25 permits since 2000 (engineer on 24 permits, authorized agent-others on 1 permit): 15 completed, 6 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230Details
1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230 | $4,552,623 | |
| Jul 30, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions includedDetails
5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included | $160,000 |
| Dec 11, 2025 | In progress issued Jul 2026 | 345 Spear St | Devcon Construction | 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.Details
1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. | $367,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardwareDetails
tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware | $350,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 345 Spear St | Devcon Construction | 5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) systemDetails
5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system | $200,000 |
| Sep 10, 2025 | In progress issued Oct 2025 | 4 Embarcadero Center | Skyline Construction | 14th fl ref pa # 2025-0808-2665. mep new ducts, heating, cooling, lighting, power and plumbingDetails
14th fl ref pa # 2025-0808-2665. mep new ducts, heating, cooling, lighting, power and plumbing | $1,200,000 |
| Jun 12, 2024 | Completed final sign-off Feb 2025 | 188 The Embarcadero | Novo Construction Inc | 1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement.Details
1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement. | $500,000 |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 188 The Embarcadero | Novo Construction Inc | 5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803Details
5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803 | |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | 2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071.Details
2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071. | $125,000 |
| Feb 21, 2023 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247.Details
4/f: west side, mep system to support approved arch t.i. ref bpa#202211287247. | $750,000 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Jun 2, 2022 | Completed final sign-off Nov 2022 | 300 Clay St | Bcci Construction Company | 15th fl: revision to pa# 201912230299. addition of non-structural partitions and minor door modifications.Details
15th fl: revision to pa# 201912230299. addition of non-structural partitions and minor door modifications. | $20,000 |
| May 17, 2022 | Completed final sign-off Nov 2022 | 300 Clay St | Bcci Construction Company | 16th fl: revision to pa# 201912230299. addition of non-structural partition and minor door modifications. mep included.Details
16th fl: revision to pa# 201912230299. addition of non-structural partition and minor door modifications. mep included. | $450,000 |
| Apr 29, 2022 | Completed final sign-off Sep 2024 | 50 Beale St | Field Construction Inc. | interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical.Details
interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical. | $391,000 |
| Jan 12, 2022 | Completed final sign-off Aug 2022 | 4 Embarcadero Center | Gci, Inc | 12th fl: interior t.i. upgraded office area including restrooms & mep.Details
12th fl: interior t.i. upgraded office area including restrooms & mep. | $2,000,000 |
| Jun 30, 2021 | Never finaled issued Jul 2021, no final | 875 Howard St | Novo Construction Inc | 5th fl: ti to (e) tenant space, mechanical and lighting upgrades restroom finish upgrades, addition of single toilet room.Details
5th fl: ti to (e) tenant space, mechanical and lighting upgrades restroom finish upgrades, addition of single toilet room. | $150,000 |
| Mar 23, 2021 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling addition of power for misc av equipment in and above ceilingDetails
11th floor: revision to pa# 201909262834: addition of a dph compliant ceiling in "kitchen sync" over the student and teacher cooking stations, revised lighting in accordance to the (n) ceiling addition of power for misc av equipment in and above ceiling | |
| Feb 25, 2021 | Never finaled issued May 2021, no final | 199 Fremont St | Skyline Construction | addition of new security doors and convert existing rooms into idf to mdf rooms. minor interior demolition of non-structural elements.Details
addition of new security doors and convert existing rooms into idf to mdf rooms. minor interior demolition of non-structural elements. | $1,000,000 |
| Feb 3, 2021 | Never finaled issued Apr 2021, no final | 40 Jessie St | Skyline Construction | level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included.Details
level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included. | $800,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 211 Main St | Deb Construction Llc | new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with newDetails
new shower room, all gender restrooms & locker room at main building lobby, security desk will be extended and the atm will be replaced with new | $465,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sfDetails
8th fl - small conference rooms & open workstations and associated amenities plus supporting mep work. total 33000 sf | $4,200,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 1 Market St | Level 10 Construction Lp | 7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada liftDetails
7th fl - partial ti (approx 26000 sf). scope to include small meeting rooms & open work stations & associated amenitites. includes mep. minor structural work for ada lift | $3,250,000 |
| Mar 8, 2012 | Never finaled issued Mar 2012, no final | 1 Market St | Gci, Inc | 6th floor - mechanical & electrical work for tenant improvement. ref arch pa #2012.02.15.9229.Details
6th floor - mechanical & electrical work for tenant improvement. ref arch pa #2012.02.15.9229. | $400,000 |
| Mar 15, 2011 | Completed final sign-off Jul 2011 | 601 Montgomery St | Rossi Builders Inc. | office ti on the 7th floor, suite # 777. demolish (e) offices and build out new officesDetails
office ti on the 7th floor, suite # 777. demolish (e) offices and build out new offices | $97,150 |
| Jan 7, 2009 | Completed final sign-off Apr 2009 | 50 Beale St | at basement: new lighting and power & signal outlets at scc room. technology room will have equipment rack, ups and power distribution. new hvac in scc room.Details
at basement: new lighting and power & signal outlets at scc room. technology room will have equipment rack, ups and power distribution. new hvac in scc room. | $50,000 |