Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 2111 Funston Av | replace railing at (e) 2nd floor deck and addition of rear deck at ground level. change rear window to door.Details
replace railing at (e) 2nd floor deck and addition of rear deck at ground level. change rear window to door. | $20,000 | |
| Sep 10, 2020 | Completed final sign-off Feb 2023 | 1001 22nd St | installation of nine electrical bus charging statons & an equipment distribution center at sfmta woods bus yard. all of the equipment will be installed outside of the building within the yard.Details
installation of nine electrical bus charging statons & an equipment distribution center at sfmta woods bus yard. all of the equipment will be installed outside of the building within the yard. | $2,600,000 | |
| Sep 17, 2019 | Completed final sign-off Nov 2020 | 1899 Waller St | revision to 2016-1221-5595: reduction of structural work scope at roof. structural work only.Details
revision to 2016-1221-5595: reduction of structural work scope at roof. structural work only. | ||
| Oct 12, 2016 | Completed final sign-off Oct 2016 | 691 29th Av | He & Kuang Inc | correction to existing square footage note on sheet a1.1. ref pa #201512215620Details
correction to existing square footage note on sheet a1.1. ref pa #201512215620 | |
| Feb 18, 2016 | Completed final sign-off Oct 2016 | 691 29th Av | He & Kuang Inc | revision to pa 2015-1221-5620 - demo addition interior partition walls: reconfigure closet & bathroom door & wall at stairs; delete new footingsDetails
revision to pa 2015-1221-5620 - demo addition interior partition walls: reconfigure closet & bathroom door & wall at stairs; delete new footings | |
| Dec 21, 2015 | Completed final sign-off Oct 2016 | 691 29th Av | He & Kuang Inc | comply w/complaint #201585081 & revision to #201512165218. relocate entry 2nd flr to 1st flr, remodel (e) skylight & stair, relocate kitchen, remove bearing wall, demolish bedroom to add bathrm, add powder rm. 1st flr: add 2 bedrooms, 2 bathrooms, family room & wet bar.Details
comply w/complaint #201585081 & revision to #201512165218. relocate entry 2nd flr to 1st flr, remodel (e) skylight & stair, relocate kitchen, remove bearing wall, demolish bedroom to add bathrm, add powder rm. 1st flr: add 2 bedrooms, 2 bathrooms, family room & wet bar. | $150,000 |
| Feb 5, 2015 | Completed final sign-off Aug 2015 | 1355 Market St | Novo Construction Inc | 2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher.Details
2nd floor:partial 2nd floor t.i. to include selective demolition, new non load bearing partitions. mep and fire/life safety under seperate permit. n/a for the maher. | $5,000 |
| Jan 21, 2015 | Completed final sign-off May 2015 | 875 Howard St | suite #500 - t.i. to include new partitions, new white boards, new workstations. modify and rewire (e) and install new power data, relocate (e) light fixtures. maher n/a.Details
suite #500 - t.i. to include new partitions, new white boards, new workstations. modify and rewire (e) and install new power data, relocate (e) light fixtures. maher n/a. | $45,000 | |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 101 California St | Novo Construction Inc | mechanical and electrical work for tenant improvement on the 43rd floor. referenced ti 2015.0113.5557Details
mechanical and electrical work for tenant improvement on the 43rd floor. referenced ti 2015.0113.5557 | $200,000 |
| Nov 18, 2014 | Completed final sign-off Aug 2015 | 50 California St | Skyline Construction | 29th floor - new non-structural partitions, doors, ceilings lights, millwork, finishes electrical, plumbing & mechanical. sprinkler & life safety under separate permit. n/a maher ordinanceDetails
29th floor - new non-structural partitions, doors, ceilings lights, millwork, finishes electrical, plumbing & mechanical. sprinkler & life safety under separate permit. n/a maher ordinance | $474,259 |
| Oct 2, 2014 | Completed final sign-off Dec 2014 | 505 Howard St | Skyline Construction | ground floor: revision to app# 201404284314 to revise reflected ceiling plan details. ref app#201404284314. n/a for the maherDetails
ground floor: revision to app# 201404284314 to revise reflected ceiling plan details. ref app#201404284314. n/a for the maher | |
| Jul 24, 2014 | Completed final sign-off Feb 2015 | 185 Berry St | Skyline Construction | grnd flr: voluntary disabled access barrier removal in the berry street building's ground floor lobby 2 restrooms. no mechanical, electrical & plumbing work; maher n/aDetails
grnd flr: voluntary disabled access barrier removal in the berry street building's ground floor lobby 2 restrooms. no mechanical, electrical & plumbing work; maher n/a | $20,000 |
| Jul 10, 2014 | Completed final sign-off Feb 2015 | 185 Berry St | Skyline Construction | voluntary disabled access barrier removal in wharfside. bldg lobby 3 3rd floor. the extg restrooms will have minor alterations to make them compliant with the current code cycle. there will be no mechanical,electrical, or plumbing work involved.Details
voluntary disabled access barrier removal in wharfside. bldg lobby 3 3rd floor. the extg restrooms will have minor alterations to make them compliant with the current code cycle. there will be no mechanical,electrical, or plumbing work involved. | $30,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 505 Howard St | Novo Construction Inc | 4th floor - revision to appl #2014.0328.1925 including new offices conference rooms & break rooms, new elevator lobby finishes. mep, sprinkler fire alarm on separate permit. n/a maher ordinanceDetails
4th floor - revision to appl #2014.0328.1925 including new offices conference rooms & break rooms, new elevator lobby finishes. mep, sprinkler fire alarm on separate permit. n/a maher ordinance | $100,000 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | (11th floor) revision to 2014-0514-5738 / ceiling detail. compliance with ordinance no 155-13 not required.Details
(11th floor) revision to 2014-0514-5738 / ceiling detail. compliance with ordinance no 155-13 not required. | |
| May 14, 2009 | Completed final sign-off Dec 2009 | 101 California St | Skyline Construction | selective demo, new partitions, doors, side lights, ceilings, casework, and finishes. mech,elec, life safety and sprinkler separate permitDetails
selective demo, new partitions, doors, side lights, ceilings, casework, and finishes. mech,elec, life safety and sprinkler separate permit | $200,000 |
| May 14, 2009 | Completed final sign-off Jul 2009 | 343 Sansome St | Gci, Inc | remodel of tenant suite including demolition of existing interior partitions. mep and fire protection under separate permitDetails
remodel of tenant suite including demolition of existing interior partitions. mep and fire protection under separate permit | $36,000 |
| May 8, 2009 | Completed final sign-off Sep 2009 | 50 California St | Skyline Construction | unit# 1603- demolition & construction of ceiling height partitions, new finishes, frames & doors. mechanical, electrical, life safety, fire sprinklers under seperate permit.Details
unit# 1603- demolition & construction of ceiling height partitions, new finishes, frames & doors. mechanical, electrical, life safety, fire sprinklers under seperate permit. | $150,000 |
| May 1, 2009 | Completed final sign-off Sep 2009 | 1 Market St | Gci, Inc | 17th floor removal of existing ceiling grid, light fixtures, wall & floor finishes, install new ceiling grid new gyp bd ceiling & soffits, new light fixtures wall & floor finishes in elevator lobby & corridor. elect, mech, life safety under separate permit.Details
17th floor removal of existing ceiling grid, light fixtures, wall & floor finishes, install new ceiling grid new gyp bd ceiling & soffits, new light fixtures wall & floor finishes in elevator lobby & corridor. elect, mech, life safety under separate permit. | $110,000 |
| Nov 25, 2008 | Completed final sign-off Jan 2009 | 1 Embarcadero Center | Skyline Construction | remove door & glazing and movable partition, add new glazing and finishes.revision to permit 2007 1129 9167.Details
remove door & glazing and movable partition, add new glazing and finishes.revision to permit 2007 1129 9167. | $8,000 |
| Nov 25, 2008 | Completed final sign-off Dec 2008 | 303 02nd St | Gci, Inc | revision to appl#200810245040 to adjust cost of job from $46,000 to $311,000.Details
revision to appl#200810245040 to adjust cost of job from $46,000 to $311,000. | $265,000 |
| Nov 24, 2008 | Completed final sign-off Mar 2009 | 655 Montgomery St | Skyline Construction | revision to application 200810285277 to change server room to equipment room.Details
revision to application 200810285277 to change server room to equipment room. | |
| Nov 17, 2008 | Completed final sign-off Apr 2009 | 555 Mission St | Skyline Construction | revision to permit app #200807297862. electrical mechanical and plmg work included in revisionDetails
revision to permit app #200807297862. electrical mechanical and plmg work included in revision | $5,000 |
| Nov 17, 2008 | Completed final sign-off Feb 2009 | 185 Berry St | Gci, Inc | 5th floor electrical & mechancical work tenant improvement, ref arch #200810103941.Details
5th floor electrical & mechancical work tenant improvement, ref arch #200810103941. | $56,000 |
| Nov 12, 2008 | Completed final sign-off Mar 2009 | 251 Rhode Island St | Novo Construction Inc | 2nd floor-mechanical, electrical work ofr tenant improvement, reference pa# 2008-0611-4157Details
2nd floor-mechanical, electrical work ofr tenant improvement, reference pa# 2008-0611-4157 | $98,000 |
| Nov 12, 2008 | Completed final sign-off Dec 2008 | 303 02nd St | Gci, Inc | 3rd floor-mechanical work for tenant improvement, reference pa# 2008-0909-1030Details
3rd floor-mechanical work for tenant improvement, reference pa# 2008-0909-1030 | $180,679 |
| Nov 10, 2008 | Completed final sign-off Feb 2009 | 550 Kearny St | electrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055Details
electrical and mechanical work for tenant improvement at the basement. ref arch. 200810144055 | $50,000 | |
| Nov 3, 2008 | Completed final sign-off Nov 2008 | 201 Mission St | Novo Construction Inc | #1450 - relocate 1 supply diffuser, add 1 supply air diffuser, relocate 2 return air grilles. ref. app #200807227320Details
#1450 - relocate 1 supply diffuser, add 1 supply air diffuser, relocate 2 return air grilles. ref. app #200807227320 | $5,500 |
| Oct 31, 2008 | Completed final sign-off Dec 2009 | 760 Market St | Skyline Construction | demolition of interior non-load bearing partitions on the 6th & 11th flr per ab-017. no exterior work. arch, mep, life safety, & fire sprinkler under seperate permit.Details
demolition of interior non-load bearing partitions on the 6th & 11th flr per ab-017. no exterior work. arch, mep, life safety, & fire sprinkler under seperate permit. | $65,000 |
| Oct 30, 2008 | Completed final sign-off Dec 2008 | 303 02nd St | Gci, Inc | 3rd floor fire sprinkelr work to include 100 relcoated & 53 removed.Details
3rd floor fire sprinkelr work to include 100 relcoated & 53 removed. | $36,000 |
| Oct 24, 2008 | Completed final sign-off Dec 2008 | 303 02nd St | Gci, Inc | 3rd floor-electrical work for tenant improvement, reference pa# 2008-0909-1030Details
3rd floor-electrical work for tenant improvement, reference pa# 2008-0909-1030 | $46,550 |
| Oct 14, 2008 | Completed final sign-off Feb 2009 | 550 Kearny St | includes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit.Details
includes selective demolition, new ceiling height partitions. new finishes, new handrails at (e) stair. mep lifie safty and fire under seperate permit. | $175,000 | |
| Oct 9, 2008 | Completed final sign-off Mar 2009 | 555 Mission St | Skyline Construction | new full floor tenant on previously unbuild, unoccupied floor. new non load bearing partitions, finishes, lighting electrical and mechanical work. no structural on job. fire and life safety under sep permitDetails
new full floor tenant on previously unbuild, unoccupied floor. new non load bearing partitions, finishes, lighting electrical and mechanical work. no structural on job. fire and life safety under sep permit | $24,000,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2008 | 717 Market St | Teamwrkx Construction | 5th floor mechanical to include providing heating & ventilation to office space provide heating ventilation & cooling to conference rooms. electrical work to include new lighting/title 24. ref arch pa #200809111390.Details
5th floor mechanical to include providing heating & ventilation to office space provide heating ventilation & cooling to conference rooms. electrical work to include new lighting/title 24. ref arch pa #200809111390. | $160,000 |
| Sep 17, 2008 | Completed final sign-off Feb 2009 | 185 Berry St | Novo Construction Inc | 4th floor-new lighting/title 24 for the 4th floor, reference pa# 2008-0528-3061Details
4th floor-new lighting/title 24 for the 4th floor, reference pa# 2008-0528-3061 | $80,000 |
| Sep 11, 2008 | Completed final sign-off Mar 2009 | 333 Market St | Skyline Construction | demolition & reconfiguration of private offices. mep., life safety & fire sprinkler under seperate permit.Details
demolition & reconfiguration of private offices. mep., life safety & fire sprinkler under seperate permit. | $40,000 |
| Sep 11, 2008 | Completed final sign-off Jun 2010 | 135 Main St | Skyline Construction | new lighting/title 24 for tenant improvement on the 5th floorDetails
new lighting/title 24 for tenant improvement on the 5th floor | $60,000 |
| Sep 9, 2008 | Completed final sign-off Oct 2008 | 1 Market St | Novo Construction Inc | demolition of interior partitions. construction to include interior partitions, door glazing, millwork, plumbing, ceiling & finishes throughtout. mep, life safety & fire sprinklers under separate permit.Details
demolition of interior partitions. construction to include interior partitions, door glazing, millwork, plumbing, ceiling & finishes throughtout. mep, life safety & fire sprinklers under separate permit. | $420,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 50 Osgood Pl | Novo Construction Inc | #110- tenant improvement to include bldg out one ceiling height non structural partition. modification will be required to extg suspended ceiling, lights, hvac, sprinkler or life saftyDetails
#110- tenant improvement to include bldg out one ceiling height non structural partition. modification will be required to extg suspended ceiling, lights, hvac, sprinkler or life safty | $15,500 |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 1 Market St | Novo Construction Inc | 26th floor tenant improvement including demolition of existing interior partitions, construction to include new partition, doors finishes. mep, life safety & fire sprinkler under separate permit.Details
26th floor tenant improvement including demolition of existing interior partitions, construction to include new partition, doors finishes. mep, life safety & fire sprinkler under separate permit. | $112,550 |
| Aug 22, 2008 | Completed final sign-off Dec 2008 | 580 California St | Novo Construction Inc | modify existing parking space to comply with ada ramp. infill existing ramp & partial parking area, install 2 handrails, restripping, new steel guardrail.Details
modify existing parking space to comply with ada ramp. infill existing ramp & partial parking area, install 2 handrails, restripping, new steel guardrail. | $69,000 |
| Aug 13, 2008 | Completed final sign-off Feb 2009 | 3 Embarcadero Center | Skyline Construction | renew pa# 207/09/25/3589 for final inspection only.Details
renew pa# 207/09/25/3589 for final inspection only. | |
| Aug 13, 2008 | Completed final sign-off Jun 2009 | 1 Front St | Skyline Construction | provide mechanical penthouse enclosure wall on roof for the boiler and chiller (permiteed separately), electrical & life safety included.Details
provide mechanical penthouse enclosure wall on roof for the boiler and chiller (permiteed separately), electrical & life safety included. | $40,000 |
| Jun 16, 2008 | Never finaled issued Jun 2008, no final | 3 Embarcadero Center | Skyline Construction | new fire alarm devices to include 41 speakers, 36 strobes, 4 smoke detectors, 8 fire smoke dampers. reference arch 200805142016Details
new fire alarm devices to include 41 speakers, 36 strobes, 4 smoke detectors, 8 fire smoke dampers. reference arch 200805142016 | $41,000 |
| Jun 11, 2008 | Completed final sign-off Apr 2009 | 1 Market St | Novo Construction Inc | mechanical work including new heat pump. relocation of lighting and plumbing. work for dishwasher and sink. ref arch app 200805222719Details
mechanical work including new heat pump. relocation of lighting and plumbing. work for dishwasher and sink. ref arch app 200805222719 | $66,000 |
| Jun 9, 2008 | Completed final sign-off Aug 2008 | 650 Townsend St | Teamwrkx Construction | suite #275-demolition and reconfiguration of office space to create private offices, conference room, open office space and additional exit from spaceDetails
suite #275-demolition and reconfiguration of office space to create private offices, conference room, open office space and additional exit from space | $250,000 |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 600 Montgomery St | Skyline Construction | 36th floor: full floor mechanical & electrical work, ref arch pa #200805071491.Details
36th floor: full floor mechanical & electrical work, ref arch pa #200805071491. | $150,000 |
| May 28, 2008 | Completed final sign-off Dec 2008 | 1 Front St | Skyline Construction | electrical connection for installation of elevator. new fire damper and exhaust fan. ref. arch. appl#200802215296Details
electrical connection for installation of elevator. new fire damper and exhaust fan. ref. arch. appl#200802215296 | $18,000 |
| May 23, 2008 | Completed final sign-off Nov 2008 | 101 Spear St | Skyline Construction | demo of interior partition, door, frame per ab 017 in anticipation for speculative suite. all interior work on the 2nd floor.Details
demo of interior partition, door, frame per ab 017 in anticipation for speculative suite. all interior work on the 2nd floor. | $10,000 |
| May 23, 2008 | Completed final sign-off Sep 2008 | 101 Spear St | Skyline Construction | partial demolition of corridor walls & doors. construction of 2 new restrooms and a new tenant suite including new partitions, ceiling, flooring. mep under separate permit.Details
partial demolition of corridor walls & doors. construction of 2 new restrooms and a new tenant suite including new partitions, ceiling, flooring. mep under separate permit. | $196,243 |
| May 14, 2008 | Completed final sign-off Jul 2008 | 199 Fremont St | Skyline Construction | relocate 1 existing speaker and 2 existing strobes. ref arch 200801243160Details
relocate 1 existing speaker and 2 existing strobes. ref arch 200801243160 | $1,000 |
| May 12, 2008 | Completed final sign-off Mar 2009 | 1 Front St | Skyline Construction | ti on the 2nd floor for electrical, lighting and mechanical work. ref. pa# 2008/02/21/5290Details
ti on the 2nd floor for electrical, lighting and mechanical work. ref. pa# 2008/02/21/5290 | $26,000 |
| May 8, 2008 | Completed final sign-off May 2009 | 717 Market St | Novo Construction Inc | suite 600, 6th floor, demo interior non-load bearing partitions and door assemblies & construct new partitions & door assemblies, new finishes. mep,fire/life safety under separate permit.Details
suite 600, 6th floor, demo interior non-load bearing partitions and door assemblies & construct new partitions & door assemblies, new finishes. mep,fire/life safety under separate permit. | $25,000 |
| May 23, 2007 | Completed final sign-off Oct 2007 | 343 Sansome St | Skyline Construction | oti-2 (8th floor) me, elDetails
oti-2 (8th floor) me, el | $60,000 |
| Jan 10, 2007 | Completed final sign-off Dec 2008 | 600 Montgomery St | Skyline Construction | oti-1, 5th floor, el, ls, spDetails
oti-1, 5th floor, el, ls, sp | $20,000 |
| Jun 3, 2004 | Expired or cancelled expired Jul 2009 | 655 Montgomery St | Skyline Construction | generator improvements in basement & parking levels. includes modifications to unit monitoring & mecDetails
generator improvements in basement & parking levels. includes modifications to unit monitoring & mec | $50,000 |