Laurie Johnston
- License
- C4522
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C4522 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2019 to Jan 2024
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (2), Level 10 Construction Lp (2)
- Architects
- Robert Stuart Donaldson (2), Anne Torney, Donna K Cook
- Engineers
- Jevin Almazan (2), Josh Mcmahan (2), Zeyn Uzman
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2024 | Completed final sign-off Jun 2024 | 345 Spear St | Bcci Construction Company | 7/f: minor reconfiguration of (e) planters and installation of a shade pergola.Details
7/f: minor reconfiguration of (e) planters and installation of a shade pergola. | $90,000 |
| Nov 21, 2019 | Completed final sign-off Nov 2021 | 1 Maritime Pz | Bcci Construction Company | 2nd fl - new non-load beraing partitions, new ceilings and light fixtures, new electrical, new office doors and frames, new millwork and finishes. structural calcs and drawings includedDetails
2nd fl - new non-load beraing partitions, new ceilings and light fixtures, new electrical, new office doors and frames, new millwork and finishes. structural calcs and drawings included | $950,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sfDetails
8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sf | $4,200,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada liftDetails
7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada lift | $3,250,000 |