Block 3744, lot 002
345 Spear St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 110,161 sq ft
- Zoning
- M1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
125 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress issued Nov 2026 | 345 Spear St | Sabah International Incorporated | 5th floor:to add a 2-way communication call boxes to an existing 2-way emergency communication per cbs section 1010.2.12.1 ref #202608056109Details
5th floor:to add a 2-way communication call boxes to an existing 2-way emergency communication per cbs section 1010.2.12.1 ref #202608056109 | $8,000 |
| Oct 21, 2026 | In progress filed Oct 2026, not yet issued | 345 Spear St | Source Planning And Construction Inc | 1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldgDetails
1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg | $292,338 |
| Sep 10, 2026 | In progress issued Sep 2026 | 345 Spear St | Novo Construction Inc | ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.Details
ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures. | $22,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power.Details
revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power. | |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | B N Builders Inc | ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep)Details
ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep) | $100,000 |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | Sc Builders, Inc | 4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers.Details
4th fl: deferred mep under 202605141302. compliant lighting and controls, demo and replace existing ductwork and diffusers. | $40,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 345 Spear St | Sc Builders, Inc | revision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms.Details
revision to pa# 202605141302 4/f: minor permit revision for (3) (e) rooms converted to 4 meeting rooms and updates to elevator lobby + restrooms. | $120,000 |
| Aug 5, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permitDetails
5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permit | $70,000 |
| Jul 30, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions includedDetails
5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included | $160,000 |
| Jul 23, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357Details
ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357 | $300,000 |
| Jul 21, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be servicedDetails
1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced | $350,000 |
| Jul 21, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591Details
mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591 | $350,000 |
| Jul 17, 2026 | Completed final sign-off Aug 2026 | 345 Spear St | B N Builders Inc | demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per sfbc ab-017 accessible compliance documentation will be provided wit ti appliction under separate permit.Details
demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per sfbc ab-017 accessible compliance documentation will be provided wit ti appliction under separate permit. | $39,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep.Details
2nd & 4th floors: revision to pa#202606173460, (6) new phone booths & (4) existing phone booths to be brought up to code on level2. (2) new phone booths on level 4 with structural drawings and calcs for anchoring. no mep. | $30,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 345 Spear St | Sc Builders, Inc | permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scopeDetails
permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scope | $20,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 345 Spear St | Devcon Construction | revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting.Details
revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting. | |
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 345 Spear St | Source Planning And Construction Inc | 2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep workDetails
2nd & 4th floors - installation of phone furniture booths, 7 on level 2 and 2 on level 4. structural plans and clacs for anchoring included. no mep work | $30,000 |
| Jun 2, 2026 | In progress issued Jul 2026 | 345 Spear St | Devcon Construction | ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit.Details
ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit. | $300,000 |
| May 21, 2026 | In progress issued Nov 2026 | 345 Spear St | Sc Builders, Inc | level 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain.Details
level 4 - t.i. at east side of the 4th floor consisting of upgrades to an (e) pantry. minor alterations to pantry to include changes to finishes, millwork, equip, doors, lighting & plumbing fixtures. (e) walls & clg to remain. | $90,000 |
| May 14, 2026 | In progress issued May 2026 | 345 Spear St | Sc Builders, Inc | level 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms.Details
level 4 - t.i. improvement at east side of the 4th flr, consisting of upgrades to existing office space, elevator lobby and restrooms. | $150,000 |
| Mar 27, 2026 | In progress issued Apr 2026 | 345 Spear St | Devcon Construction | 5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms.Details
5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms. | |
| Mar 24, 2026 | In progress issued May 2026 | 345 Spear St | Devcon Construction | 4-5/fl- ti includes the installation of (n) comunicationg stairDetails
4-5/fl- ti includes the installation of (n) comunicationg stair | $250,000 |
| Feb 24, 2026 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | to obtain final inspection for work approved under pa # 202412116597. all work is complete.Details
to obtain final inspection for work approved under pa # 202412116597. all work is complete. | |
| Dec 11, 2025 | In progress issued Jul 2026 | 345 Spear St | Devcon Construction | 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.Details
1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. | $367,000 |
| Dec 11, 2025 | In progress issued Mar 2026 | 345 Spear St | Devcon Construction | 5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) systemDetails
5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) system | $300,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardwareDetails
1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware | $240,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardwareDetails
tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware | $350,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 345 Spear St | Devcon Construction | 5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) systemDetails
5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system | $200,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 345 Spear St | Devcon Construction | 1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and caseworkDetails
1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework | $100,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 345 Spear St | Devcon Construction | 5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & caseworkDetails
5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework | $75,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | 6th fl- architectural only for 3 new phone booth units in office.Details
6th fl- architectural only for 3 new phone booth units in office. | $20,000 |
| May 1, 2025 | Completed final sign-off May 2025 | 345 Spear St | Sabah International Incorporated | 4/f: provide modification of (e) fire alarm system - add 4 led spekaer/strobe - ceiling mounted. ref pa 202504235054Details
4/f: provide modification of (e) fire alarm system - add 4 led spekaer/strobe - ceiling mounted. ref pa 202504235054 | $21,172 |
| Apr 23, 2025 | Completed final sign-off Mar 2026 | 345 Spear St | Source Planning And Construction Inc | 4th fl: installation of phone furniture booths; 4 on level 4. structural plans and calls for anchoring included. no mep work within scopeDetails
4th fl: installation of phone furniture booths; 4 on level 4. structural plans and calls for anchoring included. no mep work within scope | $20,000 |
| Apr 22, 2025 | Completed final sign-off May 2025 | 345 Spear St | Sabah International Incorporated | level 3,5,7: provide a modification of the existing fire alarm system. new private phone booths are being installed on the 3rd, 5th, and 7th floor. add 9 led speaker/strobes. ref permit 202412116597Details
level 3,5,7: provide a modification of the existing fire alarm system. new private phone booths are being installed on the 3rd, 5th, and 7th floor. add 9 led speaker/strobes. ref permit 202412116597 | $21,172 |
| Dec 11, 2024 | Expired or cancelled expired Mar 2026 | 345 Spear St | Source Planning And Construction Inc | floors 3,5,7: installation of phone furniture booths; 3 on level 3, 2 on level 5 and 4 on level 7. structural plans and calcs for anchoring included. no mep work within space.Details
floors 3,5,7: installation of phone furniture booths; 3 on level 3, 2 on level 5 and 4 on level 7. structural plans and calcs for anchoring included. no mep work within space. | $20,000 |
| Jan 16, 2024 | Completed final sign-off Jun 2024 | 345 Spear St | Bcci Construction Company | 7/f: minor reconfiguration of (e) planters and installation of a shade pergola.Details
7/f: minor reconfiguration of (e) planters and installation of a shade pergola. | $90,000 |
| Dec 15, 2023 | Completed final sign-off Dec 2023 | 345 Spear St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only (as build) fire permit 2023-1012-8512. add 7 sprinkler head under hvac ductsDetails
fire sprinkler only (as build) fire permit 2023-1012-8512. add 7 sprinkler head under hvac ducts | |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.Details
4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only. | |
| Oct 19, 2023 | Completed final sign-off Jun 2024 | 345 Spear St | Bcci Construction Company | the area of work is limited to an approx area of 2800 sf. this scope of work includes non-bearing partitions, and security doors.Details
the area of work is limited to an approx area of 2800 sf. this scope of work includes non-bearing partitions, and security doors. | $90,000 |
| Oct 18, 2023 | Completed final sign-off Feb 2024 | 345 Spear St | Sabah International Incorporated | fire alarm ti on 4th fl and for a new two-story 2-way communication system. under the scope of work emergency call station will be installed in the 4th floor west peassenger elevator lobby. ref bpa# 202308164561.Details
fire alarm ti on 4th fl and for a new two-story 2-way communication system. under the scope of work emergency call station will be installed in the 4th floor west peassenger elevator lobby. ref bpa# 202308164561. | $81,223 |
| Oct 12, 2023 | Never finaled issued Oct 2023, no final | 345 Spear St | Anderson, Rowe & Buckley, Inc. | 4th fl - existing fire sprinkler system - ti relocate 89 fire srpinklers ref pa 2023-0816-4561Details
4th fl - existing fire sprinkler system - ti relocate 89 fire srpinklers ref pa 2023-0816-4561 | $56,000 |
| Sep 8, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th fl: mep deferred 202211287247. revise hvac & associated ductwork configeration & layoutDetails
4th fl: mep deferred 202211287247. revise hvac & associated ductwork configeration & layout | |
| Aug 16, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.Details
4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes. | |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floorDetails
4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floor | |
| Mar 28, 2023 | Completed final sign-off Oct 2023 | 345 Spear St | Capitol Electric Const | b1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers.Details
b1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers. | $30,000 |
| Feb 21, 2023 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247.Details
4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247. | $750,000 |
| Feb 14, 2023 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | Bcci Construction Company | 4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinklerDetails
4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler | $185,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferredDetails
4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferred | $5,000,000 |
| Nov 28, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred.Details
4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred. | $2,100,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161Details
4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161 | $50,000 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 345 Spear St | Ayoob & Peery Plumbing Co Inc | suite #121: furnish and install new plumbing devices and all necessary connections. (1) tank type hot water heater under separate permit.Details
suite #121: furnish and install new plumbing devices and all necessary connections. (1) tank type hot water heater under separate permit. | $61,930 |
| May 23, 2022 | Completed final sign-off Aug 2022 | 345 Spear St | Martin Sign Co Inc. | installation of interior & exterior non-electric projecting double faced wall signDetails
installation of interior & exterior non-electric projecting double faced wall sign | $600 |
| May 23, 2022 | Completed final sign-off Aug 2022 | 345 Spear St | Martin Sign Co Inc. | fabrication and installation of custom painted slide through metal frame interior and exterior google sign (projecting, double faced)Details
fabrication and installation of custom painted slide through metal frame interior and exterior google sign (projecting, double faced) | $600 |
| Apr 9, 2021 | Completed final sign-off Nov 2021 | 345 Spear St | Everon Llc | fire alarm t>i. - 3rd floor. add (1) speaker strobe & replace (1). 6th floor: add (1) speaker strobe. ref # 2021-0208-4268 & 2021-0121-2986Details
fire alarm t>i. - 3rd floor. add (1) speaker strobe & replace (1). 6th floor: add (1) speaker strobe. ref # 2021-0208-4268 & 2021-0121-2986 | $2,000 |
| Jan 20, 2021 | Completed final sign-off Dec 2021 | 345 Spear St | Skyline Construction | 3/f: gender neutral restroom in (e) tenant space. interior demo of non structural partition. mep under separate permit. ref pa# 201403070168Details
3/f: gender neutral restroom in (e) tenant space. interior demo of non structural partition. mep under separate permit. ref pa# 201403070168 | $220,348 |
| Nov 13, 2020 | Completed final sign-off Sep 2021 | 345 Spear St | Bcci Construction Company | 1st fl- new wall and door inside existing lobby. ref pa# 201912230295Details
1st fl- new wall and door inside existing lobby. ref pa# 201912230295 | $45,000 |
| Sep 10, 2020 | Completed final sign-off Nov 2020 | 345 Spear St | Pribuss Engineering Inc | modify sprinkler head locations to accommodat new ceiling and partition layout for new office space on the 1st floor. total sprinklers for this project is 34. ref pa# 202006269187Details
modify sprinkler head locations to accommodat new ceiling and partition layout for new office space on the 1st floor. total sprinklers for this project is 34. ref pa# 202006269187 | $17,476 |
| Jan 3, 2020 | Completed final sign-off Sep 2021 | 345 Spear St | Bcci Construction Company | ref pa# 201912230295; 1st fl. elctrical only. permit to support appoved arch set for security turnstiles, new power and communication connections added//vif complaince with cfc 1010.3.2 -this section speaks to turnstiles and that they shall remain open upon fire alarm acuationDetails
ref pa# 201912230295; 1st fl. elctrical only. permit to support appoved arch set for security turnstiles, new power and communication connections added//vif complaince with cfc 1010.3.2 -this section speaks to turnstiles and that they shall remain open upon fire alarm acuation | $20,000 |
| Dec 23, 2019 | Completed final sign-off Sep 2021 | 345 Spear St | Bcci Construction Company | bcci to improve the security improvements in the lobby at 345 spear street.Details
bcci to improve the security improvements in the lobby at 345 spear street. | $75,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 345 Spear St | Ace Fire Equipment&Serv. | 3/f add nozzle protection to ansul system. ref app#201707121626. maher n/a.Details
3/f add nozzle protection to ansul system. ref app#201707121626. maher n/a. | |
| May 6, 2019 | Never finaled issued May 2019, no final | 345 Spear St | Bcci Construction Company | ref pa# 201903114864; mep for catenna pantry of 6th fl. grease duct work on 5th 6th & 7th fl. 1 type 1 hood & 1 fsd n/a maherDetails
ref pa# 201903114864; mep for catenna pantry of 6th fl. grease duct work on 5th 6th & 7th fl. 1 type 1 hood & 1 fsd n/a maher | $245,000 |
| Mar 11, 2019 | Never finaled issued Apr 2019, no final | 345 Spear St | Bcci Construction Company | 6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.Details
6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher. | $2,800,000 |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 345 Spear St | Garnett Signs Llc | install 1 evac sign | $600 |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 345 Spear St | installation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge.Details
installation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge. | $80,000 | |
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 345 Spear St | Bcci Construction Company | 6th flr - fire assembly stamp for assembly area permitted under 201707263017Details
6th flr - fire assembly stamp for assembly area permitted under 201707263017 | |
| Apr 30, 2018 | Completed final sign-off Jun 2018 | 345 Spear St | Red Hawk Fire & Security Ca Llc | fire alram - ti - add 2 smk det for door holder (e) layoutDetails
fire alram - ti - add 2 smk det for door holder (e) layout | $1,200 |
| Jan 31, 2018 | Completed final sign-off Nov 2018 | 345 Spear St | Bcci Construction Company | 1st floor - add 1 fire rated door in passagewayDetails
1st floor - add 1 fire rated door in passageway | $5,000 |
| Dec 7, 2017 | Completed final sign-off Jan 2018 | 345 Spear St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st fl - add 10 speaker strobes, 7 smoke detectors & heat detectors. ref 2017-0919-8995. maher n/aDetails
fire alarm ti on 1st fl - add 10 speaker strobes, 7 smoke detectors & heat detectors. ref 2017-0919-8995. maher n/a | $11,000 |
| Nov 14, 2017 | Completed final sign-off Dec 2017 | 345 Spear St | Anderson, Rowe & Buckley, Inc. | ground floor fire sprinkler per t.i. - relocate 24 heads, added 3 heads, plugged 10 heads. total fire sprinklers for project: 27. ref pa #201709198995. n/a maher ordinanceDetails
ground floor fire sprinkler per t.i. - relocate 24 heads, added 3 heads, plugged 10 heads. total fire sprinklers for project: 27. ref pa #201709198995. n/a maher ordinance | $13,500 |
| Oct 23, 2017 | Completed final sign-off Mar 2018 | 345 Spear St | Anderson, Rowe & Buckley, Inc. | 6/f: relocate 17 sprinklers, add 1 sprinkler to (e) fire sprinkler system. ref t.i. pa#201707263017. maher n/a.Details
6/f: relocate 17 sprinklers, add 1 sprinkler to (e) fire sprinkler system. ref t.i. pa#201707263017. maher n/a. | $4,000 |
| Oct 20, 2017 | Never finaled issued Oct 2017, no final | 345 Spear St | Englewood Construction Inc | interior demo of (e) nonbearing walls, space to remain vacant per ab-017. haher ord 155-13 na.Details
interior demo of (e) nonbearing walls, space to remain vacant per ab-017. haher ord 155-13 na. | $15,000 |
| Sep 19, 2017 | Completed final sign-off Jan 2018 | 345 Spear St | Englewood Construction Inc | ground fl: vacant office space to become daycare/child care. interior dmeolition of existing non-bearing walls, mechanical, electrical, plumbing to facilitate new design of classrooms & support spaces. maher naDetails
ground fl: vacant office space to become daycare/child care. interior dmeolition of existing non-bearing walls, mechanical, electrical, plumbing to facilitate new design of classrooms & support spaces. maher na | $200,000 |
| Sep 11, 2017 | Completed final sign-off Sep 2017 | 345 Spear St | Red Hawk Fire & Security Ca Llc | 5/f- fire alarm as built drawing for pa#201612195360. n/a ordinance #155-13Details
5/f- fire alarm as built drawing for pa#201612195360. n/a ordinance #155-13 | |
| May 12, 2017 | Never finaled issued Jul 2017, no final | 345 Spear St | Bcci Construction Company | 6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459Details
6th floor: renovations to the extg commercial kitchen, new dish room and food service areas, and modifications to extg mechanical, electrical and plumbing system. n/a maher refpa#201105213459 | $726,000 |
| Dec 19, 2016 | Completed final sign-off Sep 2017 | 345 Spear St | Red Hawk Fire & Security Ca Llc | 5/f: fire alarm t.i. on 5/f music cafe: add 18 speaker strobes, i relay for music shutdown, 1 duct dector for heat pump. ref pa#21512285994.Details
5/f: fire alarm t.i. on 5/f music cafe: add 18 speaker strobes, i relay for music shutdown, 1 duct dector for heat pump. ref pa#21512285994. | $11,000 |
| Dec 19, 2016 | Completed final sign-off Mar 2017 | 345 Spear St | Red Hawk Fire & Security Ca Llc | 4/f: fire alarm t.i. on 4/f: add 18 speaker strobes, ref pa#201603212643.Details
4/f: fire alarm t.i. on 4/f: add 18 speaker strobes, ref pa#201603212643. | $9,500 |
| Aug 4, 2016 | Completed final sign-off Oct 2016 | 345 Spear St | Garnett Signs Llc | 7th floor: (1) evacuation map. n/a ordinance #155-13Details
7th floor: (1) evacuation map. n/a ordinance #155-13 | $406 |
| Jul 7, 2016 | Completed final sign-off Sep 2016 | 345 Spear St | to obtain final inspection for work approved under pa# 2014 0805 3067 & 2014 0702 0401 all work is doneDetails
to obtain final inspection for work approved under pa# 2014 0805 3067 & 2014 0702 0401 all work is done | ||
| May 17, 2016 | Never finaled issued Feb 2017, no final | 345 Spear St | Artsigns | install ground non-electric double faced sign "google". n/a for maher ordinance no 155-13.Details
install ground non-electric double faced sign "google". n/a for maher ordinance no 155-13. | $6,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 345 Spear St | Red Hawk Fire & Security Ca Llc | partial 1st floor fire alarm - add 2 duct detectors, 2 relays & modules, 8 speakers/strobe, 2 strobes. ref pa #201510200219. n/a maher ordinanceDetails
partial 1st floor fire alarm - add 2 duct detectors, 2 relays & modules, 8 speakers/strobe, 2 strobes. ref pa #201510200219. n/a maher ordinance | $10,000 |
| Dec 11, 2015 | Completed final sign-off Feb 2016 | 345 Spear St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti relocate 14, plug 3, total 14Details
fire sprinkler ti relocate 14, plug 3, total 14 | $7,500 |
| Dec 10, 2015 | Completed final sign-off Jun 2016 | 345 Spear St | Acg Construction Inc | revision to pa #201510200219 - differed submittal for the sliding doors @ entry as per fire dpet. reduce size of heat pump & revise manufacturer, addiitonal electricla devices & outlets added; one suite converted into two parts to allow for future expansion. n/a maher ordinanceDetails
revision to pa #201510200219 - differed submittal for the sliding doors @ entry as per fire dpet. reduce size of heat pump & revise manufacturer, addiitonal electricla devices & outlets added; one suite converted into two parts to allow for future expansion. n/a maher ordinance | $2,500 |
| Oct 20, 2015 | Completed final sign-off Jul 2016 | 345 Spear St | Acg Construction Inc | ti_ suite 120 and 180: t.i. demo extg non-bearing walls, toilet and millwork, construct new walls for lobby, offices copy area and toilet/rest rooms, new hvac, lighting and electrical panels. n/a for maher sprinklers, fire alarm and sliding door separate permits.Details
ti_ suite 120 and 180: t.i. demo extg non-bearing walls, toilet and millwork, construct new walls for lobby, offices copy area and toilet/rest rooms, new hvac, lighting and electrical panels. n/a for maher sprinklers, fire alarm and sliding door separate permits. | $88,000 |
| Oct 15, 2015 | Completed final sign-off Oct 2016 | 345 Spear St | Garnett Signs Llc | 7th floor: 7 evac maps. maher naDetails
7th floor: 7 evac maps. maher na | $2,100 |
| Oct 15, 2015 | Completed final sign-off Apr 2016 | 345 Spear St | Garnett Signs Llc | 2nd floor: 8 evac maps maher naDetails
2nd floor: 8 evac maps maher na | $2,400 |
| Sep 15, 2015 | Completed final sign-off Jan 2016 | 345 Spear St | Red Hawk Fire & Security Ca Llc | add 12 smoke detectors, 13 duct detectors, 125 spreaker strobes, 32 strobes, 1 relay. reference arch #201507020572, mep #201508063526. n/a for maher.Details
add 12 smoke detectors, 13 duct detectors, 125 spreaker strobes, 32 strobes, 1 relay. reference arch #201507020572, mep #201508063526. n/a for maher. | $50,000 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 345 Spear St | Garnett Signs Llc | evacuation maps for 3rd floor only. n/a ordinance #155-13Details
evacuation maps for 3rd floor only. n/a ordinance #155-13 | $2,000 |
| Sep 25, 2014 | Completed final sign-off Nov 2014 | 345 Spear St | Red Hawk Fire & Security Ca Llc | 3rd floor: fire alarm t.i. ref app# 201406118144 including 3 smoke detectors, 3 duct detectors, 8 relays, 6 monitor modules, 26 speaker/strobes, 4 strobes. n/a for the maher ordinance #155-13Details
3rd floor: fire alarm t.i. ref app# 201406118144 including 3 smoke detectors, 3 duct detectors, 8 relays, 6 monitor modules, 26 speaker/strobes, 4 strobes. n/a for the maher ordinance #155-13 | $10,000 |
| Aug 11, 2014 | Completed final sign-off Sep 2014 | 345 Spear St | Bcci Construction Company | 1st floor: interior demolition of non structural partitions under ab-017.Details
1st floor: interior demolition of non structural partitions under ab-017. | $30,480 |
| Jul 17, 2014 | Completed final sign-off Jun 2016 | 345 Spear St | Bcci Construction Company | revision appl #2014.0702.0401. including high strength screw anchors.Details
revision appl #2014.0702.0401. including high strength screw anchors. | $1,000 |
| Jul 2, 2014 | Completed final sign-off Jul 2016 | 345 Spear St | Bcci Construction Company | build new mechanical shaft for 5th and 6th floor. mechanical work willbe submitted under separate permit. maher n/a.Details
build new mechanical shaft for 5th and 6th floor. mechanical work willbe submitted under separate permit. maher n/a. | $25,000 |
| Mar 31, 2014 | Completed final sign-off Jun 2014 | 345 Spear St | Golden Gate Fire Protection Inc | relocate 4 pendent sprinklers on the 3rd fl. add 1 sprinkler. maher 155-13 not required. compliance with ordinance 155-13 not required.Details
relocate 4 pendent sprinklers on the 3rd fl. add 1 sprinkler. maher 155-13 not required. compliance with ordinance 155-13 not required. | $2,575 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 345 Spear St | Bcci Construction Company | 5th fl: mech & electrical work associated with approved pa# 201306068806 including new duct, 1 new fsd & new fsd & new lighitng.Details
5th fl: mech & electrical work associated with approved pa# 201306068806 including new duct, 1 new fsd & new fsd & new lighitng. | $80,000 |
| Jun 14, 2013 | Completed final sign-off Jun 2013 | 345 Spear St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 5th fl including 1 duct detector, 1 monitor module , 4 speaker/strobes ref ti. 201108172662, 201108243131Details
fire alarm ti on the 5th fl including 1 duct detector, 1 monitor module , 4 speaker/strobes ref ti. 201108172662, 201108243131 | $7,000 |
| Jun 12, 2013 | Completed final sign-off Jun 2013 | 345 Spear St | Golden Gate Fire Protection Inc | 5th floor-relocate 35 upright sprinkler headsDetails
5th floor-relocate 35 upright sprinkler heads | $18,025 |
| Jun 6, 2013 | Completed final sign-off Jul 2013 | 345 Spear St | Bcci Construction Company | 5th floor limited construction of non-load bearing partitions & new lighting. mechanical, electrical. l.s. & sprinklers under separate permit.Details
5th floor limited construction of non-load bearing partitions & new lighting. mechanical, electrical. l.s. & sprinklers under separate permit. | $330,000 |
| Jun 5, 2013 | Never finaled issued Jun 2013, no final | 345 Spear St | Bcci Construction Company | 5th floor improvements to restrooms in order to make them ada accessible - barrier removal.Details
5th floor improvements to restrooms in order to make them ada accessible - barrier removal. | $6,000 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 345 Spear St | street space | ||
| Jun 26, 2012 | Completed final sign-off Jul 2012 | 345 Spear St | Capitol Electric Const | submission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineersDetails
submission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineers | |
| Nov 15, 2011 | Completed final sign-off Jun 2012 | 345 Spear St | Bcci Construction Company | roof pentrations for vent pirooftop -pes. 7 roof penetrationset(work is associated with 201108293459)Details
roof pentrations for vent pirooftop -pes. 7 roof penetrationset(work is associated with 201108293459) | $20,000 |
| Nov 7, 2011 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | non structural sign(painting) | $500 | |
| Nov 7, 2011 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | to erect a projected non electrical sign. | $500 | |
| Nov 7, 2011 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | sidewalk seating on private property and light fixtures. wiring and t-24 on approved seperate permit.Details
sidewalk seating on private property and light fixtures. wiring and t-24 on approved seperate permit. | $500 | |
| Oct 21, 2011 | Completed final sign-off Jun 2012 | 345 Spear St | Bcci Construction Company | revision to approved permit # 2011-0817-2661 change 1 door from 3'-6" add accessory use "a" designation to work area.Details
revision to approved permit # 2011-0817-2661 change 1 door from 3'-6" add accessory use "a" designation to work area. | $500 |
| Aug 29, 2011 | Completed final sign-off Jan 2013 | 345 Spear St | Bcci Construction Company | 6th floor-interior t.i. including new drywall, ceilings, doors, frames, glazing, millwork & finishes. mechanical, electrical, lighting, sprinklers & life safety under seperate permitDetails
6th floor-interior t.i. including new drywall, ceilings, doors, frames, glazing, millwork & finishes. mechanical, electrical, lighting, sprinklers & life safety under seperate permit | $1,376,075 |
| Aug 26, 2011 | Completed final sign-off May 2012 | 345 Spear St | Bcci Construction Company | mech and elec. work associated with pa# 2011.08.17.2661Details
mech and elec. work associated with pa# 2011.08.17.2661 | $250,000 |
| Aug 24, 2011 | Completed final sign-off Mar 2013 | 345 Spear St | Bcci Construction Company | mech and electrical work associated with approved pa# 2011.08.17.2662Details
mech and electrical work associated with approved pa# 2011.08.17.2662 | $250,000 |
| Aug 17, 2011 | Completed final sign-off Jan 2013 | 345 Spear St | Bcci Construction Company | office ti on the 5th floor incl. demo, drywall,ceilings, doors, millwork and finishesDetails
office ti on the 5th floor incl. demo, drywall,ceilings, doors, millwork and finishes | $855,600 |
| Aug 17, 2011 | Completed final sign-off Jul 2012 | 345 Spear St | Bcci Construction Company | interior alteration for offices on floor 6 including drywall, ceilings, demo, doors, millwork and finishes. mep under separate permit.Details
interior alteration for offices on floor 6 including drywall, ceilings, demo, doors, millwork and finishes. mep under separate permit. | $1,815,580 |
| Aug 16, 2011 | Completed final sign-off Sep 2011 | 345 Spear St | Red Hawk Fire & Security Ca Llc | 1st floor suite 125 fire alarm ti - 3 speaker strobes, 2 duct detectors, 2 control relays.Details
1st floor suite 125 fire alarm ti - 3 speaker strobes, 2 duct detectors, 2 control relays. | $6,000 |
| Aug 9, 2011 | Never finaled issued Aug 2011, no final | 345 Spear St | Golden Gate Fire Protection Inc | fire sprinker upgrade; relocate 15 pendant sprinkler to uprights sprinklers. relocate 2-pendant and relocate 1-sprinkler, add 1-sprinkler.Details
fire sprinker upgrade; relocate 15 pendant sprinkler to uprights sprinklers. relocate 2-pendant and relocate 1-sprinkler, add 1-sprinkler. | $9,000 |
| Jul 12, 2011 | Completed final sign-off Nov 2011 | 345 Spear St | Terra Nova Industries | unit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permitsDetails
unit #125: interior tenant improvements for restaurant includes partitions, finishes & kitchen equipment; sprinkler/fa under separate permits | $200,000 |
| Jun 8, 2011 | Completed final sign-off Oct 2011 | 345 Spear St | Bcci Construction Company | pre-construction demolition under ab017 on the 5th and 6th floors, including demo of non structural partitions, outlets, finishes, ceiling,plmg and lighting. no fire rated construction to be removed.Details
pre-construction demolition under ab017 on the 5th and 6th floors, including demo of non structural partitions, outlets, finishes, ceiling,plmg and lighting. no fire rated construction to be removed. | $185,000 |
| Nov 9, 2010 | Completed final sign-off Nov 2010 | 345 Spear St | ti upgrade on existing fire sprinkler system on the 4th floor. add 4 pendents and relocate 2 pendentsDetails
ti upgrade on existing fire sprinkler system on the 4th floor. add 4 pendents and relocate 2 pendents | $2,000 | |
| Apr 23, 2010 | Never finaled issued Apr 2010, no final | 345 Spear St | Skyline Construction | provide lighting for 7th. flr. roof deck; 2-flood lights, overide switch, exit lights, door bell push button. arch.#201004079831.Details
provide lighting for 7th. flr. roof deck; 2-flood lights, overide switch, exit lights, door bell push button. arch.#201004079831. | $8,000 |
| Feb 24, 2010 | Never finaled issued Feb 2010, no final | 345 Spear St | Capitol Electric Const | install 1-smoke detector, 1-speaker/strobe, 1-control relay. 7th floorDetails
install 1-smoke detector, 1-speaker/strobe, 1-control relay. 7th floor | $1,500 |
| Mar 10, 2009 | Completed final sign-off Apr 2009 | 345 Spear St | Q Builders Inc. | 4th floor-install new door at (e) lunch room, build new non-rated gyp board partition to support new doorDetails
4th floor-install new door at (e) lunch room, build new non-rated gyp board partition to support new door | $1,900 |
| Mar 5, 2009 | Completed final sign-off Mar 2009 | 345 Spear St | Skyline Construction | install new door at existing lunch room. build new-non rated partition to support new door.Details
install new door at existing lunch room. build new-non rated partition to support new door. | $1,900 |
| Jan 13, 2009 | Never finaled issued Jan 2009, no final | 345 Spear St | street space permit. renewal 1174015.Details
street space permit. renewal 1174015. | ||
| Dec 17, 2008 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | 5th floor ti: non structural partion and ceilings, mechanical, electrical, and finishes. life safety/sprinklers separate permitDetails
5th floor ti: non structural partion and ceilings, mechanical, electrical, and finishes. life safety/sprinklers separate permit | $85,000 | |
| Dec 14, 2007 | Completed final sign-off May 2008 | 345 Spear St | Diversified Fire Products | 3rd fl - fire alarm for google. (25) monitor modules, (6) control relays, (5) pull stations, (40) smoke detectors, (12) duct detectors, (4) power supplies, (17) speakers, (7) strobes, (111) speaker/strobes, (4) wp speaker/strobes, (7) door holds (5) fsd's.Details
3rd fl - fire alarm for google. (25) monitor modules, (6) control relays, (5) pull stations, (40) smoke detectors, (12) duct detectors, (4) power supplies, (17) speakers, (7) strobes, (111) speaker/strobes, (4) wp speaker/strobes, (7) door holds (5) fsd's. | $162,995 |
| Dec 14, 2007 | Completed final sign-off Apr 2008 | 345 Spear St | Diversified Fire Products | 2nd fl - fire alarm for google. (28) monitor modules, (5) control relays, (5) pull stations, (44) smoke detectors, (15) duct detectors, (4) power supplies, (14) speakers, (9) strobes, (125) speaker/strobes, and (4) wp speaker/strobes, (3) fsd's.Details
2nd fl - fire alarm for google. (28) monitor modules, (5) control relays, (5) pull stations, (44) smoke detectors, (15) duct detectors, (4) power supplies, (14) speakers, (9) strobes, (125) speaker/strobes, and (4) wp speaker/strobes, (3) fsd's. | $162,995 |
| Oct 16, 2006 | Expired or cancelled expired Jan 2008 | 345 Spear St | remodel (e) exercise room. no change in occupancy use or floor area. new ceiling grid. lighting and finishes.Details
remodel (e) exercise room. no change in occupancy use or floor area. new ceiling grid. lighting and finishes. | $30,000 | |
| Sep 22, 2005 | Completed final sign-off Sep 2006 | 345 Spear St | Skyline Construction | oti-2 6/f el, me,ls.Details
oti-2 6/f el, me,ls. | $150,000 |
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 345 Spear St | street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (33), Devcon Construction (17), Red Hawk Fire & Security Ca Llc (10), Source Planning And Construction Inc (7), Anderson, Rowe & Buckley, Inc. (5), Garnett Signs Llc (5), Sc Builders, Inc (5), Sabah International Incorporated (4), Skyline Construction (4), Capitol Electric Const (3), Golden Gate Fire Protection Inc (3), Acg Construction Inc (2), B N Builders Inc (2), Diversified Fire Products (2), Englewood Construction Inc (2), Martin Sign Co Inc. (2), Ace Fire Equipment&Serv., Artsigns, Ayoob & Peery Plumbing Co Inc, Everon Llc, Novo Construction Inc, Pribuss Engineering Inc, Q Builders Inc., Terra Nova Industries
- Architects
- Anne Torne (15), Daniel Pamperin (7), Stanley H Lew (5), Luda Hoe (3), Marc Penninger (2), Marc Pfenninger (2), Michelle Jones (2), Anderson & Rowe & Buckey, Bert Deviterbo, David Goldberg, George Soskin, Michael Castro, Scott E Clement, Shih-Jang Sung
- Engineers
- Joshua Mcmmahan (5), Jevin Almazan (4), Erica Hayes (3), Joshua Mcmahan (3), Madison Ryutaro Roberts (3), Jesus Esqueda (2), Christopher Jordan Malabed, Dean Macy, Glenn Friedman, Henry Holbrook Hyde Iii, Laura Weyl, Laurie Johnston, Laurie Johnston, Shawn Vessels, Stephen Shaffer, Walter Chang, Zeyn Uzman
- Authorized agents
- Reema Farhat
- Designers
- Sabah International Inc. (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.