Bradley Hollub
- Listed as
- authorized agent-others, designer, engineer
- Firm
- Randall Lamb Assoc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2014 to Oct 2026
53 permits since 2000 (engineer on 52 permits, authorized agent-others on 1 permit, designer on 1 permit): 26 completed, 18 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 225 Bush St | 15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchenDetails
15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchen | $454,138 | |
| Aug 13, 2026 | In progress issued Aug 2026 | 1570 Bay St | Matrix Hg Inc | replacement of 3 bard units, 2 serving the swgr building and 1 serving the battery building and structural support to support the units. no new fire smoke dampers required.Details
replacement of 3 bard units, 2 serving the swgr building and 1 serving the battery building and structural support to support the units. no new fire smoke dampers required. | $62,906 |
| Jun 26, 2026 | In progress issued Jul 2026 | 345 California St | Skyline Construction | 10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955Details
10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955 | $300,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Ca United Mechanical, Inc | water cooled chiller replacementDetails
water cooled chiller replacement | $1,000,000 |
| Apr 20, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | 6th & 7th floors - mechanical work for ti ref pa 202602065450Details
6th & 7th floors - mechanical work for ti ref pa 202602065450 | $175,000 |
| Mar 13, 2026 | In progress issued Apr 2026 | 114 Sansome St | Skyline Construction | office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.Details
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system. | $1,400,000 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | 1st fl - meps for 202511260493Details
1st fl - meps for 202511260493 | $194,832 |
| Jan 20, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areasDetails
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 333 Market St | replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.Details
replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet. | $600,000 | |
| Dec 30, 2025 | In progress issued Feb 2026 | 300 Mission St | Skyline Construction | tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included.Details
tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included. | $160,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539Details
13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539 | $300,000 |
| Dec 16, 2025 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.Details
l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 333 Market St | reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.Details
reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal. | $75,000 | |
| Sep 16, 2025 | Expired or cancelled cancelled May 2026 | 650 07th St | Principal Builders Inc. | interior ti of ground fl existing office space. mechanical deferred.Details
interior ti of ground fl existing office space. mechanical deferred. | $250,000 |
| Aug 15, 2025 | In progress issued Dec 2025 | 456 Montgomery St | Anderson, Rowe & Buckley, Inc. | install new fuel fill and day tank for a diesel fire pump.Details
install new fuel fill and day tank for a diesel fire pump. | $125,000 |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | level 1: deferred mep for permit 202506168762Details
level 1: deferred mep for permit 202506168762 | $257,040 |
| Mar 31, 2025 | In progress issued Mar 2025 | 151 Union St | Msr Mechanical Llc | 2 like for like water-cooled chiller replacements.Details
2 like for like water-cooled chiller replacements. | $350,000 |
| Mar 11, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included.Details
level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included. | $10,780,569 |
| Mar 10, 2025 | Completed final sign-off Oct 2025 | 3250 Van Ness Av | Msr Mechanical Llc | replace one (1) water cooled chiller at gradeDetails
replace one (1) water cooled chiller at grade | $175,000 |
| Feb 19, 2025 | In progress issued Apr 2025 | 405 Howard St | Skyline Construction | 8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal.Details
8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal. | $200,000 |
| Jan 17, 2025 | In progress issued Mar 2025 | 405 Howard St | Skyline Construction | mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controlsDetails
mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controls | $200,000 |
| Nov 21, 2024 | Expired or cancelled cancelled Mar 2025 | 1 Union St | Msr Mechanical Llc | two like for like chillers replacment.Details
two like for like chillers replacment. | $450,000 |
| Oct 10, 2024 | Completed final sign-off May 2025 | 1 Market St | Dpr Construction A | 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operationalDetails
35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational | $3,760,780 |
| Aug 13, 2024 | Completed final sign-off Nov 2025 | 22 04th St | Skyline Construction | basement l2: diesel fire pump replacement. 1000 gpm x 165 psiDetails
basement l2: diesel fire pump replacement. 1000 gpm x 165 psi | $150,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 595 Market St | Matrix Hg Inc | 13th fl, #1350 - revision to pa 202310259457 t-24 pages were updated to show correct forms neededDetails
13th fl, #1350 - revision to pa 202310259457 t-24 pages were updated to show correct forms needed | |
| Mar 7, 2024 | In progress issued Mar 2024 | 101 Mission St | Novo Construction Inc | 18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491Details
18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491 | $12,000 |
| Feb 23, 2024 | Completed final sign-off May 2024 | 650 California St | Matrix Hg Inc | 27th fl ti using base building hvac system. modifications to air distribution system in tenant space to suite arch renovations, includidng installation of water source heat pump and associated ductwork. no new fire smoke dampers required. ref 202401123873 and 202310259410Details
27th fl ti using base building hvac system. modifications to air distribution system in tenant space to suite arch renovations, includidng installation of water source heat pump and associated ductwork. no new fire smoke dampers required. ref 202401123873 and 202310259410 | $45,000 |
| Jan 29, 2024 | Completed final sign-off Jun 2024 | 120 Kearny St | Matrix Hg Inc | 27/f-ste 2700: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211257.Details
27/f-ste 2700: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211257. | $48,834 |
| Jan 29, 2024 | Completed final sign-off Jun 2024 | 120 Kearny St | Matrix Hg Inc | 34/f-ste 3450: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211204.Details
34/f-ste 3450: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211204. | $11,203 |
| Jan 12, 2024 | Completed final sign-off May 2024 | 650 California St | Matrix Hg Inc | 27/f: ti using the (e) base building hvac system. modifications to the air distribution system in the tenant space to suit architectural renovations, including installation of new vav boxes and installation of new ductwork, no new fire smoke dampers required. building permit# 202310259410.Details
27/f: ti using the (e) base building hvac system. modifications to the air distribution system in the tenant space to suit architectural renovations, including installation of new vav boxes and installation of new ductwork, no new fire smoke dampers required. building permit# 202310259410. | $69,848 |
| Nov 10, 2023 | Completed final sign-off Mar 2024 | 425 California St | Matrix Hg Inc | 22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fanDetails
22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan | $84,239 |
| Oct 5, 2023 | Completed final sign-off Jan 2024 | 1 Lombard St | Matrix Hg Inc | boiler replacement.Details
boiler replacement. | $150,000 |
| Sep 22, 2023 | Completed final sign-off Dec 2024 | 2150 Fulton St | Plant Construction Co, Lp | deferred mep for pa# 202307172314.Details
deferred mep for pa# 202307172314. | $69,438 |
| Aug 18, 2023 | Never finaled issued Sep 2023, no final | 585 Mission St | Skyline Construction | ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.Details
ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm. | $250,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 900 North Point St | Marchetti Group | deferred mep for 202307111874Details
deferred mep for 202307111874 | $349,200 |
| Jul 7, 2023 | In progress issued Apr 2024 | 111 Pine St | W. Bradley Electric | replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits.Details
replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits. | $1,500,000 |
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 425 California St | Novo Construction Inc | suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/aDetails
suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a | $50,000 |
| May 16, 2023 | Completed final sign-off Nov 2023 | 185 Berry St | Skyline Construction | 4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.Details
4/f ste 4800: mep for tenant improvement, ref pa# 202304105357. | $175,000 |
| Feb 22, 2023 | Completed final sign-off Jun 2023 | 1355 Market St | Richlen Construction | 2/f suite 210: demolition and construction of non-load bearing partitions, doors, new lighting, millwork, and finishes.Details
2/f suite 210: demolition and construction of non-load bearing partitions, doors, new lighting, millwork, and finishes. | $700,000 |
| Dec 30, 2022 | Completed final sign-off Sep 2023 | 1 Market St | Skyline Construction | 39/f: deferred mep permit for 202211307363.Details
39/f: deferred mep permit for 202211307363. | |
| Oct 18, 2022 | Expired or cancelled cancelled Jan 2026 | 1501 Tennessee St | to comply with access business entrance abe202003102554. 1st fl: barrier removal to create accessible entrance and means of egrees. new accessible lift to existing main entry door.Details
to comply with access business entrance abe202003102554. 1st fl: barrier removal to create accessible entrance and means of egrees. new accessible lift to existing main entry door. | $10,000 | |
| Aug 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | 2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.Details
2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit. | $211,514 | |
| Aug 19, 2022 | Completed final sign-off May 2023 | 555 California St | Principal Builders Inc. | 27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.Details
27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's. | $3,120,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 55 02nd St | Novo Construction Inc | 24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.Details
24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg. | $650,000 |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 71 Stevenson St | Msr Mechanical Llc | replace one existing boiler with (2) modular boilers in penthouse.Details
replace one existing boiler with (2) modular boilers in penthouse. | $120,000 |
| May 12, 2022 | Completed final sign-off Mar 2023 | 101 02nd St | Bcci Construction Company | 21st fl: partial floor tenant improvement. mep included. ref # 202108176536Details
21st fl: partial floor tenant improvement. mep included. ref # 202108176536 | $210,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| Aug 24, 2020 | Expired or cancelled cancelled Jan 2026 | 1 Front St | replace a 1,200 ton induced draft cross flow cooling tower system on the roof.Details
replace a 1,200 ton induced draft cross flow cooling tower system on the roof. | $215,000 | |
| Jun 5, 2019 | Expired or cancelled cancelled Feb 2024 | 2215 Market St | ground floor renovation, new ada restroom, new partitions and catering kitchenDetails
ground floor renovation, new ada restroom, new partitions and catering kitchen | $147,000 | |
| Dec 14, 2018 | Completed final sign-off Jun 2023 | 333 Market St | City Building Inc. | upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a**Details
upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a** | $400,000 |
| May 4, 2016 | Completed final sign-off Mar 2017 | 550 California St | Skyline Construction | 4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maherDetails
4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maher | $350,000 |
| Nov 14, 2014 | Completed final sign-off Jul 2017 | 550 California St | W. Bradley Electric | replacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/naDetails
replacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/na | $3,000,000 |