Joseph L Williams
- License
- S6772
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6772 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Zfa Structural Engineers
- Based in
- San Francisco
- On San Francisco permits
- Sep 2025 to Apr 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Tiffany Redding
- Engineers
- Antonio Jacksalem, Bradley Hollub, Christopher Lloyd, Meng Hsiu Chen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2026 | In progress issued Sep 2026 | 1007 Market St | install new limited-use/limited access "passenger" - type elevator serving floors 1,2,3. install new vertical platform lift serving basement and floor 1. building modifications as needed to structure and to (e) mech, elec, and plumbing systems. "barrier removal" project.Details
install new limited-use/limited access "passenger" - type elevator serving floors 1,2,3. install new vertical platform lift serving basement and floor 1. building modifications as needed to structure and to (e) mech, elec, and plumbing systems. "barrier removal" project. | $650,000 | |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 333 Market St | reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.Details
reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal. | $75,000 |