cost
$75,190
Address
550 Kearny St

fire sprinkler system upgrade; relocate 146 pendant sprinkler heads. delete 10 heads. upgrade earthquake bracing.

Open the permit page

$75,190
Jul 24, 2012Completed
final sign-off Jun 2013
550 Kearny StGolden Gate Fire Protection Inc7th floor-fire sprinkler system upgrade-relocate 67 pendent sprinkler heads
Details
Permit
201207245627
Status
complete
Filed
Jul 24, 2012
Permit issued
Jul 25, 2012
Final sign-off
Jun 7, 2013
Declared cost
$34,505
Address
550 Kearny St

7th floor-fire sprinkler system upgrade-relocate 67 pendent sprinkler heads

Open the permit page

$34,505
Jul 18, 2012Never finaled
issued Jul 2012, no final
550 Kearny StC B F Inc8th floor: install 32 speaker strobes, 1 booser panel, 1 smoke detector, 1 control relay, 2 duct detectors, 1 signal module, 1 pan relay
Details
Permit
201207185164
Status
issued
Filed
Jul 18, 2012
Permit issued
Jul 20, 2012
Declared cost
$20,000
Address
550 Kearny St

8th floor: install 32 speaker strobes, 1 booser panel, 1 smoke detector, 1 control relay, 2 duct detectors, 1 signal module, 1 pan relay

Open the permit page

$20,000
Jul 10, 2012Expired or cancelled
cancelled Jan 2026
550 Kearny Stintall 32 speaker-strobes, 1 booster panel, 1 signal module, intaall 2 duct detectors, 1 smoke detector, install 2 control relay, 2 emergency release pull stations, install 1 pam relay.
Details
Permit
201207104514
Status
cancelled
Filed
Jul 10, 2012
Declared cost
$20,000
Address
550 Kearny St

intall 32 speaker-strobes, 1 booster panel, 1 signal module, intaall 2 duct detectors, 1 smoke detector, install 2 control relay, 2 emergency release pull stations, install 1 pam relay.

Open the permit page

$20,000
Jul 10, 2012Completed
final sign-off Mar 2013
550 Kearny StC B F Incinstall 11 speaker-strobes on ground floor
Details
Permit
201207104511
Status
complete
Filed
Jul 10, 2012
Permit issued
Jul 11, 2012
Final sign-off
Mar 19, 2013
Declared cost
$3,500
Address
550 Kearny St

install 11 speaker-strobes on ground floor

Open the permit page

$3,500
Jul 9, 2012Expired or cancelled
cancelled Sep 2023
550 Kearny StC B F Incinstall 11 speaker-strobes
Details
Permit
201207094368
Status
cancelled
Filed
Jul 9, 2012
Declared cost
$3,500
Address
550 Kearny St

install 11 speaker-strobes

Open the permit page

$3,500
Jul 9, 2012Expired or cancelled
cancelled Sep 2023
550 Kearny StC B F Incinstall 32 speaker strobes, 1 booster panel. install 2 duct detectors, 1 smoke detector, install 2 control realy, 1 signal module. install 2 emergency release pull stations. install 1 pan relay.
Details
Permit
201207094367
Status
cancelled
Filed
Jul 9, 2012
Declared cost
$20,000
Address
550 Kearny St

install 32 speaker strobes, 1 booster panel. install 2 duct detectors, 1 smoke detector, install 2 control realy, 1 signal module. install 2 emergency release pull stations. install 1 pan relay.

Open the permit page

$20,000
Jun 25, 2012Completed
final sign-off Oct 2012
550 Kearny StSkyline Constructiontenant improvement in the 7th floor, ste. 700; 7th floor restroom upgrade; minor demolition & new construction; new work includes partitions, doors and frames, finishes, lighting, ceiling, electrical & mechanical. sprinkler & fa under separate permit.
Details
Permit
201206253385
Status
complete
Filed
Jun 25, 2012
Permit issued
Jul 2, 2012
Final sign-off
Oct 25, 2012
Declared cost
$500,000
Address
550 Kearny St

tenant improvement in the 7th floor, ste. 700; 7th floor restroom upgrade; minor demolition & new construction; new work includes partitions, doors and frames, finishes, lighting, ceiling, electrical & mechanical. sprinkler & fa under separate permit.

Open the permit page

$500,000
Jun 21, 2012Completed
final sign-off Aug 2012
550 Kearny StC B F Inc7th floor-install 13 speaker/strobes & install 1 strobe
Details
Permit
201206213158
Status
complete
Filed
Jun 21, 2012
Permit issued
Jun 21, 2012
Final sign-off
Aug 28, 2012
Declared cost
$6,000
Address
550 Kearny St

7th floor-install 13 speaker/strobes & install 1 strobe

Open the permit page

$6,000
Jun 19, 2012Completed
final sign-off Jul 2012
550 Kearny StCarter Brothers Fire & Life Safety3rd & 4th floors-as builts for pa# 2012-0208-3791
Details
Permit
201206192917
Status
complete
Filed
Jun 19, 2012
Permit issued
Jun 25, 2012
Final sign-off
Jul 12, 2012
Address
550 Kearny St

3rd & 4th floors-as builts for pa# 2012-0208-3791

Open the permit page

Jun 19, 2012Completed
final sign-off Jul 2012
550 Kearny StCarter Brothers Fire & Life Safety4th floor-install new devices in a new t.i space-this will be added to an (e) fire alarm system (t.i pa# 2012-0405-9805). 31 speaker/strobes, 6 control relays, 3 smoke detectors, 4 duct detectors, 1 new fsd to be installed by others.
Details
Permit
201206192915
Status
complete
Filed
Jun 19, 2012
Permit issued
Jun 25, 2012
Final sign-off
Jul 12, 2012
Declared cost
$27,000
Address
550 Kearny St

4th floor-install new devices in a new t.i space-this will be added to an (e) fire alarm system (t.i pa# 2012-0405-9805). 31 speaker/strobes, 6 control relays, 3 smoke detectors, 4 duct detectors, 1 new fsd to be installed by others.

Open the permit page

$27,000
Jun 6, 2012Completed
final sign-off Oct 2012
550 Kearny StSkyline Constructioninterior tenant improvement on 2 floors, minor demo, new partitions, doors, frames, ceiling, finishes, electrical and mechanical. fire alarm and sprinkler under separate permit
Details
Permit
201206061991
Status
complete
Filed
Jun 6, 2012
Permit issued
Jul 2, 2012
Final sign-off
Oct 25, 2012
Declared cost
$925,000
Address
550 Kearny St

interior tenant improvement on 2 floors, minor demo, new partitions, doors, frames, ceiling, finishes, electrical and mechanical. fire alarm and sprinkler under separate permit

Open the permit page

$925,000
May 18, 2012Expired or cancelled
cancelled Jan 2026
550 Kearny Stground floor-tenant improvement on ground floor/add retail space-work includes partitions, doors, frames, ceiling, lighting & finishes. mechanical & electrical deferred submittal. sprinkler & fire alarm under seperate permit
Details
Permit
201205180811
Status
cancelled
Filed
May 18, 2012
Declared cost
$252,000
Address
550 Kearny St

ground floor-tenant improvement on ground floor/add retail space-work includes partitions, doors, frames, ceiling, lighting & finishes. mechanical & electrical deferred submittal. sprinkler & fire alarm under seperate permit

Open the permit page

$252,000
May 4, 2012Completed
final sign-off Jul 2012
550 Kearny StSkyline Construction4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit.
Details
Permit
201205049805
Status
complete
Filed
May 4, 2012
Permit issued
May 21, 2012
Final sign-off
Jul 26, 2012
Address
550 Kearny St

4th floor-revision to pa #2012.01.18.2433 ( 4th floor): revised partitions, location, minor changes in lighting, finishes, & mechancial. sprinkler & f.a. under separate permit.

Open the permit page

Mar 20, 2012Expired or cancelled
cancelled Jul 2013
550 Kearny StCarter Brothers Fire & Life Safety6th floor-add new fire alarm devices to an (e) fire alarm system in a new tenant space-1 smoke detector & 3 duct detector, 26 speaker strobes & 2 strobes.
Details
Permit
201203206431
Status
cancelled
Filed
Mar 20, 2012
Permit issued
Mar 20, 2012
Declared cost
$7,900
Address
550 Kearny St

6th floor-add new fire alarm devices to an (e) fire alarm system in a new tenant space-1 smoke detector & 3 duct detector, 26 speaker strobes & 2 strobes.

Open the permit page

$7,900
Mar 8, 2012Completed
final sign-off Jun 2012
550 Kearny StGolden Gate Fire Protection Inc3rd & 4th floors-fire sprinkler system upgrade, relocate 24 pendent sprinkler heads & 30 upright heads on 3rd floor. relocate 55 pendent sprinkler heads on 4th floor
Details
Permit
201203085667
Status
complete
Filed
Mar 8, 2012
Permit issued
Mar 8, 2012
Final sign-off
Jun 29, 2012
Declared cost
$60,000
Address
550 Kearny St

3rd & 4th floors-fire sprinkler system upgrade, relocate 24 pendent sprinkler heads & 30 upright heads on 3rd floor. relocate 55 pendent sprinkler heads on 4th floor

Open the permit page

$60,000
Mar 5, 2012Completed
final sign-off Aug 2013
550 Kearny St6th floor-demolition of non-load bearing walls, new construction partitions, frames, ceiling, doors, casework, finishes, electrical & mechanical work. fire alarm, sprinkler under seperate permit
Details
Permit
201203055351
Status
complete
Filed
Mar 5, 2012
Permit issued
Mar 12, 2012
Final sign-off
Aug 5, 2013
Declared cost
$725,000
Address
550 Kearny St

6th floor-demolition of non-load bearing walls, new construction partitions, frames, ceiling, doors, casework, finishes, electrical & mechanical work. fire alarm, sprinkler under seperate permit

Open the permit page

$725,000
Feb 8, 2012Never finaled
issued Feb 2012, no final
550 Kearny StCarter Brothers Fire & Life Safetyadd new fire alarm devices to existing fa system in a new ti space. (ti201201182433) this includes 39 speaker strobes, 2 strobes, 1 smoke detector, 4 duct detectors, 5 control modules
Details
Permit
201202083791
Status
issued
Filed
Feb 8, 2012
Permit issued
Feb 8, 2012
Declared cost
$11,785
Address
550 Kearny St

add new fire alarm devices to existing fa system in a new ti space. (ti201201182433) this includes 39 speaker strobes, 2 strobes, 1 smoke detector, 4 duct detectors, 5 control modules

Open the permit page

$11,785
Jan 23, 2012Completed
final sign-off Jul 2012
550 Kearny StSkyline Constructionmechanical, electrical & plumbing work as deferrred submittal to pa#201201182433. fire alarm & sprinkler under seperate permit
Details
Permit
201201232704
Status
complete
Filed
Jan 23, 2012
Permit issued
Jan 26, 2012
Final sign-off
Jul 26, 2012
Declared cost
$400,000
Address
550 Kearny St

mechanical, electrical & plumbing work as deferrred submittal to pa#201201182433. fire alarm & sprinkler under seperate permit

Open the permit page

$400,000
Jan 18, 2012Completed
final sign-off Jul 2012
550 Kearny StSkyline Constructioncommercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit.
Details
Permit
201201182433
Status
complete
Filed
Jan 18, 2012
Permit issued
Jan 26, 2012
Final sign-off
Jul 26, 2012
Declared cost
$695,000
Address
550 Kearny St

commercial ti on 2 floors. minor demo, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit.

Open the permit page

$695,000
Dec 7, 2011Completed
final sign-off May 2013
550 Kearny StGiampolini & Co Dba Giampolini/Courtneyinstall new steel frame trellis over main entry & east half of front elevation exterior work only
Details
Permit
201112070256
Status
complete
Filed
Dec 7, 2011
Permit issued
Jan 17, 2012
Final sign-off
May 6, 2013
Declared cost
$85,000
Address
550 Kearny St

install new steel frame trellis over main entry & east half of front elevation exterior work only

Open the permit page

$85,000
Nov 30, 2011Never finaled
issued Dec 2011, no final
550 Kearny StAnderson, Rowe & Buckley, Inc.1st floor-fire sprinkler system, 158 sprinklers
Details
Permit
201111309785
Status
issued
Filed
Nov 30, 2011
Permit issued
Dec 1, 2011
Declared cost
$79,000
Address
550 Kearny St

1st floor-fire sprinkler system, 158 sprinklers

Open the permit page

$79,000
Oct 21, 2011Completed
final sign-off Apr 2012
550 Kearny StPeacock Construction Incoffice ti at ground fl. voluntary accessibility upgrades. (n) entry door operators, (n) accessibility lift, relocation of door, no increase in area, no change in occup or use. mep under separate permit
Details
Permit
201110217371
Status
complete
Filed
Oct 21, 2011
Permit issued
Oct 25, 2011
Final sign-off
Apr 26, 2012
Declared cost
$47,000
Address
550 Kearny St

office ti at ground fl. voluntary accessibility upgrades. (n) entry door operators, (n) accessibility lift, relocation of door, no increase in area, no change in occup or use. mep under separate permit

Open the permit page

$47,000
Sep 14, 2011Never finaled
issued Sep 2011, no final
550 Kearny Ststreet space and mta parking
Details
Permit
M279367
Status
issued
Filed
Sep 14, 2011
Permit issued
Sep 14, 2011
Address
550 Kearny St

street space and mta parking

Open the permit page

Sep 13, 2011Never finaled
filed Sep 2011, never issued
550 Kearny St
Details
Permit
201109134525
Status
filed
Filed
Sep 13, 2011
Declared cost
$93,000,000
Address
550 Kearny St

Open the permit page

$93,000,000
Aug 25, 2011Completed
final sign-off Oct 2011
550 Kearny StAnderson, Rowe & Buckley, Inc.10th floor:fire sprinklers .sprinkler system. 266 sprinklers and new piping with calculations- including window protection windows- space has no ceiling
Details
Permit
201108253281
Status
complete
Filed
Aug 25, 2011
Permit issued
Aug 26, 2011
Final sign-off
Oct 17, 2011
Declared cost
$12,500
Address
550 Kearny St

10th floor:fire sprinklers .sprinkler system. 266 sprinklers and new piping with calculations- including window protection windows- space has no ceiling

Open the permit page

$12,500
Jul 28, 2011Completed
final sign-off Apr 2013
550 Kearny StGiampolini & Co Dba Giampolini/Courtneyremodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit)
Details
Permit
201107281225
Status
complete
Filed
Jul 28, 2011
Permit issued
Sep 1, 2011
Final sign-off
Apr 24, 2013
Declared cost
$250,000
Address
550 Kearny St

remodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit)

Open the permit page

$250,000
Jun 9, 2011Never finaled
issued Jun 2011, no final
550 Kearny StAnderson, Rowe & Buckley, Inc.fire sprinkler system 267 upright sprinklers and 6 pendent sprinklers at 4th floor
Details
Permit
201106097758
Status
issued
Filed
Jun 9, 2011
Permit issued
Jun 9, 2011
Declared cost
$86,000
Address
550 Kearny St

fire sprinkler system 267 upright sprinklers and 6 pendent sprinklers at 4th floor

Open the permit page

$86,000
Jun 9, 2011Completed
final sign-off Aug 2011
550 Kearny StAnderson, Rowe & Buckley, Inc.fire sprinkler system 127 upright sprinklers and 6 pendent sprinklers at 5th floor- using 4th floor claculations- new seismic bracing. hydro required
Details
Permit
201106097760
Status
complete
Filed
Jun 9, 2011
Permit issued
Jun 9, 2011
Final sign-off
Aug 31, 2011
Declared cost
$16,400
Address
550 Kearny St

fire sprinkler system 127 upright sprinklers and 6 pendent sprinklers at 5th floor- using 4th floor claculations- new seismic bracing. hydro required

Open the permit page

$16,400
Apr 29, 2011Completed
final sign-off Nov 2011
550 Kearny StR.M.R. Construction Company5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.
Details
Permit
201104295027
Status
complete
Filed
Apr 29, 2011
Permit issued
May 5, 2011
Final sign-off
Nov 8, 2011
Declared cost
$50,000
Address
550 Kearny St

5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.

Open the permit page

$50,000
Apr 29, 2011Completed
final sign-off Nov 2011
550 Kearny StR.M.R. Construction Company5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.
Details
Permit
201104295029
Status
complete
Filed
Apr 29, 2011
Permit issued
May 5, 2011
Final sign-off
Nov 8, 2011
Declared cost
$50,000
Address
550 Kearny St

5th floor - demolition backc to core & shell - south side of floor, ref to ab-017.

Open the permit page

$50,000
Apr 29, 2011Completed
final sign-off Nov 2011
550 Kearny StR.M.R. Construction Company10th floor - demolition back to core & shell - full floor, ref to ab-017.
Details
Permit
201104295030
Status
complete
Filed
Apr 29, 2011
Permit issued
May 5, 2011
Final sign-off
Nov 8, 2011
Declared cost
$50,000
Address
550 Kearny St

10th floor - demolition back to core & shell - full floor, ref to ab-017.

Open the permit page

$50,000
Mar 15, 2011Never finaled
issued Mar 2011, no final
550 Kearny StR.M.R. Construction Companydemolition only of part of ground floor per ab-017.
Details
Permit
201103152084
Status
issued
Filed
Mar 15, 2011
Permit issued
Mar 18, 2011
Declared cost
$50,000
Address
550 Kearny St

demolition only of part of ground floor per ab-017.

Open the permit page

$50,000
Jul 20, 2010Never finaled
issued Aug 2010, no final
550 Kearny StCarter Brothers Fire & Life Safetyfire alarm system upgrade. replace the old edwards fa system with a new edwards est 3 system. bring all core areas up to code. a cap has been approved for tenant areas.
Details
Permit
201007207006
Status
issued
Filed
Jul 20, 2010
Permit issued
Aug 25, 2010
Declared cost
$82,000
Address
550 Kearny St

fire alarm system upgrade. replace the old edwards fa system with a new edwards est 3 system. bring all core areas up to code. a cap has been approved for tenant areas.

Open the permit page

$82,000
Jun 17, 2009Never finaled
issued Oct 2009, no final
550 Kearny StDonnelly Kerley Builders Inc.elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements.
Details
Permit
200906170637
Status
issued
Filed
Jun 17, 2009
Permit issued
Oct 28, 2009
Declared cost
$105,000
Address
550 Kearny St

elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements.

Open the permit page

$105,000
May 15, 2009Expired or cancelled
cancelled Jun 2010
550 Kearny StCarter Brothers Fire & Life Safetyfire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the same
Details
Permit
200905158524
Status
cancelled
Filed
May 15, 2009
Declared cost
$74,000
Address
550 Kearny St

fire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the same

Open the permit page

$74,000
Mar 23, 2009Completed
final sign-off Jul 2009
550 Kearny StArtsignserect new projecting electric single faced sign.
Details
Permit
200903234625
Status
complete
Filed
Mar 23, 2009
Permit issued
Mar 23, 2009
Final sign-off
Jul 2, 2009
Declared cost
$8,750
Address
550 Kearny St

erect new projecting electric single faced sign.

Open the permit page

$8,750
Jan 16, 2009Completed
final sign-off Feb 2009
550 Kearny Stshow as built conditions of existing restroom. correct door swing in mens room accessible stall. original appl. 200810144055.
Details
Permit
200901160348
Status
complete
Filed
Jan 16, 2009
Permit issued
Jan 16, 2009
Final sign-off
Feb 13, 2009
Address
550 Kearny St

show as built conditions of existing restroom. correct door swing in mens room accessible stall. original appl. 200810144055.

Open the permit page

Nov 21, 2008Completed
final sign-off Feb 2009
550 Kearny StC B F Incbasement-life safety work-add 7 new strobes, 3 new speakers
Details
Permit
200811217111
Status
complete
Filed
Nov 21, 2008
Permit issued
Nov 21, 2008
Final sign-off
Feb 13, 2009
Declared cost
$4,500
Address
550 Kearny St

basement-life safety work-add 7 new strobes, 3 new speakers

Open the permit page

$4,500
Nov 10, 2008Completed
final sign-off Feb 2009
550 Kearny Stelectrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055
Details
Permit
200811106202
Status
complete
Filed
Nov 10, 2008
Permit issued
Nov 17, 2008
Final sign-off
Feb 13, 2009
Declared cost
$50,000
Address
550 Kearny St

electrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055

Open the permit page

$50,000
Oct 14, 2008Completed
final sign-off Feb 2009
550 Kearny Stincludes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit.
Details
Permit
200810144055
Status
complete
Filed
Oct 14, 2008
Permit issued
Oct 15, 2008
Final sign-off
Feb 13, 2009
Declared cost
$175,000
Address
550 Kearny St

includes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit.

Open the permit page

$175,000
Oct 3, 2008Never finaled
issued Oct 2008, no final
550 Kearny Ststreet space only
Details
Permit
M136168
Status
issued
Filed
Oct 3, 2008
Permit issued
Oct 3, 2008
Address
550 Kearny St

street space only

Open the permit page

Jul 7, 2008Never finaled
issued Jul 2008, no final
550 Kearny StR L H Fire Protection Incumbrella permit - compliance with high-rise sprinkler ordinance #377-93.
Details
Permit
200807076115
Status
issued
Filed
Jul 7, 2008
Permit issued
Jul 8, 2008
Final sign-off
Jul 8, 2008
Declared cost
$400
Address
550 Kearny St

umbrella permit - compliance with high-rise sprinkler ordinance #377-93.

Open the permit page

$400
Jun 10, 2008Completed
final sign-off Jul 2008
550 Kearny StC B F Inc1st floor - life safety system modifications @ social security admin., furnish & install approx 10 devices. install new & replace (e) devices with code complaint devices.
Details
Permit
200806104055
Status
complete
Filed
Jun 10, 2008
Permit issued
Jun 10, 2008
Final sign-off
Jul 16, 2008
Declared cost
$5,500
Address
550 Kearny St

1st floor - life safety system modifications @ social security admin., furnish & install approx 10 devices. install new & replace (e) devices with code complaint devices.

Open the permit page

$5,500
Jun 5, 2008Never finaled
issued Jun 2008, no final
550 Kearny Ststreet space permit only.
Details
Permit
M121946
Status
issued
Filed
Jun 5, 2008
Permit issued
Jun 5, 2008
Address
550 Kearny St

street space permit only.

Open the permit page

May 14, 2008Expired or cancelled
cancelled Jan 2026
550 Kearny St1st floor: life safety system- furnish, install new and replace existing devices with code compliance devices.
Details
Permit
200805142043
Status
cancelled
Filed
May 14, 2008
Declared cost
$5,500
Address
550 Kearny St

1st floor: life safety system- furnish, install new and replace existing devices with code compliance devices.

Open the permit page

$5,500
Apr 30, 2008Expired or cancelled
expired Jul 2009
550 Kearny StR L H Fire Protection Incti upgrade on ex. sprinkler system. add 16 head and relocate 13 heads at various locations in the bldg
Details
Permit
200804300926
Status
expired
Filed
Apr 30, 2008
Permit issued
Apr 30, 2008
Declared cost
$6,400
Address
550 Kearny St

ti upgrade on ex. sprinkler system. add 16 head and relocate 13 heads at various locations in the bldg

Open the permit page

$6,400
Feb 22, 2008Completed
final sign-off Jul 2008
550 Kearny StMatrix Hg Incmodify e hvac systems duct layout, add n 2/2 serving interview room, including assoc d/w and refer piping. ref oti 200704178937
Details
Permit
200802225414
Status
complete
Filed
Feb 22, 2008
Permit issued
Mar 13, 2008
Final sign-off
Jul 16, 2008
Declared cost
$30,341
Address
550 Kearny St

modify e hvac systems duct layout, add n 2/2 serving interview room, including assoc d/w and refer piping. ref oti 200704178937

Open the permit page

$30,341
Feb 21, 2008Completed
final sign-off Jul 2008
550 Kearny StBcci Construction Companyrevision to pa# 200710155412-fabricate and install new eyebrow feature and dental elements on building face
Details
Permit
200802215222
Status
complete
Filed
Feb 21, 2008
Permit issued
Feb 22, 2008
Final sign-off
Jul 11, 2008
Declared cost
$5,000
Address
550 Kearny St

revision to pa# 200710155412-fabricate and install new eyebrow feature and dental elements on building face

Open the permit page

$5,000
Feb 19, 2008Never finaled
issued Feb 2008, no final
550 Kearny Ststreet space only
Details
Permit
M108125
Status
issued
Filed
Feb 19, 2008
Permit issued
Feb 19, 2008
Address
550 Kearny St

street space only

Open the permit page

Feb 19, 2008Completed
final sign-off Jul 2008
550 Kearny StThomas Swan Sign Co Incnon-electric, projecting & single faced address sign.
Details
Permit
200802195011
Status
complete
Filed
Feb 19, 2008
Permit issued
Feb 25, 2008
Final sign-off
Jul 11, 2008
Declared cost
$2,000
Address
550 Kearny St

non-electric, projecting & single faced address sign.

Open the permit page

$2,000
Jan 29, 2008Completed
final sign-off Jun 2008
550 Kearny StC B F Inc3rd floor - provide receptacles and lighting for the office space, also provide title 24 calculations. ref. appl.# 2007-1024-6273
Details
Permit
200801293498
Status
complete
Filed
Jan 29, 2008
Permit issued
Jan 29, 2008
Final sign-off
Jun 25, 2008
Declared cost
$13,000
Address
550 Kearny St

3rd floor - provide receptacles and lighting for the office space, also provide title 24 calculations. ref. appl.# 2007-1024-6273

Open the permit page

$13,000
Jan 24, 2008Completed
final sign-off Jun 2008
550 Kearny StC B F Incinstall total 13 new strobes on 3rd floor. 1 new smoke detector, 10 speaker/strobe, 3 strobes.
Details
Permit
200801243170
Status
complete
Filed
Jan 24, 2008
Permit issued
Jan 24, 2008
Final sign-off
Jun 25, 2008
Declared cost
$6,000
Address
550 Kearny St

install total 13 new strobes on 3rd floor. 1 new smoke detector, 10 speaker/strobe, 3 strobes.

Open the permit page

$6,000
Jan 7, 2008Completed
final sign-off Jun 2008
550 Kearny StAyoob & Peery Plumbing Co Increlocate 34 sprinkler heads for ti on the 3rd floor.
Details
Permit
200801071922
Status
complete
Filed
Jan 7, 2008
Permit issued
Jan 7, 2008
Final sign-off
Jun 25, 2008
Declared cost
$3,300
Address
550 Kearny St

relocate 34 sprinkler heads for ti on the 3rd floor.

Open the permit page

$3,300
Nov 30, 2007Completed
final sign-off Mar 2008
550 Kearny StC B F Inc2nd floor ste #250: life safety system verifications, furnish & install 1 speaker strobe light, 3 strobes, & 2 speakers.
Details
Permit
200711309378
Status
complete
Filed
Nov 30, 2007
Permit issued
Nov 30, 2007
Final sign-off
Mar 19, 2008
Declared cost
$2,500
Address
550 Kearny St

2nd floor ste #250: life safety system verifications, furnish & install 1 speaker strobe light, 3 strobes, & 2 speakers.

Open the permit page

$2,500
Nov 20, 2007Completed
final sign-off Mar 2008
550 Kearny StAllied Fire Protection2nd floor: relocate 7 fire sprinklers
Details
Permit
200711208674
Status
complete
Filed
Nov 20, 2007
Permit issued
Nov 20, 2007
Final sign-off
Mar 19, 2008
Declared cost
$3,100
Address
550 Kearny St

2nd floor: relocate 7 fire sprinklers

Open the permit page

$3,100
Oct 24, 2007Completed
final sign-off Jun 2008
550 Kearny StBcci Construction Companyt/i suite 300 a&b, restrooms: new walls & doors ,relocate restroom fixtures. mep under separate application
Details
Permit
200710246273
Status
complete
Filed
Oct 24, 2007
Permit issued
Oct 26, 2007
Final sign-off
Jun 25, 2008
Declared cost
$180,000
Address
550 Kearny St

t/i suite 300 a&b, restrooms: new walls & doors ,relocate restroom fixtures. mep under separate application

Open the permit page

$180,000
Oct 24, 2007Completed
final sign-off Mar 2008
550 Kearny StBcci Construction Companyt/i suite 200: new conference room, office and open office, millwork . mep under sep. application.
Details
Permit
200710246267
Status
complete
Filed
Oct 24, 2007
Permit issued
Oct 25, 2007
Final sign-off
Mar 19, 2008
Declared cost
$70,000
Address
550 Kearny St

t/i suite 200: new conference room, office and open office, millwork . mep under sep. application.

Open the permit page

$70,000
Oct 15, 2007Completed
final sign-off Jul 2008
550 Kearny StBcci Construction Companylimited replacement of exterior finish panels cladding and awnings, including rain leaders and lighting
Details
Permit
200710155412
Status
complete
Filed
Oct 15, 2007
Permit issued
Oct 15, 2007
Final sign-off
Jul 11, 2008
Declared cost
$480,000
Address
550 Kearny St

limited replacement of exterior finish panels cladding and awnings, including rain leaders and lighting

Open the permit page

$480,000
Sep 4, 2007Never finaled
issued Sep 2007, no final
550 Kearny Ststreet space
Details
Permit
M84725
Status
issued
Filed
Sep 4, 2007
Permit issued
Sep 4, 2007
Address
550 Kearny St

street space

Open the permit page

Aug 24, 2007Never finaled
issued Aug 2007, no final
550 Kearny Ststreet space permit only.
Details
Permit
M83485
Status
issued
Filed
Aug 24, 2007
Permit issued
Aug 24, 2007
Address
550 Kearny St

street space permit only.

Open the permit page

Aug 23, 2007Never finaled
issued Aug 2007, no final
550 Kearny StBcci Construction Companydemo only - b/1/3/4/7/8/10 floors only - ls and sp to remain functional. - areas to remain unoccupied per ab-017
Details
Permit
200708230688
Status
issued
Filed
Aug 23, 2007
Permit issued
Aug 23, 2007
Declared cost
$50,000
Address
550 Kearny St

demo only - b/1/3/4/7/8/10 floors only - ls and sp to remain functional. - areas to remain unoccupied per ab-017

Open the permit page

$50,000
May 16, 2007Completed
final sign-off Jun 2007
550 Kearny StAlmer Corp.rev. to 2007/03/26/7251: install single low drinking fountain in (e) alcove per inspector's request. administrative paper change only. approved & priced on previous aopplic. #2007/02/08/3668.
Details
Permit
200705161478
Status
complete
Filed
May 16, 2007
Permit issued
May 16, 2007
Final sign-off
Jun 6, 2007
Address
550 Kearny St

rev. to 2007/03/26/7251: install single low drinking fountain in (e) alcove per inspector's request. administrative paper change only. approved & priced on previous aopplic. #2007/02/08/3668.

Open the permit page

Apr 17, 2007Completed
final sign-off Jul 2008
550 Kearny Stbeth hanson, oti-1, 1st floor.
Details
Permit
200704178937
Status
complete
Filed
Apr 17, 2007
Permit issued
Apr 17, 2007
Final sign-off
Jul 16, 2008
Declared cost
$31,000
Address
550 Kearny St

beth hanson, oti-1, 1st floor.

Open the permit page

$31,000
Mar 26, 2007Completed
final sign-off Jun 2007
550 Kearny StAlmer Corp.administrative permit revision. remove drinking fountain per original app #200702083668/new hi low fountain under separate permit at a later date.
Details
Permit
200703267251
Status
complete
Filed
Mar 26, 2007
Permit issued
Mar 26, 2007
Final sign-off
Jun 6, 2007
Address
550 Kearny St

administrative permit revision. remove drinking fountain per original app #200702083668/new hi low fountain under separate permit at a later date.

Open the permit page

Feb 8, 2007Completed
final sign-off Jun 2007
550 Kearny StAlmer Corp.administrative permit based on appl#200611178003 to perform plumbing & electrical for purpose of acquiring a plumbing & electrical permits to perform all trades. all work remains the same. no change to appl#200611178003. all work to be performed on 9/f
Details
Permit
200702083668
Status
complete
Filed
Feb 8, 2007
Permit issued
Feb 8, 2007
Final sign-off
Jun 6, 2007
Declared cost
$13,500
Address
550 Kearny St

administrative permit based on appl#200611178003 to perform plumbing & electrical for purpose of acquiring a plumbing & electrical permits to perform all trades. all work remains the same. no change to appl#200611178003. all work to be performed on 9/f

Open the permit page

$13,500
Jan 16, 2007Completed
final sign-off Mar 2007
550 Kearny StC B F Inclife safety system modifications at 550 kearny 9th fl installing 1 power supply, 1 dual sq module 15 wall mounted stocks , 1 ceiling mounted strobe, 15 speakers, 1manual pull station, 2 smoke detectors, 2 boxes
Details
Permit
200701161681
Status
complete
Filed
Jan 16, 2007
Permit issued
Jan 16, 2007
Final sign-off
Mar 26, 2007
Declared cost
$18,000
Address
550 Kearny St

life safety system modifications at 550 kearny 9th fl installing 1 power supply, 1 dual sq module 15 wall mounted stocks , 1 ceiling mounted strobe, 15 speakers, 1manual pull station, 2 smoke detectors, 2 boxes

Open the permit page

$18,000
Jan 9, 2007Completed
final sign-off Mar 2007
550 Kearny StR L H Fire Protection Inct.i upgrade on fire spkr sys. dwa 9th flr (#3334) reloc-32, add-2, delete-2.
Details
Permit
200701091307
Status
complete
Filed
Jan 9, 2007
Permit issued
Jan 9, 2007
Final sign-off
Mar 26, 2007
Declared cost
$6,800
Address
550 Kearny St

t.i upgrade on fire spkr sys. dwa 9th flr (#3334) reloc-32, add-2, delete-2.

Open the permit page

$6,800
Jan 9, 2007Completed
final sign-off Mar 2007
550 Kearny StPankow Special Projects Lpoti-2 lt me floor 9
Details
Permit
200701091309
Status
complete
Filed
Jan 9, 2007
Permit issued
Jan 9, 2007
Final sign-off
Mar 26, 2007
Declared cost
$95,000
Address
550 Kearny St

oti-2 lt me floor 9

Open the permit page

$95,000
Nov 27, 2006Never finaled
issued Nov 2006, no final
550 Kearny Stdemolish interior non bearing walls and suspended ceiling at portion of floors.
Details
Permit
200611278516
Status
issued
Filed
Nov 27, 2006
Permit issued
Nov 27, 2006
Declared cost
$24,000
Address
550 Kearny St

demolish interior non bearing walls and suspended ceiling at portion of floors.

Open the permit page

$24,000
Nov 17, 2006Completed
final sign-off Mar 2007
550 Kearny StPankow Special Projects Lpoti-1 9th/fl-el, me,ls,sp.
Details
Permit
200611178003
Status
complete
Filed
Nov 17, 2006
Permit issued
Dec 27, 2006
Final sign-off
Mar 26, 2007
Declared cost
$250,000
Address
550 Kearny St

oti-1 9th/fl-el, me,ls,sp.

Open the permit page

$250,000
Nov 7, 2006Never finaled
issued Nov 2006, no final
550 Kearny Stdemo interior non bearing walls and portiion suspended ceiling at north suite on 3rd floor
Details
Permit
200611077079
Status
issued
Filed
Nov 7, 2006
Permit issued
Nov 7, 2006
Declared cost
$12,500
Address
550 Kearny St

demo interior non bearing walls and portiion suspended ceiling at north suite on 3rd floor

Open the permit page

$12,500
Nov 2, 2006Never finaled
issued Nov 2006, no final
550 Kearny StPankow Special Projects Lp9th floor-non structural demolition within the t.i. space, 950 & 980.
Details
Permit
200611026718
Status
issued
Filed
Nov 2, 2006
Permit issued
Nov 2, 2006
Declared cost
$25,000
Address
550 Kearny St

9th floor-non structural demolition within the t.i. space, 950 & 980.

Open the permit page

$25,000
Apr 14, 2004Never finaled
issued Apr 2004, no final
550 Kearny StSigns America Inc Dba Sign A Ramaerect electric projecting multi faced sign
Details
Permit
200404141220
Status
issued
Filed
Apr 14, 2004
Permit issued
Apr 14, 2004
Address
550 Kearny St

erect electric projecting multi faced sign

Open the permit page

Nov 4, 2003Completed
final sign-off Nov 2004
550 Kearny StL.D. Strobel Co Ltdinstallation of an unoccupied telecommunications facility & antenna on the roof
Details
Permit
200311049379
Status
complete
Filed
Nov 4, 2003
Permit issued
Aug 3, 2004
Final sign-off
Nov 3, 2004
Declared cost
$50,000
Address
550 Kearny St

installation of an unoccupied telecommunications facility & antenna on the roof

Open the permit page

$50,000
May 20, 2003Expired or cancelled
cancelled Apr 2004
550 Kearny StCahill Const Service Incoti-4 3rd fl. el
Details
Permit
200305205094
Status
cancelled
Filed
May 20, 2003
Declared cost
$16,000
Address
550 Kearny St

oti-4 3rd fl. el

Open the permit page

$16,000
May 16, 2003Completed
final sign-off Nov 2003
550 Kearny StCahill Const Service Incoti-3 = l/s (3rd fl only)
Details
Permit
200305164825
Status
complete
Filed
May 16, 2003
Permit issued
May 23, 2003
Final sign-off
Nov 7, 2003
Declared cost
$16,000
Address
550 Kearny St

oti-3 = l/s (3rd fl only)

Open the permit page

$16,000
May 9, 2003Completed
final sign-off Nov 2003
550 Kearny StCahill Const Service Incoti-2, 3rd floor, me, sp
Details
Permit
200305094170
Status
complete
Filed
May 9, 2003
Permit issued
May 20, 2003
Final sign-off
Nov 7, 2003
Declared cost
$52,000
Address
550 Kearny St

oti-2, 3rd floor, me, sp

Open the permit page

$52,000
Mar 26, 2003Never finaled
issued Apr 2003, no final
550 Kearny StCahill Const Service Incoti-2, 9th fl, le, me, ls, sp
Details
Permit
200303260682
Status
issued
Filed
Mar 26, 2003
Permit issued
Apr 10, 2003
Declared cost
$21,500
Address
550 Kearny St

oti-2, 9th fl, le, me, ls, sp

Open the permit page

$21,500
Mar 10, 2003Completed
final sign-off Nov 2003
550 Kearny StCahill Const Service Incoti-1 3rd fl. el, me, ls
Details
Permit
200303109222
Status
complete
Filed
Mar 10, 2003
Permit issued
May 8, 2003
Final sign-off
Nov 7, 2003
Declared cost
$225,000
Address
550 Kearny St

oti-1 3rd fl. el, me, ls

Open the permit page

$225,000
Mar 4, 2003Never finaled
issued Mar 2003, no final
550 Kearny StCahill Const Service Incoti-1 9th fl el,me, ls, sp
Details
Permit
200303048724
Status
issued
Filed
Mar 4, 2003
Permit issued
Mar 21, 2003
Declared cost
$68,000
Address
550 Kearny St

oti-1 9th fl el,me, ls, sp

Open the permit page

$68,000
Oct 18, 2002Expired or cancelled
cancelled Jun 2003
550 Kearny StCahill Const Service Incoti- 6th floor l/s
Details
Permit
200210189334
Status
cancelled
Filed
Oct 18, 2002
Declared cost
$52,000
Address
550 Kearny St

oti- 6th floor l/s

Open the permit page

$52,000
Sep 27, 2002Completed
final sign-off Feb 2003
550 Kearny StCahill Const Service Incoti-3 6th floor, me, sp
Details
Permit
200209277622
Status
complete
Filed
Sep 27, 2002
Permit issued
Oct 10, 2002
Final sign-off
Feb 27, 2003
Declared cost
$12,000
Address
550 Kearny St

oti-3 6th floor, me, sp

Open the permit page

$12,000
Sep 23, 2002Completed
final sign-off Feb 2003
550 Kearny StCahill Const Service Incoti-2, 6th floor, el, ls
Details
Permit
200209237206
Status
complete
Filed
Sep 23, 2002
Permit issued
Oct 10, 2002
Final sign-off
Feb 27, 2003
Declared cost
$16,000
Address
550 Kearny St

oti-2, 6th floor, el, ls

Open the permit page

$16,000
Sep 6, 2002Completed
final sign-off Feb 2003
550 Kearny StCahill Const Service Incoti-1 6th floor, el, me, ls
Details
Permit
200209065823
Status
complete
Filed
Sep 6, 2002
Permit issued
Sep 23, 2002
Final sign-off
Feb 27, 2003
Declared cost
$25,000
Address
550 Kearny St

oti-1 6th floor, el, me, ls

Open the permit page

$25,000
Apr 10, 2002Completed
final sign-off Jul 2002
550 Kearny StCahill Const Service Increnew expired permit 200007135038 for final inspection
Details
Permit
200204103547
Status
complete
Filed
Apr 10, 2002
Permit issued
Apr 10, 2002
Final sign-off
Jul 22, 2002
Address
550 Kearny St

renew expired permit 200007135038 for final inspection

Open the permit page

Feb 8, 2002Completed
final sign-off Apr 2002
550 Kearny StCahill Const Service Increvision to app #200201096510 and 200009140556 permit for verification purposes only
Details
Permit
200202088842
Status
complete
Filed
Feb 8, 2002
Permit issued
Feb 8, 2002
Final sign-off
Apr 5, 2002
Address
550 Kearny St

revision to app #200201096510 and 200009140556 permit for verification purposes only

Open the permit page

Jan 25, 2002Completed
final sign-off Apr 2002
550 Kearny StCahill Const Service Incoti-2 - 1st floor el, me, l/ss, sp
Details
Permit
200201257733
Status
complete
Filed
Jan 25, 2002
Permit issued
Feb 6, 2002
Final sign-off
Apr 5, 2002
Declared cost
$49,500
Address
550 Kearny St

oti-2 - 1st floor el, me, l/ss, sp

Open the permit page

$49,500
Jan 9, 2002Completed
final sign-off Apr 2002
550 Kearny StCahill Const Service Incoti-1 gr fl el, me,sp,ls
Details
Permit
200201096510
Status
complete
Filed
Jan 9, 2002
Permit issued
Jan 24, 2002
Final sign-off
Apr 5, 2002
Declared cost
$85,000
Address
550 Kearny St

oti-1 gr fl el, me,sp,ls

Open the permit page

$85,000
Oct 11, 2001Completed
final sign-off Dec 2001
540 Kearny StCahill Const Service Incoti-2,grd flr,ls,spr
Details
Permit
200110110425
Status
complete
Filed
Oct 11, 2001
Permit issued
Nov 8, 2001
Final sign-off
Dec 5, 2001
Declared cost
$12,000
Address
540 Kearny St

oti-2,grd flr,ls,spr

Open the permit page

$12,000
Aug 16, 2001Completed
final sign-off Dec 2001
540 Kearny StCahill Const Service Incoti-1 ground floor, ltg, mech
Details
Permit
200108166217
Status
complete
Filed
Aug 16, 2001
Permit issued
Sep 11, 2001
Final sign-off
Dec 5, 2001
Declared cost
$39,000
Address
540 Kearny St

oti-1 ground floor, ltg, mech

Open the permit page

$39,000
Jan 23, 2001Expired or cancelled
expired Jul 2001
550 Kearny Ststreet space permit
Details
Permit
M15345
Status
expired
Filed
Jan 23, 2001
Permit issued
Jan 23, 2001
Address
550 Kearny St

street space permit

Open the permit page

Sep 14, 2000Completed
final sign-off Apr 2002
550 Kearny StCahill Const Service Incinterior non-structural demolition only under this permit. demolition of approx. 480 lf of drywall
Details
Permit
200009140556
Status
complete
Filed
Sep 14, 2000
Permit issued
Sep 19, 2000
Final sign-off
Apr 5, 2002
Declared cost
$18,500
Address
550 Kearny St

interior non-structural demolition only under this permit. demolition of approx. 480 lf of drywall

Open the permit page

$18,500
Sep 14, 2000Completed
final sign-off Dec 2001
550 Kearny StCahill Const Service Incoti 2 ground fl, ltg, mech, spr, ls.
Details
Permit
200009140558
Status
complete
Filed
Sep 14, 2000
Permit issued
Nov 14, 2000
Final sign-off
Dec 5, 2001
Declared cost
$21,000
Address
550 Kearny St

oti 2 ground fl, ltg, mech, spr, ls.

Open the permit page

$21,000
Jul 13, 2000Completed
final sign-off Jul 2002
550 Kearny StCahill Const Service Incwork to be completed on the 9th floor, demolition of 300 lf ot drywall partitions
Details
Permit
200007135038
Status
complete
Filed
Jul 13, 2000
Permit issued
Aug 7, 2000
Final sign-off
Jul 22, 2002
Declared cost
$3,000
Address
550 Kearny St

work to be completed on the 9th floor, demolition of 300 lf ot drywall partitions

Open the permit page

$3,000
May 11, 2000Completed
final sign-off Dec 2001
550 Kearny StCahill Const Service Incoti-1 el, me, l/s, sp 1st floor
Details
Permit
200005119687
Status
complete
Filed
May 11, 2000
Permit issued
Jun 13, 2000
Final sign-off
Dec 5, 2001
Declared cost
$61,500
Address
550 Kearny St

oti-1 el, me, l/s, sp 1st floor

Open the permit page

$61,500

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.