- Nov 2006 to Sep 2026
111 permits since 2000 (architect on 110 permits, designer on 1 permit): 73 completed, 16 in progress, 15 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 111.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 425 Market St | ste 900; demo of non-load bearing partitions, ceiling grid, lights, outlets, finishes, doors, frames and glazing. ab-017 applesDetails
ste 900; demo of non-load bearing partitions, ceiling grid, lights, outlets, finishes, doors, frames and glazing. ab-017 apples | $250,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 451 Pacific Av | exterior scope for this core + shell project. the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)accessDetails
exterior scope for this core + shell project. the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)access | $250,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 425 Market St | suite 1600; conversion of a single tenant flr to multi-tenant including full tenant suite demolition, construction of new multi-tenant cooridor and restroom remodel. unit 1600Details
suite 1600; conversion of a single tenant flr to multi-tenant including full tenant suite demolition, construction of new multi-tenant cooridor and restroom remodel. unit 1600 | $250,000 | |
| Sep 10, 2026 | In progress issued Sep 2026 | 345 Spear St | Novo Construction Inc | ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.Details
ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures. | $22,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 2 Harrison St | Sc Builders, Inc | 5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes.Details
5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes. | $470,000 |
| Aug 6, 2026 | In progress filed Aug 2026, not yet issued | 333 Bush St | suite 800: t.i. project includes selective demo and construction of non-load bearing partitions, new doors, storefronts, light fixtures, ceiling, millwork, and interior finishes.Details
suite 800: t.i. project includes selective demo and construction of non-load bearing partitions, new doors, storefronts, light fixtures, ceiling, millwork, and interior finishes. | $1,049,750 | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 425 Market St | tenanat improvement project involves demolition of non load bearing partitons, ceiling grid and tile, lights, electrical outlets, finishes, doors, frames, glazing. no remodediatin work included in scope. acm to be removed or encapsulated by landlord subcontractor prior to demolition.Details
tenanat improvement project involves demolition of non load bearing partitons, ceiling grid and tile, lights, electrical outlets, finishes, doors, frames, glazing. no remodediatin work included in scope. acm to be removed or encapsulated by landlord subcontractor prior to demolition. | $250,000 | |
| May 26, 2026 | Completed final sign-off Sep 2026 | 2001 37th Av | Devcon Construction | this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter tops, lighting and fixtures.Details
this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter tops, lighting and fixtures. | $209,208 |
| May 21, 2026 | In progress issued Jun 2026 | 188 The Embarcadero | Novo Construction Inc | removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included.Details
removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included. | $2,000,000 |
| May 18, 2026 | In progress issued Sep 2026 | 451 Pacific Av | Build Group Inc. | revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab woodDetails
revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab wood | $50,000 |
| Feb 12, 2026 | In progress issued Jul 2026 | 451 Pacific Av | Build Group Inc. | 3rd fl arch ti - new non-load bearing partitions, doors & door hardware, interior glazing, ceilings, light fixtures, millwork and associated finishes. mep under separate permit see pa 202505126265 for arch core/shellDetails
3rd fl arch ti - new non-load bearing partitions, doors & door hardware, interior glazing, ceilings, light fixtures, millwork and associated finishes. mep under separate permit see pa 202505126265 for arch core/shell | $150,000 |
| Jan 14, 2026 | In progress issued Jan 2026 | 451 Pacific Av | Build Group Inc. | revision 202505126265- to include the moment frame foundation are necessitated by field verified conditions of tghe (e) footing. (e) footing was found to be too shallow to accomadate the required dowels to resist design uplift forcesDetails
revision 202505126265- to include the moment frame foundation are necessitated by field verified conditions of tghe (e) footing. (e) footing was found to be too shallow to accomadate the required dowels to resist design uplift forces | |
| Dec 19, 2025 | In progress issued Jan 2026 | 451 Pacific Av | Build Group Inc. | level 2 - 2m: scope of work includes construction of new non-load bearing partitions, doors and door + door hardware, interior glazing, ceilings, light fixtures, millwork, and associated finishes. mep under seperate permit.Details
level 2 - 2m: scope of work includes construction of new non-load bearing partitions, doors and door + door hardware, interior glazing, ceilings, light fixtures, millwork, and associated finishes. mep under seperate permit. | $150,000 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 350 University St | Woolsey Construction Inc | all work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associatedDetails
all work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associated | $150,000 |
| Oct 3, 2025 | In progress issued Jan 2026 | 451 Pacific Av | Build Group Inc. | 1st floor: interior office build-out of level 1 and level2 mezzanine (l1 +lm1). scope includes construction of new non-load bearing partitions, doors, and door hardware, interior glazing ceilings, light fixtures, millwork, and associated finishes.Details
1st floor: interior office build-out of level 1 and level2 mezzanine (l1 +lm1). scope includes construction of new non-load bearing partitions, doors, and door hardware, interior glazing ceilings, light fixtures, millwork, and associated finishes. | $150,000 |
| Aug 14, 2025 | Completed final sign-off Apr 2026 | 425 Market St | Bcci Construction Company | 18th floor: modification and expansion of existing full floor office suite to include selective demolition and construction of non-load bearing partitions, existing modifications to ceiling grid & tile, light fixture relocation & new including re-switching, new office doors & frames,Details
18th floor: modification and expansion of existing full floor office suite to include selective demolition and construction of non-load bearing partitions, existing modifications to ceiling grid & tile, light fixture relocation & new including re-switching, new office doors & frames, | $5,000,000 |
| Jun 26, 2025 | Completed final sign-off Jan 2026 | 345 California St | Clune Construction Company L P | 17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittalsDetails
17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittals | $210,000 |
| Jun 6, 2025 | In progress issued Nov 2025 | 451 Pacific Av | Build Group Inc. | addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes.Details
addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes. | $2,100,000 |
| Apr 22, 2025 | Completed final sign-off May 2026 | 651 Brannan St | Novo Construction Inc | 1st fl: to includes demo of non bearing partitions, millwork and partial ceiling; relocation of existing storefront entry doors and construction of new non load bearing partitions, security turnstiles and ceiling. scope also includes related power/data and lightingDetails
1st fl: to includes demo of non bearing partitions, millwork and partial ceiling; relocation of existing storefront entry doors and construction of new non load bearing partitions, security turnstiles and ceiling. scope also includes related power/data and lighting | $250,000 |
| Mar 27, 2025 | Completed final sign-off May 2025 | 350 Bush St | Principal Builders Inc. | 3rd fl - project limited to demising of an executive dining area from the remaining dining on the 3rd fl; demo scope includes the removal of (e) millwork seating and light fixtures; construction scope of work includes the introductionof a new non-load bearing interior partition & door, new glazaing,Details
3rd fl - project limited to demising of an executive dining area from the remaining dining on the 3rd fl; demo scope includes the removal of (e) millwork seating and light fixtures; construction scope of work includes the introductionof a new non-load bearing interior partition & door, new glazaing, | $116,000 |
| Mar 24, 2025 | Completed final sign-off Oct 2025 | 651 Brannan St | Novo Construction Inc | addition of a deck mounted light grid pipe system in the (e) recording studio. no additional new construction is included in this scope of workDetails
addition of a deck mounted light grid pipe system in the (e) recording studio. no additional new construction is included in this scope of work | $141,226 |
| Mar 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2nd/f, ste 200: floor structural renforcement & slab opening for future t.i.Details
2nd/f, ste 200: floor structural renforcement & slab opening for future t.i. | $340,000 |
| Feb 24, 2025 | In progress issued Sep 2025 | 451 Pacific Av | Build Group Inc. | front bldg: ab-017. interior non structural demo of non-bearing interior partitions, doors, ceilings, lighting, mech, ductwork, interior finishesDetails
front bldg: ab-017. interior non structural demo of non-bearing interior partitions, doors, ceilings, lighting, mech, ductwork, interior finishes | $20,000 |
| Oct 9, 2024 | In progress issued Nov 2024 | 505 Howard St | Bcci Construction Company | 4-5/f: revision to pa# 202406285521, to update smoke control report.Details
4-5/f: revision to pa# 202406285521, to update smoke control report. | |
| Oct 4, 2024 | Completed final sign-off Apr 2025 | 425 Market St | Skyline Construction | 15th flr. the project is the t.i. conversion of a single tenant flr to a multi-tenant flr by the construction of a non-rated corridor around the bldg core. the scope of work is lmted to the 15th flr common areas and restrooms and includes the addition of non-bearing partitions, doors, lighting,Details
15th flr. the project is the t.i. conversion of a single tenant flr to a multi-tenant flr by the construction of a non-rated corridor around the bldg core. the scope of work is lmted to the 15th flr common areas and restrooms and includes the addition of non-bearing partitions, doors, lighting, | $200,000 |
| Aug 12, 2024 | Completed final sign-off Sep 2024 | 475 Sansome St | Principal Builders Inc. | 11th floor: demo of non-load bearing partitions. ceiling, light fixtures, finishes, and doors. new non- bearing corridor partitions and doors.Details
11th floor: demo of non-load bearing partitions. ceiling, light fixtures, finishes, and doors. new non- bearing corridor partitions and doors. | $133,686 |
| Jul 24, 2024 | Completed final sign-off Nov 2024 | 425 Market St | Source Planning And Construction Inc | 9th & 10th floors: demolition of non-load bearing partitions, ceiling grid and tile, light fixtures, electrical outlets, millwork and sinks, finishes doors, frames, and glazing ab-017Details
9th & 10th floors: demolition of non-load bearing partitions, ceiling grid and tile, light fixtures, electrical outlets, millwork and sinks, finishes doors, frames, and glazing ab-017 | $500,000 |
| Aug 8, 2023 | Completed final sign-off Feb 2024 | 188 Spear St | Richlen Construction | selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.Details
selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017. | $225,000 |
| Jun 8, 2023 | Completed final sign-off Apr 2024 | 1 Embarcadero Center | Hathaway Dinwiddie Co. | ste 1320: 13th fl-tenant improvement involves (e) tenant space to include selective demo & construction of non-load bearing walls, new grid, ceiling tiles, new light fixtures, office doors, & frames, millwork & finishes. fire sprinkler & life safety alarm work under separate permit.Details
ste 1320: 13th fl-tenant improvement involves (e) tenant space to include selective demo & construction of non-load bearing walls, new grid, ceiling tiles, new light fixtures, office doors, & frames, millwork & finishes. fire sprinkler & life safety alarm work under separate permit. | $400,000 |
| May 23, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | revision to 202302222355 revised structural detailsDetails
revision to 202302222355 revised structural details | |
| Feb 22, 2023 | Completed final sign-off Nov 2023 | 101 02nd St | Source Planning And Construction Inc | unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcoveDetails
unit 100c: new recessed entry/exit alcove, new storefront on mission street, new entry door, sidelight, modificaiton to street level facade @ alcove, minor concrete flatwork & finish at alcove | $250,000 |
| Mar 22, 2022 | Completed final sign-off May 2022 | 88 Kearny St | Novo Construction Inc | infill of (e) rated openings into an abandoned communicating stair enclosure & associated demolition & partition construction. demo of an (e) fire-rated double door on 4th fl & demo of (e) fire rated rolldown door on 5th fl. the openings will be infilled with 1 hr rated non-load bearing partitions.Details
infill of (e) rated openings into an abandoned communicating stair enclosure & associated demolition & partition construction. demo of an (e) fire-rated double door on 4th fl & demo of (e) fire rated rolldown door on 5th fl. the openings will be infilled with 1 hr rated non-load bearing partitions. | $5,000 |
| Feb 22, 2022 | Never finaled filed Feb 2022, never issued | 55 New Montgomery St | addition of a new roof deck on the 9th lvl or 8th floor roof converting this level to an occupied roof deck as amentity to the commercial office. new 735 sf roof deck, roof deck planters, egress paths, perimeter guard rails, new 2-stop elevator for accessibility & extending two mstairs to roof.Details
addition of a new roof deck on the 9th lvl or 8th floor roof converting this level to an occupied roof deck as amentity to the commercial office. new 735 sf roof deck, roof deck planters, egress paths, perimeter guard rails, new 2-stop elevator for accessibility & extending two mstairs to roof. | $900,000 | |
| Feb 18, 2022 | Never finaled issued Apr 2022, no final | 900 Kearny St | Precision Air Systems Inc | ab17 demo e gr level tenant suite, community stairs to the basement level, partial basement leel partitions, millwork, finishesDetails
ab17 demo e gr level tenant suite, community stairs to the basement level, partial basement leel partitions, millwork, finishes | $80,000 |
| Jan 5, 2022 | Completed final sign-off Feb 2023 | 510 Townsend St | Florian Industries Inc | this project involes the installation of guard rails around (e) skylights on the roof deck.Details
this project involes the installation of guard rails around (e) skylights on the roof deck. | $35,000 |
| Aug 11, 2021 | Completed final sign-off Oct 2024 | 525 Market St | Skyline Construction | subbasement: replace (e) life safety diesel generator.Details
subbasement: replace (e) life safety diesel generator. | $1,600,000 |
| May 7, 2021 | Completed final sign-off Aug 2022 | 114 Grant Av | Sc Builders, Inc | replacement of existing storefront glazing system for retail space.Details
replacement of existing storefront glazing system for retail space. | $130,000 |
| Feb 10, 2021 | Completed final sign-off Nov 2023 | 785 Market St | D W Nicholson Corporation | revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level.Details
revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level. | |
| Jan 21, 2021 | Completed final sign-off Sep 2022 | 55 New Montgomery St | Skyline Capital Builders Llc | barrier removal at one ground level tenant suite (house of shields). addition of a power door operator at (e) historic entry doors & associated high-low push buttons.Details
barrier removal at one ground level tenant suite (house of shields). addition of a power door operator at (e) historic entry doors & associated high-low push buttons. | $2,500 |
| Dec 17, 2020 | Completed final sign-off Jan 2022 | 50 California St | Hathaway Dinwiddie Construct Co | a new communication stair and portal between 11th & 12th fl.Details
a new communication stair and portal between 11th & 12th fl. | $700,000 |
| Dec 7, 2020 | Completed final sign-off Feb 2022 | 88 Kearny St | Principal Builders Inc. | removal and installation of new entry doorsDetails
removal and installation of new entry doors | $110,000 |
| Sep 9, 2020 | Completed final sign-off Nov 2023 | 785 Market St | barrier removal: to include modification to (e) bldg. elevator machine rooms + supoport spaces. elevator project permitted seperately. construction of non-load bearing partitions. new doors, frames & finishes. accessibility upgrade to basement.Details
barrier removal: to include modification to (e) bldg. elevator machine rooms + supoport spaces. elevator project permitted seperately. construction of non-load bearing partitions. new doors, frames & finishes. accessibility upgrade to basement. | $25,000 | |
| Aug 25, 2020 | Completed final sign-off Dec 2025 | 55 New Montgomery St | Skyline Capital Builders Llc | new fire rated shaftwall construction for new electrical & mechanical systems on level 2 to 8. new fire protected stair enclosures. new electrical room in basement & 1 hour fire rated corridor on roof new mechanical units. steel equipment platforms & new tpo single - ply roofing system.Details
new fire rated shaftwall construction for new electrical & mechanical systems on level 2 to 8. new fire protected stair enclosures. new electrical room in basement & 1 hour fire rated corridor on roof new mechanical units. steel equipment platforms & new tpo single - ply roofing system. | $6,500,000 |
| Mar 16, 2020 | Expired or cancelled cancelled Jan 2026 | 650 Townsend St | 4th & 5th fl - interior soft demo for future ti. demo of non-load bearing partitions, doors & frames, ceiling systems, lights, millwork of (e) vacant offices spacesDetails
4th & 5th fl - interior soft demo for future ti. demo of non-load bearing partitions, doors & frames, ceiling systems, lights, millwork of (e) vacant offices spaces | $10,000 | |
| Nov 5, 2019 | Expired or cancelled cancelled Jan 2026 | 2548 Mission St | 2nd fl - this project includes the extent of a new 2nd floor professional design office suite. no construction under this pa ref pa 2017-0829-6246Details
2nd fl - this project includes the extent of a new 2nd floor professional design office suite. no construction under this pa ref pa 2017-0829-6246 | ||
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 350 California St | Bcci Construction Company | lower level - demo and relocation of partions. revision to approved architectual ref #201808016173.Details
lower level - demo and relocation of partions. revision to approved architectual ref #201808016173. | $3,000 |
| Oct 29, 2018 | Expired or cancelled expired Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. project involves the addition of a new temporary atm in the central window bay, which will be accessed from the exterior entry door on california st. and serviced from the bldg lobby. scope of work includes new temporary partial height atm enclosure with entry door. n/a for maherDetails
t.i. project involves the addition of a new temporary atm in the central window bay, which will be accessed from the exterior entry door on california st. and serviced from the bldg lobby. scope of work includes new temporary partial height atm enclosure with entry door. n/a for maher | $55,000 |
| Sep 5, 2018 | Expired or cancelled expired Jan 2023 | 2548 Mission St | Bradford Construction | revision to pa# 2017-1222-7264. relocation of atrium stair. clarification of the stairs construction. no other work.Details
revision to pa# 2017-1222-7264. relocation of atrium stair. clarification of the stairs construction. no other work. | |
| Aug 1, 2018 | Completed final sign-off Sep 2019 | 350 California St | Bcci Construction Company | tenant improvement at basement to existing storage room (approx 400 sq ft) to include selective demolition and construction of non load bearing paritions, new ceiling grid and tile, new lights and finishes for new breakroom. minor work to janitorial closet. mep and fire under separate permits.Details
tenant improvement at basement to existing storage room (approx 400 sq ft) to include selective demolition and construction of non load bearing paritions, new ceiling grid and tile, new lights and finishes for new breakroom. minor work to janitorial closet. mep and fire under separate permits. | $350,000 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 49 Geary St | Swinerton Builders | revision of pa#201507232305, modify demo of 2nd level mezzanine slab removalDetails
revision of pa#201507232305, modify demo of 2nd level mezzanine slab removal | $5,000 |
| Feb 23, 2018 | Never finaled issued Apr 2018, no final | 350 California St | Bcci Construction Company | 8/f: project involves selective demolition of non-load bearing walls, ceilings, light fixtures, millwork, plumbing and finishes. maher na. tenant improvement under separate permit per ab-017.Details
8/f: project involves selective demolition of non-load bearing walls, ceilings, light fixtures, millwork, plumbing and finishes. maher na. tenant improvement under separate permit per ab-017. | $85,000 |
| Feb 23, 2018 | Never finaled issued Mar 2018, no final | 350 California St | Bcci Construction Company | ti involves an expansion of (e) suite 1460. ti to include selective demo & construction of non-load bearing partitions, modifications to (e) ceiling grid, new door & frame & finishes. additional work to reduce suite 1450 that includes selective demo & const of non-load bearing partitions. maher naDetails
ti involves an expansion of (e) suite 1460. ti to include selective demo & construction of non-load bearing partitions, modifications to (e) ceiling grid, new door & frame & finishes. additional work to reduce suite 1450 that includes selective demo & const of non-load bearing partitions. maher na | $50,000 |
| Dec 22, 2017 | Completed final sign-off Jan 2023 | 2548 Mission St | Bradford Construction | modification of existing tenant spaces to include selective demolition and consturction non-load bearing partitions, new accessible restrooms; and new finishes; information technology room at the server room. mep is deferred. n/a maherDetails
modification of existing tenant spaces to include selective demolition and consturction non-load bearing partitions, new accessible restrooms; and new finishes; information technology room at the server room. mep is deferred. n/a maher | $250,000 |
| Sep 14, 2017 | Completed final sign-off Dec 2017 | 350 California St | Bcci Construction Company | 20/f: tenant improvement involves modification of e tenant suite to include selective demo and construction of non load bearing partitions, minor modifications to ceiling tiles and grid as neede in area of workDetails
20/f: tenant improvement involves modification of e tenant suite to include selective demo and construction of non load bearing partitions, minor modifications to ceiling tiles and grid as neede in area of work | $5,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2019 | 2548 Mission St | Bradford Construction | revision to 201708154919 and 201010082585 to document land use of design professional service in partial 1st and 2nd fl with partial gr level retail on 1st flr as principally permitted by pc sec 750. no constructionDetails
revision to 201708154919 and 201010082585 to document land use of design professional service in partial 1st and 2nd fl with partial gr level retail on 1st flr as principally permitted by pc sec 750. no construction | |
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 7th floor: t.i. project involves modifications of extg tenant suite to inlclude selective demolition and the construction of a non load bearing partition, modification to ceiling tiles and grid as needed in area of work and new finishes. n/a for maher.Details
7th floor: t.i. project involves modifications of extg tenant suite to inlclude selective demolition and the construction of a non load bearing partition, modification to ceiling tiles and grid as needed in area of work and new finishes. n/a for maher. | $15,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinanceDetails
4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinance | |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Apr 27, 2017 | Never finaled issued Apr 2017, no final | 350 California St | Swinerton Builders | removal of the existing exterior tenant signage and the associated patch & repair work. n/a ordinance #155-13Details
removal of the existing exterior tenant signage and the associated patch & repair work. n/a ordinance #155-13 | $75,000 |
| Mar 15, 2017 | Completed final sign-off Dec 2017 | 300 Clay St | Skyline Construction | interior demolition of partitions, doors & glazing systems. restoration of affected adjacent surfaces and finishesDetails
interior demolition of partitions, doors & glazing systems. restoration of affected adjacent surfaces and finishes | $350,000 |
| Mar 2, 2017 | Never finaled issued Apr 2017, no final | 525 Market St | Skyline Construction | 21st floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred.Details
21st floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred. | $150,000 |
| Mar 2, 2017 | Never finaled issued Apr 2017, no final | 525 Market St | Skyline Construction | 25th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred.Details
25th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred. | $150,000 |
| Mar 2, 2017 | Completed final sign-off May 2019 | 525 Market St | Skyline Construction | 26th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred.Details
26th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred. | $150,000 |
| Mar 2, 2017 | Completed final sign-off Feb 2019 | 525 Market St | Skyline Construction | 19th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred.Details
19th floor - this project involves demolition of non-load bearing partitions, ceiling grid & tile, light fixtures, doors, frames, millwork, & finishes. (per ab-017). alarm, sprinkler deferred. | $150,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | suite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulationsDetails
suite 375: modification of extg tenant suite to include selective demolition & construction of non-load bearing partitions, new lighting, controls, new millwork and new finishes. all work shall comply with federal state and local codes including sf bldg code, vav title 24 and federal ada regulations | $90,635 | |
| Dec 5, 2016 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain.Details
4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain. | $2,500,000 |
| Aug 30, 2016 | Completed final sign-off Apr 2017 | 101 California St | Source Planning And Construction Inc | 47th floor: common area improvement includes: modification of extg elevator lobby and construction of new common corridor work includes of construction of non-load bearing partitions. modifications to ceiling grill at elevator lobby, new ceiling grip and tile at new corridor.Details
47th floor: common area improvement includes: modification of extg elevator lobby and construction of new common corridor work includes of construction of non-load bearing partitions. modifications to ceiling grill at elevator lobby, new ceiling grip and tile at new corridor. | $163,303 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 20 California St | Gci, Inc | revision to existing permit 201601278056 to include room layout changes, associated changes to power , rcp, and details.Details
revision to existing permit 201601278056 to include room layout changes, associated changes to power , rcp, and details. | |
| Apr 26, 2016 | Completed final sign-off Dec 2016 | 145 Jefferson St | Bevilacqua & Sons | modification to extg admission area at ground floor(museum). scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, communicating door, lighting, and finishes for 's.f. dungeon'.Details
modification to extg admission area at ground floor(museum). scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, communicating door, lighting, and finishes for 's.f. dungeon'. | $60,000 |
| Apr 26, 2016 | Completed final sign-off Dec 2016 | 145 Jefferson St | Bevilacqua & Sons | modification to extg admission area at ground floor. scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, exit door, lighting, and finishes for 'madame tussauds'.Details
modification to extg admission area at ground floor. scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, exit door, lighting, and finishes for 'madame tussauds'. | $75,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | Deb Construction Llc | 6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes.Details
6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes. | $1,700,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | Deb Construction Llc | 16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes.Details
16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes. | $1,800,000 |
| Jan 28, 2016 | Never finaled issued Feb 2016, no final | 77 Ofarrell St | Dickinson Cameron Construction Company I | construction of partition wall on 6th fl of retail bldg for conversion of retail departmentDetails
construction of partition wall on 6th fl of retail bldg for conversion of retail department | $30,000 |
| Jan 26, 2016 | Completed final sign-off Mar 2017 | 425 Market St | Plant Construction Co, Lp | 9th to 10th floor: stair retrofit mock-up of a single landing in preparation of full stair retrofit. maher naDetails
9th to 10th floor: stair retrofit mock-up of a single landing in preparation of full stair retrofit. maher na | $40,000 |
| Jan 21, 2016 | Completed final sign-off Feb 2017 | 77 Ofarrell St | Shawmut Woodworking & Supply Inc | 1st floor: ti- to expand ground floor retail space into adjacent suite; w/in the bld/ work includes demo of non load bearing partitions, doors, millwork, furnishing & finishes; and construction of (n) partitions and millwork and finishes.Details
1st floor: ti- to expand ground floor retail space into adjacent suite; w/in the bld/ work includes demo of non load bearing partitions, doors, millwork, furnishing & finishes; and construction of (n) partitions and millwork and finishes. | $2,000,000 |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 450 Shotwell St | Rossi Builders Inc. | demo within (1) suite on 2nd floor of (e) 2 story f-1 (light industrial) bldg. scope includes demo of (e) non-structural partitions, bathroom, millwork, mezzanine, access ladder & finishes. per ab-017. compliance with maher ordinance no 155-13 not required.Details
demo within (1) suite on 2nd floor of (e) 2 story f-1 (light industrial) bldg. scope includes demo of (e) non-structural partitions, bathroom, millwork, mezzanine, access ladder & finishes. per ab-017. compliance with maher ordinance no 155-13 not required. | $8,000 |
| Dec 14, 2015 | Completed final sign-off Apr 2016 | 77 Ofarrell St | Shawmut Woodworking & Supply Inc | 2nd floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes.Details
2nd floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes. | $600,000 |
| Dec 9, 2015 | Expired or cancelled expired Sep 2016 | 450 Shotwell St | Rossi Builders Inc. | revision to pa# 201501286911 for structural & lighting. n/a ordinance #155-13Details
revision to pa# 201501286911 for structural & lighting. n/a ordinance #155-13 | |
| Dec 9, 2015 | Completed final sign-off May 2017 | 1125 Mission St | Skyline Construction | revision to pa#201509308464, revision include bathroom design change with corresponding mechanical. n/a ordinance #155-13Details
revision to pa#201509308464, revision include bathroom design change with corresponding mechanical. n/a ordinance #155-13 | $10,000 |
| Nov 2, 2015 | Completed final sign-off Mar 2017 | 1125 Mission St | Skyline Construction | change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13Details
change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13 | $350,000 |
| Oct 13, 2015 | Completed final sign-off Nov 2016 | 1 California St | R.M.R. Construction Company | revision to pa#2015-0505-5366, change t24 lighting, switch in gound to down light. n/a ordinance #155-13Details
revision to pa#2015-0505-5366, change t24 lighting, switch in gound to down light. n/a ordinance #155-13 | |
| Oct 7, 2015 | Completed final sign-off Apr 2016 | 438 Shotwell St | Rossi Builders Inc. | change of use from storage to light industrial ti to (e) tenant suite for construction of non-load bearing partitions, (n) exit corridor, (n) entry store front (e) facade, (n) light fixtures & ceiling changeDetails
change of use from storage to light industrial ti to (e) tenant suite for construction of non-load bearing partitions, (n) exit corridor, (n) entry store front (e) facade, (n) light fixtures & ceiling change | $135,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2017 | 1125 Mission St | Skyline Construction | core and shell improvement to (e) 3 level parking and storage structure. scope includes construction of new restrooms on all levels, egress stairs, mezzanine and stairs, and mepDetails
core and shell improvement to (e) 3 level parking and storage structure. scope includes construction of new restrooms on all levels, egress stairs, mezzanine and stairs, and mep | $750,000 |
| Sep 28, 2015 | Completed final sign-off Apr 2016 | 450 Shotwell St | Rossi Builders Inc. | revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13Details
revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13 | |
| Jul 30, 2015 | Completed final sign-off Aug 2015 | 49 Geary St | San Francisco Commercial Builders Inc | modification of extg t.i. to include construction of non-load bearing partitions, relocate and reswitch one light fixture, one new office door, frame & sidellight, new countertop and new sink at extg location, and new finishes. suite # 500Details
modification of extg t.i. to include construction of non-load bearing partitions, relocate and reswitch one light fixture, one new office door, frame & sidellight, new countertop and new sink at extg location, and new finishes. suite # 500 | $51,273 |
| Jul 1, 2015 | Completed final sign-off May 2016 | 114 Sansome St | to comply with ab-056 path of travel documentation.Details
to comply with ab-056 path of travel documentation. | ||
| May 7, 2015 | Completed final sign-off Jul 2016 | 651 Brannan St | Novo Construction Inc | 2nd floor: t.i. project involves modification of extg tenant space to include non-load bearing partition, new ceilings, and light fixtures and a new interconnecting stair between 1st and 2nd floor.Details
2nd floor: t.i. project involves modification of extg tenant space to include non-load bearing partition, new ceilings, and light fixtures and a new interconnecting stair between 1st and 2nd floor. | $2,000,000 |
| Mar 26, 2015 | Completed final sign-off Apr 2016 | 450 Shotwell St | Plant Construction Co, Lp | demo of existing non compliant & concrete stoop. renovation to an accessible entry, reference core & shell improvement pa#201501286911. n/a ordinance #155-13Details
demo of existing non compliant & concrete stoop. renovation to an accessible entry, reference core & shell improvement pa#201501286911. n/a ordinance #155-13 | $10,000 |
| Jan 28, 2015 | Completed final sign-off Mar 2016 | 450 Shotwell St | Plant Construction Company Lp | core and shell gr floor alteration to existing 2 story warehouse. demo non bearing walls, lighting. construction of restrooms and rated corridor for exiting.Details
core and shell gr floor alteration to existing 2 story warehouse. demo non bearing walls, lighting. construction of restrooms and rated corridor for exiting. | $231,000 |
| May 1, 2014 | Completed final sign-off Aug 2014 | 71 Stevenson St | Source Planning And Construction Inc | #600- scope includes selective demolition of non-load bearing partitions, partial new suspended ceiling grid & tile, relocate or new light fixtures, new outlets & new finishes. mep., fire life safety & fire sprinklers design build & under seperate permit.Details
#600- scope includes selective demolition of non-load bearing partitions, partial new suspended ceiling grid & tile, relocate or new light fixtures, new outlets & new finishes. mep., fire life safety & fire sprinklers design build & under seperate permit. | $130,000 |
| Apr 18, 2014 | Completed final sign-off Jan 2015 | 114 Sansome St | Rudolph Commercial Interiors Inc, Rci | 5th floor - modification of (e) tenant improvements to include construct non-load bearing prtitoins, modification of (e) ceiling grid & tile, new light fixtures including re-switching, new office doors + frames, salvage + reuse of (e) selected materials if practicable, new millwork, sink & finishe.Details
5th floor - modification of (e) tenant improvements to include construct non-load bearing prtitoins, modification of (e) ceiling grid & tile, new light fixtures including re-switching, new office doors + frames, salvage + reuse of (e) selected materials if practicable, new millwork, sink & finishe. | $824,280 |
| Mar 3, 2014 | Completed final sign-off Jul 2014 | 71 Stevenson St | suites 725a and 725b for demising an extg commercial office space into multiple suites. suite 725a:demolition of interior partitions, construction of non-load bearing partitions, new corridor doors, new and reconfigured extg clg rid & tile, new lighting, and new finishes.Details
suites 725a and 725b for demising an extg commercial office space into multiple suites. suite 725a:demolition of interior partitions, construction of non-load bearing partitions, new corridor doors, new and reconfigured extg clg rid & tile, new lighting, and new finishes. | $130,000 | |
| Jan 22, 2014 | Completed final sign-off Mar 2014 | 1 Lombard St | Jones Lang La Salle Construction Company | revision to pa#2013-10-04-8481. to project notes 'e' clarifying the mechanical or plumbing work/scope in this project & permit.Details
revision to pa#2013-10-04-8481. to project notes 'e' clarifying the mechanical or plumbing work/scope in this project & permit. | |
| Dec 13, 2013 | Completed final sign-off Apr 2014 | 731 Market St | Peacock Construction Inc | revision to appl #2013.1105.1118 - rating of (e) elevation machine room & structure.Details
revision to appl #2013.1105.1118 - rating of (e) elevation machine room & structure. | $2,000 |
| Oct 11, 2013 | Never finaled issued Oct 2013, no final | 300 California St | D A Pope Inc | addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearanceDetails
addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearance | $32,000 |
| Oct 4, 2013 | Completed final sign-off Mar 2014 | 1 Lombard St | Jones Lang La Salle Construction Company | common area improvement on 2nd fl including new ceiling, lighting, paritions, doorsDetails
common area improvement on 2nd fl including new ceiling, lighting, paritions, doors | $33,000 |
| Aug 29, 2013 | Never finaled issued Sep 2013, no final | 655 Montgomery St | Teamwrkx Inc. | 4/f- t.i. from shell condition including non-load bearing partitions, doors, frames, interior glazing, casework, lighting, oiling grid, mech, electrical, plumbing included. life safety & sprinkler to be designed build.Details
4/f- t.i. from shell condition including non-load bearing partitions, doors, frames, interior glazing, casework, lighting, oiling grid, mech, electrical, plumbing included. life safety & sprinkler to be designed build. | $1,188,550 |
| Jul 22, 2013 | Completed final sign-off May 2014 | 731 Market St | Peacock Construction Inc | new 1-hr fire rated enclosure at future pump room (part of sprinkler retrofit), includes new 60 min. entry door in basement level. core and shell work. t.i. work under separate permit.Details
new 1-hr fire rated enclosure at future pump room (part of sprinkler retrofit), includes new 60 min. entry door in basement level. core and shell work. t.i. work under separate permit. | $3,500 |
| Jul 22, 2013 | Completed final sign-off Jan 2015 | 731 Market St | Peacock Construction Inc | new stevenson street entry with new lobby and canopy; storefront, interior entry stair into basement, and enclosure of 1 existing exit stair. core and shell per ab-017. ti under separate permit.Details
new stevenson street entry with new lobby and canopy; storefront, interior entry stair into basement, and enclosure of 1 existing exit stair. core and shell per ab-017. ti under separate permit. | $324,425 |