Block 3744, lot 002

345 Spear St

City’s use
Miscellaneous/Mixed-Use
Lot
110,161 sq ft
Zoning
M1
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

125 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
issued Nov 2026
345 Spear StSabah International Incorporated5th floor:to add a 2-way communication call boxes to an existing 2-way emergency communication per cbs section 1010.2.12.1 ref #202608056109
Details
Permit
202611100584
Permit issued
Nov 10, 2026

5th floor:to add a 2-way communication call boxes to an existing 2-way emergency communication per cbs section 1010.2.12.1 ref #202608056109

Open the permit page

$8,000
Oct 21, 2026In progress
filed Oct 2026, not yet issued
345 Spear StSource Planning And Construction Inc1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg
Details
Permit
202610219700

1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg

Open the permit page

$292,338
Sep 10, 2026In progress
issued Sep 2026
345 Spear StNovo Construction Incground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.
Details
Permit
202609107912
Permit issued
Sep 21, 2026

ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.

Open the permit page

$22,000
Sep 3, 2026In progress
issued Sep 2026
345 Spear StDevcon Constructionrevision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power.
Details
Permit
202609037656
Permit issued
Sep 3, 2026

revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power.

Open the permit page

Aug 28, 2026In progress
issued Sep 2026
345 Spear StB N Builders Incground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep)
Details
Permit
202608287381
Permit issued
Sep 18, 2026

ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep)

Open the permit page

$100,000
Aug 28, 2026In progress
issued Sep 2026
345 Spear StSc Builders, Inc4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers.
Details
Permit
202608287393
Permit issued
Sep 16, 2026

4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers.

Open the permit page

$40,000
Aug 6, 2026In progress
issued Aug 2026
345 Spear StSc Builders, Increvision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms.
Details
Permit
202608066185
Permit issued
Aug 24, 2026

revision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms.

Open the permit page

$120,000
Aug 5, 2026In progress
issued Sep 2026
345 Spear StDevcon Construction5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permit
Details
Permit
202608056109
Permit issued
Sep 9, 2026

5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permit

Open the permit page

$70,000
Jul 30, 2026In progress
issued Sep 2026
345 Spear StDevcon Construction5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included
Details
Permit
202607305849
Permit issued
Sep 2, 2026

5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included

Open the permit page

$160,000
Jul 23, 2026In progress
issued Sep 2026
345 Spear StDevcon Constructionground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357
Details
Permit
202607235489
Permit issued
Sep 2, 2026

ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357

Open the permit page

$300,000
Jul 21, 2026In progress
issued Sep 2026
345 Spear StDevcon Construction1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced
Details
Permit
202607215359
Permit issued
Sep 2, 2026

1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced

Open the permit page

$350,000
Jul 21, 2026In progress
issued Sep 2026
345 Spear StDevcon Constructionmep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591
Details
Permit
202607215337
Permit issued
Sep 2, 2026

mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591

Open the permit page

$350,000
Jul 17, 2026Completed
final sign-off Aug 2026
345 Spear StB N Builders Incdemolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per sfbc ab-017 accessible compliance documentation will be provided wit ti appliction under separate permit.
Details
Permit
202607175234
Permit issued
Jul 24, 2026
Final sign-off
Aug 13, 2026

demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per sfbc ab-017 accessible compliance documentation will be provided wit ti appliction under separate permit.

Open the permit page

$39,000
Jul 14, 2026Completed
final sign-off Sep 2026
345 Spear StSource Planning And Construction Inc2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.
Details
Permit
202607145001
Permit issued
Jul 20, 2026
Final sign-off
Sep 11, 2026

2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.

Open the permit page

$30,000
Jul 2, 2026In progress
issued Jul 2026
345 Spear StSc Builders, Incpermit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scope
Details
Permit
202607024487
Permit issued
Jul 10, 2026

permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scope

Open the permit page

$20,000
Jun 26, 2026In progress
issued Jul 2026
345 Spear StDevcon Constructionrevison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting.
Details
Permit
202606263991
Permit issued
Jul 7, 2026

revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting.

Open the permit page

Jun 17, 2026Completed
final sign-off Sep 2026
345 Spear StSource Planning And Construction Inc2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work
Details
Permit
202606173460
Permit issued
Jun 22, 2026
Final sign-off
Sep 11, 2026

2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work

Open the permit page

$30,000
Jun 2, 2026In progress
issued Jul 2026
345 Spear StDevcon Constructionti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit.
Details
Permit
202606022357
Permit issued
Jul 23, 2026

ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit.

Open the permit page

$300,000
May 21, 2026In progress
issued Nov 2026
345 Spear StSc Builders, Inclevel 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain.
Details
Permit
202605211677
Permit issued
Nov 10, 2026

level 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain.

Open the permit page

$90,000
May 14, 2026In progress
issued May 2026
345 Spear StSc Builders, Inclevel 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms.
Details
Permit
202605141302
Permit issued
May 21, 2026

level 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms.

Open the permit page

$150,000
Mar 27, 2026In progress
issued Apr 2026
345 Spear StDevcon Construction5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms.
Details
Permit
202603278457
Permit issued
Apr 10, 2026

5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms.

Open the permit page

Mar 24, 2026In progress
issued May 2026
345 Spear StDevcon Construction4-5/fl- ti includes the installation of (n) comunicationg stair
Details
Permit
202512111611
Permit issued
May 4, 2026

4-5/fl- ti includes the installation of (n) comunicationg stair

Open the permit page

$250,000
Feb 24, 2026Completed
final sign-off Mar 2026
345 Spear StSource Planning And Construction Incto obtain final inspection for work approved under pa # 202412116597. all work is complete.
Details
Permit
202602246427
Permit issued
Mar 5, 2026
Final sign-off
Mar 16, 2026

to obtain final inspection for work approved under pa # 202412116597. all work is complete.

Open the permit page

Dec 11, 2025In progress
issued Jul 2026
345 Spear StDevcon Construction1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.
Details
Permit
202512111591
Permit issued
Jul 14, 2026

1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.

Open the permit page

$367,000
Dec 11, 2025In progress
issued Mar 2026
345 Spear StDevcon Construction5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) system
Details
Permit
202512111612
Permit issued
Mar 9, 2026

5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) system

Open the permit page

$300,000
Dec 11, 2025In progress
issued Sep 2026
345 Spear StDevcon Construction1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware
Details
Permit
202512111551
Permit issued
Sep 8, 2026

1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware

Open the permit page

$240,000
Dec 11, 2025In progress
issued Sep 2026
345 Spear StDevcon Constructiontenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware
Details
Permit
202512111594
Permit issued
Sep 16, 2026

tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware

Open the permit page

$350,000
Dec 11, 2025In progress
issued Feb 2026
345 Spear StDevcon Construction5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system
Details
Permit
202512111608
Permit issued
Feb 27, 2026

5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system

Open the permit page

$200,000
Dec 11, 2025In progress
issued Jan 2026
345 Spear StDevcon Construction1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework
Details
Permit
202512111586
Permit issued
Jan 16, 2026

1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework

Open the permit page

$100,000
Dec 11, 2025In progress
issued Jan 2026
345 Spear StDevcon Construction5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework
Details
Permit
202512111610
Permit issued
Jan 16, 2026

5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework

Open the permit page

$75,000
Oct 7, 2025Completed
final sign-off Mar 2026
345 Spear StSource Planning And Construction Inc6th fl- architectural only for 3 new phone booth units in office.
Details
Permit
202510076905
Permit issued
Nov 6, 2025
Final sign-off
Mar 16, 2026

6th fl- architectural only for 3 new phone booth units in office.

Open the permit page

$20,000
May 1, 2025Completed
final sign-off May 2025
345 Spear StSabah International Incorporated4/f: provide modification of (e) fire alarm system - add 4 led spekaer/strobe - ceiling mounted. ref pa 202504235054
Details
Permit
202505015583
Permit issued
May 1, 2025
Final sign-off
May 15, 2025

4/f: provide modification of (e) fire alarm system - add 4 led spekaer/strobe - ceiling mounted. ref pa 202504235054

Open the permit page

$21,172
Apr 23, 2025Completed
final sign-off Mar 2026
345 Spear StSource Planning And Construction Inc4th fl: installation of phone furniture booths; 4 on level 4. structural plans and calls for anchoring included. no mep work within scope
Details
Permit
202504235054
Permit issued
Apr 29, 2025
Final sign-off
Mar 13, 2026

4th fl: installation of phone furniture booths; 4 on level 4. structural plans and calls for anchoring included. no mep work within scope

Open the permit page

$20,000
Apr 22, 2025Completed
final sign-off May 2025
345 Spear StSabah International Incorporatedlevel 3,5,7: provide a modification of the existing fire alarm system. new private phone booths are being installed on the 3rd, 5th, and 7th floor. add 9 led speaker/strobes. ref permit 202412116597
Details
Permit
202504224941
Permit issued
Apr 22, 2025
Final sign-off
May 15, 2025

level 3,5,7: provide a modification of the existing fire alarm system. new private phone booths are being installed on the 3rd, 5th, and 7th floor. add 9 led speaker/strobes. ref permit 202412116597

Open the permit page

$21,172
Dec 11, 2024Expired or cancelled
expired Mar 2026
345 Spear StSource Planning And Construction Incfloors 3,5,7: installation of phone furniture booths; 3 on level 3, 2 on level 5 and 4 on level 7. structural plans and calcs for anchoring included. no mep work within space.
Details
Permit
202412116597
Permit issued
Dec 20, 2024

floors 3,5,7: installation of phone furniture booths; 3 on level 3, 2 on level 5 and 4 on level 7. structural plans and calcs for anchoring included. no mep work within space.

Open the permit page

$20,000
Jan 16, 2024Completed
final sign-off Jun 2024
345 Spear StBcci Construction Company7/f: minor reconfiguration of (e) planters and installation of a shade pergola.
Details
Permit
202401164005
Permit issued
Feb 21, 2024
Final sign-off
Jun 21, 2024

7/f: minor reconfiguration of (e) planters and installation of a shade pergola.

Open the permit page

$90,000
Dec 15, 2023Completed
final sign-off Dec 2023
345 Spear StAnderson, Rowe & Buckley, Inc.fire sprinkler only (as build) fire permit 2023-1012-8512. add 7 sprinkler head under hvac ducts
Details
Permit
202312152639
Permit issued
Dec 15, 2023
Final sign-off
Dec 26, 2023

fire sprinkler only (as build) fire permit 2023-1012-8512. add 7 sprinkler head under hvac ducts

Open the permit page

Nov 6, 2023Completed
final sign-off Jul 2024
345 Spear StBcci Construction Company4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.
Details
Permit
202311060260
Permit issued
Nov 7, 2023
Final sign-off
Jul 9, 2024

4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.

Open the permit page

Oct 19, 2023Completed
final sign-off Jun 2024
345 Spear StBcci Construction Companythe area of work is limited to an approx area of 2800 sf. this scope of work includes non-bearing partitions, and security doors.
Details
Permit
202310198984
Permit issued
Nov 15, 2023
Final sign-off
Jun 21, 2024

the area of work is limited to an approx area of 2800 sf. this scope of work includes non-bearing partitions, and security doors.

Open the permit page

$90,000
Oct 18, 2023Completed
final sign-off Feb 2024
345 Spear StSabah International Incorporatedfire alarm ti on 4th fl and for a new two-story 2-way communication system. under the scope of work emergency call station will be installed in the 4th floor west peassenger elevator lobby. ref bpa# 202308164561.
Details
Permit
202310188954
Permit issued
Jan 22, 2024
Final sign-off
Feb 9, 2024

fire alarm ti on 4th fl and for a new two-story 2-way communication system. under the scope of work emergency call station will be installed in the 4th floor west peassenger elevator lobby. ref bpa# 202308164561.

Open the permit page

$81,223
Oct 12, 2023Never finaled
issued Oct 2023, no final
345 Spear StAnderson, Rowe & Buckley, Inc.4th fl - existing fire sprinkler system - ti relocate 89 fire srpinklers ref pa 2023-0816-4561
Details
Permit
202310128512
Permit issued
Oct 17, 2023

4th fl - existing fire sprinkler system - ti relocate 89 fire srpinklers ref pa 2023-0816-4561

Open the permit page

$56,000
Sep 8, 2023Completed
final sign-off Jul 2024
345 Spear StBcci Construction Company4th fl: mep deferred 202211287247. revise hvac & associated ductwork configeration & layout
Details
Permit
202309086195
Permit issued
Sep 8, 2023
Final sign-off
Jul 9, 2024

4th fl: mep deferred 202211287247. revise hvac & associated ductwork configeration & layout

Open the permit page

Aug 16, 2023Completed
final sign-off Jul 2024
345 Spear StBcci Construction Company4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.
Details
Permit
202308164561
Permit issued
Aug 31, 2023
Final sign-off
Jul 9, 2024

4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.

Open the permit page

Jun 21, 2023Completed
final sign-off Jul 2024
345 Spear StBcci Construction Company4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floor
Details
Permit
202306210530
Permit issued
Jun 22, 2023
Final sign-off
Jul 9, 2024

4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floor

Open the permit page

Mar 28, 2023Completed
final sign-off Oct 2023
345 Spear StCapitol Electric Constb1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers.
Details
Permit
202303284520
Permit issued
Aug 15, 2023
Final sign-off
Oct 16, 2023

b1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers.

Open the permit page

$30,000
Feb 21, 2023Completed
final sign-off Dec 2024
345 Spear StBcci Construction Company4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247.
Details
Permit
202302212287
Permit issued
Mar 1, 2023
Final sign-off
Dec 26, 2024

4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247.

Open the permit page

$750,000
Feb 14, 2023Expired or cancelled
cancelled Jan 2026
345 Spear StBcci Construction Company4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler
Details
Permit
202302141975

4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler

Open the permit page

$185,000
Dec 19, 2022Completed
final sign-off Dec 2024
345 Spear StBcci Construction Company4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferred
Details
Permit
202212198675
Permit issued
Feb 23, 2023
Final sign-off
Dec 26, 2024

4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferred

Open the permit page

$5,000,000
Nov 28, 2022Completed
final sign-off Dec 2024
345 Spear StBcci Construction Company4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred.
Details
Permit
202211287247
Permit issued
Jan 31, 2023
Final sign-off
Dec 26, 2024

4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred.

Open the permit page

$2,100,000
Nov 10, 2022Completed
final sign-off Dec 2024
345 Spear StBcci Construction Company4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161
Details
Permit
202211106283
Permit issued
Nov 28, 2022
Final sign-off
Dec 26, 2024

4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161

Open the permit page

$50,000
Aug 25, 2022Completed
final sign-off Oct 2022
345 Spear StAyoob & Peery Plumbing Co Incsuite #121: furnish and install new plumbing devices and all necessary connections. (1) tank type hot water heater under separate permit.
Details
Permit
202208251307
Permit issued
Sep 2, 2022
Final sign-off
Oct 4, 2022

suite #121: furnish and install new plumbing devices and all necessary connections. (1) tank type hot water heater under separate permit.

Open the permit page

$61,930
May 23, 2022Completed
final sign-off Aug 2022
345 Spear StMartin Sign Co Inc.installation of interior & exterior non-electric projecting double faced wall sign
Details
Permit
202205234815
Permit issued
May 25, 2022
Final sign-off
Aug 25, 2022

installation of interior & exterior non-electric projecting double faced wall sign

Open the permit page

$600
May 23, 2022Completed
final sign-off Aug 2022
345 Spear StMartin Sign Co Inc.fabrication and installation of custom painted slide through metal frame interior and exterior google sign (projecting, double faced)
Details
Permit
202205234812
Permit issued
May 25, 2022
Final sign-off
Aug 25, 2022

fabrication and installation of custom painted slide through metal frame interior and exterior google sign (projecting, double faced)

Open the permit page

$600
Apr 9, 2021Completed
final sign-off Nov 2021
345 Spear StEveron Llcfire alarm t>i. - 3rd floor. add (1) speaker strobe & replace (1). 6th floor: add (1) speaker strobe. ref # 2021-0208-4268 & 2021-0121-2986
Details
Permit
202104098279
Permit issued
May 5, 2021
Final sign-off
Nov 10, 2021

fire alarm t>i. - 3rd floor. add (1) speaker strobe & replace (1). 6th floor: add (1) speaker strobe. ref # 2021-0208-4268 & 2021-0121-2986

Open the permit page

$2,000
Jan 20, 2021Completed
final sign-off Dec 2021
345 Spear StSkyline Construction3/f: gender neutral restroom in (e) tenant space. interior demo of non structural partition. mep under separate permit. ref pa# 201403070168
Details
Permit
202101202961
Permit issued
Mar 3, 2021
Final sign-off
Dec 7, 2021

3/f: gender neutral restroom in (e) tenant space. interior demo of non structural partition. mep under separate permit. ref pa# 201403070168

Open the permit page

$220,348
Nov 13, 2020Completed
final sign-off Sep 2021
345 Spear StBcci Construction Company1st fl- new wall and door inside existing lobby. ref pa# 201912230295
Details
Permit
202011138796
Permit issued
Jan 27, 2021
Final sign-off
Sep 27, 2021

1st fl- new wall and door inside existing lobby. ref pa# 201912230295

Open the permit page

$45,000
Sep 10, 2020Completed
final sign-off Nov 2020
345 Spear StPribuss Engineering Incmodify sprinkler head locations to accommodat new ceiling and partition layout for new office space on the 1st floor. total sprinklers for this project is 34. ref pa# 202006269187
Details
Permit
202009103886
Permit issued
Oct 9, 2020
Final sign-off
Nov 13, 2020

modify sprinkler head locations to accommodat new ceiling and partition layout for new office space on the 1st floor. total sprinklers for this project is 34. ref pa# 202006269187

Open the permit page

$17,476
Jan 3, 2020Completed
final sign-off Sep 2021
345 Spear StBcci Construction Companyref pa# 201912230295; 1st fl. elctrical only. permit to support appoved arch set for security turnstiles, new power and communication connections added//vif complaince with cfc 1010.3.2 -this section speaks to turnstiles and that they shall remain open upon fire alarm acuation
Details
Permit
202001031241
Permit issued
Jan 7, 2020
Final sign-off
Sep 27, 2021

ref pa# 201912230295; 1st fl. elctrical only. permit to support appoved arch set for security turnstiles, new power and communication connections added//vif complaince with cfc 1010.3.2 -this section speaks to turnstiles and that they shall remain open upon fire alarm acuation

Open the permit page

$20,000
Dec 23, 2019Completed
final sign-off Sep 2021
345 Spear StBcci Construction Companybcci to improve the security improvements in the lobby at 345 spear street.
Details
Permit
201912230295
Permit issued
Dec 26, 2019
Final sign-off
Sep 27, 2021

bcci to improve the security improvements in the lobby at 345 spear street.

Open the permit page

$75,000
Nov 5, 2019Never finaled
issued Nov 2019, no final
345 Spear StAce Fire Equipment&Serv.3/f add nozzle protection to ansul system. ref app#201707121626. maher n/a.
Details
Permit
201911056440
Permit issued
Nov 5, 2019

3/f add nozzle protection to ansul system. ref app#201707121626. maher n/a.

Open the permit page

May 6, 2019Never finaled
issued May 2019, no final
345 Spear StBcci Construction Companyref pa# 201903114864; mep for catenna pantry of 6th fl. grease duct work on 5th 6th & 7th fl. 1 type 1 hood & 1 fsd n/a maher
Details
Permit
201905069778
Permit issued
May 22, 2019

ref pa# 201903114864; mep for catenna pantry of 6th fl. grease duct work on 5th 6th & 7th fl. 1 type 1 hood & 1 fsd n/a maher

Open the permit page

$245,000
Mar 11, 2019Never finaled
issued Apr 2019, no final
345 Spear StBcci Construction Company6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.
Details
Permit
201903114864
Permit issued
Apr 17, 2019

6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.

Open the permit page

$2,800,000
Sep 10, 2018Never finaled
issued Sep 2018, no final
345 Spear StGarnett Signs Llcinstall 1 evac sign
Details
Permit
201809109513
Permit issued
Sep 10, 2018

install 1 evac sign

Open the permit page

$600
Jun 22, 2018Expired or cancelled
cancelled Nov 2022
345 Spear Stinstallation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge.
Details
Permit
201806222736

installation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge.

Open the permit page

$80,000
Jun 11, 2018Never finaled
issued Jun 2018, no final
345 Spear StBcci Construction Company6th flr - fire assembly stamp for assembly area permitted under 201707263017
Details
Permit
201806111540
Permit issued
Jun 11, 2018

6th flr - fire assembly stamp for assembly area permitted under 201707263017

Open the permit page

Apr 30, 2018Completed
final sign-off Jun 2018
345 Spear StRed Hawk Fire & Security Ca Llcfire alram - ti - add 2 smk det for door holder (e) layout
Details
Permit
201804307816
Permit issued
May 4, 2018
Final sign-off
Jun 27, 2018

fire alram - ti - add 2 smk det for door holder (e) layout

Open the permit page

$1,200
Jan 31, 2018Completed
final sign-off Nov 2018
345 Spear StBcci Construction Company1st floor - add 1 fire rated door in passageway
Details
Permit
201801310078
Permit issued
Mar 20, 2018
Final sign-off
Nov 5, 2018

1st floor - add 1 fire rated door in passageway

Open the permit page

$5,000
Dec 7, 2017Completed
final sign-off Jan 2018
345 Spear StRed Hawk Fire & Security Ca Llcfire alarm ti on 1st fl - add 10 speaker strobes, 7 smoke detectors & heat detectors. ref 2017-0919-8995. maher n/a
Details
Permit
201712075805
Permit issued
Dec 12, 2017
Final sign-off
Jan 16, 2018

fire alarm ti on 1st fl - add 10 speaker strobes, 7 smoke detectors & heat detectors. ref 2017-0919-8995. maher n/a

Open the permit page

$11,000
Nov 14, 2017Completed
final sign-off Dec 2017
345 Spear StAnderson, Rowe & Buckley, Inc.ground floor fire sprinkler per t.i. - relocate 24 heads, added 3 heads, plugged 10 heads. total fire sprinklers for project: 27. ref pa #201709198995. n/a maher ordinance
Details
Permit
201711143946
Permit issued
Nov 20, 2017
Final sign-off
Dec 28, 2017

ground floor fire sprinkler per t.i. - relocate 24 heads, added 3 heads, plugged 10 heads. total fire sprinklers for project: 27. ref pa #201709198995. n/a maher ordinance

Open the permit page

$13,500
Oct 23, 2017Completed
final sign-off Mar 2018
345 Spear StAnderson, Rowe & Buckley, Inc.6/f: relocate 17 sprinklers, add 1 sprinkler to (e) fire sprinkler system. ref t.i. pa#201707263017. maher n/a.
Details
Permit
201710231950
Permit issued
Oct 23, 2017
Final sign-off
Mar 1, 2018

6/f: relocate 17 sprinklers, add 1 sprinkler to (e) fire sprinkler system. ref t.i. pa#201707263017. maher n/a.

Open the permit page

$4,000
Oct 20, 2017Never finaled
issued Oct 2017, no final
345 Spear StEnglewood Construction Incinterior demo of (e) nonbearing walls, space to remain vacant per ab-017. haher ord 155-13 na.
Details
Permit
201710201808
Permit issued
Oct 20, 2017

interior demo of (e) nonbearing walls, space to remain vacant per ab-017. haher ord 155-13 na.

Open the permit page

$15,000
Sep 19, 2017Completed
final sign-off Jan 2018
345 Spear StEnglewood Construction Incground fl: vacant office space to become daycare/child care. interior dmeolition of existing non-bearing walls, mechanical, electrical, plumbing to facilitate new design of classrooms & support spaces. maher na
Details
Permit
201709198995
Permit issued
Nov 3, 2017
Final sign-off
Jan 10, 2018

ground fl: vacant office space to become daycare/child care. interior dmeolition of existing non-bearing walls, mechanical, electrical, plumbing to facilitate new design of classrooms & support spaces. maher na

Open the permit page

$200,000
Sep 11, 2017Completed
final sign-off Sep 2017
345 Spear StRed Hawk Fire & Security Ca Llc5/f- fire alarm as built drawing for pa#201612195360. n/a ordinance #155-13
Details
Permit
201709117490
Permit issued
Sep 11, 2017
Final sign-off
Sep 27, 2017

5/f- fire alarm as built drawing for pa#201612195360. n/a ordinance #155-13

Open the permit page

May 12, 2017Never finaled
issued Jul 2017, no final
345 Spear StBcci Construction Company6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459
Details
Permit
201705126510
Permit issued
Jul 5, 2017

6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459

Open the permit page

$726,000
Dec 19, 2016Completed
final sign-off Sep 2017
345 Spear StRed Hawk Fire & Security Ca Llc5/f: fire alarm t.i. on 5/f music cafe: add 18 speaker strobes, i relay for music shutdown, 1 duct dector for heat pump. ref pa#21512285994.
Details
Permit
201612195360
Permit issued
Dec 20, 2016
Final sign-off
Sep 19, 2017

5/f: fire alarm t.i. on 5/f music cafe: add 18 speaker strobes, i relay for music shutdown, 1 duct dector for heat pump. ref pa#21512285994.

Open the permit page

$11,000
Dec 19, 2016Completed
final sign-off Mar 2017
345 Spear StRed Hawk Fire & Security Ca Llc4/f: fire alarm t.i. on 4/f: add 18 speaker strobes, ref pa#201603212643.
Details
Permit
201612195359
Permit issued
Dec 20, 2016
Final sign-off
Mar 14, 2017

4/f: fire alarm t.i. on 4/f: add 18 speaker strobes, ref pa#201603212643.

Open the permit page

$9,500
Aug 4, 2016Completed
final sign-off Oct 2016
345 Spear StGarnett Signs Llc7th floor: (1) evacuation map. n/a ordinance #155-13
Details
Permit
201608044183
Permit issued
Aug 4, 2016
Final sign-off
Oct 24, 2016

7th floor: (1) evacuation map. n/a ordinance #155-13

Open the permit page

$406
Jul 7, 2016Completed
final sign-off Sep 2016
345 Spear Stto obtain final inspection for work approved under pa# 2014 0805 3067 & 2014 0702 0401 all work is done
Details
Permit
201607071823
Permit issued
Jul 7, 2016
Final sign-off
Sep 22, 2016

to obtain final inspection for work approved under pa# 2014 0805 3067 & 2014 0702 0401 all work is done

Open the permit page

May 17, 2016Never finaled
issued Feb 2017, no final
345 Spear StArtsignsinstall ground non-electric double faced sign "google". n/a for maher ordinance no 155-13.
Details
Permit
201605177641
Permit issued
Feb 2, 2017

install ground non-electric double faced sign "google". n/a for maher ordinance no 155-13.

Open the permit page

$6,000
Jan 20, 2016Never finaled
issued Jan 2016, no final
345 Spear StRed Hawk Fire & Security Ca Llcpartial 1st floor fire alarm - add 2 duct detectors, 2 relays & modules, 8 speakers/strobe, 2 strobes. ref pa #201510200219. n/a maher ordinance
Details
Permit
201601207411
Permit issued
Jan 20, 2016

partial 1st floor fire alarm - add 2 duct detectors, 2 relays & modules, 8 speakers/strobe, 2 strobes. ref pa #201510200219. n/a maher ordinance

Open the permit page

$10,000
Dec 11, 2015Completed
final sign-off Feb 2016
345 Spear StAnderson, Rowe & Buckley, Inc.fire sprinkler ti relocate 14, plug 3, total 14
Details
Permit
201512114804
Permit issued
Dec 11, 2015
Final sign-off
Feb 1, 2016

fire sprinkler ti relocate 14, plug 3, total 14

Open the permit page

$7,500
Dec 10, 2015Completed
final sign-off Jun 2016
345 Spear StAcg Construction Increvision to pa #201510200219 - differed submittal for the sliding doors @ entry as per fire dpet. reduce size of heat pump & revise manufacturer, addiitonal electricla devices & outlets added; one suite converted into two parts to allow for future expansion. n/a maher ordinance
Details
Permit
201512104717
Permit issued
Feb 4, 2016
Final sign-off
Jun 17, 2016

revision to pa #201510200219 - differed submittal for the sliding doors @ entry as per fire dpet. reduce size of heat pump & revise manufacturer, addiitonal electricla devices & outlets added; one suite converted into two parts to allow for future expansion. n/a maher ordinance

Open the permit page

$2,500
Oct 20, 2015Completed
final sign-off Jul 2016
345 Spear StAcg Construction Incti_ suite 120 and 180: t.i. demo extg non-bearing walls, toilet and millwork, construct new walls for lobby, offices copy area and toilet/rest rooms, new hvac, lighting and electrical panels. n/a for maher sprinklers, fire alarm and sliding door separate permits.
Details
Permit
201510200219
Permit issued
Nov 24, 2015
Final sign-off
Jul 1, 2016

ti_ suite 120 and 180: t.i. demo extg non-bearing walls, toilet and millwork, construct new walls for lobby, offices copy area and toilet/rest rooms, new hvac, lighting and electrical panels. n/a for maher sprinklers, fire alarm and sliding door separate permits.

Open the permit page

$88,000
Oct 15, 2015Completed
final sign-off Oct 2016
345 Spear StGarnett Signs Llc7th floor: 7 evac maps. maher na
Details
Permit
201510159728
Permit issued
Oct 15, 2015
Final sign-off
Oct 24, 2016

7th floor: 7 evac maps. maher na

Open the permit page

$2,100
Oct 15, 2015Completed
final sign-off Apr 2016
345 Spear StGarnett Signs Llc2nd floor: 8 evac maps maher na
Details
Permit
201510159727
Permit issued
Oct 15, 2015
Final sign-off
Apr 6, 2016

2nd floor: 8 evac maps maher na

Open the permit page

$2,400
Sep 15, 2015Completed
final sign-off Jan 2016
345 Spear StRed Hawk Fire & Security Ca Llcadd 12 smoke detectors, 13 duct detectors, 125 spreaker strobes, 32 strobes, 1 relay. reference arch #201507020572, mep #201508063526. n/a for maher.
Details
Permit
201509156925
Permit issued
Sep 28, 2015
Final sign-off
Jan 14, 2016

add 12 smoke detectors, 13 duct detectors, 125 spreaker strobes, 32 strobes, 1 relay. reference arch #201507020572, mep #201508063526. n/a for maher.

Open the permit page

$50,000
Mar 24, 2015Never finaled
issued Mar 2015, no final
345 Spear StGarnett Signs Llcevacuation maps for 3rd floor only. n/a ordinance #155-13
Details
Permit
201503241701
Permit issued
Mar 24, 2015

evacuation maps for 3rd floor only. n/a ordinance #155-13

Open the permit page

$2,000
Sep 25, 2014Completed
final sign-off Nov 2014
345 Spear StRed Hawk Fire & Security Ca Llc3rd floor: fire alarm t.i. ref app# 201406118144 including 3 smoke detectors, 3 duct detectors, 8 relays, 6 monitor modules, 26 speaker/strobes, 4 strobes. n/a for the maher ordinance #155-13
Details
Permit
201409257269
Permit issued
Sep 25, 2014
Final sign-off
Nov 24, 2014

3rd floor: fire alarm t.i. ref app# 201406118144 including 3 smoke detectors, 3 duct detectors, 8 relays, 6 monitor modules, 26 speaker/strobes, 4 strobes. n/a for the maher ordinance #155-13

Open the permit page

$10,000
Aug 11, 2014Completed
final sign-off Sep 2014
345 Spear StBcci Construction Company1st floor: interior demolition of non structural partitions under ab-017.
Details
Permit
201408113504
Permit issued
Aug 11, 2014
Final sign-off
Sep 17, 2014

1st floor: interior demolition of non structural partitions under ab-017.

Open the permit page

$30,480
Jul 17, 2014Completed
final sign-off Jun 2016
345 Spear StBcci Construction Companyrevision appl #2014.0702.0401. including high strength screw anchors.
Details
Permit
201407171527
Permit issued
Jul 17, 2014
Final sign-off
Jun 16, 2016

revision appl #2014.0702.0401. including high strength screw anchors.

Open the permit page

$1,000
Jul 2, 2014Completed
final sign-off Jul 2016
345 Spear StBcci Construction Companybuild new mechanical shaft for 5th and 6th floor. mechanical work willbe submitted under separate permit. maher n/a.
Details
Permit
201407020401
Permit issued
Jul 2, 2014
Final sign-off
Jul 15, 2016

build new mechanical shaft for 5th and 6th floor. mechanical work willbe submitted under separate permit. maher n/a.

Open the permit page

$25,000
Mar 31, 2014Completed
final sign-off Jun 2014
345 Spear StGolden Gate Fire Protection Increlocate 4 pendent sprinklers on the 3rd fl. add 1 sprinkler. maher 155-13 not required. compliance with ordinance 155-13 not required.
Details
Permit
201403312000
Permit issued
Mar 31, 2014
Final sign-off
Jun 26, 2014

relocate 4 pendent sprinklers on the 3rd fl. add 1 sprinkler. maher 155-13 not required. compliance with ordinance 155-13 not required.

Open the permit page

$2,575
Jun 20, 2013Never finaled
issued Jun 2013, no final
345 Spear StBcci Construction Company5th fl: mech & electrical work associated with approved pa# 201306068806 including new duct, 1 new fsd & new fsd & new lighitng.
Details
Permit
201306200042
Permit issued
Jun 20, 2013

5th fl: mech & electrical work associated with approved pa# 201306068806 including new duct, 1 new fsd & new fsd & new lighitng.

Open the permit page

$80,000
Jun 14, 2013Completed
final sign-off Jun 2013
345 Spear StRed Hawk Fire & Security Ca Llcfire alarm ti on the 5th fl including 1 duct detector, 1 monitor module , 4 speaker/strobes ref ti. 201108172662, 201108243131
Details
Permit
201306149525
Permit issued
Jun 14, 2013
Final sign-off
Jun 28, 2013

fire alarm ti on the 5th fl including 1 duct detector, 1 monitor module , 4 speaker/strobes ref ti. 201108172662, 201108243131

Open the permit page

$7,000
Jun 12, 2013Completed
final sign-off Jun 2013
345 Spear StGolden Gate Fire Protection Inc5th floor-relocate 35 upright sprinkler heads
Details
Permit
201306129284
Permit issued
Jun 12, 2013
Final sign-off
Jun 25, 2013

5th floor-relocate 35 upright sprinkler heads

Open the permit page

$18,025
Jun 6, 2013Completed
final sign-off Jul 2013
345 Spear StBcci Construction Company5th floor limited construction of non-load bearing partitions & new lighting. mechanical, electrical. l.s. & sprinklers under separate permit.
Details
Permit
201306068806
Permit issued
Jun 6, 2013
Final sign-off
Jul 1, 2013

5th floor limited construction of non-load bearing partitions & new lighting. mechanical, electrical. l.s. & sprinklers under separate permit.

Open the permit page

$330,000
Jun 5, 2013Never finaled
issued Jun 2013, no final
345 Spear StBcci Construction Company5th floor improvements to restrooms in order to make them ada accessible - barrier removal.
Details
Permit
201306058782
Permit issued
Jun 6, 2013

5th floor improvements to restrooms in order to make them ada accessible - barrier removal.

Open the permit page

$6,000
Dec 12, 2012Never finaled
issued Dec 2012, no final
345 Spear Ststreet space
Details
Permit
M362128
Permit issued
Dec 12, 2012

street space

Open the permit page

Jun 26, 2012Completed
final sign-off Jul 2012
345 Spear StCapitol Electric Constsubmission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineers
Details
Permit
201206263489
Permit issued
Jun 26, 2012
Final sign-off
Jul 5, 2012

submission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineers

Open the permit page

Nov 15, 2011Completed
final sign-off Jun 2012
345 Spear StBcci Construction Companyroof pentrations for vent pirooftop -pes. 7 roof penetrationset(work is associated with 201108293459)
Details
Permit
201111158878
Permit issued
Nov 15, 2011
Final sign-off
Jun 7, 2012

roof pentrations for vent pirooftop -pes. 7 roof penetrationset(work is associated with 201108293459)

Open the permit page

$20,000
Nov 7, 2011Expired or cancelled
cancelled Jan 2026
345 Spear Stnon structural sign(painting)
Details
Permit
201111078443

non structural sign(painting)

Open the permit page

$500
Nov 7, 2011Expired or cancelled
cancelled Jan 2026
345 Spear Stto erect a projected non electrical sign.
Details
Permit
201111078441

to erect a projected non electrical sign.

Open the permit page

$500
Nov 7, 2011Expired or cancelled
cancelled Jan 2026
345 Spear Stsidewalk seating on private property and light fixtures. wiring and t-24 on approved seperate permit.
Details
Permit
201111078450

sidewalk seating on private property and light fixtures. wiring and t-24 on approved seperate permit.

Open the permit page

$500
Oct 21, 2011Completed
final sign-off Jun 2012
345 Spear StBcci Construction Companyrevision to approved permit # 2011-0817-2661 change 1 door from 3'-6" add accessory use "a" designation to work area.
Details
Permit
201110217318
Permit issued
Oct 21, 2011
Final sign-off
Jun 14, 2012

revision to approved permit # 2011-0817-2661 change 1 door from 3'-6" add accessory use "a" designation to work area.

Open the permit page

$500
Aug 29, 2011Completed
final sign-off Jan 2013
345 Spear StBcci Construction Company6th floor-interior t.i. including new drywall, ceilings, doors, frames, glazing, millwork & finishes. mechanical, electrical, lighting, sprinklers & life safety under seperate permit
Details
Permit
201108293459
Permit issued
Sep 7, 2011
Final sign-off
Jan 2, 2013

6th floor-interior t.i. including new drywall, ceilings, doors, frames, glazing, millwork & finishes. mechanical, electrical, lighting, sprinklers & life safety under seperate permit

Open the permit page

$1,376,075
Aug 26, 2011Completed
final sign-off May 2012
345 Spear StBcci Construction Companymech and elec. work associated with pa# 2011.08.17.2661
Details
Permit
201108263385
Permit issued
Aug 26, 2011
Final sign-off
May 1, 2012

mech and elec. work associated with pa# 2011.08.17.2661

Open the permit page

$250,000
Aug 24, 2011Completed
final sign-off Mar 2013
345 Spear StBcci Construction Companymech and electrical work associated with approved pa# 2011.08.17.2662
Details
Permit
201108243131
Permit issued
Aug 26, 2011
Final sign-off
Mar 7, 2013

mech and electrical work associated with approved pa# 2011.08.17.2662

Open the permit page

$250,000
Aug 17, 2011Completed
final sign-off Jan 2013
345 Spear StBcci Construction Companyoffice ti on the 5th floor incl. demo, drywall,ceilings, doors, millwork and finishes
Details
Permit
201108172662
Permit issued
Aug 19, 2011
Final sign-off
Jan 2, 2013

office ti on the 5th floor incl. demo, drywall,ceilings, doors, millwork and finishes

Open the permit page

$855,600
Aug 17, 2011Completed
final sign-off Jul 2012
345 Spear StBcci Construction Companyinterior alteration for offices on floor 6 including drywall, ceilings, demo, doors, millwork and finishes. mep under separate permit.
Details
Permit
201108172661
Permit issued
Aug 19, 2011
Final sign-off
Jul 19, 2012

interior alteration for offices on floor 6 including drywall, ceilings, demo, doors, millwork and finishes. mep under separate permit.

Open the permit page

$1,815,580
Aug 16, 2011Completed
final sign-off Sep 2011
345 Spear StRed Hawk Fire & Security Ca Llc1st floor suite 125 fire alarm ti - 3 speaker strobes, 2 duct detectors, 2 control relays.
Details
Permit
201108162508
Permit issued
Aug 16, 2011
Final sign-off
Sep 22, 2011

1st floor suite 125 fire alarm ti - 3 speaker strobes, 2 duct detectors, 2 control relays.

Open the permit page

$6,000
Aug 9, 2011Never finaled
issued Aug 2011, no final
345 Spear StGolden Gate Fire Protection Incfire sprinker upgrade; relocate 15 pendant sprinkler to uprights sprinklers. relocate 2-pendant and relocate 1-sprinkler, add 1-sprinkler.
Details
Permit
201108092082
Permit issued
Aug 10, 2011

fire sprinker upgrade; relocate 15 pendant sprinkler to uprights sprinklers. relocate 2-pendant and relocate 1-sprinkler, add 1-sprinkler.

Open the permit page

$9,000
Jul 12, 2011Completed
final sign-off Nov 2011
345 Spear StTerra Nova Industriesunit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permits
Details
Permit
201107120047
Permit issued
Sep 19, 2011
Final sign-off
Nov 28, 2011

unit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permits

Open the permit page

$200,000
Jun 8, 2011Completed
final sign-off Oct 2011
345 Spear StBcci Construction Companypre-construction demolition under ab017 on the 5th and 6th floors, including demo of non structural partitions, outlets, finishes, ceiling,plmg and lighting. no fire rated construction to be removed.
Details
Permit
201106087659
Permit issued
Jun 8, 2011
Final sign-off
Oct 14, 2011

pre-construction demolition under ab017 on the 5th and 6th floors, including demo of non structural partitions, outlets, finishes, ceiling,plmg and lighting. no fire rated construction to be removed.

Open the permit page

$185,000
Nov 9, 2010Completed
final sign-off Nov 2010
345 Spear Stti upgrade on existing fire sprinkler system on the 4th floor. add 4 pendents and relocate 2 pendents
Details
Permit
201011094615
Permit issued
Nov 9, 2010
Final sign-off
Nov 30, 2010

ti upgrade on existing fire sprinkler system on the 4th floor. add 4 pendents and relocate 2 pendents

Open the permit page

$2,000
Apr 23, 2010Never finaled
issued Apr 2010, no final
345 Spear StSkyline Constructionprovide lighting for 7th. flr. roof deck; 2-flood lights, overide switch, exit lights, door bell push button. arch.#201004079831.
Details
Permit
201004230938
Permit issued
Apr 23, 2010

provide lighting for 7th. flr. roof deck; 2-flood lights, overide switch, exit lights, door bell push button. arch.#201004079831.

Open the permit page

$8,000
Feb 24, 2010Never finaled
issued Feb 2010, no final
345 Spear StCapitol Electric Constinstall 1-smoke detector, 1-speaker/strobe, 1-control relay. 7th floor
Details
Permit
201002247060
Permit issued
Feb 24, 2010

install 1-smoke detector, 1-speaker/strobe, 1-control relay. 7th floor

Open the permit page

$1,500
Mar 10, 2009Completed
final sign-off Apr 2009
345 Spear StQ Builders Inc.4th floor-install new door at (e) lunch room, build new non-rated gyp board partition to support new door
Details
Permit
200903103710
Permit issued
Mar 17, 2009
Final sign-off
Apr 8, 2009

4th floor-install new door at (e) lunch room, build new non-rated gyp board partition to support new door

Open the permit page

$1,900
Mar 5, 2009Completed
final sign-off Mar 2009
345 Spear StSkyline Constructioninstall new door at existing lunch room. build new-non rated partition to support new door.
Details
Permit
200903053435
Permit issued
Mar 5, 2009
Final sign-off
Mar 30, 2009

install new door at existing lunch room. build new-non rated partition to support new door.

Open the permit page

$1,900
Jan 13, 2009Never finaled
issued Jan 2009, no final
345 Spear Ststreet space permit. renewal 1174015.
Details
Permit
M147204
Permit issued
Jan 13, 2009

street space permit. renewal 1174015.

Open the permit page

Dec 17, 2008Expired or cancelled
cancelled Jan 2026
345 Spear St5th floor ti: non structural partion and ceilings, mechanical, electrical, and finishes. life safety/sprinklers separate permit
Details
Permit
200812178707

5th floor ti: non structural partion and ceilings, mechanical, electrical, and finishes. life safety/sprinklers separate permit

Open the permit page

$85,000
Dec 14, 2007Completed
final sign-off May 2008
345 Spear StDiversified Fire Products3rd fl - fire alarm for google. (25) monitor modules, (6) control relays, (5) pull stations, (40) smoke detectors, (12) duct detectors, (4) power supplies, (17) speakers, (7) strobes, (111) speaker/strobes, (4) wp speaker/strobes, (7) door holds (5) fsd's.
Details
Permit
200712140447
Permit issued
Feb 15, 2008
Final sign-off
May 6, 2008

3rd fl - fire alarm for google. (25) monitor modules, (6) control relays, (5) pull stations, (40) smoke detectors, (12) duct detectors, (4) power supplies, (17) speakers, (7) strobes, (111) speaker/strobes, (4) wp speaker/strobes, (7) door holds (5) fsd's.

Open the permit page

$162,995
Dec 14, 2007Completed
final sign-off Apr 2008
345 Spear StDiversified Fire Products2nd fl - fire alarm for google. (28) monitor modules, (5) control relays, (5) pull stations, (44) smoke detectors, (15) duct detectors, (4) power supplies, (14) speakers, (9) strobes, (125) speaker/strobes, and (4) wp speaker/strobes, (3) fsd's.
Details
Permit
200712140442
Permit issued
Feb 15, 2008
Final sign-off
Apr 9, 2008

2nd fl - fire alarm for google. (28) monitor modules, (5) control relays, (5) pull stations, (44) smoke detectors, (15) duct detectors, (4) power supplies, (14) speakers, (9) strobes, (125) speaker/strobes, and (4) wp speaker/strobes, (3) fsd's.

Open the permit page

$162,995
Oct 16, 2006Expired or cancelled
expired Jan 2008
345 Spear Stremodel (e) exercise room. no change in occupancy use or floor area. new ceiling grid. lighting and finishes.
Details
Permit
200610165164
Permit issued
Oct 16, 2006

remodel (e) exercise room. no change in occupancy use or floor area. new ceiling grid. lighting and finishes.

Open the permit page

$30,000
Sep 22, 2005Completed
final sign-off Sep 2006
345 Spear StSkyline Constructionoti-2 6/f el, me,ls.
Details
Permit
200509223550
Permit issued
Dec 23, 2005
Final sign-off
Sep 12, 2006

oti-2 6/f el, me,ls.

Open the permit page

$150,000
Aug 22, 2005Never finaled
issued Aug 2005, no final
345 Spear Ststreet space
Details
Permit
M33943
Permit issued
Aug 22, 2005

street space

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Bcci Construction Company (33), Devcon Construction (17), Red Hawk Fire & Security Ca Llc (10), Source Planning And Construction Inc (7), Anderson, Rowe & Buckley, Inc. (5), Garnett Signs Llc (5), Sc Builders, Inc (5), Sabah International Incorporated (4), Skyline Construction (4), Capitol Electric Const (3), Golden Gate Fire Protection Inc (3), Acg Construction Inc (2), B N Builders Inc (2), Diversified Fire Products (2), Englewood Construction Inc (2), Martin Sign Co Inc. (2), Ace Fire Equipment&Serv., Artsigns, Ayoob & Peery Plumbing Co Inc, Everon Llc, Novo Construction Inc, Pribuss Engineering Inc, Q Builders Inc., Terra Nova Industries
Architects
Anne Torne (15), Daniel Pamperin (7), Stanley H Lew (5), Luda Hoe (3), Marc Penninger (2), Marc Pfenninger (2), Michelle Jones (2), Anderson & Rowe & Buckey, Bert Deviterbo, David Goldberg, George Soskin, Michael Castro, Scott E Clement, Shih-Jang Sung
Engineers
Joshua Mcmmahan (5), Jevin Almazan (4), Erica Hayes (3), Joshua Mcmahan (3), Madison Ryutaro Roberts (3), Jesus Esqueda (2), Christopher Jordan Malabed, Dean Macy, Glenn Friedman, Henry Holbrook Hyde Iii, Laura Weyl, Laurie Johnston, Laurie Johnston, Shawn Vessels, Stephen Shaffer, Walter Chang, Zeyn Uzman
Authorized agents
Reema Farhat
Designers
Sabah International Inc. (2)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.