Block 3708, lot 028
71 Stevenson St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 23
- Building
- 348,000 sq ft
- Lot
- 20,555 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 71 Stevenson St | revision to bpa:202607014426 - interior tenant improvement demolition and new non-structural partitions, new muti-tenant corridor, new finishes and relocated lighting. mep, fire life safety under separate permit (9th floor ste900)Details
revision to bpa:202607014426 - interior tenant improvement demolition and new non-structural partitions, new muti-tenant corridor, new finishes and relocated lighting. mep, fire life safety under separate permit (9th floor ste900) | ||
| Sep 18, 2026 | In progress issued Sep 2026 | 71 Stevenson St | Marchetti Group | to obtain final inspection for work approved under pa# 2015608285538. all work is complete.Details
to obtain final inspection for work approved under pa# 2015608285538. all work is complete. | |
| Sep 10, 2026 | In progress issued Sep 2026 | 71 Stevenson St | Marchetti Group | provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426Details
provide sheet metal modification to accomadate (n) t.i., furnish & install (n) transfer fan. ref. bpa#202607014426 | $96,000 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 71 Stevenson St | Marchetti Group | 9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit.Details
9/f suites 925 and 950: interior tenant improvement - demolition and new non-structural paritions, new finishes, fixtures, and relocate lighting. mep, fire life safety under separate permit. | $569,163 |
| Aug 18, 2026 | In progress issued Aug 2026 | 71 Stevenson St | Phase One Fire Life Safety Systems Inc | 19/f: add 2 new call stations to existing two-way system for access control elevator. 1 call station to passenger elevator on 19/f. 1 call station to service elevator on 19/f. ref bpa 202606102960Details
19/f: add 2 new call stations to existing two-way system for access control elevator. 1 call station to passenger elevator on 19/f. 1 call station to service elevator on 19/f. ref bpa 202606102960 | $5,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 71 Stevenson St | Marchetti Group | deferred mechanical/electrical work ref pa#202606102960: rebalance (e) vav boxes where medicated to serve (n) & (e) zones demo (e) and install (n) low side duct & grills as required. relocate (e) vav tsats as required. electrical: lighting & controls for 3 (n) meeting rooms w/associatedDetails
deferred mechanical/electrical work ref pa#202606102960: rebalance (e) vav boxes where medicated to serve (n) & (e) zones demo (e) and install (n) low side duct & grills as required. relocate (e) vav tsats as required. electrical: lighting & controls for 3 (n) meeting rooms w/associated | $133,750 |
| Jul 1, 2026 | In progress issued Jul 2026 | 71 Stevenson St | Marchetti Group | 9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permitDetails
9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fixtures, and relocated lighting. mep, fire life safety under separate permit | $800,000 |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 71 Stevenson St | 1/fl-ti for restaurant to include replacing equipment on the service line and limited pantry. no mep workDetails
1/fl-ti for restaurant to include replacing equipment on the service line and limited pantry. no mep work | $7,500 | |
| Jun 10, 2026 | In progress issued Jun 2026 | 71 Stevenson St | Marchetti Group | 19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferredDetails
19th floor: interior tenant improvement-new partitions, finishes and lighting, mechanical, electrical are deferred. fire life safety and sprinkler deferred | $150,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 71 Stevenson St | Marchetti Group | documentation and anchoring of single person phone booth (7) with new signage to accessible phone room.Details
documentation and anchoring of single person phone booth (7) with new signage to accessible phone room. | $20,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 71 Stevenson St | Marchetti Group | 10th fl - install pre-fabricated phone booth in existing officeDetails
10th fl - install pre-fabricated phone booth in existing office | $2,400 |
| Apr 3, 2025 | Completed final sign-off Jul 2025 | 71 Stevenson St | Marchetti Group | 18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant spaceDetails
18th fl ref pa #2025-0121-8674: modify existing ductwork to better serve tenant space | $16,750 |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinler permit. add one and delete one pendent fire spinkelrs on the 18/f. t.i ref pa# 202501218674Details
fire sprinler permit. add one and delete one pendent fire spinkelrs on the 18/f. t.i ref pa# 202501218674 | $1,000 |
| Mar 19, 2025 | Completed final sign-off May 2025 | 71 Stevenson St | Sabah International Incorporated | 18/fl-ref 202501218674- scope of work is to add (2) new 2 -way emergency communication call boxes to service elevator lobbyDetails
18/fl-ref 202501218674- scope of work is to add (2) new 2 -way emergency communication call boxes to service elevator lobby | $8,072 |
| Mar 4, 2025 | Completed final sign-off Apr 2026 | 71 Stevenson St | Marchetti Group | relocation and documentation of single person phone booths and new signage to accessible phone roomDetails
relocation and documentation of single person phone booths and new signage to accessible phone room | $11,237 |
| Jan 21, 2025 | Completed final sign-off Jul 2025 | 71 Stevenson St | Marchetti Group | 18th/f interior t.i.: new partition, door assembles, minor electrical & finish upgrades. mep , fire life safety & sprinkler under seprate permitDetails
18th/f interior t.i.: new partition, door assembles, minor electrical & finish upgrades. mep , fire life safety & sprinkler under seprate permit | $175,000 |
| Dec 16, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | Mc Millan Electric | 10/fl- ti 202410183227- install (n) fire alarm notification appliances to accomadate to the tiDetails
10/fl- ti 202410183227- install (n) fire alarm notification appliances to accomadate to the ti | $17,298 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | R L H Fire Protection Inc | 10/f: fire sprinkler permit. relocate 71, add 8, and delete 10 sprinklers on the 10th floor. ti# 202410183227Details
10/f: fire sprinkler permit. relocate 71, add 8, and delete 10 sprinklers on the 10th floor. ti# 202410183227 | $25,000 |
| Nov 21, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | Sabah International Incorporated | 22nd & 23rd - to add 4(n) 2 way emergency communication call boxes to an existing (non-ul listed) 2 2ay ecs system to meet the requirement per the cbc section 1010.2.12.1 access control elevator lobby doors in a high rise office ref pa 202406063908Details
22nd & 23rd - to add 4(n) 2 way emergency communication call boxes to an existing (non-ul listed) 2 2ay ecs system to meet the requirement per the cbc section 1010.2.12.1 access control elevator lobby doors in a high rise office ref pa 202406063908 | $6,213 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | Marchetti Group | 10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes.Details
10th flr. interior t.i. to 10th flr. to include walls, ceilings and finishes. | $1,400,000 |
| Aug 20, 2024 | In progress issued Sep 2024 | 71 Stevenson St | Mc Millan Electric | ti 202408138572- fire alarm project involving the one for one replacement of notification appliances as well as additional applicanceDetails
ti 202408138572- fire alarm project involving the one for one replacement of notification appliances as well as additional applicance | $9,726 |
| Aug 13, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | Marchetti Group | ref pa 2024-0606-3908 demo and reroute low dide duct to accomodate new floor plan and rebalance existing grilles. provide new vav boxes and assoicated low side system to accomodate new zones where required.Details
ref pa 2024-0606-3908 demo and reroute low dide duct to accomodate new floor plan and rebalance existing grilles. provide new vav boxes and assoicated low side system to accomodate new zones where required. | $373,500 |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 71 Stevenson St | R L H Fire Protection Inc | t.i. to an (e) fire sprinkler system relocate on the 22nd and 23rd floor 148 sprinklers, add 10 delete 5 ti pa# 2024-0606-3908Details
t.i. to an (e) fire sprinkler system relocate on the 22nd and 23rd floor 148 sprinklers, add 10 delete 5 ti pa# 2024-0606-3908 | $60,000 |
| Jul 16, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | Marchetti Group | 22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908Details
22nd and 23rd floors: installation of indoor lighting, controls, and associated power distribution. ref. approved pa #202406063908 | $35,000 |
| Jun 6, 2024 | Completed final sign-off May 2025 | 71 Stevenson St | Marchetti Group | floors 22 &23- interior tenant improvement, selective demo and construction of non structural partitions. minor reworking of e ceilings and light fixtures, new millwork, finishes, mep deferred.Details
floors 22 &23- interior tenant improvement, selective demo and construction of non structural partitions. minor reworking of e ceilings and light fixtures, new millwork, finishes, mep deferred. | $2,200,000 |
| Mar 4, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | Mc Millan Electric | install 12 (n) fire alarm appliances & 2 new fire alarm initiating devices to accomodate ste 1450 t.i. 202401254666Details
install 12 (n) fire alarm appliances & 2 new fire alarm initiating devices to accomodate ste 1450 t.i. 202401254666 | $9,650 |
| Feb 14, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | Marchetti Group | 14/f ste 1450: demo & reourt low side duct to accommodate new floor plan and rebalance e grills. provided new vav boxes and associated low side system to accommodate new zones where required. provide lighting w/ asso circuits & controls, power & signal w/ asso circuites & wiring for office retrofit.Details
14/f ste 1450: demo & reourt low side duct to accommodate new floor plan and rebalance e grills. provided new vav boxes and associated low side system to accommodate new zones where required. provide lighting w/ asso circuits & controls, power & signal w/ asso circuites & wiring for office retrofit. | $137,621 |
| Feb 12, 2024 | Completed final sign-off Feb 2024 | 71 Stevenson St | R L H Fire Protection Inc | ref pa# 202401254666 fire sprinkler permit. relocate 6 pendent sprinklers. add 3 and delete 1 sprinkler on the 14th flDetails
ref pa# 202401254666 fire sprinkler permit. relocate 6 pendent sprinklers. add 3 and delete 1 sprinkler on the 14th fl | $3,000 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | Marchetti Group | interior tenant improvement: demolition of non structural partitions, millwork, finnishes. new partitions, finishes and reolcated lighting. mep, fire and life safety under sep permitDetails
interior tenant improvement: demolition of non structural partitions, millwork, finnishes. new partitions, finishes and reolcated lighting. mep, fire and life safety under sep permit | $566,784 |
| Jul 26, 2023 | Completed final sign-off Aug 2023 | 71 Stevenson St | R L H Fire Protection Inc | 14/f: fire sprinkler, relocate 6, add 1 and delete sprinkler, ti 202306079438Details
14/f: fire sprinkler, relocate 6, add 1 and delete sprinkler, ti 202306079438 | $2,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 71 Stevenson St | Marchetti Group | 14/f: use existing reheat and cooling only vav boxes, install low side supply ductwork.Details
14/f: use existing reheat and cooling only vav boxes, install low side supply ductwork. | $25,000 |
| Jan 12, 2023 | Completed final sign-off Mar 2023 | 71 Stevenson St | Marchetti Group | replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372Details
replace all existing light fixtures w/ energy efficient led lighting. ref ti permit 202104279372 | $25,000 |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 71 Stevenson St | Msr Mechanical Llc | replace one existing boiler with (2) modular boilers in penthouse.Details
replace one existing boiler with (2) modular boilers in penthouse. | $120,000 |
| Mar 24, 2022 | Completed final sign-off Feb 2023 | 71 Stevenson St | Marchetti Group | accessibility path of travel and ramp.Details
accessibility path of travel and ramp. | |
| Jan 25, 2022 | Completed final sign-off Aug 2024 | 71 Stevenson St | Sabah International Incorporated | basement: fire alarm tenant improvement for new bike room. add 1 speaker/strobe. ref pa# 202104279372.Details
basement: fire alarm tenant improvement for new bike room. add 1 speaker/strobe. ref pa# 202104279372. | $12,220 |
| Jan 25, 2022 | Never finaled issued Jan 2022, no final | 71 Stevenson St | Sabah International Incorporated | add 5 speaker/strobe. add 1 power extender. add 1 system status display. add 1 intelligent dual interface. demo 4 existing speaker. ref pa# 202104279372.Details
add 5 speaker/strobe. add 1 power extender. add 1 system status display. add 1 intelligent dual interface. demo 4 existing speaker. ref pa# 202104279372. | $25,810 |
| Sep 28, 2021 | Completed final sign-off Apr 2022 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 14 and delete 1 sprinler for lobby remodel 202104279372Details
fire sprinkler relocate 14 and delete 1 sprinler for lobby remodel 202104279372 | $4,000 |
| Apr 27, 2021 | Completed final sign-off Feb 2023 | 71 Stevenson St | Marchetti Group | interior tenant improvement: upgrade ground floor lobby finishes & lighting. existing lobby exterior doors to be replaced. mep to be filed separately.Details
interior tenant improvement: upgrade ground floor lobby finishes & lighting. existing lobby exterior doors to be replaced. mep to be filed separately. | $468,000 |
| Aug 24, 2020 | Completed final sign-off May 2022 | 71 Stevenson St | Msr Mechanical Llc | replace existing hot water boiler with 3 modular boilers (less weight) in the mechanical penthouse.Details
replace existing hot water boiler with 3 modular boilers (less weight) in the mechanical penthouse. | $180,000 |
| Aug 18, 2020 | Completed final sign-off Nov 2020 | 71 Stevenson St | Pyro-Comm Systems, Inc. | fire alarm as built: 1 smoke detector was added to member storage area. 05-813 to monitor the damper. see job card for ref app# 202005207646.Details
fire alarm as built: 1 smoke detector was added to member storage area. 05-813 to monitor the damper. see job card for ref app# 202005207646. | |
| Jul 13, 2020 | Never finaled issued Sep 2020, no final | 71 Stevenson St | Sc Builders, Inc | (5th flr) this is the mechanical, electrical and plumbing deferred plan submittal associated with permit number 2019-1206-8955. work includes a new break area with sink, mothers room with sink, electrical installation and lighting and air distribution.Details
(5th flr) this is the mechanical, electrical and plumbing deferred plan submittal associated with permit number 2019-1206-8955. work includes a new break area with sink, mothers room with sink, electrical installation and lighting and air distribution. | |
| Jun 12, 2020 | Never finaled issued Aug 2020, no final | 71 Stevenson St | R L H Fire Protection Inc | elevator mondernization: remove all sprinklers and sprinkler piping from elevator machine rooms and top of elevator shafts. ased on sffd letter dated 01/18/2019. maher n/a.Details
elevator mondernization: remove all sprinklers and sprinkler piping from elevator machine rooms and top of elevator shafts. ased on sffd letter dated 01/18/2019. maher n/a. | $5,000 |
| May 20, 2020 | Completed final sign-off Nov 2020 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 5/f fire alarm: (28) ceiling speaker strobes, (4) ceiling speakers to added to (e) facuDetails
5/f fire alarm: (28) ceiling speaker strobes, (4) ceiling speakers to added to (e) facu | $15,000 |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 71 Stevenson St | R L H Fire Protection Inc | 5th fl - fire sprinkler permit. relocate 155, add 23 and delete 6 sprinklers. ref pa 2019-1206-8955Details
5th fl - fire sprinkler permit. relocate 155, add 23 and delete 6 sprinklers. ref pa 2019-1206-8955 | $45,000 |
| Jan 7, 2020 | Completed final sign-off Jul 2020 | 71 Stevenson St | Mc Millan Electric | 6/f & 7/f: title 24 compliance to ti.i pa201910094036 & pa201907166033Details
6/f & 7/f: title 24 compliance to ti.i pa201910094036 & pa201907166033 | $75,000 |
| Jan 6, 2020 | Completed final sign-off Mar 2020 | 71 Stevenson St | Sc Builders, Inc | demolition only. non-structural no mep's for existing permit 2019-1206-8955Details
demolition only. non-structural no mep's for existing permit 2019-1206-8955 | |
| Dec 27, 2019 | Completed final sign-off Jul 2022 | 71 Stevenson St | Msr Mechanical Llc | g/f: replace (e) water-cooled chiller with new.Details
g/f: replace (e) water-cooled chiller with new. | $85,000 |
| Dec 6, 2019 | Completed final sign-off Nov 2020 | 71 Stevenson St | Sc Builders, Inc | 5th floor: t.i. of office suite spaces. install new partitions and gyp bd ceiling. install new millwork, countertops and fixtures. new finishes and installtion of light fixtures.Details
5th floor: t.i. of office suite spaces. install new partitions and gyp bd ceiling. install new millwork, countertops and fixtures. new finishes and installtion of light fixtures. | $1,000,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2020 | 71 Stevenson St | Wework Construction Llc Dba Wework Const | 6th and 7th floor: architectural revision to app#201907166033 including changes in layout, occupancy load, egress path of travel and da checklist.Details
6th and 7th floor: architectural revision to app#201907166033 including changes in layout, occupancy load, egress path of travel and da checklist. | |
| Oct 7, 2019 | Completed final sign-off Nov 2019 | 71 Stevenson St | R L H Fire Protection Inc | revision to 201908209260 install 5 additional sprinklers for arch revisionsDetails
revision to 201908209260 install 5 additional sprinklers for arch revisions | $2,500 |
| Sep 4, 2019 | Completed final sign-off Jul 2020 | 71 Stevenson St | Innovative Mechanical Inc | r&r hvac systems on the 6th & 7th floorsDetails
r&r hvac systems on the 6th & 7th floors | $585,250 |
| Aug 28, 2019 | Completed final sign-off Feb 2020 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 6th and 7th floor: 44ceiling speakers strobes, 4 ceiling speakers, 2 ceiling strobes, 1 smoke detector to be added to extg facu. ref app#201906254396Details
6th and 7th floor: 44ceiling speakers strobes, 4 ceiling speakers, 2 ceiling strobes, 1 smoke detector to be added to extg facu. ref app#201906254396 | $25,000 |
| Aug 20, 2019 | Completed final sign-off Nov 2019 | 71 Stevenson St | R L H Fire Protection Inc | 6th and 7th floor, fire sprinlker permit. install 168 upright sprinklers an d16 pendent sprinkler. ref pa 2019-0716-6033Details
6th and 7th floor, fire sprinlker permit. install 168 upright sprinklers an d16 pendent sprinkler. ref pa 2019-0716-6033 | $37,000 |
| Aug 20, 2019 | Completed final sign-off Jul 2020 | 71 Stevenson St | Wework Construction Llc Dba Wework Const | rev to pa# 201907166033; installation of new non-structural partitions and gyp bd ceiling, adding new card readers, installation of hard lid ceiling in confeence rooms o7-e and 07-e to coneal (e) ductworkDetails
rev to pa# 201907166033; installation of new non-structural partitions and gyp bd ceiling, adding new card readers, installation of hard lid ceiling in confeence rooms o7-e and 07-e to coneal (e) ductwork | |
| Jul 16, 2019 | Completed final sign-off Jul 2020 | 71 Stevenson St | Wework Construction Llc Dba Wework Const | 6th & 7th flr - installation of: new partitions & gyp board ceiling, millwork, countertops 7 fixutres, light fixtures. new finishes throughout, paint and floor coveringDetails
6th & 7th flr - installation of: new partitions & gyp board ceiling, millwork, countertops 7 fixutres, light fixtures. new finishes throughout, paint and floor covering | $735,000 |
| Jun 25, 2019 | Completed final sign-off Oct 2019 | 71 Stevenson St | Wework Construction Llc Dba Wework Const | demo permit for 6th & 7th floors; remove non-structural partitions, remove storefront & doors, remove selected fixtures & framing, remove selected plumbing fixtures & accessories & cap. per ab-017Details
demo permit for 6th & 7th floors; remove non-structural partitions, remove storefront & doors, remove selected fixtures & framing, remove selected plumbing fixtures & accessories & cap. per ab-017 | $75,000 |
| May 31, 2019 | Completed final sign-off Jul 2019 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 19th and 20th floor- ref pa# 201905241635: five alarm ti 3 new ceiling strobes, 8 new ceiling speaker strobes and relocate 13 (e) speaker strobes all devices will be added to (e) facuDetails
19th and 20th floor- ref pa# 201905241635: five alarm ti 3 new ceiling strobes, 8 new ceiling speaker strobes and relocate 13 (e) speaker strobes all devices will be added to (e) facu | $8,000 |
| May 24, 2019 | Completed final sign-off Jun 2019 | 71 Stevenson St | R L H Fire Protection Inc | 19th/f, fire sprinklers. relocate 12 sprinklers. ref t.i pa 201905029621Details
19th/f, fire sprinklers. relocate 12 sprinklers. ref t.i pa 201905029621 | $2,500 |
| May 23, 2019 | Completed final sign-off Jun 2019 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler: relocate 12, add 4, delete 6 sprinklers on the 20th fl. ti #201905029625.Details
fire sprinkler: relocate 12, add 4, delete 6 sprinklers on the 20th fl. ti #201905029625. | $3,500 |
| May 20, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | deferred meps for 201905029625. 20th fl.Details
deferred meps for 201905029625. 20th fl. | |
| May 20, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | deferred meps for 201905029621. 19th flDetails
deferred meps for 201905029621. 19th fl | |
| May 2, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | 20th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 20th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes.Details
20th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 20th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes. | $500,000 |
| May 2, 2019 | Completed final sign-off Dec 2019 | 71 Stevenson St | Arco Murray Design Build | 19th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 19th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes.Details
19th fl: demolition of non-structural partitions, ceiling and lighting, finishes and power on 19th fl. new non-structural partitions, ceilings, lighting, millwork, power and finishes. | $500,000 |
| Feb 20, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | Dpr Construction | ref pa# 201901251225; revised sheets 12a-1.0,4.15,5.1,6.19.0 per removal of (cn) doors and partitionsDetails
ref pa# 201901251225; revised sheets 12a-1.0,4.15,5.1,6.19.0 per removal of (cn) doors and partitions | |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 71 Stevenson St | Dpr Construction | 12th fl - outlets, circuiting, 1 light fixture. ref pa 2019-0125-1225Details
12th fl - outlets, circuiting, 1 light fixture. ref pa 2019-0125-1225 | |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 71 Stevenson St | Dpr Construction | 13th fl - outlets, circuiting, 1 panel 125a w/60 a main breaker. ref pa 2019-0125-1227Details
13th fl - outlets, circuiting, 1 panel 125a w/60 a main breaker. ref pa 2019-0125-1227 | |
| Jan 25, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | Dpr Construction | 13th flr. select removal of (e) flooring and base. new power / data, electrical, finishes, mop sink and wall hung sink. no change in occupance or use. no floor area increaseDetails
13th flr. select removal of (e) flooring and base. new power / data, electrical, finishes, mop sink and wall hung sink. no change in occupance or use. no floor area increase | $195,537 |
| Jan 25, 2019 | Completed final sign-off Mar 2019 | 71 Stevenson St | Dpr Construction | 12th flr. select demo of non-structural partitions, store front system, doors, finishes and millwork. new non-structural partitions, door, power / data, electrical and finishes. no change in occupancy or use. no floor area increaseDetails
12th flr. select demo of non-structural partitions, store front system, doors, finishes and millwork. new non-structural partitions, door, power / data, electrical and finishes. no change in occupancy or use. no floor area increase | $354,375 |
| Oct 26, 2018 | Completed final sign-off Feb 2021 | 71 Stevenson St | Pyro-Comm Systems, Inc. | fire alarm - smoke detectors, 1 heat detectors hooked up to existing facu. 1st, 15th, 24th fl. includes flashing helmet, shunt trip and elevator recall- work n floors 1, 15,24, and penthouseDetails
fire alarm - smoke detectors, 1 heat detectors hooked up to existing facu. 1st, 15th, 24th fl. includes flashing helmet, shunt trip and elevator recall- work n floors 1, 15,24, and penthouse | $2,500 |
| Jul 30, 2018 | Completed final sign-off Aug 2021 | 71 Stevenson St | National Fail Safe | head end replacement of fire alarm control panel with new addressable control panel (xls) from siements. all existing wiring and field devices to remain. system is ul listed & csfm listed for compatiblilty with existing devicesDetails
head end replacement of fire alarm control panel with new addressable control panel (xls) from siements. all existing wiring and field devices to remain. system is ul listed & csfm listed for compatiblilty with existing devices | $40,000 |
| Mar 29, 2018 | Completed final sign-off Jun 2018 | 71 Stevenson St | Pyro-Comm Systems, Inc. | pyrocomm will provide 4 audible/visual devices. ref pa# 201802060520Details
pyrocomm will provide 4 audible/visual devices. ref pa# 201802060520 | $2,100 |
| Feb 28, 2018 | Completed final sign-off Aug 2018 | 71 Stevenson St | Marchetti Group | 14th floor: mep work only. ref app#201802060520Details
14th floor: mep work only. ref app#201802060520 | $30,000 |
| Feb 20, 2018 | Never finaled issued Mar 2018, no final | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler permit - relocate 14, add 5 and delete 2 pendents on the 14th floor. ref pa 2018-0206-0520Details
fire sprinkler permit - relocate 14, add 5 and delete 2 pendents on the 14th floor. ref pa 2018-0206-0520 | $5,500 |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 71 Stevenson St | Marchetti Group | 14th floor: revision to app#201802060520. to revise clearance from bathroom sink to urinal in proposed men's restroom.Details
14th floor: revision to app#201802060520. to revise clearance from bathroom sink to urinal in proposed men's restroom. | |
| Feb 6, 2018 | Completed final sign-off Aug 2018 | 71 Stevenson St | Marchetti Group | 14th floor-modification of (e) tenant space - constuction of non loading bearing partition, new bld standard ceiling grid & tiles, new light fixtures and devices, new office doors and frame, new millwork and finishes. new accessible restrooms provided. mep/sprinkler under sep permitDetails
14th floor-modification of (e) tenant space - constuction of non loading bearing partition, new bld standard ceiling grid & tiles, new light fixtures and devices, new office doors and frame, new millwork and finishes. new accessible restrooms provided. mep/sprinkler under sep permit | $92,000 |
| Oct 19, 2017 | Completed final sign-off Jan 2018 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 17/f, 21/f- fire alarm t.i., 2 ceiling mount strobes and 4 ceiling mount speaker strobes, and 3 relocates (1 on 17/f, 2 on 21/f). ref 17th fl 2017-1002-0099, ref 21st fl 2017-1002-0098Details
17/f, 21/f- fire alarm t.i., 2 ceiling mount strobes and 4 ceiling mount speaker strobes, and 3 relocates (1 on 17/f, 2 on 21/f). ref 17th fl 2017-1002-0099, ref 21st fl 2017-1002-0098 | $3,000 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler permits. add 1 fire sprinkler on the 17th floor. t.i pa# 201710020099Details
fire sprinkler permits. add 1 fire sprinkler on the 17th floor. t.i pa# 201710020099 | $1,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler permit. relocate 2 add 1 pendent sprinkler on 21st fl ref 201710020098Details
fire sprinkler permit. relocate 2 add 1 pendent sprinkler on 21st fl ref 201710020098 | $1,000 |
| Oct 2, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 21st fl - interior ti of new non-structural partitions, existing power/telecom, finishes, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted under separate permitDetails
21st fl - interior ti of new non-structural partitions, existing power/telecom, finishes, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted under separate permit | $14,875 |
| Oct 2, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 17th fl - interior ti of (n) non-structural partitions. existing power/telecom, finises, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted separatelyDetails
17th fl - interior ti of (n) non-structural partitions. existing power/telecom, finises, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted separately | $19,875 |
| Sep 29, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler permit - relocate 25, add 5 and delete 1 sprinkler on the 10th fl. ref pa 2017-0828-6027Details
fire sprinkler permit - relocate 25, add 5 and delete 1 sprinkler on the 10th fl. ref pa 2017-0828-6027 | $8,500 |
| Sep 29, 2017 | Completed final sign-off Apr 2018 | 71 Stevenson St | Pyro-Comm Systems, Inc. | fa ti, 10th fl add 10 nac devices, connect to (e) fa system. ref pa 2017-0828-6027Details
fa ti, 10th fl add 10 nac devices, connect to (e) fa system. ref pa 2017-0828-6027 | $51,000 |
| Sep 28, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10th fl - ref pa 2017-0828-6027- mechanical and electrical permitDetails
10th fl - ref pa 2017-0828-6027- mechanical and electrical permit | |
| Aug 28, 2017 | Completed final sign-off Nov 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10th fl - interior ti of (e) office space; minimal (n) non structural partitions. mep's, life safety & sprinkler permits under separate permit submittal if needed.Details
10th fl - interior ti of (e) office space; minimal (n) non structural partitions. mep's, life safety & sprinkler permits under separate permit submittal if needed. | |
| Aug 23, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10/f- selective demo of wall etc. non-structural partition power/telecom outlets, finishes per ab-017Details
10/f- selective demo of wall etc. non-structural partition power/telecom outlets, finishes per ab-017 | $15,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 21, 22 and 23rd floor - fa ti add 2 relay modules and 23 nac appliances, connect to existing fire alarm system. pa 2017-0404-3091 (23rd floor), 2017-0404-3090 (22nd floor) and 2017-06018102 (21st floor)Details
21, 22 and 23rd floor - fa ti add 2 relay modules and 23 nac appliances, connect to existing fire alarm system. pa 2017-0404-3091 (23rd floor), 2017-0404-3090 (22nd floor) and 2017-06018102 (21st floor) | $12,500 |
| Jun 8, 2017 | Completed final sign-off Jul 2017 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 15, 16 and 17th floor fa ti add 1 relay module and 26 nac appliances, connect to existing fire alarm system. pa 2017-0404-3086 (15th floor), 2017-0404-3088 (16th floor) and 2017-0404-3089 (17th floor)Details
15, 16 and 17th floor fa ti add 1 relay module and 26 nac appliances, connect to existing fire alarm system. pa 2017-0404-3086 (15th floor), 2017-0404-3088 (16th floor) and 2017-0404-3089 (17th floor) | $12,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 17th floor: electrical for app#2017-04-04-3089Details
17th floor: electrical for app#2017-04-04-3089 | $95,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 15th floor: electrical for app#201705197095Details
15th floor: electrical for app#201705197095 | $80,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 22 st flr: electrical for 201705197098Details
22 st flr: electrical for 201705197098 | $100,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 21 st flr: power upgrades for furniture & change out of minumal lighting fixtures. per applicant, no demolition or architectural changes to existing layout. reuse existing layout.Details
21 st flr: power upgrades for furniture & change out of minumal lighting fixtures. per applicant, no demolition or architectural changes to existing layout. reuse existing layout. | $40,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 23rd flr: electrical for 201705197099Details
23rd flr: electrical for 201705197099 | $100,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16th floor: electrical for app#201705197097Details
16th floor: electrical for app#201705197097 | $80,000 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 23/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
23/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $51,740 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 15/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
15/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $44,560 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. no mechanical work to be performed.Details
16/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. no mechanical work to be performed. | $50,240 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 22/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
22/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $47,400 |
| May 9, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | 18th fl: replace 59 standard response sprinklers to quick response. relocate 22, add 4. and delete 4 pendent sprinklers. t.i. #2017-0327-2399.Details
18th fl: replace 59 standard response sprinklers to quick response. relocate 22, add 4. and delete 4 pendent sprinklers. t.i. #2017-0327-2399. | $24,000 |
| May 3, 2017 | Expired or cancelled cancelled May 2017 | 71 Stevenson St | Source Planning And Construction Inc | 18th flr: mechanical & electrical for 201703272399Details
18th flr: mechanical & electrical for 201703272399 | $225,000 |
| Apr 28, 2017 | Completed final sign-off Jul 2017 | 71 Stevenson St | Source Planning And Construction Inc | 17/f- barrier removal, restrooms & signage.Details
17/f- barrier removal, restrooms & signage. | $185,000 |
| Apr 28, 2017 | Completed final sign-off Jul 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16/f- barrier removal, restrooms & signage.Details
16/f- barrier removal, restrooms & signage. | $185,000 |
| Apr 26, 2017 | Expired or cancelled cancelled Jan 2026 | 71 Stevenson St | Mc Millan Electric | on 15, 16, 17, 21, 22, and 23 floor- electrical lighting & power revisions upgrades t-24. ref pa #201704043091, 201704043090, 201704043089, 201704043088, 201704043086.Details
on 15, 16, 17, 21, 22, and 23 floor- electrical lighting & power revisions upgrades t-24. ref pa #201704043091, 201704043090, 201704043089, 201704043088, 201704043086. | $450,000 |
| Apr 26, 2017 | Completed final sign-off Jul 2017 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 18th floor: floor addition of 1 relay module, 31 nac appliances. connect to extg f a system. ref app#201703272399Details
18th floor: floor addition of 1 relay module, 31 nac appliances. connect to extg f a system. ref app#201703272399 | $12,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 18 pendent sprinklers on the 21st flDetails
fire sprinkler relocate 18 pendent sprinklers on the 21st fl | $4,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 6 delete 2 pendent sprinklers on the 22 fl, pa# 201704043090Details
fire sprinkler relocate 6 delete 2 pendent sprinklers on the 22 fl, pa# 201704043090 | $1,500 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 12 pendent sprinklers on the 17th fl, ti 201704040389Details
fire sprinkler relocate 12 pendent sprinklers on the 17th fl, ti 201704040389 | $3,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 3 pendent sprinklers on the 16th fl t.i. 201704043088Details
fire sprinkler relocate 3 pendent sprinklers on the 16th fl t.i. 201704043088 | $1,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 9 pendants & delete sprinkler on hte 23rd fl ti # 201704043091Details
fire sprinkler relocate 9 pendants & delete sprinkler on hte 23rd fl ti # 201704043091 | $2,500 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 2 pendent sprinklers on the 15th flDetails
fire sprinkler relocate 2 pendent sprinklers on the 15th fl | $1,000 |
| Apr 7, 2017 | Completed final sign-off Nov 2017 | 71 Stevenson St | Source Planning And Construction Inc | 18th floor: mechanical and electrical for 2017-0327-2399.Details
18th floor: mechanical and electrical for 2017-0327-2399. | $470,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 15th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. ref fire sprinkler permit pa#201704174099.Details
15th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. ref fire sprinkler permit pa#201704174099. | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174100Details
16th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174100 | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 23rd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174104Details
23rd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174104 | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 22nd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. f/s pa#201704174103.Details
22nd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. f/s pa#201704174103. | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 17th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174101Details
17th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174101 | $24,000 |
| Mar 27, 2017 | Completed final sign-off Nov 2017 | 71 Stevenson St | Source Planning And Construction Inc | 18th floor - ti (e) office space including minimal (n) non structural partitions, finishes; meps & life safety under separate permitDetails
18th floor - ti (e) office space including minimal (n) non structural partitions, finishes; meps & life safety under separate permit | $430,161 |
| May 2, 2016 | Never finaled issued May 2016, no final | 71 Stevenson St | Source Planning And Construction Inc | 10th floor: t.i. of extg office space. some demo and some new non-structural walls. meps under seperate permit.Details
10th floor: t.i. of extg office space. some demo and some new non-structural walls. meps under seperate permit. | $500,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2016 | 71 Stevenson St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ansul r102 fire supression system in the hood & duct in the kitchen area.Details
installation of ansul r102 fire supression system in the hood & duct in the kitchen area. | $3,000 |
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13th floor revision to pa #201507060699 - restroom revision.Details
13th floor revision to pa #201507060699 - restroom revision. | |
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 9th floor - revision to pa #201507060701 - restroom revision.Details
9th floor - revision to pa #201507060701 - restroom revision. | |
| Apr 7, 2016 | Completed final sign-off Jun 2016 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 1st flr: new fire alarm devices added to (e)janitor/storage closet in (e)building to include (1)smoke detector & (1) speaker/strobe.Details
1st flr: new fire alarm devices added to (e)janitor/storage closet in (e)building to include (1)smoke detector & (1) speaker/strobe. | $1,000 |
| Mar 14, 2016 | Completed final sign-off May 2016 | 71 Stevenson St | R L H Fire Protection Inc | 1st flr: fire sprinkler permit, 5 relocated pendants, 8 added pendants and 6 deleted pendants.t.i. #201508285538Details
1st flr: fire sprinkler permit, 5 relocated pendants, 8 added pendants and 6 deleted pendants.t.i. #201508285538 | $5,000 |
| Feb 10, 2016 | Completed final sign-off Jul 2016 | 71 Stevenson St | Pyro-Comm Systems, Inc. | new fire alrm devices added a tenant improvement in existing building to include 1 power supply, 1 monitor module, ansul system, 2 pull stations, 1 strobes, 4 speaker strobes 1st fl ref 201508285538Details
new fire alrm devices added a tenant improvement in existing building to include 1 power supply, 1 monitor module, ansul system, 2 pull stations, 1 strobes, 4 speaker strobes 1st fl ref 201508285538 | $5,600 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 71 Stevenson St | Source Planning And Construction Inc | 2nd fl suite 200 : ti minor demo and partition build back creating 2 rooms out of one etc. no meps under sep permitDetails
2nd fl suite 200 : ti minor demo and partition build back creating 2 rooms out of one etc. no meps under sep permit | $25,000 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 71 Stevenson St | Pyro-Comm Systems, Inc. | new fire alarm appliances for a tenant improvement in an existing building to include 3 speaker/strobes 1st flDetails
new fire alarm appliances for a tenant improvement in an existing building to include 3 speaker/strobes 1st fl | $1,500 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 71 Stevenson St | R L H Fire Protection Inc | 1st fl: fire sprinkler ti. relocate 6 pendent sprinklers, add 4 pendent sprinklers ref ti 2015-0917-7263Details
1st fl: fire sprinkler ti. relocate 6 pendent sprinklers, add 4 pendent sprinklers ref ti 2015-0917-7263 | $4,000 |
| Sep 29, 2015 | Completed final sign-off Apr 2016 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 9th floor: new fire alarm devices added to a t.i. in an extg bldg to include 2 strobes, 23 speaker/strobes. ref app#201507060701Details
9th floor: new fire alarm devices added to a t.i. in an extg bldg to include 2 strobes, 23 speaker/strobes. ref app#201507060701 | $9,430 |
| Sep 22, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13/f- revision to pa# 2015-0706-0699 architectural for detail clarification.Details
13/f- revision to pa# 2015-0706-0699 architectural for detail clarification. | |
| Sep 17, 2015 | Completed final sign-off Dec 2015 | 71 Stevenson St | Desert West Contracting | unit# 110. interior non bearing partitions, new receptacles and lights, new brk sink.Details
unit# 110. interior non bearing partitions, new receptacles and lights, new brk sink. | $25,000 |
| Sep 17, 2015 | Completed final sign-off Apr 2016 | 71 Stevenson St | Novo Construction Inc | 1st floor barrier removal only to upgrade restroom to comply to ada standardsDetails
1st floor barrier removal only to upgrade restroom to comply to ada standards | $10,200 |
| Sep 16, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13th flr: mechanical for project pa 201507060699Details
13th flr: mechanical for project pa 201507060699 | $108,000 |
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | 9th fl mechanical and electrical for 201507060701Details
9th fl mechanical and electrical for 201507060701 | $375,000 |
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | movable wall structural for 201507060699Details
movable wall structural for 201507060699 | |
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | electrical for 201507060699Details
electrical for 201507060699 | $265,000 |
| Sep 4, 2015 | Completed final sign-off Sep 2015 | 71 Stevenson St | R L H Fire Protection Inc | 13th flr: fire sprinkler permit - relocated 25, add 6 and delete 5 sprinklers on the 13th floor. ti 2015-0706-0699Details
13th flr: fire sprinkler permit - relocated 25, add 6 and delete 5 sprinklers on the 13th floor. ti 2015-0706-0699 | $15,934 |
| Sep 4, 2015 | Completed final sign-off Oct 2015 | 71 Stevenson St | R L H Fire Protection Inc | 9th flr: fire sprinkler permit - relocated 25, add 11 and delete 7 sprinklers on the 9th floor. ti 2015-0706-0701Details
9th flr: fire sprinkler permit - relocated 25, add 11 and delete 7 sprinklers on the 9th floor. ti 2015-0706-0701 | $18,504 |
| Sep 2, 2015 | Completed final sign-off Oct 2015 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 13th flr: fire alarm devices: 1 smoke det. 1 relay module. 1 speaker. 22 speaker/strobes. 6 strobes. ref pa 2015 0706 0699Details
13th flr: fire alarm devices: 1 smoke det. 1 relay module. 1 speaker. 22 speaker/strobes. 6 strobes. ref pa 2015 0706 0699 | $6,300 |
| Aug 28, 2015 | Never finaled issued Jan 2016, no final | 71 Stevenson St | Marchetti Group | demo non structural walls of e restaurant. add new small commercial kitchen. interior lighting. mech/lighting/plumbin/elec, note type 1 hood to remain (replacement plans for ti for a restaurant at ground floor,reduced scope) fire sprinkler and alarm under separate permit.Details
demo non structural walls of e restaurant. add new small commercial kitchen. interior lighting. mech/lighting/plumbin/elec, note type 1 hood to remain (replacement plans for ti for a restaurant at ground floor,reduced scope) fire sprinkler and alarm under separate permit. | $460,000 |
| Aug 24, 2015 | Expired or cancelled cancelled Mar 2017 | 71 Stevenson St | R 3 Builders Inc. | interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permitDetails
interior, soft demo of extg restaurant finishes. interior work only ab-017 arch., mep, l/s under separate permit | $30,000 |
| Jul 6, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 9th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.Details
9th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit. | $486,000 |
| Jul 6, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.Details
13th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit. | $702,000 |
| Mar 20, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 20th floor: movable partition. revision to app#201502057621Details
20th floor: movable partition. revision to app#201502057621 | |
| Mar 19, 2015 | Completed final sign-off Jun 2015 | 71 Stevenson St | Pyro-Comm Systems, Inc. | (fire alarm) new fire alarm devices added to ti to existing building to include 11 speaker strobes 19th and 20th flDetails
(fire alarm) new fire alarm devices added to ti to existing building to include 11 speaker strobes 19th and 20th fl | $2,900 |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 71 Stevenson St | R L H Fire Protection Inc | 19th & 20th floor fire sprinkler permit - relcoate 29, add 5, delete 3 pendents. relocate 4 & add 1 upright. ref #2015.0205.7618 & 2015.0205.7621.Details
19th & 20th floor fire sprinkler permit - relcoate 29, add 5, delete 3 pendents. relocate 4 & add 1 upright. ref #2015.0205.7618 & 2015.0205.7621. | $20,046 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 71 Stevenson St | Source Planning And Construction Inc | 19th & 20th flrs: revision to 201502057618 and 201502057621; (n) communicating stair. sprinkler/smoke/alarm deferred.Details
19th & 20th flrs: revision to 201502057618 and 201502057621; (n) communicating stair. sprinkler/smoke/alarm deferred. | $125,000 |
| Mar 3, 2015 | Completed final sign-off Apr 2015 | 71 Stevenson St | Source Planning And Construction Inc | revision to 201502057621. e elevator doors being replaced by s doors. createing 1 n nr cooridor and extending another nr corridorDetails
revision to 201502057621. e elevator doors being replaced by s doors. createing 1 n nr cooridor and extending another nr corridor | |
| Feb 5, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.Details
t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit. | $550,000 |
| Feb 5, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 20th fl: t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.Details
20th fl: t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit. | $700,000 |
| Jan 26, 2015 | Completed final sign-off Apr 2015 | 71 Stevenson St | Source Planning And Construction Inc | 20th floor demo of selective existing ceiling tile, grid, non-load bearing partitions, finishes, millwork, etc. floor to remain un-occupied per ab-017Details
20th floor demo of selective existing ceiling tile, grid, non-load bearing partitions, finishes, millwork, etc. floor to remain un-occupied per ab-017 | $20,000 |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 71 Stevenson St | Yesco Signs Llc | 2 non electric wall signsDetails
2 non electric wall signs | $3,000 |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 71 Stevenson St | Yesco Signs Llc | 2 non illuminated panel signDetails
2 non illuminated panel sign | $3,000 |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 71 Stevenson St | Yesco Signs Llc | 2 non illuminated tenant panel signsDetails
2 non illuminated tenant panel signs | $3,000 |
| Nov 10, 2014 | Completed final sign-off Jan 2015 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 7th floor suite 750: new fire alarm devices for t.i. to include 2 speaker/strobes. ref. t.i. permit 2014.1021.9475.Details
7th floor suite 750: new fire alarm devices for t.i. to include 2 speaker/strobes. ref. t.i. permit 2014.1021.9475. | $2,000 |
| Oct 21, 2014 | Completed final sign-off Jan 2015 | 71 Stevenson St | Source Planning And Construction Inc | 7th floor suite #750: demolition of interior partitions - non load bearing walls under ab-017.Details
7th floor suite #750: demolition of interior partitions - non load bearing walls under ab-017. | $5,000 |
| Sep 12, 2014 | Completed final sign-off Oct 2014 | 71 Stevenson St | Pyro-Comm Systems, Inc. | new fire alarm device for a tenant improvement to an existing building to include: (1) speaker / strobe.Details
new fire alarm device for a tenant improvement to an existing building to include: (1) speaker / strobe. | $2,500 |
| Aug 13, 2014 | Completed final sign-off Sep 2014 | 71 Stevenson St | R L H Fire Protection Inc | room 1233: fire sprinkler modification, replace 6 (e) semi-recess heads with new concealed sprinkers.Details
room 1233: fire sprinkler modification, replace 6 (e) semi-recess heads with new concealed sprinkers. | $2,840 |
| Aug 7, 2014 | Never finaled issued Aug 2014, no final | 71 Stevenson St | Source Planning And Construction Inc | 5th floor suite #500: t.i. includes selective demo and construction of non load bearing partitions. partial modification of extg ceiling grid and tile. lighting fixture relocation etc. fire sprinkler and life safety alarm work will be under separate permit.Details
5th floor suite #500: t.i. includes selective demo and construction of non load bearing partitions. partial modification of extg ceiling grid and tile. lighting fixture relocation etc. fire sprinkler and life safety alarm work will be under separate permit. | $54,954 |
| Jul 16, 2014 | Completed final sign-off Jul 2014 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler permit. relocate 4 and add 1 pendent sprinkler on the 3rd floor, t.i. pa#201406047435Details
fire sprinkler permit. relocate 4 and add 1 pendent sprinkler on the 3rd floor, t.i. pa#201406047435 | $2,570 |
| Jul 15, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Pyro-Comm Systems, Inc. | new fire alarm devices for tenant improvement to the 3rd floor of an existing building. new devices to include: (2) speakers/ strobes. relocating (1) speaker/ strobe. ref ti pa# 2014-0604-7435Details
new fire alarm devices for tenant improvement to the 3rd floor of an existing building. new devices to include: (2) speakers/ strobes. relocating (1) speaker/ strobe. ref ti pa# 2014-0604-7435 | $2,000 |
| Jul 15, 2014 | Completed final sign-off Aug 2016 | 71 Stevenson St | Source Planning And Construction Inc | 3rd floor- mechanical drawings for refence pa 2014.0604.7435.Details
3rd floor- mechanical drawings for refence pa 2014.0604.7435. | $100,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2014 | 71 Stevenson St | Source Planning And Construction Inc | 7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715.Details
7th floor #725a & 725b- mechanical & electrical for project #2014.0303.9715. | $5,000 |
| Jun 25, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Source Planning And Construction Inc | 6th floor - mechanical for project #2014.0501.4720.Details
6th floor - mechanical for project #2014.0501.4720. | $5,000 |
| Jun 23, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Source Planning And Construction Inc | #1450- demo only, tenant improvement to follow, disabled access to be addressed under t.i. per ab-017Details
#1450- demo only, tenant improvement to follow, disabled access to be addressed under t.i. per ab-017 | $2,500 |
| Jun 4, 2014 | Completed final sign-off Aug 2016 | 71 Stevenson St | t.i. , demo, construction of non-load bearing partitions. partial modification of ceiling grid. fire sprinklers and life safety, alarm work under seperate permit.Details
t.i. , demo, construction of non-load bearing partitions. partial modification of ceiling grid. fire sprinklers and life safety, alarm work under seperate permit. | $50,000 | |
| May 28, 2014 | Completed final sign-off Jun 2014 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler. relocate 6 pendents on the 7th fl. ti ref pa# 201403039715Details
fire sprinkler. relocate 6 pendents on the 7th fl. ti ref pa# 201403039715 | $3,072 |
| May 1, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Source Planning And Construction Inc | #600- scope includes selective demolition of non-load bearing partitions, partial new suspended ceiling grid & tile, relocate or new light fixtures, new outlets & new finishes. mep., fire life safety & fire sprinklers design build & under seperate permit.Details
#600- scope includes selective demolition of non-load bearing partitions, partial new suspended ceiling grid & tile, relocate or new light fixtures, new outlets & new finishes. mep., fire life safety & fire sprinklers design build & under seperate permit. | $130,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 5th floor fa ti: new fire alarm devices added to tenant improvement of existing building to include 5 speaker/strobes, relocate 2 speaker strobes ref app#201404022324Details
5th floor fa ti: new fire alarm devices added to tenant improvement of existing building to include 5 speaker/strobes, relocate 2 speaker strobes ref app#201404022324 | $4,000 |
| Apr 23, 2014 | Completed final sign-off Feb 2017 | 71 Stevenson St | R L H Fire Protection Inc | 5th floor fire sprinkler permit - relcoate 10 & add 12 pendent sprinklers. ref t.i. #2014.0402.2324.Details
5th floor fire sprinkler permit - relcoate 10 & add 12 pendent sprinklers. ref t.i. #2014.0402.2324. | $11,308 |
| Apr 2, 2014 | Never finaled issued Apr 2014, no final | 71 Stevenson St | Source Planning And Construction Inc | 5th floor: t.i. in extg tenant space to demo and construct non-load bearing walls, doors, and partitions. mechanical,and electrical included. life safety and sprinklers on seperate permit.Details
5th floor: t.i. in extg tenant space to demo and construct non-load bearing walls, doors, and partitions. mechanical,and electrical included. life safety and sprinklers on seperate permit. | $450,000 |
| Mar 11, 2014 | Completed final sign-off Jun 2014 | 71 Stevenson St | Source Planning And Construction Inc | 5th floor: demolition of non-load bearing partitions, doors, and finishes on 5th floor space to remain vacant per ab-017. ada will be addressed under separate permit.Details
5th floor: demolition of non-load bearing partitions, doors, and finishes on 5th floor space to remain vacant per ab-017. ada will be addressed under separate permit. | $40,000 |
| Mar 3, 2014 | Completed final sign-off Jul 2014 | 71 Stevenson St | suites 725a and 725b for demising an extg commercial office space into multiple suites. suite 725a:demolition of interior partitions, construction of non-load bearing partitions, new corridor doors, new and reconfigured extg clg rid & tile, new lighting, and new finishes.Details
suites 725a and 725b for demising an extg commercial office space into multiple suites. suite 725a:demolition of interior partitions, construction of non-load bearing partitions, new corridor doors, new and reconfigured extg clg rid & tile, new lighting, and new finishes. | $130,000 | |
| Jan 8, 2014 | Completed final sign-off Mar 2014 | 71 Stevenson St | R L H Fire Protection Inc | 19th & 20th floor fire sprinkler permit- 19th flr: relocate 14, add 2 & delete 6 pendents, ref pa #2013.12.10.3776. 20th flr: relcoate 41, add 2 & delete 2 pendents. ref pa # 2013.12.10.3771Details
19th & 20th floor fire sprinkler permit- 19th flr: relocate 14, add 2 & delete 6 pendents, ref pa #2013.12.10.3776. 20th flr: relcoate 41, add 2 & delete 2 pendents. ref pa # 2013.12.10.3771 | $32,382 |
| Jan 7, 2014 | Never finaled issued Jan 2014, no final | 71 Stevenson St | Pyro-Comm Systems, Inc. | added fire alarm devices to ti build out. all core building fire alarm system components are existing and to remain unless otherwise specified. 1 area smoke detector, 3 fire alarm relay modules, 2 speakes, 39 speaker/strobes, 3 strobes. pa 201312103776/3771Details
added fire alarm devices to ti build out. all core building fire alarm system components are existing and to remain unless otherwise specified. 1 area smoke detector, 3 fire alarm relay modules, 2 speakes, 39 speaker/strobes, 3 strobes. pa 201312103776/3771 | $20,000 |
| Dec 23, 2013 | Expired or cancelled cancelled Jan 2026 | 71 Stevenson St | 19 & 20th - restrooms remode. finishes mepDetails
19 & 20th - restrooms remode. finishes mep | $200,000 | |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 71 Stevenson St | Source Planning And Construction Inc | 19th & 20th floor:mechanical and electrical for permits: 19th floor per app#201312103776 and 20th floor per app#201312103771. demo for 20th floor under app#201311212537Details
19th & 20th floor:mechanical and electrical for permits: 19th floor per app#201312103776 and 20th floor per app#201312103771. demo for 20th floor under app#201311212537 | $170,000 |
| Dec 17, 2013 | Completed final sign-off Jan 2014 | 71 Stevenson St | R L H Fire Protection Inc | 2nd fl. suite 200. modify fire sprinklers for new walls, 6 heads light hazard. ti pa#2013-1205-3417Details
2nd fl. suite 200. modify fire sprinklers for new walls, 6 heads light hazard. ti pa#2013-1205-3417 | $3,084 |
| Dec 10, 2013 | Completed final sign-off Mar 2014 | 71 Stevenson St | Source Planning And Construction Inc | 20/f - modification of existing t.i. to include non-load bearing partitions, new light fixtures, new millwork. fire sprinkler & life safety work will be under separate permit. (demo under pa #2013.1121.2537)Details
20/f - modification of existing t.i. to include non-load bearing partitions, new light fixtures, new millwork. fire sprinkler & life safety work will be under separate permit. (demo under pa #2013.1121.2537) | $350,000 |
| Dec 10, 2013 | Completed final sign-off Mar 2014 | 71 Stevenson St | Source Planning And Construction Inc | 19th floor - modification of existing t.i. to include non-load bearing partitions, new light fixtures, new millwork. mep, fire sprinkler & life safety work will be under separate permit. (demo under pa #2013.1121.2537.Details
19th floor - modification of existing t.i. to include non-load bearing partitions, new light fixtures, new millwork. mep, fire sprinkler & life safety work will be under separate permit. (demo under pa #2013.1121.2537. | $350,000 |
| Dec 5, 2013 | Completed final sign-off Jan 2014 | 71 Stevenson St | Source Planning And Construction Inc | 2nd floor #200 - tenant improvement to demo & construct non-load bearing partitions, doors, frames & finsihes. mep, ls, sprinkler on separate permit.Details
2nd floor #200 - tenant improvement to demo & construct non-load bearing partitions, doors, frames & finsihes. mep, ls, sprinkler on separate permit. | $100,000 |
| Nov 21, 2013 | Completed final sign-off Mar 2014 | 71 Stevenson St | Source Planning And Construction Inc | 19th & 20th floor - demolitoin of non-structural partitions, doors, frames, millwork & finishes. space will remain vacant under ab-017, ada requirements will be addressed under future t.i. permit.Details
19th & 20th floor - demolitoin of non-structural partitions, doors, frames, millwork & finishes. space will remain vacant under ab-017, ada requirements will be addressed under future t.i. permit. | $30,000 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 71 Stevenson St | Pyro-Comm Systems, Inc. | add new fire alarm device to new tenant build out. all core building fire alarm system componets are to remain. 1 relay module, 1 ceiling sprinkler, 20 speaker/strobes, 3 strobes. ti. 2013.08224976Details
add new fire alarm device to new tenant build out. all core building fire alarm system componets are to remain. 1 relay module, 1 ceiling sprinkler, 20 speaker/strobes, 3 strobes. ti. 2013.08224976 | $8,000 |
| Oct 7, 2013 | Completed final sign-off Oct 2013 | 71 Stevenson St | Pioneer Fire Inc. | 12th floor: tenant improvement of (e) sprinkler system, consisting of (11) relocated pendents, and (2) added pendents. ti 201308224976Details
12th floor: tenant improvement of (e) sprinkler system, consisting of (11) relocated pendents, and (2) added pendents. ti 201308224976 | $8,791 |
| Aug 22, 2013 | Completed final sign-off Nov 2013 | 71 Stevenson St | Source Planning And Construction Inc | t.i. on 12th floor to do selective demo and construct new non-olad bearing partitions, doors and finishes with mep. life safety and sprinklersDetails
t.i. on 12th floor to do selective demo and construct new non-olad bearing partitions, doors and finishes with mep. life safety and sprinklers | $500,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 71 Stevenson St | Source Planning And Construction Inc | 12/f- interior demolition of partitions, doors, millwork & finishes on 12th floor. space to remain acant under ab017 with ada requirements to follow on seperate t.i. permit.Details
12/f- interior demolition of partitions, doors, millwork & finishes on 12th floor. space to remain acant under ab017 with ada requirements to follow on seperate t.i. permit. | $30,000 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 71 Stevenson St | Pyro-Comm Systems, Inc. | new fire alarm devices added to new tenant build-out. new 7 ceiling speaker/strobes, 2 wall strobe, 3 relay module, 1 relay 24vdc. relocate 7 ceiling speaker/strobes & 1 wall strobe.Details
new fire alarm devices added to new tenant build-out. new 7 ceiling speaker/strobes, 2 wall strobe, 3 relay module, 1 relay 24vdc. relocate 7 ceiling speaker/strobes & 1 wall strobe. | $7,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 71 Stevenson St | Golden Gate Fire Protection Inc | 11th floor-relocate 7 pendent sprinkler headsDetails
11th floor-relocate 7 pendent sprinkler heads | $3,605 |
| Jul 18, 2013 | Never finaled issued Jul 2013, no final | 71 Stevenson St | Pioneer Fire Inc. | 7th floor:relocate 12 pendents and add 2 pendents.Details
7th floor:relocate 12 pendents and add 2 pendents. | $11,717 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 11th floor - add new fire alarm devices to new tenant improvement build-out 1 relay, 3 speaker strobes. ti. #2013.06.18.9805Details
11th floor - add new fire alarm devices to new tenant improvement build-out 1 relay, 3 speaker strobes. ti. #2013.06.18.9805 | $8,000 |
| Jun 18, 2013 | Never finaled issued Jun 2013, no final | 71 Stevenson St | Source Planning And Construction Inc | 11th floor suite 1100 - partial floor t.i. in exisitng t.i. space to demo & construct non-load bearing partitions, doors, millwork, finishes & ceiling & mep equipment. life safety & sprinklers will be submitted under separate permit.Details
11th floor suite 1100 - partial floor t.i. in exisitng t.i. space to demo & construct non-load bearing partitions, doors, millwork, finishes & ceiling & mep equipment. life safety & sprinklers will be submitted under separate permit. | $480,000 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 71 Stevenson St | Source Planning And Construction Inc | 11th floor - interior demo of doors, partitions & finishes. space to remain vacant & ada requirements will be addressed under separate t.i. permit.Details
11th floor - interior demo of doors, partitions & finishes. space to remain vacant & ada requirements will be addressed under separate t.i. permit. | $25,000 |
| May 29, 2013 | Completed final sign-off Feb 2014 | 71 Stevenson St | Source Planning And Construction Inc | 7th fl:dimising an extg commercial b-office space into multiple suites. suite 700:demolition and construction of non load bearing partitions, new or reconfiguration of extg ceiling grid and tile, relocation of new light fixtures, new outlets, and new finishes suite 725 limitted to the constructionDetails
7th fl:dimising an extg commercial b-office space into multiple suites. suite 700:demolition and construction of non load bearing partitions, new or reconfiguration of extg ceiling grid and tile, relocation of new light fixtures, new outlets, and new finishes suite 725 limitted to the construction | $275,000 |
| May 28, 2013 | Completed final sign-off Feb 2014 | 71 Stevenson St | Source Planning And Construction Inc | 6th floor t.i. include selective demolition & construction of non-load bearing partitions, partial new suspended ceiling grid & tile, relocated or new light fixtures, new outlets, new finishes. fire sprinkler, life safety alarm work will be under separate permit.Details
6th floor t.i. include selective demolition & construction of non-load bearing partitions, partial new suspended ceiling grid & tile, relocated or new light fixtures, new outlets, new finishes. fire sprinkler, life safety alarm work will be under separate permit. | $119,343 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 71 Stevenson St | Pyro-Comm Systems, Inc. | 3rd floor:relocate extg speaker/strobes on the 3rd floor to new layout. t.i. app#201211083865.Details
3rd floor:relocate extg speaker/strobes on the 3rd floor to new layout. t.i. app#201211083865. | $8,000 |
| Jan 3, 2013 | Never finaled issued Jan 2013, no final | 71 Stevenson St | Pioneer Fire Inc. | 2nd and 3rd floor:relocate 11 sprinklers. add 14 sprinkler. ref app#201211083865Details
2nd and 3rd floor:relocate 11 sprinklers. add 14 sprinkler. ref app#201211083865 | $13,639 |
| Dec 14, 2012 | Never finaled issued Dec 2012, no final | 71 Stevenson St | Source Planning And Construction Inc | mechanical and electrical to relocate and install new equipment on 2nd and 3rd floor.. please refer to app#201211083865 for t.i. work.Details
mechanical and electrical to relocate and install new equipment on 2nd and 3rd floor.. please refer to app#201211083865 for t.i. work. | $75,000 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 71 Stevenson St | Source Planning And Construction Inc | 2nd & 3rd floor:two floor tenant improvement on floors 2 and 3 to do. minor demo and construction of non load bearing partitions doors, and finishes. sructural work included to remove concrete slab and install new inter connecting non egress stair. mech,el, ls, sp on seperate permit.Details
2nd & 3rd floor:two floor tenant improvement on floors 2 and 3 to do. minor demo and construction of non load bearing partitions doors, and finishes. sructural work included to remove concrete slab and install new inter connecting non egress stair. mech,el, ls, sp on seperate permit. | $475,000 |
| Aug 23, 2012 | Expired or cancelled cancelled Sep 2023 | 71 Stevenson St | R L H Fire Protection Inc | fire sprinkler only - remove/replace diesel pump in basement.Details
fire sprinkler only - remove/replace diesel pump in basement. | $5,000 |
| Jun 29, 2012 | Completed final sign-off Sep 2012 | 71 Stevenson St | Novo Construction Inc | barrier removal only, restroom upgrade on the 15th. floor.Details
barrier removal only, restroom upgrade on the 15th. floor. | $25,000 |
| May 2, 2012 | Never finaled issued May 2012, no final | 71 Stevenson St | Anderson, Rowe & Buckley, Inc. | tenant improvements. existing fire sprinkler system. remove 110, add 107, relocate 36Details
tenant improvements. existing fire sprinkler system. remove 110, add 107, relocate 36 | $53,500 |
| Apr 26, 2012 | Completed final sign-off Aug 2012 | 71 Stevenson St | Novo Construction Inc | mech and electrical work for ti on the 15th floor. ref arch #201203125808.Details
mech and electrical work for ti on the 15th floor. ref arch #201203125808. | $150,000 |
Find contractors for work like this