Block 3710, lot 020
333 Market St
- City’s use
- Commercial Office
- Built
- 1981
- Stories
- 33
- Building
- 694,334 sq ft
- Lot
- 44,118 sq ft
- Zoning
- C3O
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2026 | In progress filed Feb 2026, not yet issued | 333 Market St | Honeywell International, Inc | revision to bpa: 202506138710. installation and pre-test. (redline markups are implemented. new panel added on 7th floor.)Details
revision to bpa: 202506138710. installation and pre-test. (redline markups are implemented. new panel added on 7th floor.) | |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 333 Market St | replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.Details
replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet. | $600,000 | |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 333 Market St | reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.Details
reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal. | $75,000 | |
| Sep 24, 2025 | Expired or cancelled cancelled Mar 2026 | 333 Market St | Mckinstry Essention Llc | installation of 12 ev chargers and associated electrical infrastructore. level 2Details
installation of 12 ev chargers and associated electrical infrastructore. level 2 | $368,484 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 333 Market St | Honeywell International, Inc | 8th floor: fire alarm t.i. demo 5 ceiling speaker/strobes and add 3 ceiling speaker/strobes, 3 ceiling strobes, and 1 relay.Details
8th floor: fire alarm t.i. demo 5 ceiling speaker/strobes and add 3 ceiling speaker/strobes, 3 ceiling strobes, and 1 relay. | $3,500 |
| Sep 14, 2025 | In progress issued Jan 2026 | 333 Market St | Honeywell International, Inc | fire alarm upgrade phase 2. upgrade xls1000 fire panel to new xls2000. nodes 14, nodes 15 in the annex building. new panel interface with (e) field devices.Details
fire alarm upgrade phase 2. upgrade xls1000 fire panel to new xls2000. nodes 14, nodes 15 in the annex building. new panel interface with (e) field devices. | $45,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 8th fl - fire sprinkler ti relocate 7, add 2 total 9. ref pa 202506047877Details
8th fl - fire sprinkler ti relocate 7, add 2 total 9. ref pa 202506047877 | $4,626 |
| Aug 11, 2025 | In progress filed Aug 2025, not yet issued | 333 Market St | City Building Inc. | 335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers andDetails
335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers and | $175,000 |
| Aug 4, 2025 | In progress filed Aug 2025, not yet issued | 333 Market St | Honeywell International, Inc | voluntary fire alarm upgrade phase 1 construction. upgrade xls-1000 fire panel to new xls-3000. nodes 11,12,13 to be upgraded and interface with existing equipment.Details
voluntary fire alarm upgrade phase 1 construction. upgrade xls-1000 fire panel to new xls-3000. nodes 11,12,13 to be upgraded and interface with existing equipment. | $45,000 |
| Jun 23, 2025 | In progress issued Aug 2025 | 333 Market St | Honeywell International, Inc | fa & evc system upgrade to digital com system. (e) honeywell xls1000 za15/za20 modules to ds-db & ds-amp modules. add temp xls-3000 at node-1 & cross connect w/ (e) xls-1000 fire panels for phase. add amps & dedicated cabinets where reqd. replace (e) sffd tele rise w/ new tele modules & jacks.Details
fa & evc system upgrade to digital com system. (e) honeywell xls1000 za15/za20 modules to ds-db & ds-amp modules. add temp xls-3000 at node-1 & cross connect w/ (e) xls-1000 fire panels for phase. add amps & dedicated cabinets where reqd. replace (e) sffd tele rise w/ new tele modules & jacks. | $1,700,000 |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work.Details
8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work. | $175,000 |
| May 28, 2025 | Completed final sign-off Jan 2026 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support.Details
basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support. | $15,000 |
| Apr 4, 2025 | Completed final sign-off May 2025 | 333 Market St | Skyline Construction | revision to pa# 202408269423, to remove (future nic) from scope of work.Details
revision to pa# 202408269423, to remove (future nic) from scope of work. | |
| Mar 26, 2025 | Completed final sign-off Jun 2025 | 333 Market St | Sotello Graphic Associates | 1/f: make new drawings, fabricate and install 4 evacuation mapsDetails
1/f: make new drawings, fabricate and install 4 evacuation maps | $4,190 |
| Mar 14, 2025 | Completed final sign-off Jul 2025 | 333 Market St | Honeywell International, Inc | 2nd fl - fire alarm tenant improvement satelite building. devices to be removed and re-installed after ceiling is replaced ref pa 202407156457Details
2nd fl - fire alarm tenant improvement satelite building. devices to be removed and re-installed after ceiling is replaced ref pa 202407156457 | |
| Mar 10, 2025 | Completed final sign-off Jun 2025 | 333 Market St | Honeywell International, Inc | 1st fl ref pa 2024-0925-1548 -fire alarm ti relocate 1 speaker/strobe & 1 strobe. install 1 speaker/strobeDetails
1st fl ref pa 2024-0925-1548 -fire alarm ti relocate 1 speaker/strobe & 1 strobe. install 1 speaker/strobe | $2,500 |
| Feb 18, 2025 | Completed final sign-off May 2025 | 333 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. tenant improvement. 2 added and 8 relocated sprinker. arch pa# 202409251548Details
existing fire sprinkler system. tenant improvement. 2 added and 8 relocated sprinker. arch pa# 202409251548 | $3,300 |
| Dec 19, 2024 | Completed final sign-off Apr 2025 | 333 Market St | Honeywell International, Inc | fire alarm t.i. on 9th floor unit #902. demo 4 speaker/strobe, add one ceiling speaker/strobe, 3 speakers, relocate 4 speaker/strobes. ref arch. #202409251549Details
fire alarm t.i. on 9th floor unit #902. demo 4 speaker/strobe, add one ceiling speaker/strobe, 3 speakers, relocate 4 speaker/strobes. ref arch. #202409251549 | $3,500 |
| Nov 20, 2024 | Completed final sign-off Dec 2024 | 333 Market St | Sotello Graphic Associates | 9th floor: make and install 4 evacuation maps.Details
9th floor: make and install 4 evacuation maps. | $3,434 |
| Nov 12, 2024 | Completed final sign-off Nov 2024 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 2nd fl- ti to (e) fire sprinklers system. relocate 4 sprinklersDetails
2nd fl- ti to (e) fire sprinklers system. relocate 4 sprinklers | $1,000 |
| Nov 12, 2024 | Completed final sign-off Dec 2024 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 9th fl- ref pa # 2024-0925-1549 ti to (e) fire sprinkler system relocate 3 sprinklersDetails
9th fl- ref pa # 2024-0925-1549 ti to (e) fire sprinkler system relocate 3 sprinklers | $1,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 333 Market St | Honeywell International, Inc | 9th fl ref pa 2024-0715-6458 fire alarm ti demo 8 speaker/strobes, 1 strobe. add 6 speaker/strobes, 3 strobes, 2 relays for transfer fanDetails
9th fl ref pa 2024-0715-6458 fire alarm ti demo 8 speaker/strobes, 1 strobe. add 6 speaker/strobes, 3 strobes, 2 relays for transfer fan | $8,500 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft.Details
9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft. | $150,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room andDetails
1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room and | $150,000 |
| Sep 19, 2024 | In progress issued Sep 2024 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 9th fl- ref pa 2024-0715-6458 existing fire sprinklers system ti 1 added & 8 relocated sprinklersDetails
9th fl- ref pa 2024-0715-6458 existing fire sprinklers system ti 1 added & 8 relocated sprinklers | $6,000 |
| Aug 26, 2024 | Completed final sign-off May 2025 | 333 Market St | Skyline Construction | (at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required.Details
(at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required. | $100,000 |
| Jul 19, 2024 | Completed final sign-off Aug 2024 | 333 Market St | Honeywell International, Inc | 2nd floor:voluntary-converting storage room to temporary mail room. additional 1 speaker strobe being added.Details
2nd floor:voluntary-converting storage room to temporary mail room. additional 1 speaker strobe being added. | $3,500 |
| Jul 15, 2024 | Completed final sign-off Aug 2025 | 333 Market St | Skyline Construction | 2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of workDetails
2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of work | $25,000 |
| Jul 15, 2024 | Completed final sign-off Feb 2025 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work.Details
9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work. | $220,000 |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 333 Market St | Anderson, Rowe & Buckley, Inc. | add prv to edc supply to satellite bldg. upgrade existing fdc check valves to 300 psi ratingDetails
add prv to edc supply to satellite bldg. upgrade existing fdc check valves to 300 psi rating | |
| Jun 12, 2024 | In progress issued Jun 2024 | 333 Market St | Sotello Graphic Associates | 9th fl - create new drawings fabricate & install 4 evacuation mapsDetails
9th fl - create new drawings fabricate & install 4 evacuation maps | $3,438 |
| May 3, 2024 | In progress filed May 2024, not yet issued | 333 Market St | Cosco Fire Protection Inc. | 1/f: add and install (1) new pendent fire sprinkler to accomodate the construction of a new platform in the starbucks workroom on the first floor.Details
1/f: add and install (1) new pendent fire sprinkler to accomodate the construction of a new platform in the starbucks workroom on the first floor. | $2,000 |
| Apr 29, 2024 | Completed final sign-off May 2024 | 333 Market St | Honeywell International, Inc | 9/fl- fire alarm ti - remove (2) speaker strobes, add(1) speaker strobe, relocate (1) speaker strobe. ref permit 202402125689Details
9/fl- fire alarm ti - remove (2) speaker strobes, add(1) speaker strobe, relocate (1) speaker strobe. ref permit 202402125689 | $7,500 |
| Apr 5, 2024 | Completed final sign-off Apr 2024 | 333 Market St | Anderson, Rowe & Buckley, Inc. | suite 900-9th floor: fire sprinkler only. relocate 4 pendents for the new offices. wells fargo. ref#202402125689.Details
suite 900-9th floor: fire sprinkler only. relocate 4 pendents for the new offices. wells fargo. ref#202402125689. | $2,200 |
| Feb 12, 2024 | Completed final sign-off Jul 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.Details
9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan. | $175,000 |
| Jan 31, 2024 | In progress issued Jan 2024 | 333 Market St | Sotello Graphic Associates | create new drawings, fabricate and install 3 evacuation map. 1 for 1st floor and 2 for the mezzanine.Details
create new drawings, fabricate and install 3 evacuation map. 1 for 1st floor and 2 for the mezzanine. | $2,604 |
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 333 Market St | Pribuss Engineering Inc | 1st fl - modify sprinkler head locations to accommodate new ceiling and partition layout for new bank space. reloc 24 and add 6 heads. ref 2023-1108-0425Details
1st fl - modify sprinkler head locations to accommodate new ceiling and partition layout for new bank space. reloc 24 and add 6 heads. ref 2023-1108-0425 | $7,500 |
| Nov 21, 2023 | In progress issued Nov 2023 | 333 Market St | Pribuss Engineering Inc | 1st fl - modify sprinkler head locations to accommodate new wall and casework on and new lighting layout on mezzanine level. reloc 3 and add 1 head. ref pa 2023-1108-0439Details
1st fl - modify sprinkler head locations to accommodate new wall and casework on and new lighting layout on mezzanine level. reloc 3 and add 1 head. ref pa 2023-1108-0439 | $1,000 |
| Nov 8, 2023 | Completed final sign-off Mar 2024 | 333 Market St | Honeywell International, Inc | 1st fl: remove and replace 1 duct smoke detector fcu 1-4. connect existing speaker/strobe circuit to new rps. ref pa# 202306210488.Details
1st fl: remove and replace 1 duct smoke detector fcu 1-4. connect existing speaker/strobe circuit to new rps. ref pa# 202306210488. | $18,000 |
| Nov 8, 2023 | Completed final sign-off Mar 2024 | 333 Market St | Honeywell International, Inc | 1/f annex: f/a t.i., install (19) speaker/strobes, (1) rps, (1) control module, (2) duct detectors, (4) relay modules, (2) smoke detectors. reb bpa#202306079418Details
1/f annex: f/a t.i., install (19) speaker/strobes, (1) rps, (1) control module, (2) duct detectors, (4) relay modules, (2) smoke detectors. reb bpa#202306079418 | $18,000 |
| Sep 19, 2023 | Completed final sign-off Nov 2023 | 333 Market St | Honeywell International, Inc | remove 4 smoke detectors, 4 door holders. add 1 speaker strobe, 2 duct detectors 2 relays.Details
remove 4 smoke detectors, 4 door holders. add 1 speaker strobe, 2 duct detectors 2 relays. | $16,890 |
| Sep 19, 2023 | Completed final sign-off Nov 2023 | 333 Market St | Honeywell International, Inc | 33/f: roof tenant improvement-add 1 speaker/strobes and 1 smoke dector. ref 201901220827.Details
33/f: roof tenant improvement-add 1 speaker/strobes and 1 smoke dector. ref 201901220827. | $6,000 |
| Sep 18, 2023 | Completed final sign-off Nov 2023 | 333 Market St | Honeywell International, Inc | 27/f: voluntary: add and remove (1) horn strobe.Details
27/f: voluntary: add and remove (1) horn strobe. | $10,131 |
| Aug 23, 2023 | Completed final sign-off Jul 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | ground fl loading dock. infill existing loading dock ramp.Details
ground fl loading dock. infill existing loading dock ramp. | $225,000 |
| Aug 10, 2023 | Never finaled issued Aug 2023, no final | 333 Market St | Sotello Graphic Associates | install 4 evacuation maps for floor 2.Details
install 4 evacuation maps for floor 2. | $2,504 |
| Jul 31, 2023 | Completed final sign-off Jul 2024 | 333 Market St | Signtech Electrical Advertising Inc. | install (2) illuminated wall signs. "wells fargo"Details
install (2) illuminated wall signs. "wells fargo" | $12,000 |
| Jul 28, 2023 | Completed final sign-off Aug 2023 | 333 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. tenant improvements relocate 4 fire sprinklersDetails
existing fire sprinkler system. tenant improvements relocate 4 fire sprinklers | $2,500 |
| Jul 24, 2023 | Never finaled filed Jul 2023, never issued | 333 Market St | Honeywell International, Inc | f/a modification on roof tower building, maintain (e) f/a sequence of operations, install new (1) qty speaker/strobe, (1) qty smoke detector w/standard baseDetails
f/a modification on roof tower building, maintain (e) f/a sequence of operations, install new (1) qty speaker/strobe, (1) qty smoke detector w/standard base | $10,874 |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodelDetails
1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel | $135,000 |
| Jun 21, 2023 | Completed final sign-off Dec 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new constructionDetails
5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction | $125,000 |
| Jun 7, 2023 | Completed final sign-off Aug 2023 | 333 Market St | Honeywell International, Inc | 2/f: fire alarm mods. maintain existing fire alarm sequence. remove 4 speaker strobes, install 4 speaker strobes/ install 1 strobe. two-way communication lobby intercom. maher n/a.Details
2/f: fire alarm mods. maintain existing fire alarm sequence. remove 4 speaker strobes, install 4 speaker strobes/ install 1 strobe. two-way communication lobby intercom. maher n/a. | $10,131 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installedDetails
interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installed | $446,280 |
| May 17, 2023 | Completed final sign-off Jan 2024 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps addedDetails
9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps added | $162,000 |
| May 4, 2023 | Completed final sign-off Jul 2023 | 333 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system t.i.. relocate 27, add 3 pendents, relocate 1 upright sprinkler. ref pa# 202208180787.Details
existing fire sprinkler system t.i.. relocate 27, add 3 pendents, relocate 1 upright sprinkler. ref pa# 202208180787. | $20,000 |
| May 3, 2023 | Completed final sign-off Mar 2024 | 333 Market St | Gci, Inc | conversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spacesDetails
conversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spaces | $175,000 |
| Feb 7, 2023 | Never finaled issued Feb 2023, no final | 333 Market St | Sotello Graphic Associates | 15/f: install 4 evacuation mapsDetails
15/f: install 4 evacuation maps | $3,356 |
| Jan 24, 2023 | Never finaled issued Jan 2023, no final | 333 Market St | Sotello Graphic Associates | make and install 4 evacuation maps on 32nd fl.Details
make and install 4 evacuation maps on 32nd fl. | $3,356 |
| Jan 12, 2023 | Completed final sign-off Jan 2024 | 333 Market St | Richlen Construction | roof: 1 new back-up condenser water pump is being added.Details
roof: 1 new back-up condenser water pump is being added. | $375,023 |
| Nov 18, 2022 | Completed final sign-off Feb 2023 | 333 Market St | Honeywell International, Inc | 15th fl. fa modification: remove (4) smoke detectors, (4) door holders, (7) sprinkler/strobes, install new (10) sprinkler/strobes, (3) strobes, (1) rib relayDetails
15th fl. fa modification: remove (4) smoke detectors, (4) door holders, (7) sprinkler/strobes, install new (10) sprinkler/strobes, (3) strobes, (1) rib relay | $8,500 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 333 Market St | 18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use.Details
18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use. | $100,000 | |
| Nov 10, 2022 | Completed final sign-off Jan 2023 | 333 Market St | Pribuss Engineering Inc | 15/f: modify sprinkler head locations to accommodate new ceiling/partition layout for new office space. total sprinklers (22)Details
15/f: modify sprinkler head locations to accommodate new ceiling/partition layout for new office space. total sprinklers (22) | $11,308 |
| Oct 19, 2022 | Never finaled issued Oct 2022, no final | 333 Market St | Anderson, Rowe & Buckley, Inc. | relocate 123 pendents and add 2 pendents and relocate 9 uprights total 134 heads. for wells fargo 32nd floor. ref permit 202205113966.Details
relocate 123 pendents and add 2 pendents and relocate 9 uprights total 134 heads. for wells fargo 32nd floor. ref permit 202205113966. | $67,000 |
| Sep 12, 2022 | Never finaled issued Sep 2022, no final | 333 Market St | Honeywell International, Inc | 32/f: ref pa#202205113964, modification: remove (25) sprinkler/strobes, (4) smoke detectors, (5) door holders, (5) strobes, add (30) spklr/stbs, (8) strobes, (3) door release partition buttons, (1) control relay, (1) call station; replace: (5)spkr/strbs, (1) strobes, (3) spkrsDetails
32/f: ref pa#202205113964, modification: remove (25) sprinkler/strobes, (4) smoke detectors, (5) door holders, (5) strobes, add (30) spklr/stbs, (8) strobes, (3) door release partition buttons, (1) control relay, (1) call station; replace: (5)spkr/strbs, (1) strobes, (3) spkrs | $45,000 |
| Aug 18, 2022 | Completed final sign-off Sep 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/aDetails
2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/a | $250,000 |
| Aug 16, 2022 | Never finaled issued Aug 2022, no final | 333 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only relocate 74 pendents, add 8, plug off 9 outlets for 19th fl. ref 2021 1022 0996Details
fire sprinkler only relocate 74 pendents, add 8, plug off 9 outlets for 19th fl. ref 2021 1022 0996 | $41,000 |
| Aug 5, 2022 | Never finaled issued Nov 2022, no final | 333 Market St | G L C Construction Company Inc | 15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodelDetails
15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel | $500,000 |
| Aug 4, 2022 | Completed final sign-off Dec 2022 | 333 Market St | Sotello Graphic Associates | 24/f: create new drawings, fabricate & install 4 evacuation mapsDetails
24/f: create new drawings, fabricate & install 4 evacuation maps | $3,138 |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 333 Market St | Sotello Graphic Associates | 31/f: create new drawings fabricate & install 4 evacuation mapsDetails
31/f: create new drawings fabricate & install 4 evacuation maps | $3,138 |
| Aug 4, 2022 | Completed final sign-off Dec 2022 | 333 Market St | Sotello Graphic Associates | 19/f: create new drawings, fabricate & install 4 evacuation mapsDetails
19/f: create new drawings, fabricate & install 4 evacuation maps | $3,138 |
| Aug 4, 2022 | Completed final sign-off Dec 2022 | 333 Market St | Sotello Graphic Associates | 23/f: create new drawings, fabricate & install 4 evacuation mapsDetails
23/f: create new drawings, fabricate & install 4 evacuation maps | $3,138 |
| Aug 2, 2022 | Completed final sign-off Feb 2023 | 333 Market St | Honeywell International, Inc | fls modification on 25/f. add 1 spks/strobe, 4 strobe, 1 control relay and 2 rvb relays. replace 2 spkers with a combination spker/strobe. ref pa #202205063683Details
fls modification on 25/f. add 1 spks/strobe, 4 strobe, 1 control relay and 2 rvb relays. replace 2 spkers with a combination spker/strobe. ref pa #202205063683 | $5,500 |
| Jul 27, 2022 | Completed final sign-off Nov 2022 | 333 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. relocate 90 pendetns, add 7 pendents to the 23/f and relocate 80 pendents, add 2 to the 24/f for wells fargo.Details
fire sprinkler only. relocate 90 pendetns, add 7 pendents to the 23/f and relocate 80 pendents, add 2 to the 24/f for wells fargo. | $89,500 |
| Jul 19, 2022 | Completed final sign-off Nov 2022 | 333 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. t.i ref pa# 202110220996. relocate 115 pendents. add 10 pendents, plug off 14 for wells fargo on the 31/fDetails
fire sprinkler only. t.i ref pa# 202110220996. relocate 115 pendents. add 10 pendents, plug off 14 for wells fargo on the 31/f | $62,500 |
| Jul 12, 2022 | Never finaled issued Jul 2022, no final | 333 Market St | Honeywell International, Inc | 23/f: ref permit 202109178632. fa modification: remove 31 spkr/strbs, 7 smk detectors, 6 door holders, 3 emergency door release, 4 strbs. add 28 spkr/strbs, 8 strbs, 1 strb power supply, 3 control relays, 3 emergency door releases, 1 duct det., 1 rib, 1 two-way call station.Details
23/f: ref permit 202109178632. fa modification: remove 31 spkr/strbs, 7 smk detectors, 6 door holders, 3 emergency door release, 4 strbs. add 28 spkr/strbs, 8 strbs, 1 strb power supply, 3 control relays, 3 emergency door releases, 1 duct det., 1 rib, 1 two-way call station. | $30,000 |
| Jul 1, 2022 | Expired or cancelled withdrawn Mar 2024 | 333 Market St | 27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work.Details
27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work. | $350,000 | |
| Jun 28, 2022 | Completed final sign-off Dec 2022 | 333 Market St | Honeywell International, Inc | 31 fl: modification remove (29) sprk 1 strobe, (6) detectors (6) door holders, (4) strobes (8) emergency recess, install (28) sprk/strb, (8) strb, (3) door releases (1) duct detcetor, (2) control relays (1) rib relay, (1) two wa call station,replace (11) nac devices with new ref pa# 2021-1022-0996Details
31 fl: modification remove (29) sprk 1 strobe, (6) detectors (6) door holders, (4) strobes (8) emergency recess, install (28) sprk/strb, (8) strb, (3) door releases (1) duct detcetor, (2) control relays (1) rib relay, (1) two wa call station,replace (11) nac devices with new ref pa# 2021-1022-0996 | $30,000 |
| Jun 28, 2022 | Never finaled issued Jun 2022, no final | 333 Market St | Honeywell International, Inc | 24th fl: remove 28 sprs/strb: 6 smoke detectors, 6 door holders, 3 strobes, install 28 spkr/strb, 8 strobes, 3 control relays, 1 duct det. 2 rib 1 two way call station replace 3 emergency door release 11 nac device with new ref pa#2021-0923-9013Details
24th fl: remove 28 sprs/strb: 6 smoke detectors, 6 door holders, 3 strobes, install 28 spkr/strb, 8 strobes, 3 control relays, 1 duct det. 2 rib 1 two way call station replace 3 emergency door release 11 nac device with new ref pa#2021-0923-9013 | $30,000 |
| Jun 28, 2022 | Never finaled issued Jun 2022, no final | 333 Market St | Honeywell International, Inc | 19th fl: remove 19 sprs/strb: 4 smk detectors, 6 door holders, 9 strobes, 3 spkrs, install 30 spkr/strobes 9 strobes 2 control relays, 1 duct detector 1 rib relays, 1 2-way call station replace 10 nac device w/new and 1 emergeny door release ref pa# 2021-1001-9629Details
19th fl: remove 19 sprs/strb: 4 smk detectors, 6 door holders, 9 strobes, 3 spkrs, install 30 spkr/strobes 9 strobes 2 control relays, 1 duct detector 1 rib relays, 1 2-way call station replace 10 nac device w/new and 1 emergeny door release ref pa# 2021-1001-9629 | $30,000 |
| Jun 10, 2022 | Completed final sign-off Aug 2022 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 20th fl - revision to pa 2021-1202-3563 fire sprinkler onlyDetails
20th fl - revision to pa 2021-1202-3563 fire sprinkler only | $1,000 |
| May 11, 2022 | Completed final sign-off Apr 2023 | 333 Market St | Skyline Construction | 32nd fl: t.i. in a 33 floor hi-rise bldg.selective demo,new partiitons,doors,ceilings,mechanical,electrical & plumbing. work cafe classifed as employee breakroom/pantry. no change of use.Details
32nd fl: t.i. in a 33 floor hi-rise bldg.selective demo,new partiitons,doors,ceilings,mechanical,electrical & plumbing. work cafe classifed as employee breakroom/pantry. no change of use. | $1,500,000 |
| May 6, 2022 | Completed final sign-off Mar 2023 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.Details
25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms. | $150,000 |
| Mar 28, 2022 | Completed final sign-off Sep 2022 | 333 Market St | Sotello Graphic Associates | 20th flr: make and install 4 evacuation mapsDetails
20th flr: make and install 4 evacuation maps | $3,200 |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 333 Market St | Sotello Graphic Associates | make and install 5 evacuation maps.Details
make and install 5 evacuation maps. | $3,600 |
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 333 Market St | Honeywell International, Inc | this is an as built permit for pa 202104229173. changes includes (2) strobes, change to speaker/strobes; add (2) door holders; (2) rib relays; (1) control relays and relocate yellow pull station from lobby security desk to fcc room and change (1) ceiling spkr/strb to wall mount.Details
this is an as built permit for pa 202104229173. changes includes (2) strobes, change to speaker/strobes; add (2) door holders; (2) rib relays; (1) control relays and relocate yellow pull station from lobby security desk to fcc room and change (1) ceiling spkr/strb to wall mount. | $1,260 |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 333 Market St | G L C Construction Company Inc | 30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only.Details
30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only. | $50,000 |
| Dec 7, 2021 | Completed final sign-off Aug 2022 | 333 Market St | Honeywell International, Inc | 20/f f/a addition: install (41) nac divices; (3) emergeny door replace;(1) duct det; (1) rib relay; (1) 2-way call box; replace (2) spkr/strb w/ new demo (29) nac devices; (4) smk det; (6) door holders; (3) old emergengy door replace; (2) spkrs; (2) strobesDetails
20/f f/a addition: install (41) nac divices; (3) emergeny door replace;(1) duct det; (1) rib relay; (1) 2-way call box; replace (2) spkr/strb w/ new demo (29) nac devices; (4) smk det; (6) door holders; (3) old emergengy door replace; (2) spkrs; (2) strobes | $26,700 |
| Dec 6, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Richlen Construction | installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel.Details
installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel. | $16,000 |
| Dec 2, 2021 | Completed final sign-off Aug 2022 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 20th flr - t.i. to (e) fire sprinkler system . added 9 sprinkler heads, relocate 71 sprinkler heads. remove 6 sprinklers. ref permit 202107164536Details
20th flr - t.i. to (e) fire sprinkler system . added 9 sprinkler heads, relocate 71 sprinkler heads. remove 6 sprinklers. ref permit 202107164536 | $22,000 |
| Dec 2, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 17th flr - t.i. to (e) fire sprinkler system . added 1 sprinkler head, relocate 12 sprinkler heads. ref#2021-0809-6055Details
17th flr - t.i. to (e) fire sprinkler system . added 1 sprinkler head, relocate 12 sprinkler heads. ref#2021-0809-6055 | $6,500 |
| Nov 19, 2021 | Completed final sign-off Jun 2022 | 333 Market St | Honeywell International, Inc | 17th fl - ref pa 2021-0809-6055 f/a addition, remove (3) speaker strobes; replace (1) strobe to speaker/strobe. install new 10 speaker strobes; 2 control relays; 1 emergency door release; 2 rib relaysDetails
17th fl - ref pa 2021-0809-6055 f/a addition, remove (3) speaker strobes; replace (1) strobe to speaker/strobe. install new 10 speaker strobes; 2 control relays; 1 emergency door release; 2 rib relays | $11,400 |
| Nov 10, 2021 | Completed final sign-off Nov 2021 | 333 Market St | Honeywell International, Inc | 9th floor: as built permit for the approved pa#2021/0806/5959. the scope of work under this permit is to reflect the audio/soundmasking shutdown output in the sequences of operations matrix per inspector's comments. no new devices had been added.Details
9th floor: as built permit for the approved pa#2021/0806/5959. the scope of work under this permit is to reflect the audio/soundmasking shutdown output in the sequences of operations matrix per inspector's comments. no new devices had been added. | |
| Nov 5, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Honeywell International, Inc | 6/f: fire alarm addition: install 1 contact relay; 1 duct detector, 2 aux relays. ref pa 202110271264.Details
6/f: fire alarm addition: install 1 contact relay; 1 duct detector, 2 aux relays. ref pa 202110271264. | $2,760 |
| Nov 2, 2021 | Never finaled issued Nov 2021, no final | 333 Market St | Sotello Graphic Associates | create new drawings, fabricate & install 6 evacuation maps (for 1st floor)Details
create new drawings, fabricate & install 6 evacuation maps (for 1st floor) | $4,400 |
| Oct 27, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Matrix Hg Inc | adding 1 new heat pump to 6th fl. no new fsd's are being added.Details
adding 1 new heat pump to 6th fl. no new fsd's are being added. | $41,342 |
| Oct 27, 2021 | Never finaled issued Oct 2021, no final | 333 Market St | Sotello Graphic Associates | new drawnings, fabricate & install 4 evacuations map @ fl 9Details
new drawnings, fabricate & install 4 evacuations map @ fl 9 | $3,200 |
| Oct 22, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $1,530,000 |
| Oct 1, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $1,530,000 |
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | 24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $1,530,000 |
| Sep 17, 2021 | Completed final sign-off Mar 2023 | 333 Market St | Skyline Construction | conversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits.Details
conversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits. | $1,530,000 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 333 Market St | 17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only.Details
17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only. | $250,000 | |
| Aug 6, 2021 | Completed final sign-off Nov 2021 | 333 Market St | Honeywell International, Inc | ref pa 2021-0419-8849 f/a addition in 9th fl: remove (2) spkr/strobes; (a) sink detectors & (1) door hold. relocate (1) spkr/strobe; (5) spkr/strobe; 2 strobes; 1 control relay; 3 emergency door release; (1) 2 way-comm call stationDetails
ref pa 2021-0419-8849 f/a addition in 9th fl: remove (2) spkr/strobes; (a) sink detectors & (1) door hold. relocate (1) spkr/strobe; (5) spkr/strobe; 2 strobes; 1 control relay; 3 emergency door release; (1) 2 way-comm call station | $6,440 |
| Jul 29, 2021 | Completed final sign-off Sep 2021 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 9/f: existing fire sprinkler system, t.i. add 1 and relocate 12 sprinklers.Details
9/f: existing fire sprinkler system, t.i. add 1 and relocate 12 sprinklers. | $6,000 |
| Jul 16, 2021 | Completed final sign-off Nov 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.Details
20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit. | $1,530,000 |
| Jul 14, 2021 | Completed final sign-off Sep 2021 | 333 Market St | Anderson, Rowe & Buckley, Inc. | relocate 12 sprinkler heads, tenant improvements to the existing fire sprinkler sytem.Details
relocate 12 sprinkler heads, tenant improvements to the existing fire sprinkler sytem. | $6,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 333 Market St | Honeywell International, Inc | ref p/a 2021-0406-7935 f/a addition on 4/f: add (1) duct detector; (1) control relay; (1) rib relayDetails
ref p/a 2021-0406-7935 f/a addition on 4/f: add (1) duct detector; (1) control relay; (1) rib relay | $2,440 |
| Apr 22, 2021 | Never finaled issued May 2021, no final | 333 Market St | Honeywell International, Inc | ref. pa 2020-1017-6782. 1/f & basement f/a addition; remove (3) spkrs; (5) strobes; (3) smks; add: (6) c-rly, (8) smks, (11) spkr/strbs; (2) strbs; (2) duct det.; (3) manual pull stations; (2) monitor modules; (2) rib rlys; (1) emergency door release; (1) yellow security override pull stationDetails
ref. pa 2020-1017-6782. 1/f & basement f/a addition; remove (3) spkrs; (5) strobes; (3) smks; add: (6) c-rly, (8) smks, (11) spkr/strbs; (2) strbs; (2) duct det.; (3) manual pull stations; (2) monitor modules; (2) rib rlys; (1) emergency door release; (1) yellow security override pull station | $20,520 |
| Apr 19, 2021 | Completed final sign-off Jan 2022 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.Details
9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction. | $466,000 |
| Apr 6, 2021 | Completed final sign-off Sep 2021 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work.Details
4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting work. | $75,000 |
| Mar 4, 2021 | Never finaled issued Apr 2021, no final | 333 Market St | Sotello Graphic Associates | install 7 evacuation mapsDetails
install 7 evacuation maps | $5,038 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 333 Market St | Sotello Graphic Associates | install 4 evacuation maps - 27th fl.Details
install 4 evacuation maps - 27th fl. | |
| Feb 25, 2021 | Never finaled issued Mar 2021, no final | 333 Market St | Sotello Graphic Associates | install 4 evacuation maps, 28th fl.Details
install 4 evacuation maps, 28th fl. | $3,300 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 333 Market St | Sotello Graphic Associates | install 4 evacuation mapsDetails
install 4 evacuation maps | |
| Feb 25, 2021 | Completed final sign-off May 2021 | 333 Market St | Sotello Graphic Associates | install 4 evacuation maps 29th floorDetails
install 4 evacuation maps 29th floor | $3,300 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only.Details
28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work only. | $27,000 |
| Feb 9, 2021 | Completed final sign-off Apr 2021 | 333 Market St | Honeywell International, Inc | ref p/a 2020-1010-6325 f/a t.i. on the 28th floor; remove (1) spkr/strb; install (8) spkr/strbs; (8) strbs; (5) control relays; (4) rib relays; (2) duct det.; (2) synch mod; (1) 2-way call box; remove & replace with new (1) strb pwr supply; (21) spkr/strb; (6) strbs; (3) duct det.; (3) pull stationsDetails
ref p/a 2020-1010-6325 f/a t.i. on the 28th floor; remove (1) spkr/strb; install (8) spkr/strbs; (8) strbs; (5) control relays; (4) rib relays; (2) duct det.; (2) synch mod; (1) 2-way call box; remove & replace with new (1) strb pwr supply; (21) spkr/strb; (6) strbs; (3) duct det.; (3) pull stations | $39,800 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 333 Market St | Honeywell International, Inc | ref. p/a 2020-1017-6713 f/a modification/remodel of 29/f. install (9) spkr/strbs; (6) strobes; (3) emergency dor rel.; (4) cntrl rlys; (4) rib rlys; (2) synch modules; (1) 2-way comm. call box. replace (1) strb pwr supply; (26) spkr/strobes; (4) strobes; (6) strobes replace w/spkr/strbs; (1) spkr reDetails
ref. p/a 2020-1017-6713 f/a modification/remodel of 29/f. install (9) spkr/strbs; (6) strobes; (3) emergency dor rel.; (4) cntrl rlys; (4) rib rlys; (2) synch modules; (1) 2-way comm. call box. replace (1) strb pwr supply; (26) spkr/strobes; (4) strobes; (6) strobes replace w/spkr/strbs; (1) spkr re | $39,800 |
| Jan 28, 2021 | Completed final sign-off Mar 2021 | 333 Market St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system. 28th floor - 2 added & 7 relocated sprinklers 29th floor - 3 added & 2 relocated sprinklersDetails
tenant improvements to existing fire sprinkler system. 28th floor - 2 added & 7 relocated sprinklers 29th floor - 3 added & 2 relocated sprinklers | $7,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2021 | 333 Market St | Honeywell International, Inc | ref p/a 2020-1002-5749. f/a modification on 27th floor: install (5) spkr/strb; (3) strobes and (1) dual synch module - remove and replace with new (10) spkr/strbs.Details
ref p/a 2020-1002-5749. f/a modification on 27th floor: install (5) spkr/strb; (3) strobes and (1) dual synch module - remove and replace with new (10) spkr/strbs. | $5,580 |
| Jan 21, 2021 | Never finaled issued Feb 2021, no final | 333 Market St | Sotello Graphic Associates | create new drawing, fabricate & install 24 evacuation maps, 4 each for floors 19, 20, 23, 24, 31, 32Details
create new drawing, fabricate & install 24 evacuation maps, 4 each for floors 19, 20, 23, 24, 31, 32 | $18,000 |
| Dec 28, 2020 | Completed final sign-off Apr 2021 | 333 Market St | Honeywell International, Inc | ref. p/a 2020-0924-4919. 21/f: demo; install new: (28) spkr/strbs, (8) strbs, (1) spkr, (2) relays, (3) door releases, (4) duct det/relay, (1) 2-way comm stn (201901220827); replace w/new: (9) spkr/strbs, (7) relays, (3) door releases, (3) duct det, (1) power supply, (12) smk det, (4) modsDetails
ref. p/a 2020-0924-4919. 21/f: demo; install new: (28) spkr/strbs, (8) strbs, (1) spkr, (2) relays, (3) door releases, (4) duct det/relay, (1) 2-way comm stn (201901220827); replace w/new: (9) spkr/strbs, (7) relays, (3) door releases, (3) duct det, (1) power supply, (12) smk det, (4) mods | $34,380 |
| Dec 28, 2020 | Completed final sign-off Apr 2021 | 333 Market St | R L H Fire Protection Inc | fire sprinkler permit. relocate 152, add 21 and delete 41 sprinklers on the 5th floor.Details
fire sprinkler permit. relocate 152, add 21 and delete 41 sprinklers on the 5th floor. | $43,000 |
| Dec 28, 2020 | Never finaled issued Feb 2021, no final | 333 Market St | Sotello Graphic Associates | make & install 24 evacuation maps floors 7, 12, 25, 26, 30, 33Details
make & install 24 evacuation maps floors 7, 12, 25, 26, 30, 33 | $13,000 |
| Dec 21, 2020 | Never finaled issued Feb 2021, no final | 333 Market St | Sotello Graphic Associates | make and install 35 evacuation maps. floors 2,3,4,6,22, mezzanine and basement.Details
make and install 35 evacuation maps. floors 2,3,4,6,22, mezzanine and basement. | $20,000 |
| Dec 21, 2020 | Completed final sign-off Apr 2021 | 333 Market St | Honeywell International, Inc | ref. p/a 2020-0924-4923/ 5/f f/a modification: replace with new (23) smoke det; (7) duct det; (14) control relays; (7) monitor mod.; (2) strb pwr supply; (20) spkr/strobes; (6) strobes; (6) pull station; (2) cntrl mod; add (42) spkr/strobes; (23) strobes; (3) duct det; (6) control relays; (2) tw-wagDetails
ref. p/a 2020-0924-4923/ 5/f f/a modification: replace with new (23) smoke det; (7) duct det; (14) control relays; (7) monitor mod.; (2) strb pwr supply; (20) spkr/strobes; (6) strobes; (6) pull station; (2) cntrl mod; add (42) spkr/strobes; (23) strobes; (3) duct det; (6) control relays; (2) tw-wag | $53,080 |
| Dec 15, 2020 | Completed final sign-off Apr 2021 | 333 Market St | Anderson, Rowe & Buckley, Inc. | arch 2020-0924-4919. existing fire sprinkler system. tenant improvements. 26 removed sprinkler. 4 added sprinklers. 82 relocated sprinklers.Details
arch 2020-0924-4919. existing fire sprinkler system. tenant improvements. 26 removed sprinkler. 4 added sprinklers. 82 relocated sprinklers. | $45,000 |
| Dec 10, 2020 | Never finaled issued Jan 2021, no final | 333 Market St | Sotello Graphic Associates | make and install 28 evacuation maps for floors 8, 10, 11, 15, 16, 17, & 18.Details
make and install 28 evacuation maps for floors 8, 10, 11, 15, 16, 17, & 18. | $15,000 |
| Oct 28, 2020 | Completed final sign-off Jan 2021 | 333 Market St | Anderson, Rowe & Buckley, Inc. | added 33 fire sprinklers. tenant improvements - existing fire sprinkler wet stem from preaction system.Details
added 33 fire sprinklers. tenant improvements - existing fire sprinkler wet stem from preaction system. | $15,500 |
| Oct 26, 2020 | Never finaled issued Nov 2020, no final | 333 Market St | Sotello Graphic Associates | make & install 4 evacuation maps.Details
make & install 4 evacuation maps. | $3,400 |
| Oct 17, 2020 | Completed final sign-off Jul 2022 | 333 Market St | Richlen Construction | 1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door.Details
1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door. | $325,000 |
| Oct 17, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $790,150 |
| Oct 10, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel.Details
28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel. | $780,150 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a.Details
27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a. | $175,000 |
| Sep 24, 2020 | Completed final sign-off Dec 2020 | 333 Market St | Skyline Construction | 4/f & 5/f:t.i. selective demo of service room cabintes and equip assosciated mech & electrical, plumbing infrastructure service the space to be removed. maher n/a.Details
4/f & 5/f:t.i. selective demo of service room cabintes and equip assosciated mech & electrical, plumbing infrastructure service the space to be removed. maher n/a. | $175,000 |
| Sep 24, 2020 | Completed final sign-off Apr 2021 | 333 Market St | Gci, Inc | 5/f:t.i. to entire floor exceptiong of (e) server room in suite 505 and (e) building infrastruture spaces. new partitions, doors, ceilings, electrical, mechanical, plumbing, interior finishes and employee breakroom & pantry. maher n/a.Details
5/f:t.i. to entire floor exceptiong of (e) server room in suite 505 and (e) building infrastruture spaces. new partitions, doors, ceilings, electrical, mechanical, plumbing, interior finishes and employee breakroom & pantry. maher n/a. | $3,177,498 |
| Sep 24, 2020 | Completed final sign-off Jul 2021 | 333 Market St | G L C Construction Company Inc | 21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a.Details
21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a. | $1,530,000 |
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 333 Market St | Honeywell International, Inc | 6/f: add one (1) control module to fire alarm for white noise shuntDetails
6/f: add one (1) control module to fire alarm for white noise shunt | $8,280 |
| Mar 13, 2020 | Completed final sign-off Mar 2022 | 333 Market St | Swinerton Builders | replacement of spill bucket & overfill valve for ecisting underground storage tank (fuel).Details
replacement of spill bucket & overfill valve for ecisting underground storage tank (fuel). | |
| Feb 13, 2020 | Expired or cancelled cancelled Jan 2026 | 333 Market St | 2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracingDetails
2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracing | $10,000 | |
| Jan 27, 2020 | Completed final sign-off Apr 2020 | 333 Market St | Honeywell International, Inc | 25th fl - ref pa 2019-1105-6451 f/a modification demo 9 speaker/strobes; install 13 speaker/strobes; 3 speakers; 2 strobes; 4 control relays; 1 emergency door release; 3 rib relays; 2 duct detectors; 1 smoke detector; (1) 2 way comm call station; replace 2 emergency door releaseDetails
25th fl - ref pa 2019-1105-6451 f/a modification demo 9 speaker/strobes; install 13 speaker/strobes; 3 speakers; 2 strobes; 4 control relays; 1 emergency door release; 3 rib relays; 2 duct detectors; 1 smoke detector; (1) 2 way comm call station; replace 2 emergency door release | $19,600 |
| Jan 24, 2020 | Completed final sign-off Apr 2020 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 15/f: mod (e) fire sprinklers system. relocate 8 & remove 1 sprinkler head. ref t.i. pa201911056455. maher n/a.Details
15/f: mod (e) fire sprinklers system. relocate 8 & remove 1 sprinkler head. ref t.i. pa201911056455. maher n/a. | $4,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 333 Market St | Honeywell International, Inc | 15th fl - fa modification - remove (5) ceiling speaker/strobe, install 10 speaker strobe, 3 speakers; 2 control relays & 1 emergency door release; 2 rib relays, (1) 2 way comm call stationDetails
15th fl - fa modification - remove (5) ceiling speaker/strobe, install 10 speaker strobe, 3 speakers; 2 control relays & 1 emergency door release; 2 rib relays, (1) 2 way comm call station | $10,580 |
| Jan 15, 2020 | Completed final sign-off Apr 2020 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 25th fl: existing fire sprinkler ti. relocate 15 sprinklers. ref pa #201911056451.Details
25th fl: existing fire sprinkler ti. relocate 15 sprinklers. ref pa #201911056451. | $7,500 |
| Nov 13, 2019 | Completed final sign-off Nov 2019 | 333 Market St | Honeywell International, Inc | 33rd floor: as built permit for aproved fire alarm pa# 2019-0920-2207. changes in this permit is to update device addresses and remove from plans existing devices that are not existing in this fieldDetails
33rd floor: as built permit for aproved fire alarm pa# 2019-0920-2207. changes in this permit is to update device addresses and remove from plans existing devices that are not existing in this field | |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 333 Market St | Anderson, Rowe & Buckley, Inc. | 18th fl - existing fire sprinkler system ti, 2 relocated sprinklers. ref pa 2019-0906-0908Details
18th fl - existing fire sprinkler system ti, 2 relocated sprinklers. ref pa 2019-0906-0908 | $1,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2020 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 14th fl - existing fire sprinkler system ti, 70 relocated sprinklers. ref pa 2019-0906-0909Details
14th fl - existing fire sprinkler system ti, 70 relocated sprinklers. ref pa 2019-0906-0909 | $35,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2020 | 333 Market St | Honeywell International, Inc | 18th floor: f/a modification - install 4 speaker/strobe, 2 strobes, 3 emergency door release, 1 2-way comm call station, 1 pilot relayDetails
18th floor: f/a modification - install 4 speaker/strobe, 2 strobes, 3 emergency door release, 1 2-way comm call station, 1 pilot relay | $5,622 |
| Nov 5, 2019 | Completed final sign-off Jul 2020 | 333 Market St | G L C Construction Company Inc | 25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.Details
25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel. | $516,115 |
| Nov 5, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.Details
15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel. | $715,803 |
| Nov 1, 2019 | Completed final sign-off Mar 2020 | 333 Market St | Honeywell International, Inc | f/a modification 14th fl: remove 15 speaker strobess, 6 strobes. install 14 speakers/strobes, 3 strobes, 5 control relays, 3 emergency door release, 8 rib relays, 2 duct detectors, 1 slc loop card, 1 2-way comm call stationDetails
f/a modification 14th fl: remove 15 speaker strobess, 6 strobes. install 14 speakers/strobes, 3 strobes, 5 control relays, 3 emergency door release, 8 rib relays, 2 duct detectors, 1 slc loop card, 1 2-way comm call station | $19,060 |
| Oct 2, 2019 | Completed final sign-off Jan 2020 | 333 Market St | G L C Construction Company Inc | install movable gas partition. (electrical door)Details
install movable gas partition. (electrical door) | $50,000 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 333 Market St | Honeywell International, Inc | 33rd fl - ref pa 2019-0605-2530 fa adds: remove 27 speaker/strobes; 6 door holders; 6 strobes, 6 det; install 36 spkr/strobes; 3 spkrs;4 strobe; 6 control relays, 3 door release; add 1 call station, 6 rib; 6 duct det; 2 audio amp; replace 1 strobe power supply; 3 strobes, 4 spkr/strobes; 12 dets, 3Details
33rd fl - ref pa 2019-0605-2530 fa adds: remove 27 speaker/strobes; 6 door holders; 6 strobes, 6 det; install 36 spkr/strobes; 3 spkrs;4 strobe; 6 control relays, 3 door release; add 1 call station, 6 rib; 6 duct det; 2 audio amp; replace 1 strobe power supply; 3 strobes, 4 spkr/strobes; 12 dets, 3 | $45,800 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 333 Market St | Honeywell International, Inc | 26th fl - ref pa 2019-0605-2531 fa adds: remove, 28 speaker/strobes; 2 strobes; 6 door holders; 6 det; install 42 spkr/strobes; 8 strobes; 7 control relays; 3 door release, 6 rib; 4 duct det; 12 zone amplifier; 1 call station; replace 1 bps; 12 detectors; 3 duct det, 3 mps; 3 monitor mod; 8 control;Details
26th fl - ref pa 2019-0605-2531 fa adds: remove, 28 speaker/strobes; 2 strobes; 6 door holders; 6 det; install 42 spkr/strobes; 8 strobes; 7 control relays; 3 door release, 6 rib; 4 duct det; 12 zone amplifier; 1 call station; replace 1 bps; 12 detectors; 3 duct det, 3 mps; 3 monitor mod; 8 control; | $45,800 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech.Details
14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech. | $850,000 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 333 Market St | Rudolph Commercial Interiors Inc, Rci | 18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech.Details
18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech. | $350,000 |
| Jul 24, 2019 | Completed final sign-off Dec 2019 | 333 Market St | Pribuss Engineering Inc | fire sprinkler ti on 33rd flr total heads 73Details
fire sprinkler ti on 33rd flr total heads 73 | $37,522 |
| Jul 24, 2019 | Completed final sign-off Dec 2019 | 333 Market St | Pribuss Engineering Inc | fire sprinkler ti on 26th flr total heads 55Details
fire sprinkler ti on 26th flr total heads 55 | $28,270 |
| Jun 6, 2019 | Completed final sign-off Aug 2019 | 333 Market St | Pribuss Engineering Inc | 8th flr fire sprinkler relocate pendent sprinklers 13, add 1 ref 201901039517Details
8th flr fire sprinkler relocate pendent sprinklers 13, add 1 ref 201901039517 | $7,196 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 333 Market St | G L C Construction Company Inc | 33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a.Details
33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a. | $1,962,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 333 Market St | Honeywell International, Inc | 08th floor: ref ti. 201901039517: remove:7 spkr/strbs:4 strobes;2 door holder; 2smoke detectors; intall:19 spkr/strbs;1 spkr,3strbs;5control relays;3 door release;2 door holder; 3 rib relays; 2 smoke det;4 duct detc;1 2way call box. replace; 1 strobe power supply;20 smoke detec;3 duct det; 9 ctr modDetails
08th floor: ref ti. 201901039517: remove:7 spkr/strbs:4 strobes;2 door holder; 2smoke detectors; intall:19 spkr/strbs;1 spkr,3strbs;5control relays;3 door release;2 door holder; 3 rib relays; 2 smoke det;4 duct detc;1 2way call box. replace; 1 strobe power supply;20 smoke detec;3 duct det; 9 ctr mod | $22,260 |
| Jun 5, 2019 | Completed final sign-off Nov 2019 | 333 Market St | Honeywell International, Inc | f/a modification on basement floor. add 2 monitor module for the new valve tamper.Details
f/a modification on basement floor. add 2 monitor module for the new valve tamper. | $1,300 |
| Jun 5, 2019 | Completed final sign-off Jul 2020 | 333 Market St | G L C Construction Company Inc | 26/f, office remodel. (n) conference rooms, huddle rooms, focus rooms, 1 breakroom, new furniture and finishes. upgrade all fixtures to (n) led lighting, hvac upgrade for new remodel. maher n/a.Details
26/f, office remodel. (n) conference rooms, huddle rooms, focus rooms, 1 breakroom, new furniture and finishes. upgrade all fixtures to (n) led lighting, hvac upgrade for new remodel. maher n/a. | $1,962,000 |
| May 13, 2019 | Never finaled issued May 2019, no final | 333 Market St | Honeywell International, Inc | 2nd fl - f/a modification - remove 1 speaker/strobe, install 3 speakers/strobes ref pa 2019-0308-4749Details
2nd fl - f/a modification - remove 1 speaker/strobe, install 3 speakers/strobes ref pa 2019-0308-4749 | $2,070 |
| May 9, 2019 | Completed final sign-off May 2019 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 2nd flr - fire sprinklers ti add 1 fire sprinklers, relocate 5, and plug 1 ref 201903084749Details
2nd flr - fire sprinklers ti add 1 fire sprinklers, relocate 5, and plug 1 ref 201903084749 | $3,000 |
| Mar 8, 2019 | Completed final sign-off Jul 2019 | 333 Market St | G L C Construction Company Inc | suite 200. remodel of (e) office space into (n) waiting room, (n) observation room & (n) interview room. upgrae all lights fixtures in suite to (n) led lighting. hvac upgrade for (n) remodel.Details
suite 200. remodel of (e) office space into (n) waiting room, (n) observation room & (n) interview room. upgrae all lights fixtures in suite to (n) led lighting. hvac upgrade for (n) remodel. | $75,000 |
| Feb 1, 2019 | Completed final sign-off Feb 2019 | 333 Market St | Honeywell International, Inc | 27th fl - fire alarm asbuilt for pa 2018-1206-7590. no additional scope of workDetails
27th fl - fire alarm asbuilt for pa 2018-1206-7590. no additional scope of work | |
| Jan 24, 2019 | Completed final sign-off Jan 2019 | 333 Market St | Honeywell International, Inc | as built for approved f/a pa #201811145805. no additional scope of work. 30th flDetails
as built for approved f/a pa #201811145805. no additional scope of work. 30th fl | |
| Jan 22, 2019 | Never finaled issued Sep 2019, no final | 333 Market St | Swinerton Builders | replacement of internal tank lining for e water cistern in the basement of 333 market. also replace e pipes and access ladder coatingDetails
replacement of internal tank lining for e water cistern in the basement of 333 market. also replace e pipes and access ladder coating | $35,000 |
| Jan 22, 2019 | Completed final sign-off Jan 2021 | 333 Market St | Honeywell International, Inc | install backbone 2 way communication system for floors that have not been remodeled. install call stations at floors that have been remodeled. add 1 main panel, 1 remote panel, 6 expansion switches, 7 call stations, 7 power supplies, 7 dual monitor modules. ** maher: n/a **Details
install backbone 2 way communication system for floors that have not been remodeled. install call stations at floors that have been remodeled. add 1 main panel, 1 remote panel, 6 expansion switches, 7 call stations, 7 power supplies, 7 dual monitor modules. ** maher: n/a ** | $6,000 |
| Jan 3, 2019 | Completed final sign-off Jul 2020 | 333 Market St | G L C Construction Company Inc | 8th flr. office remodel of (n) conference rooms, huddle rooms, focus rooms and break rooms. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodelDetails
8th flr. office remodel of (n) conference rooms, huddle rooms, focus rooms and break rooms. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel | $729,000 |
| Dec 17, 2018 | Completed final sign-off Jan 2019 | 333 Market St | Ayoob & Peery Plumbing Co Inc | fire alrm 27th fl add 8, relocate 64 plug 4 to conform w new wall ceiling layout ti refDetails
fire alrm 27th fl add 8, relocate 64 plug 4 to conform w new wall ceiling layout ti ref | $18,600 |
| Dec 17, 2018 | Completed final sign-off Jan 2019 | 333 Market St | Ayoob & Peery Plumbing Co Inc | fire sprinkler 30th fl add 17, relocate 128 plug 10 sprinklers to convorm with new wall/ceiling layout ti refDetails
fire sprinkler 30th fl add 17, relocate 128 plug 10 sprinklers to convorm with new wall/ceiling layout ti ref | $37,725 |
| Dec 14, 2018 | Completed final sign-off Jun 2023 | 333 Market St | City Building Inc. | upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a**Details
upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a** | $400,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2019 | 333 Market St | Honeywell International, Inc | 27th fl - per pa 2018-0828-8510 f/a modificiation remove 13 speaker/strobes & 2 door holders; install 13 speaker/strobes; 2 speakers; 4 strobes; 14 control relays; 3 emergency door release; 2 door holders; 2 rib; 1 sic card; 1 duct det replace 1 rps; 4 strobes; 4 speaker/strobes; 15 smoke detectors;Details
27th fl - per pa 2018-0828-8510 f/a modificiation remove 13 speaker/strobes & 2 door holders; install 13 speaker/strobes; 2 speakers; 4 strobes; 14 control relays; 3 emergency door release; 2 door holders; 2 rib; 1 sic card; 1 duct det replace 1 rps; 4 strobes; 4 speaker/strobes; 15 smoke detectors; | $44,630 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 333 Market St | Honeywell International, Inc | fa modifcation on 30/f: remove 27 spkrs/strobes; 4 door holders & 2 smoke detectors. install new: 27 spkr/strobes, 6 spkrs; 3 strobes; 13 control relays; 3 emergency door release; 3 door holders; 10 rib relays; 2 duct det.; 1 slc loop cand. r/r: 1 bps; 3 strobes; 4 spkr/strobes; 16 smoke det.;3 ductDetails
fa modifcation on 30/f: remove 27 spkrs/strobes; 4 door holders & 2 smoke detectors. install new: 27 spkr/strobes, 6 spkrs; 3 strobes; 13 control relays; 3 emergency door release; 3 door holders; 10 rib relays; 2 duct det.; 1 slc loop cand. r/r: 1 bps; 3 strobes; 4 spkr/strobes; 16 smoke det.;3 duct | $36,916 |
| Aug 28, 2018 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | 30th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. maher naDetails
30th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. maher na | $1,400,000 |
| Aug 28, 2018 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | 27th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. partial remodel of 27th flr maher naDetails
27th flr - demo (e) offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. partial remodel of 27th flr maher na | $750,000 |
| Jun 29, 2018 | Completed final sign-off Aug 2018 | 333 Market St | Honeywell International, Inc | ref pa 2018-0504-8254 3rd fl lfa modifications: remove 3 speaker/strobes; relocate 1 speaker/strobes; replace 3 strobes to a speaker/strobes; 2 speaker/strobes; add 6 speaker/strobes; 2 ceiling speakers; 3 control relays; 3 emergency door release; 5 rib relays; 1 slc loop cordDetails
ref pa 2018-0504-8254 3rd fl lfa modifications: remove 3 speaker/strobes; relocate 1 speaker/strobes; replace 3 strobes to a speaker/strobes; 2 speaker/strobes; add 6 speaker/strobes; 2 ceiling speakers; 3 control relays; 3 emergency door release; 5 rib relays; 1 slc loop cord | $12,648 |
| Jun 19, 2018 | Completed final sign-off Dec 2018 | 333 Market St | Honeywell International, Inc | 10th fl f/a modifications: demo (3) speaker/strobes, install (2) speaker/strobe; (3) speakers, (2) control relays, (3) emergency door release, (3) rib relays. relocate (2) speaker/strobes. ref pa #201710110873. maher naDetails
10th fl f/a modifications: demo (3) speaker/strobes, install (2) speaker/strobe; (3) speakers, (2) control relays, (3) emergency door release, (3) rib relays. relocate (2) speaker/strobes. ref pa #201710110873. maher na | $5,600 |
| Jun 13, 2018 | Never finaled issued Nov 2018, no final | 333 Market St | Anderson, Rowe & Buckley, Inc. | replacement of dph re-called underground fuel piping to compy after citiation. pulling new flexible piping withing existing carrier undergroundDetails
replacement of dph re-called underground fuel piping to compy after citiation. pulling new flexible piping withing existing carrier underground | $125,000 |
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 333 Market St | Pribuss Engineering Inc | 3/f: ref pa# 2018 0504 8254; fire sprinkler t.i. relocated sprinklers (26) total (26) $514.00 n/a maherDetails
3/f: ref pa# 2018 0504 8254; fire sprinkler t.i. relocated sprinklers (26) total (26) $514.00 n/a maher | $13,364 |
| May 15, 2018 | Completed final sign-off Jul 2018 | 333 Market St | Pribuss Engineering Inc | fire sprinklers 10th fl, relocated 5 sprinklers. ref pa 2017-1011-0873Details
fire sprinklers 10th fl, relocated 5 sprinklers. ref pa 2017-1011-0873 | $2,570 |
| May 4, 2018 | Completed final sign-off Nov 2018 | 333 Market St | Swinerton Builders | remodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of spaceDetails
remodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of space | $250,000 |
| Nov 21, 2017 | Completed final sign-off Dec 2017 | 333 Market St | Pribuss Engineering Inc | 7th floor: fire sprinklers t.i. relocated sprinklers 1 heads. added sprinklers 1 heads. total 2. ref app#201708225486. n/a for maherDetails
7th floor: fire sprinklers t.i. relocated sprinklers 1 heads. added sprinklers 1 heads. total 2. ref app#201708225486. n/a for maher | $1,028 |
| Nov 20, 2017 | Completed final sign-off Dec 2017 | 333 Market St | Honeywell International, Inc | 7th floor fire alarm modifications: install (3) speaker/strobes; (2) speakers; (3) control relays; (3) emergency door release; (2) duct detectros; (3) rib relays; (1) slc loop card; (1) replace strobe to a speaker. ref amep pa #201708225486. n/a maher ordinanceDetails
7th floor fire alarm modifications: install (3) speaker/strobes; (2) speakers; (3) control relays; (3) emergency door release; (2) duct detectros; (3) rib relays; (1) slc loop card; (1) replace strobe to a speaker. ref amep pa #201708225486. n/a maher ordinance | $11,354 |
| Nov 3, 2017 | Completed final sign-off Dec 2017 | 333 Market St | Ayoob & Peery Plumbing Co Inc | tenant improvement 3rd fl, add 21, relocate 143, plug 9 to convorm with the wall ceiling layout of tenant improvment ref 201706230196. na for maherDetails
tenant improvement 3rd fl, add 21, relocate 143, plug 9 to convorm with the wall ceiling layout of tenant improvment ref 201706230196. na for maher | $43,200 |
| Oct 19, 2017 | Never finaled issued Oct 2017, no final | 333 Market St | Honeywell International, Inc | 22nd floor: ref app#201708023619 f/a modification to demo 3 speaker/strobes, install 8 speaker/stobes, 4 speakers, 3 control relays, 2 emergency door release,3 duct detectors, 5 rib relays, 1 slc loop card. n/a for maher.Details
22nd floor: ref app#201708023619 f/a modification to demo 3 speaker/strobes, install 8 speaker/stobes, 4 speakers, 3 control relays, 2 emergency door release,3 duct detectors, 5 rib relays, 1 slc loop card. n/a for maher. | $18,799 |
| Oct 13, 2017 | Completed final sign-off Feb 2018 | 333 Market St | Honeywell International, Inc | 3/f: f/a mod:remove 3 wall strobes, 3 spkr/strb, 1 speaker. install 26 spkr/strb; 2 spkr,4 sd, 6door holders, 5 cntl rly, 1 emergency door release, 7 duct det, 9 rib rly, 1 slc loop cond, relocate 11spkr/stb, upgrade 5 smoke det to new, upgrade 1 spkr to spkr/strb. ref t.i. pa201706230196. maher n/aDetails
3/f: f/a mod:remove 3 wall strobes, 3 spkr/strb, 1 speaker. install 26 spkr/strb; 2 spkr,4 sd, 6door holders, 5 cntl rly, 1 emergency door release, 7 duct det, 9 rib rly, 1 slc loop cond, relocate 11spkr/stb, upgrade 5 smoke det to new, upgrade 1 spkr to spkr/strb. ref t.i. pa201706230196. maher n/a | $41,254 |
| Oct 11, 2017 | Completed final sign-off Nov 2018 | 333 Market St | Swinerton Builders | partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher naDetails
partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher na | $140,000 |
| Oct 3, 2017 | Completed final sign-off Dec 2017 | 333 Market St | Ayoob & Peery Plumbing Co Inc | f/s ti 22nd fl: add (2), relocate (12), and plug (5) sprinklers to conform with the new wall/ceiling layout of the ti. ref pa #201708023619. maher naDetails
f/s ti 22nd fl: add (2), relocate (12), and plug (5) sprinklers to conform with the new wall/ceiling layout of the ti. ref pa #201708023619. maher na | $3,750 |
| Aug 29, 2017 | Completed final sign-off Oct 2017 | 333 Market St | Anderson, Rowe & Buckley, Inc. | 16/f- (e) fire sprinkler system t.i., relocate 50, add 7 pendent sprinklers, add 6 upright sprinklers, re-supply preaction system. t.i. pa#201703292641. n/a ordinance #155-13 to feed from both stand pipesDetails
16/f- (e) fire sprinkler system t.i., relocate 50, add 7 pendent sprinklers, add 6 upright sprinklers, re-supply preaction system. t.i. pa#201703292641. n/a ordinance #155-13 to feed from both stand pipes | $16,500 |
| Aug 22, 2017 | Never finaled issued Oct 2017, no final | 333 Market St | Skyline Construction | 7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13Details
7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13 | $225,000 |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 333 Market St | Honeywell International, Inc | ref pa 2017-0622-0068 fa modification on 11th floor. install 6 speaker/strobes; 3 emergency door release; 1 control relay; 6 rib relay, upgrade 1 strobe power supply. maher naDetails
ref pa 2017-0622-0068 fa modification on 11th floor. install 6 speaker/strobes; 3 emergency door release; 1 control relay; 6 rib relay, upgrade 1 strobe power supply. maher na | $8,738 |
| Aug 8, 2017 | Completed final sign-off Mar 2019 | 333 Market St | Honeywell International, Inc | ref pa 2017-0329-2641 fa modification on 16th fl: remove 7 speaker/strobes & 6 speakers; install new: 6 speaker/strobes; 27 speakers, 1 strobe; 2 emergency door release; 2 rib relays; 1 control relay 1 speaker amplifire; 1 battery cabinet & 2 batteries. maher naDetails
ref pa 2017-0329-2641 fa modification on 16th fl: remove 7 speaker/strobes & 6 speakers; install new: 6 speaker/strobes; 27 speakers, 1 strobe; 2 emergency door release; 2 rib relays; 1 control relay 1 speaker amplifire; 1 battery cabinet & 2 batteries. maher na | $21,074 |
| Aug 4, 2017 | Completed final sign-off Oct 2017 | 333 Market St | Ac3 | install protective guardrail at existing mechanical roof penthouse on an existnig low rise building. 333 market annex is 5 story highDetails
install protective guardrail at existing mechanical roof penthouse on an existnig low rise building. 333 market annex is 5 story high | $3,000 |
| Aug 2, 2017 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces.Details
remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces. | $275,000 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 333 Market St | Ayoob & Peery Plumbing Co Inc | 11/f- add (1) and relocate (9) sprinklers to conform with new wall/ceiling layout of the t.i. ref. to pa#201706220068. n/a ordinance #155-13Details
11/f- add (1) and relocate (9) sprinklers to conform with new wall/ceiling layout of the t.i. ref. to pa#201706220068. n/a ordinance #155-13 | $5,250 |
| Jun 23, 2017 | Completed final sign-off May 2019 | 333 Market St | T C B Builders Inc | 3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.Details
3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits. | $1,500,000 |
| Jun 23, 2017 | Completed final sign-off Jul 2017 | 333 Market St | Honeywell International, Inc | fire alarm addition on 2nd floor idf room - add 2 duct detectors for fsd's & heat pumps; 3 rib relays, 1 control relay. ref pa 201706199691. maher naDetails
fire alarm addition on 2nd floor idf room - add 2 duct detectors for fsd's & heat pumps; 3 rib relays, 1 control relay. ref pa 201706199691. maher na | $3,084 |
| Jun 22, 2017 | Completed final sign-off Mar 2019 | 333 Market St | G L C Construction Company Inc | (tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.Details
(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work. | $195,000 |
| Jun 19, 2017 | Completed final sign-off Aug 2017 | 333 Market St | Paradigm General Contractors, Anderson, Rowe & Buckley, Inc. | add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser waterDetails
add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser water | $45,000 |