Block 3744, lot 005

2 Harrison St

City’s use
Commercial Office
Built
1925
Stories
7
Rooms
14 bathrooms
Building
232,922 sq ft
Lot
41,088 sq ft
Zoning
M1
Construction type
B

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
2 Harrison StSabah International Incorporatedmodification of the existing 2 way communication system shall include: addition of new call box in the elevator lobby of level 2,3, and 5
Details
Permit
202611100585

modification of the existing 2 way communication system shall include: addition of new call box in the elevator lobby of level 2,3, and 5

Open the permit page

$7,000
Oct 6, 2026In progress
filed Oct 2026, not yet issued
2 Harrison StSc Builders, Inc5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes.
Details
Permit
202610069092

5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes.

Open the permit page

$22,000
Sep 9, 2026In progress
filed Sep 2026, not yet issued
2 Harrison St1st floor: partial ground floor t.i. selective non-structural demolition. construction of open office, meeting rooms, restroom, and employee break room/pantry, and associated mep
Details
Permit
202609097832

1st floor: partial ground floor t.i. selective non-structural demolition. construction of open office, meeting rooms, restroom, and employee break room/pantry, and associated mep

Open the permit page

$2,283,427
Sep 9, 2026In progress
filed Sep 2026, not yet issued
2 Harrison St1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230
Details
Permit
202609097839

1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230

Open the permit page

$4,552,623
Sep 9, 2026In progress
issued Nov 2026
2 Harrison StB N Builders Incnew grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen equipment is part of separate permit. accessibility deferred due to hvac work only.
Details
Permit
202609097834
Permit issued
Nov 5, 2026

new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen equipment is part of separate permit. accessibility deferred due to hvac work only.

Open the permit page

$44,730
Sep 4, 2026In progress
filed Sep 2026, not yet issued
2 Harrison StSc Builders, Inc2/f: replacement of (4) water source heat pump
Details
Permit
202609047701

2/f: replacement of (4) water source heat pump

Open the permit page

$30,000
Aug 31, 2026In progress
issued Sep 2026
2 Harrison StSc Builders, Inc5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes.
Details
Permit
202608317428
Permit issued
Sep 16, 2026

5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes.

Open the permit page

$470,000
Jul 17, 2026In progress
issued Aug 2026
2 Harrison StB N Builders Inc1st floor- interior non-structural demo only permit per ab-017
Details
Permit
202607175230
Permit issued
Aug 17, 2026

1st floor- interior non-structural demo only permit per ab-017

Open the permit page

$300,000
May 18, 2026In progress
issued Nov 2026
2 Harrison StB N Builders Incfloors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.
Details
Permit
202605181469
Permit issued
Nov 16, 2026

floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.

Open the permit page

May 14, 2026In progress
issued Nov 2026
2 Harrison StB N Builders Inc2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included.
Details
Permit
202605141285
Permit issued
Nov 5, 2026

2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included.

Open the permit page

Dec 30, 2025In progress
issued Apr 2026
2 Harrison StB N Builders Inc3/f, 4/f, 5/f - partial demo of non structural walls, ceilings and light fixtures. new construction of non structural walls, finishes and power. mech and electr included.
Details
Permit
202512302985
Permit issued
Apr 27, 2026

3/f, 4/f, 5/f - partial demo of non structural walls, ceilings and light fixtures. new construction of non structural walls, finishes and power. mech and electr included.

Open the permit page

$1,870,000
Dec 30, 2025In progress
issued Apr 2026
2 Harrison StB N Builders Inc2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.
Details
Permit
202512302974
Permit issued
Apr 27, 2026

2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.

Open the permit page

$500,000
Dec 18, 2025Completed
final sign-off Jan 2026
2 Harrison Stref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblity
Details
Permit
202512182168
Permit issued
Dec 18, 2025
Final sign-off
Jan 7, 2026

ref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblity

Open the permit page

Jun 10, 2025Completed
final sign-off Nov 2025
2 Harrison StSkyline Constructionbarrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current code
Details
Permit
202506108301
Permit issued
Aug 22, 2025
Final sign-off
Nov 21, 2025

barrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current code

Open the permit page

$150,000
Aug 1, 2024Completed
final sign-off Sep 2024
2 Harrison StBcci Construction Company7/f: demo of partitions and ceilings. ref sprinkler 202407297491
Details
Permit
202408017763
Permit issued
Aug 7, 2024
Final sign-off
Sep 18, 2024

7/f: demo of partitions and ceilings. ref sprinkler 202407297491

Open the permit page

$45,000
Jul 29, 2024Completed
final sign-off Sep 2024
2 Harrison StAnderson, Rowe & Buckley, Inc.7/f: relocate 103 fire sprinklers to provide shell protection.
Details
Permit
202407297491
Permit issued
Jul 29, 2024
Final sign-off
Sep 6, 2024

7/f: relocate 103 fire sprinklers to provide shell protection.

Open the permit page

$55,000
Nov 16, 2023In progress
issued Mar 2024
2 Harrison StRainbow Waterproofing & Restoron street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters.
Details
Permit
202311160895
Permit issued
Mar 11, 2024

on street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters.

Open the permit page

$1,750,000
Oct 17, 2023Completed
final sign-off Feb 2024
2 Harrison StAnderson, Rowe & Buckley, Inc.2-5/f: existing fire sprnikler system tenant improvements 2nd fl. add 2 & relocate 3 sprinklers (pendents) 3rd fl. add 7 & relocate 21 pendent sprinkers 4th fl. add 8 & relocate 34 pendent sprinklers (remove 2) 5th fl. remove 3 & relocate 14 sprinklers
Details
Permit
202310178763
Permit issued
Oct 17, 2023
Final sign-off
Feb 8, 2024

2-5/f: existing fire sprnikler system tenant improvements 2nd fl. add 2 & relocate 3 sprinklers (pendents) 3rd fl. add 7 & relocate 21 pendent sprinkers 4th fl. add 8 & relocate 34 pendent sprinklers (remove 2) 5th fl. remove 3 & relocate 14 sprinklers

Open the permit page

$56,000
Oct 17, 2023Completed
final sign-off Feb 2024
2 Harrison StSabah International Incorporated2-4/f: fire alarm , add 14 led strobe- ceiling mounted, add 23 led speaker/strobes- ceiling mounted. ref pa# 202308144326, 202308144312, 202308144314.
Details
Permit
202310178757
Permit issued
Oct 17, 2023
Final sign-off
Feb 13, 2024

2-4/f: fire alarm , add 14 led strobe- ceiling mounted, add 23 led speaker/strobes- ceiling mounted. ref pa# 202308144326, 202308144312, 202308144314.

Open the permit page

$26,077
Aug 31, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Increv to pa# 2023-0814-4314; add restrooms to scope of work
Details
Permit
202308315670
Permit issued
Sep 22, 2023
Final sign-off
Jan 24, 2024

rev to pa# 2023-0814-4314; add restrooms to scope of work

Open the permit page

$75,000
Aug 31, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Increv to pa# 202308144301; to replace sinks @ restrooms and drinking fountain to scope of work
Details
Permit
202308315668
Permit issued
Sep 22, 2023
Final sign-off
Jan 24, 2024

rev to pa# 202308144301; to replace sinks @ restrooms and drinking fountain to scope of work

Open the permit page

$75,000
Aug 31, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Increv to pa# 2023-0814-4326: to add drinking fountain to scope of work, ceiling and lighting near room 221. ref arch pa# 2023-0814-4326
Details
Permit
202308315665
Permit issued
Oct 11, 2023
Final sign-off
Jan 24, 2024

rev to pa# 2023-0814-4326: to add drinking fountain to scope of work, ceiling and lighting near room 221. ref arch pa# 2023-0814-4326

Open the permit page

$15,000
Aug 29, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Increvision to pa# 202308144312. add restrooms and enlarge conf 313 and 314. change doors and phone 327, 328.
Details
Permit
202308295523
Permit issued
Oct 5, 2023
Final sign-off
Jan 24, 2024

revision to pa# 202308144312. add restrooms and enlarge conf 313 and 314. change doors and phone 327, 328.

Open the permit page

$75,000
Aug 24, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Inc5th fl: mechanical & electrical work on 5th fl for t.i.. ref arch pa# 202308144301.
Details
Permit
202308245191
Permit issued
Aug 29, 2023
Final sign-off
Jan 24, 2024

5th fl: mechanical & electrical work on 5th fl for t.i.. ref arch pa# 202308144301.

Open the permit page

$25,000
Aug 24, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Inc2nd fl: mechanical & electrical work on 2nd fl for t.i.. ref arch pa# 202308144326.
Details
Permit
202308245188
Permit issued
Aug 29, 2023
Final sign-off
Jan 24, 2024

2nd fl: mechanical & electrical work on 2nd fl for t.i.. ref arch pa# 202308144326.

Open the permit page

$30,000
Aug 24, 2023Completed
final sign-off Feb 2024
2 Harrison StNovo Construction Inc4th fl: mechanical & electrical work on 4th fl for t.i.. ref arch pa# 202308144314.
Details
Permit
202308245190
Permit issued
Aug 29, 2023
Final sign-off
Feb 2, 2024

4th fl: mechanical & electrical work on 4th fl for t.i.. ref arch pa# 202308144314.

Open the permit page

$25,000
Aug 23, 2023Completed
final sign-off Feb 2024
2 Harrison StNovo Construction Incmechanical and electrical work to tenant improvement on the 3rd fl. ref 202308144312
Details
Permit
202308235065
Permit issued
Aug 25, 2023
Final sign-off
Feb 2, 2024

mechanical and electrical work to tenant improvement on the 3rd fl. ref 202308144312

Open the permit page

$30,000
Aug 14, 2023Completed
final sign-off Feb 2024
2 Harrison StNovo Construction Incdemo of (e) non-structual partitons accoustical grid tile a gyp bord, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit
Details
Permit
202308144312
Permit issued
Aug 23, 2023
Final sign-off
Feb 2, 2024

demo of (e) non-structual partitons accoustical grid tile a gyp bord, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit

Open the permit page

$175,000
Aug 14, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Inc2/f: demo of existing non-structural paritions acoustical grid, tile gyp board. construction of non-structural partitions, ceiling, light fixtires, millwork. mep, life safety panel fire sprinkler under separate permit.
Details
Permit
202308144326
Permit issued
Aug 25, 2023
Final sign-off
Jan 26, 2024

2/f: demo of existing non-structural paritions acoustical grid, tile gyp board. construction of non-structural partitions, ceiling, light fixtires, millwork. mep, life safety panel fire sprinkler under separate permit.

Open the permit page

$75,000
Aug 14, 2023Completed
final sign-off Feb 2024
2 Harrison StNovo Construction Incdemo of (e) non-structual partitons accoustical grid tile a gyp board, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit
Details
Permit
202308144314
Permit issued
Aug 28, 2023
Final sign-off
Feb 2, 2024

demo of (e) non-structual partitons accoustical grid tile a gyp board, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit

Open the permit page

$175,000
Aug 14, 2023Completed
final sign-off Jan 2024
2 Harrison StNovo Construction Inc5/f: demo of existing non-structural partitions acoustical and tile & gyp board. construction of non-structural partitions,doors, ceilings, light fixtures & millwork. mep, life safety and fire sprinklers under separate permit.
Details
Permit
202308144301
Permit issued
Aug 25, 2023
Final sign-off
Jan 24, 2024

5/f: demo of existing non-structural partitions acoustical and tile & gyp board. construction of non-structural partitions,doors, ceilings, light fixtures & millwork. mep, life safety and fire sprinklers under separate permit.

Open the permit page

$175,000
Mar 23, 2021Completed
final sign-off Dec 2021
2 Harrison StSource Planning And Construction Inc4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maher
Details
Permit
202103237109
Permit issued
Aug 19, 2021
Final sign-off
Dec 3, 2021

4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maher

Open the permit page

$100,000
Dec 15, 2020Completed
final sign-off Feb 2021
2 Harrison StGolden Gate Fire Protection Incfire sprinkler only. relocate 2 pendents for suite #180 (1st floor). ref #2020-0917-4438.
Details
Permit
202012151017
Permit issued
Jan 29, 2021
Final sign-off
Feb 17, 2021

fire sprinkler only. relocate 2 pendents for suite #180 (1st floor). ref #2020-0917-4438.

Open the permit page

$1,000
Dec 8, 2020Completed
final sign-off Feb 2021
2 Harrison StEveron Llcfire alarm t.i.: suite 180. add (2) speaker strobes, relocate & remove notification appliances as shown on plan. ref # 2020-0917-4418.
Details
Permit
202012080559
Permit issued
Jan 25, 2021
Final sign-off
Feb 12, 2021

fire alarm t.i.: suite 180. add (2) speaker strobes, relocate & remove notification appliances as shown on plan. ref # 2020-0917-4418.

Open the permit page

$1,200
Nov 12, 2020Completed
final sign-off Feb 2021
2 Harrison StSkyline Constructionste #180: mechanical & electrical work for tenant improvement. ref arch pa# 202009174438.
Details
Permit
202011128694
Permit issued
Dec 24, 2020
Final sign-off
Feb 26, 2021

ste #180: mechanical & electrical work for tenant improvement. ref arch pa# 202009174438.

Open the permit page

$25,000
Sep 17, 2020Completed
final sign-off Feb 2021
2 Harrison StSkyline Constructionsuite 180. interior alterations are limited to 1,147 sq ft area of work on level 1. the purpose is to prepare for future tenant occupancy. limited demo of exist door, glass panels & finish flooring
Details
Permit
202009174438
Permit issued
Nov 5, 2020
Final sign-off
Feb 26, 2021

suite 180. interior alterations are limited to 1,147 sq ft area of work on level 1. the purpose is to prepare for future tenant occupancy. limited demo of exist door, glass panels & finish flooring

Open the permit page

$135,000
Aug 26, 2020Never finaled
issued Sep 2020, no final
2 Harrison StBcci Construction Company5/f: arch permit to reduce scope of work, eliminating all delayed egress locs. elevator lobby remains as-is with emergency release button for egress. new partition to enclose space for reception, new finishes, flooring & paint. new electrical, no new lighting.
Details
Permit
202008262721
Permit issued
Sep 2, 2020

5/f: arch permit to reduce scope of work, eliminating all delayed egress locs. elevator lobby remains as-is with emergency release button for egress. new partition to enclose space for reception, new finishes, flooring & paint. new electrical, no new lighting.

Open the permit page

$45,000
Jul 14, 2020Never finaled
issued Aug 2020, no final
2 Harrison StAnderson, Rowe & Buckley, Inc.relocate 3 sprinklers
Details
Permit
202007140150
Permit issued
Aug 26, 2020

relocate 3 sprinklers

Open the permit page

$1,500
Feb 4, 2020Completed
final sign-off Oct 2020
2 Harrison StBcci Construction Company3rd floor: revision to app#201910184899 and 201911258090 due to change order at the client's request.
Details
Permit
202002043458
Permit issued
Feb 5, 2020
Final sign-off
Oct 16, 2020

3rd floor: revision to app#201910184899 and 201911258090 due to change order at the client's request.

Open the permit page

Jan 21, 2020Never finaled
issued Jan 2020, no final
2 Harrison StRed Hawk Fire & Security Ca Llcfire alar ti on the 5th fl add 2 speaker strobes, 1 duct detector for fsd ref 201910285755
Details
Permit
202001212330
Permit issued
Jan 21, 2020

fire alar ti on the 5th fl add 2 speaker strobes, 1 duct detector for fsd ref 201910285755

Open the permit page

$3,000
Jan 7, 2020Completed
final sign-off Oct 2020
2 Harrison StBcci Construction Company3rd fl - revision to previously approved mep permit. add new fsds. ref pa 2019-1018-4899, 2019-1126-8218
Details
Permit
202001071388
Permit issued
Jan 9, 2020
Final sign-off
Oct 16, 2020

3rd fl - revision to previously approved mep permit. add new fsds. ref pa 2019-1018-4899, 2019-1126-8218

Open the permit page

Dec 30, 2019Completed
final sign-off Feb 2020
2 Harrison StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system ti relocated 2 sprinklers
Details
Permit
201912300861
Permit issued
Dec 30, 2019
Final sign-off
Feb 1, 2020

existing fire sprinkler system ti relocated 2 sprinklers

Open the permit page

$8,500
Dec 24, 2019Never finaled
issued Jan 2020, no final
2 Harrison StRed Hawk Fire & Security Ca Llc3/f: fire alarm t.i. - add 5 speakers, 2 duct detectors with control relay and monitor module. ref t.i. pa201910184899. maher n/a.
Details
Permit
201912240468
Permit issued
Jan 21, 2020

3/f: fire alarm t.i. - add 5 speakers, 2 duct detectors with control relay and monitor module. ref t.i. pa201910184899. maher n/a.

Open the permit page

$3,000
Dec 13, 2019Completed
final sign-off Feb 2020
2 Harrison StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system ti 1 added & 14 relocated sprinklers, 1 plugged/removed. ref pa 2019-1126-8218
Details
Permit
201912139536
Permit issued
Dec 13, 2019
Final sign-off
Feb 1, 2020

existing fire sprinkler system ti 1 added & 14 relocated sprinklers, 1 plugged/removed. ref pa 2019-1126-8218

Open the permit page

$7,500
Nov 26, 2019Never finaled
issued Dec 2019, no final
2 Harrison StBcci Construction Company3rd & 4th flr mep submittal to support approved arch set. adjust air terminals and vav terminal units to accomodate new lighting and ceiling layout. reference pa# 2019-1125-8090, 2019-9018-4899
Details
Permit
201911268218
Permit issued
Dec 3, 2019

3rd & 4th flr mep submittal to support approved arch set. adjust air terminals and vav terminal units to accomodate new lighting and ceiling layout. reference pa# 2019-1125-8090, 2019-9018-4899

Open the permit page

$30,000
Nov 25, 2019Completed
final sign-off Oct 2020
2 Harrison StBcci Construction Company3rd fl - revision to pa previously approved arch set. mep dererred ref pa 2019-1018-4899
Details
Permit
201911258090
Permit issued
Nov 26, 2019
Final sign-off
Oct 16, 2020

3rd fl - revision to pa previously approved arch set. mep dererred ref pa 2019-1018-4899

Open the permit page

Oct 28, 2019Completed
final sign-off Feb 2020
2 Harrison St5th fl new partitions to enclose space for 2 new genders neutral restrooms. new finishes, flooring, paint, elec, lighting. mep deferred
Details
Permit
201910285755
Permit issued
Oct 29, 2019
Final sign-off
Feb 27, 2020

5th fl new partitions to enclose space for 2 new genders neutral restrooms. new finishes, flooring, paint, elec, lighting. mep deferred

Open the permit page

$100,000
Oct 18, 2019Completed
final sign-off Oct 2020
2 Harrison StBcci Construction Company3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979
Details
Permit
201910184899
Permit issued
Nov 6, 2019
Final sign-off
Oct 16, 2020

3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979

Open the permit page

$410,000
Oct 11, 2019Completed
final sign-off Oct 2020
2 Harrison StRed Hawk Fire & Security Ca Llc2 way comm. revision to app#201903054457 update scope of work/area of work to remove comm on 3rd floor. ref: 201810193678 for 4th flr arch ti. n/a for maher
Details
Permit
201910114309
Permit issued
Oct 15, 2019
Final sign-off
Oct 15, 2020

2 way comm. revision to app#201903054457 update scope of work/area of work to remove comm on 3rd floor. ref: 201810193678 for 4th flr arch ti. n/a for maher

Open the permit page

Sep 30, 2019Expired or cancelled
cancelled Jan 2026
2 Harrison StBcci Construction Company5th fl - new partitions to enclose space for reception. new finishes, flooring and paint. new electrical and lighting. mep deferred
Details
Permit
201909303022

5th fl - new partitions to enclose space for reception. new finishes, flooring and paint. new electrical and lighting. mep deferred

Open the permit page

$68,000
Apr 1, 2019Never finaled
issued Apr 2019, no final
2 Harrison StBcci Construction Company3rd & 4th floor - furniture permit for rockwell partition system ref 201810193680 & 201810193678
Details
Permit
201904016767
Permit issued
Apr 1, 2019

3rd & 4th floor - furniture permit for rockwell partition system ref 201810193680 & 201810193678

Open the permit page

$10,000
Mar 5, 2019Completed
final sign-off Oct 2020
2 Harrison StRed Hawk Fire & Security Ca Llcprovide new 2 way communication system include 1 master unit to be installed in fcc, 1 sub station at security desk; 2 call stations to be located at elevator lobby on 3rd & 4th fl. ref pa 2018-1019-3680 & 2018-1019-3678
Details
Permit
201903054457
Permit issued
Mar 7, 2019
Final sign-off
Oct 27, 2020

provide new 2 way communication system include 1 master unit to be installed in fcc, 1 sub station at security desk; 2 call stations to be located at elevator lobby on 3rd & 4th fl. ref pa 2018-1019-3680 & 2018-1019-3678

Open the permit page

$10,000
Jan 23, 2019Completed
final sign-off Aug 2019
2 Harrison StBcci Construction Company4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678.
Details
Permit
201901230980
Permit issued
Mar 20, 2019
Final sign-off
Aug 21, 2019

4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678.

Open the permit page

$100,000
Jan 23, 2019Completed
final sign-off Aug 2019
2 Harrison StBcci Construction Company3/f revision to previously approved arch and mep permits. changes to turn gender neutral restroom into phone rooms. minor chagnes to mk tub storage room. ref pa# 201810193680
Details
Permit
201901230979
Permit issued
Mar 12, 2019
Final sign-off
Aug 20, 2019

3/f revision to previously approved arch and mep permits. changes to turn gender neutral restroom into phone rooms. minor chagnes to mk tub storage room. ref pa# 201810193680

Open the permit page

$100,000
Jan 17, 2019Never finaled
issued Jan 2019, no final
2 Harrison StRed Hawk Fire & Security Ca Llc3/f & 4/f: fire alarm t.i. 3/f:remove (e) appliances shown on plan.add 34 ceiling speaker stronbe, 1 ceiling weatherproof speaker strobe, 2 celiing strobes, 3 ceiling speakrs 1 duct detctors for fsd w/ control & monitoring.
Details
Permit
201901170661
Permit issued
Jan 22, 2019

3/f & 4/f: fire alarm t.i. 3/f:remove (e) appliances shown on plan.add 34 ceiling speaker stronbe, 1 ceiling weatherproof speaker strobe, 2 celiing strobes, 3 ceiling speakrs 1 duct detctors for fsd w/ control & monitoring.

Open the permit page

$46,000
Jan 3, 2019Completed
final sign-off Feb 2019
2 Harrison StAnderson, Rowe & Buckley, Inc.3rd & 4th flrs - modify (e) fire sprinkler system for ti ref 201810193680 & 201810193678 changeout 15 heads 3rd floor, remove 23 relocate 13 4th floor relocate 20, remove 4
Details
Permit
201901039516
Permit issued
Jan 4, 2019
Final sign-off
Feb 27, 2019

3rd & 4th flrs - modify (e) fire sprinkler system for ti ref 201810193680 & 201810193678 changeout 15 heads 3rd floor, remove 23 relocate 13 4th floor relocate 20, remove 4

Open the permit page

$8,534
Dec 28, 2018Completed
final sign-off Aug 2019
2 Harrison StBcci Construction Company4th flr - mep dwgs to support previously approved arch set 201810193678 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump
Details
Permit
201812289302
Permit issued
Jan 7, 2019
Final sign-off
Aug 20, 2019

4th flr - mep dwgs to support previously approved arch set 201810193678 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump

Open the permit page

$650,000
Dec 28, 2018Completed
final sign-off Aug 2019
2 Harrison StBcci Construction Company3rdflr - mep dwgs to support previously approved arch set 201810193680 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump
Details
Permit
201812289304
Permit issued
Jan 7, 2019
Final sign-off
Aug 20, 2019

3rdflr - mep dwgs to support previously approved arch set 201810193680 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump

Open the permit page

$610,000
Oct 19, 2018Completed
final sign-off Mar 2021
2 Harrison StBcci Construction Company3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.
Details
Permit
201810193680
Permit issued
Dec 27, 2018
Final sign-off
Mar 4, 2021

3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.

Open the permit page

$980,000
Oct 19, 2018Completed
final sign-off Mar 2021
2 Harrison StBcci Construction Company4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.
Details
Permit
201810193678
Permit issued
Dec 27, 2018
Final sign-off
Mar 4, 2021

4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.

Open the permit page

$980,000
Oct 3, 2018Completed
final sign-off Aug 2019
2 Harrison StBcci Construction Company3rd and 4th floor - demo of non-structural partitions. ab-017 applies.
Details
Permit
201810032086
Permit issued
Oct 3, 2018
Final sign-off
Aug 21, 2019

3rd and 4th floor - demo of non-structural partitions. ab-017 applies.

Open the permit page

$80,000
Aug 17, 2018Completed
final sign-off Sep 2018
2 Harrison StRed Hawk Fire & Security Ca Llc7/f: fire alarm as built drawing for app#201806141942. maher n/a.
Details
Permit
201808177707
Permit issued
Aug 20, 2018
Final sign-off
Sep 25, 2018

7/f: fire alarm as built drawing for app#201806141942. maher n/a.

Open the permit page

Jun 14, 2018Completed
final sign-off Sep 2018
2 Harrison StRed Hawk Fire & Security Ca Llc7th floor: fire alarm t.i. add 1 ceiling speaker strobes. ref app#201805159100. n/a for mehar
Details
Permit
201806141942
Permit issued
Jun 15, 2018
Final sign-off
Sep 24, 2018

7th floor: fire alarm t.i. add 1 ceiling speaker strobes. ref app#201805159100. n/a for mehar

Open the permit page

$500
Jun 8, 2018Expired or cancelled
cancelled Nov 2022
2 Harrison Stinstallation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software.
Details
Permit
201806081449

installation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software.

Open the permit page

$52,998
Jun 5, 2018Completed
final sign-off Jun 2018
2 Harrison StAnderson, Rowe & Buckley, Inc.7th floor sprinkler ti to existing fire sprinkler system ti 5 sprinklers ref pa 201805159100
Details
Permit
201806051032
Permit issued
Jun 5, 2018
Final sign-off
Jun 23, 2018

7th floor sprinkler ti to existing fire sprinkler system ti 5 sprinklers ref pa 201805159100

Open the permit page

$2,500
May 15, 2018Completed
final sign-off Sep 2018
2 Harrison StBcci Construction Company7th fl - selective demo & divide an existing conference room into 2 phone room ref pa 2014-0307-0168. maher na.
Details
Permit
201805159100
Permit issued
May 15, 2018
Final sign-off
Sep 25, 2018

7th fl - selective demo & divide an existing conference room into 2 phone room ref pa 2014-0307-0168. maher na.

Open the permit page

$25,000
Feb 28, 2018Completed
final sign-off May 2018
2 Harrison StAnderson, Rowe & Buckley, Inc.1st flr - arch 201802201761 (e) fire sprinklers system ti - 3 added sprinklers 1 plug maher na
Details
Permit
201802282437
Permit issued
Feb 28, 2018
Final sign-off
May 4, 2018

1st flr - arch 201802201761 (e) fire sprinklers system ti - 3 added sprinklers 1 plug maher na

Open the permit page

$2,000
Feb 20, 2018Never finaled
issued Feb 2018, no final
2 Harrison StEnglewood Construction Inccosmetic in nature - new flooring, painting, ceiling tile, casework replacement minor demolition & construction of particions & pony walls, branch circuit electrical work & relocate plumbing fixture,maher na
Details
Permit
201802201761
Permit issued
Feb 21, 2018

cosmetic in nature - new flooring, painting, ceiling tile, casework replacement minor demolition & construction of particions & pony walls, branch circuit electrical work & relocate plumbing fixture,maher na

Open the permit page

$150,244
Oct 30, 2017Completed
final sign-off May 2018
2 Harrison StThomas Swan Sign Co Incto erect 3 electric, projecting, double faced signs.
Details
Permit
201710302555
Permit issued
Apr 9, 2018
Final sign-off
May 3, 2018

to erect 3 electric, projecting, double faced signs.

Open the permit page

$5,000
Oct 30, 2017Completed
final sign-off May 2018
2 Harrison StThomas Swan Sign Co Incto erect one non-illuminated wall single faced sign.
Details
Permit
201710302556
Permit issued
Apr 9, 2018
Final sign-off
May 3, 2018

to erect one non-illuminated wall single faced sign.

Open the permit page

$2,000
Sep 22, 2017Completed
final sign-off Oct 2017
2 Harrison StRed Hawk Fire & Security Ca Llcfire alarm ti on 2nd fl add 3 speaker/strobes, relocate 1 speaker strobes, change candela setting on 1 existing speaker strobe maher not req; maher ord 155-13 na
Details
Permit
201709229362
Permit issued
Sep 25, 2017
Final sign-off
Oct 20, 2017

fire alarm ti on 2nd fl add 3 speaker/strobes, relocate 1 speaker strobes, change candela setting on 1 existing speaker strobe maher not req; maher ord 155-13 na

Open the permit page

$1,500
Aug 9, 2017Never finaled
issued Aug 2017, no final
2 Harrison StBcci Construction Company2/f #200- 1 new fan coil unit, 1 new branch selector box. plumbing of new ada resteroom, new fixtures, new lighting & power branch circuiting. t.i. pa#201706260334. n/a ordinance #155-13
Details
Permit
201708094300
Permit issued
Aug 9, 2017

2/f #200- 1 new fan coil unit, 1 new branch selector box. plumbing of new ada resteroom, new fixtures, new lighting & power branch circuiting. t.i. pa#201706260334. n/a ordinance #155-13

Open the permit page

$387,000
Jul 25, 2017Completed
final sign-off Aug 2017
2 Harrison StAnderson, Rowe & Buckley, Inc.2/f- existing fire sprinkler system ti relocate 9 sprinklers, add 3 sprinklers ref pa 2017-0626-0334. maher na
Details
Permit
201707252852
Permit issued
Jul 25, 2017
Final sign-off
Aug 1, 2017

2/f- existing fire sprinkler system ti relocate 9 sprinklers, add 3 sprinklers ref pa 2017-0626-0334. maher na

Open the permit page

$6,000
Jun 26, 2017Never finaled
issued Jun 2017, no final
2 Harrison StBcci Construction Company2nd floor - new partitions, ceilings and finishes. n/a for maher.
Details
Permit
201706260334
Permit issued
Jun 27, 2017

2nd floor - new partitions, ceilings and finishes. n/a for maher.

Open the permit page

$300,000
Jul 29, 2016Completed
final sign-off Nov 2016
2 Harrison StGci, Incsuite 138: minor ti -adding two doors and frames to office space maher na
Details
Permit
201607293722
Permit issued
Aug 9, 2016
Final sign-off
Nov 10, 2016

suite 138: minor ti -adding two doors and frames to office space maher na

Open the permit page

$65,000
May 2, 2016Completed
final sign-off May 2016
2 Harrison StRed Hawk Fire & Security Ca Llc2nd fl: fire alarm ti add 12 ceiling speaker strobes, 1 ceiling strobes, 2 duct detectors for heat pump. ref ti 2015-1221-5663. compliance with maher ordinance no 155-13 not required.
Details
Permit
201605026317
Permit issued
May 2, 2016
Final sign-off
May 31, 2016

2nd fl: fire alarm ti add 12 ceiling speaker strobes, 1 ceiling strobes, 2 duct detectors for heat pump. ref ti 2015-1221-5663. compliance with maher ordinance no 155-13 not required.

Open the permit page

$8,500
Mar 22, 2016Completed
final sign-off Mar 2016
2 Harrison StAnderson, Rowe & Buckley, Inc.fire sprinkler t.i., relocate 15 heads, add 2 heads, plug 1 head. t.i. pa#201512215663, n/a ordinance #155-13
Details
Permit
201603222725
Permit issued
Mar 22, 2016
Final sign-off
Mar 28, 2016

fire sprinkler t.i., relocate 15 heads, add 2 heads, plug 1 head. t.i. pa#201512215663, n/a ordinance #155-13

Open the permit page

$9,000
Mar 15, 2016Expired or cancelled
cancelled Jan 2026
2 Harrison St1st floor - minor tenant improvements on first floor of building. addition of counter areas in suites 138 and 146.
Details
Permit
201603152023

1st floor - minor tenant improvements on first floor of building. addition of counter areas in suites 138 and 146.

Open the permit page

$135,000
Dec 21, 2015Completed
final sign-off Jul 2016
2 Harrison StBcci Construction Companyt.i. in suite 201 including demo and new partitions, ceiling, finishes, associated mep. fire life safty under seperate permit.
Details
Permit
201512215663
Permit issued
Jan 5, 2016
Final sign-off
Jul 15, 2016

t.i. in suite 201 including demo and new partitions, ceiling, finishes, associated mep. fire life safty under seperate permit.

Open the permit page

$1,500,000
Nov 13, 2015Never finaled
issued Nov 2015, no final
2 Harrison StRed Hawk Fire & Security Ca Llcste 149: add 1 speaker, 10 speaker/strobes, 1 strobe, 10 duct detectors with 10 relays. 11.16.15 approved otc
Details
Permit
201511132501
Permit issued
Nov 16, 2015

ste 149: add 1 speaker, 10 speaker/strobes, 1 strobe, 10 duct detectors with 10 relays. 11.16.15 approved otc

Open the permit page

$17,000
Nov 13, 2015Never finaled
issued Nov 2015, no final
2 Harrison StRed Hawk Fire & Security Ca Llcste 200, add 3 duct detector with 3 relay. ref pa 2015-09023-7760. maher na
Details
Permit
201511132497
Permit issued
Nov 13, 2015

ste 200, add 3 duct detector with 3 relay. ref pa 2015-09023-7760. maher na

Open the permit page

$2,000
Oct 21, 2015Completed
final sign-off Jan 2016
2 Harrison StAnderson, Rowe & Buckley, Inc.fire sprinklers- 1st floor, suite #149: ref 2015 0814 4273: add hds: 3, relocate hds: 24 maher na
Details
Permit
201510210307
Permit issued
Oct 21, 2015
Final sign-off
Jan 27, 2016

fire sprinklers- 1st floor, suite #149: ref 2015 0814 4273: add hds: 3, relocate hds: 24 maher na

Open the permit page

$14,000
Sep 23, 2015Never finaled
issued Sep 2015, no final
2 Harrison StRed Hawk Fire & Security Ca Llc2nd floor suite 200: add 9 strobes, 24 speaker/strobes, 3 smoke detectors, 17 duct detectors w/17 relays
Details
Permit
201509237760
Permit issued
Sep 23, 2015

2nd floor suite 200: add 9 strobes, 24 speaker/strobes, 3 smoke detectors, 17 duct detectors w/17 relays

Open the permit page

$15,000
Aug 25, 2015Completed
final sign-off Oct 2015
2 Harrison StAnderson, Rowe & Buckley, Inc.2nd flr: fire sprinkler ti - add 7 heads, relocate 46 heads, ref pa 2015 0710 1229 maher na
Details
Permit
201508255162
Permit issued
Aug 25, 2015
Final sign-off
Oct 15, 2015

2nd flr: fire sprinkler ti - add 7 heads, relocate 46 heads, ref pa 2015 0710 1229 maher na

Open the permit page

$13,000
Aug 10, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Companyt.i. suite #149 including minor demolition and the build back of new partitions, doors, finishes & associated mep. fire ls under separate permit. n/a maher ord. 155-13
Details
Permit
201508103854
Permit issued
Aug 11, 2015
Final sign-off
May 5, 2016

t.i. suite #149 including minor demolition and the build back of new partitions, doors, finishes & associated mep. fire ls under separate permit. n/a maher ord. 155-13

Open the permit page

$265,000
Jul 31, 2015Completed
final sign-off Aug 2015
2 Harrison StEngler Construction(n) non structural partition, no change in occupancy, use or area. divide sute 168 into two tenant space. architectural, mep under separation permit. n/a ordinance #155-13
Details
Permit
201507312989
Permit issued
Aug 4, 2015
Final sign-off
Aug 13, 2015

(n) non structural partition, no change in occupancy, use or area. divide sute 168 into two tenant space. architectural, mep under separation permit. n/a ordinance #155-13

Open the permit page

$10,000
Jul 10, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Company2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a.
Details
Permit
201507101229
Permit issued
Jul 20, 2015
Final sign-off
May 27, 2016

2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a.

Open the permit page

$1,416,000
May 4, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Companysuite #500: mechanical work associated with approval appl. #2015.0210.7968 including new vav boxes, heat pumps and fans. fire life safety under separate permit. maher n/a.
Details
Permit
201505045320
Permit issued
May 5, 2015
Final sign-off
May 24, 2016

suite #500: mechanical work associated with approval appl. #2015.0210.7968 including new vav boxes, heat pumps and fans. fire life safety under separate permit. maher n/a.

Open the permit page

$125,000
Apr 27, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Companydemolition under ab-017 on level 2 suite 200 including demolition of extg walls, partitions and finish flooring. n/a for maher ordinance.
Details
Permit
201504274742
Permit issued
Apr 28, 2015
Final sign-off
May 27, 2016

demolition under ab-017 on level 2 suite 200 including demolition of extg walls, partitions and finish flooring. n/a for maher ordinance.

Open the permit page

$112,000
Apr 3, 2015Completed
final sign-off May 2015
2 Harrison StRed Hawk Fire & Security Ca Llc5th floor: t.i. 6 speakers, 19 speaker strobes, 1 strobe. ref app#201502107968. n/a for the maher.
Details
Permit
201504032726
Permit issued
Apr 3, 2015
Final sign-off
May 11, 2015

5th floor: t.i. 6 speakers, 19 speaker strobes, 1 strobe. ref app#201502107968. n/a for the maher.

Open the permit page

$9,000
Mar 2, 2015Completed
final sign-off Sep 2015
2 Harrison StBcci Construction Companyinstallation of platform lift. n/a for the maher ordinance
Details
Permit
201503029667
Permit issued
May 4, 2015
Final sign-off
Sep 9, 2015

installation of platform lift. n/a for the maher ordinance

Open the permit page

$15,000
Feb 27, 2015Completed
final sign-off Jun 2015
2 Harrison StAnderson, Rowe & Buckley, Inc.#350- fire sprinkler t.i., plug 4, relocate 19, add 3, total 22 sprinklers. arch. pa# 201501276745. n/a ordinance #155-13
Details
Permit
201502279561
Permit issued
Feb 27, 2015
Final sign-off
Jun 17, 2015

#350- fire sprinkler t.i., plug 4, relocate 19, add 3, total 22 sprinklers. arch. pa# 201501276745. n/a ordinance #155-13

Open the permit page

$11,350
Feb 24, 2015Completed
final sign-off Mar 2015
2 Harrison StRed Hawk Fire & Security Ca Llc1st floor suite 140 fire alarm including 3 strobes & 5 speaker/strobes. ref #2015.0202.7263. n/a maher ordinance
Details
Permit
201502249151
Permit issued
Feb 24, 2015
Final sign-off
Mar 20, 2015

1st floor suite 140 fire alarm including 3 strobes & 5 speaker/strobes. ref #2015.0202.7263. n/a maher ordinance

Open the permit page

$4,000
Feb 24, 2015Completed
final sign-off May 2016
2 Harrison StRed Hawk Fire & Security Ca Llcfire alarm ti-3rd floor suite 350 fire alarm including 1 duct detector, 1 smoke detector, 2 relays, 2 monitor modules, 12 speaker/strobes. n/a maher ordinance
Details
Permit
201502249147
Permit issued
Feb 24, 2015
Final sign-off
May 27, 2016

fire alarm ti-3rd floor suite 350 fire alarm including 1 duct detector, 1 smoke detector, 2 relays, 2 monitor modules, 12 speaker/strobes. n/a maher ordinance

Open the permit page

$4,000
Feb 20, 2015Completed
final sign-off Mar 2015
2 Harrison StAnderson, Rowe & Buckley, Inc.fire sprinkler ti: added sprk: 1, relocate sprk: 4 to suite 140 mahar - not required
Details
Permit
201502208890
Permit issued
Feb 20, 2015
Final sign-off
Mar 18, 2015

fire sprinkler ti: added sprk: 1, relocate sprk: 4 to suite 140 mahar - not required

Open the permit page

$2,600
Feb 20, 2015Completed
final sign-off Mar 2015
2 Harrison StAyoob & Peery Plumbing Co Increlocate (3) sprinklers per tenant improvements. t.i. pa#201502057617. n/a ordinance #155-13
Details
Permit
201502208897
Permit issued
Feb 20, 2015
Final sign-off
Mar 5, 2015

relocate (3) sprinklers per tenant improvements. t.i. pa#201502057617. n/a ordinance #155-13

Open the permit page

$1,542
Feb 10, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Companyminor demolition of existing non-structural partitions and addition of new millwork and finishes- mep, sprinklesr and fire alarm separate permits.
Details
Permit
201502107968
Permit issued
Feb 19, 2015
Final sign-off
May 24, 2016

minor demolition of existing non-structural partitions and addition of new millwork and finishes- mep, sprinklesr and fire alarm separate permits.

Open the permit page

$250,000
Feb 10, 2015Completed
final sign-off Mar 2015
2 Harrison StRed Hawk Fire & Security Ca Llcfire alarm 6th fl 2 speaker strobes. reference ti 2015.0205.7617
Details
Permit
201502107865
Permit issued
Feb 10, 2015
Final sign-off
Mar 20, 2015

fire alarm 6th fl 2 speaker strobes. reference ti 2015.0205.7617

Open the permit page

$3,000
Feb 5, 2015Completed
final sign-off Oct 2015
2 Harrison StBcci Construction Companysute #600: new partitions, relocate supply grilles, t- stats and return grilles, re-balance supply grilles. associated electrical work. n/a for the maher.
Details
Permit
201502057617
Permit issued
Feb 19, 2015
Final sign-off
Oct 9, 2015

sute #600: new partitions, relocate supply grilles, t- stats and return grilles, re-balance supply grilles. associated electrical work. n/a for the maher.

Open the permit page

$66,000
Feb 2, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Companysuite 140: t.i. including demolition of non-structural partitions and adding new partition finishes and associated mechanical, & electrical work. life safety deferred; under separate permit. n/a for the maher.
Details
Permit
201502027263
Permit issued
Feb 9, 2015
Final sign-off
May 23, 2016

suite 140: t.i. including demolition of non-structural partitions and adding new partition finishes and associated mechanical, & electrical work. life safety deferred; under separate permit. n/a for the maher.

Open the permit page

$300,000
Jan 27, 2015Completed
final sign-off May 2016
2 Harrison StBcci Construction Company3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permit
Details
Permit
201501276745
Permit issued
Feb 3, 2015
Final sign-off
May 27, 2016

3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permit

Open the permit page

$678,000
Jan 15, 2015Never finaled
issued Jan 2015, no final
2 Harrison StC B F Incwork is part of pa# 201412173892, #201412173889; minor electrical buildout of restrooms including adding (8) wall sconces and (8) dimmer switches. n/a ordinance #155-13
Details
Permit
201501155799
Permit issued
Jan 15, 2015

work is part of pa# 201412173892, #201412173889; minor electrical buildout of restrooms including adding (8) wall sconces and (8) dimmer switches. n/a ordinance #155-13

Open the permit page

$12,000
Dec 17, 2014Completed
final sign-off Apr 2015
2 Harrison StClune Construction Company L Pground flr: non structural demo (n) plumb, fixtures, accessories, counter, finishes, no change in area, occupancy or use. maher n/a
Details
Permit
201412173892
Permit issued
Jan 6, 2015
Final sign-off
Apr 13, 2015

ground flr: non structural demo (n) plumb, fixtures, accessories, counter, finishes, no change in area, occupancy or use. maher n/a

Open the permit page

$100,000
Mar 24, 2014Never finaled
issued Mar 2014, no final
2 Harrison StSkyline Constructionmechanical and electrical work for tenant improvment at first floor ref 201403110426
Details
Permit
201403241516
Permit issued
Mar 24, 2014

mechanical and electrical work for tenant improvment at first floor ref 201403110426

Open the permit page

$12,000
Mar 21, 2014Never finaled
issued Mar 2014, no final
2 Harrison StGolden Gate Fire Protection Inc1st floor - relocate 11 pendent sprinklers. ref #2014.0311.0426. compliance with compliance #155-13 not required
Details
Permit
201403211338
Permit issued
Mar 27, 2014

1st floor - relocate 11 pendent sprinklers. ref #2014.0311.0426. compliance with compliance #155-13 not required

Open the permit page

$5,665
Mar 18, 2014Completed
final sign-off Apr 2014
2 Harrison StRed Hawk Fire & Security Ca Llcfire alarm ti on 1st fl including 2 speakers, 4 speaker strobes; compliance with ord 155-13 not required.
Details
Permit
201403181019
Permit issued
Mar 18, 2014
Final sign-off
Apr 15, 2014

fire alarm ti on 1st fl including 2 speakers, 4 speaker strobes; compliance with ord 155-13 not required.

Open the permit page

$4,000
Mar 11, 2014Completed
final sign-off May 2014
2 Harrison StSkyline Construction1st & 5th floor - interior renovation of existing office space. no change in or occupancy. new finishes, lighting and minimal modification to mechanical system. f/a, sprinklers, mep under separate permit. compliance with ordinance #155-13 not required
Details
Permit
201403110426
Permit issued
Mar 19, 2014
Final sign-off
May 1, 2014

1st & 5th floor - interior renovation of existing office space. no change in or occupancy. new finishes, lighting and minimal modification to mechanical system. f/a, sprinklers, mep under separate permit. compliance with ordinance #155-13 not required

Open the permit page

$30,000
Mar 7, 2014Completed
final sign-off Apr 2014
2 Harrison StBcci Construction Companybarrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required
Details
Permit
201403070168
Permit issued
Mar 7, 2014
Final sign-off
Apr 10, 2014

barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required

Open the permit page

$6,500
Feb 25, 2014Completed
final sign-off Apr 2014
2 Harrison StBcci Construction Companyto obtain final inspection for work approved under pa#2011.0729.1376. all work is complete.
Details
Permit
201402259286
Permit issued
Feb 25, 2014
Final sign-off
Apr 14, 2014

to obtain final inspection for work approved under pa#2011.0729.1376. all work is complete.

Open the permit page

Dec 4, 2013Completed
final sign-off Jan 2014
2 Harrison StRed Hawk Fire & Security Ca Llcfire sprinkler ti on 3rd and 4th fl including 5 speaker/strobes, 1 smoke detector
Details
Permit
201312043262
Permit issued
Dec 4, 2013
Final sign-off
Jan 2, 2014

fire sprinkler ti on 3rd and 4th fl including 5 speaker/strobes, 1 smoke detector

Open the permit page

$5,000
Nov 15, 2013Completed
final sign-off Nov 2013
2 Harrison StBcci Construction Companyremove existing 3 dimensional sign (non historic grain silo and concrete platform)
Details
Permit
201311152068
Permit issued
Nov 15, 2013
Final sign-off
Nov 26, 2013

remove existing 3 dimensional sign (non historic grain silo and concrete platform)

Open the permit page

$16,500
Nov 15, 2013Never finaled
issued Nov 2013, no final
2 Harrison Stmta permit
Details
Permit
M444607
Permit issued
Nov 15, 2013

mta permit

Open the permit page

Nov 14, 2013Never finaled
issued Nov 2013, no final
2 Harrison Ststreet space
Details
Permit
M444247
Permit issued
Nov 14, 2013

street space

Open the permit page

Nov 14, 2013Never finaled
issued Nov 2013, no final
2 Harrison Ststreet space permit (scaffolding)
Details
Permit
M444147
Permit issued
Nov 14, 2013

street space permit (scaffolding)

Open the permit page

Nov 4, 2013Completed
final sign-off Feb 2014
2 Harrison StPrincipal Builders Inc.voluntary accesibility upgrade to restroom on 4th floor existing t.i. space to relocate partitions and toilet accessory and finishes.
Details
Permit
201311041050
Permit issued
Nov 4, 2013
Final sign-off
Feb 28, 2014

voluntary accesibility upgrade to restroom on 4th floor existing t.i. space to relocate partitions and toilet accessory and finishes.

Open the permit page

$69,568
Oct 16, 2013Completed
final sign-off Dec 2013
2 Harrison StRed Hawk Fire & Security Ca Llc1st floor fire alarm t.i. including (1) speaker, (8) speaker/strobes. ref pa #2013.10.04.8493.
Details
Permit
201310169346
Permit issued
Oct 16, 2013
Final sign-off
Dec 9, 2013

1st floor fire alarm t.i. including (1) speaker, (8) speaker/strobes. ref pa #2013.10.04.8493.

Open the permit page

$4,000
Oct 16, 2013Completed
final sign-off Feb 2014
2 Harrison StBcci Construction Companyrevision to pa# 2011-0525-6560-additional millwork & modify bathrooms to bring up to code
Details
Permit
201310169383
Permit issued
Oct 17, 2013
Final sign-off
Feb 20, 2014

revision to pa# 2011-0525-6560-additional millwork & modify bathrooms to bring up to code

Open the permit page

$20,000
Oct 4, 2013Completed
final sign-off Jan 2014
2 Harrison StBcci Construction Company1st floor - revisions to approved & issued site application #201207306043s-1 & s-2 - mis. tenant improvement revisions, walls, sink, mechanical and electrical to create a training area & offices.
Details
Permit
201310048493
Permit issued
Oct 9, 2013
Final sign-off
Jan 2, 2014

1st floor - revisions to approved & issued site application #201207306043s-1 & s-2 - mis. tenant improvement revisions, walls, sink, mechanical and electrical to create a training area & offices.

Open the permit page

$20,000
Oct 4, 2013Completed
final sign-off Oct 2013
2 Harrison StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system ti. add 2 sprinklers, relocate 3 sprinklers 1st fl
Details
Permit
201310048460
Permit issued
Oct 4, 2013
Final sign-off
Oct 15, 2013

existing fire sprinkler system ti. add 2 sprinklers, relocate 3 sprinklers 1st fl

Open the permit page

$2,500
Sep 20, 2013Completed
final sign-off Feb 2014
2 Harrison StThomas Swan Sign Co Incerect a ground electric four faced direct new sign
Details
Permit
201309207356
Permit issued
Oct 7, 2013
Final sign-off
Feb 26, 2014

erect a ground electric four faced direct new sign

Open the permit page

$12,000
Jul 31, 2013Completed
final sign-off Dec 2013
2 Harrison StDettaglio Construction Inc Dba Dci Const3rd floor-restroom upgrades
Details
Permit
201307313188
Permit issued
Jul 31, 2013
Final sign-off
Dec 23, 2013

3rd floor-restroom upgrades

Open the permit page

$30,000
Apr 23, 2013Expired or cancelled
cancelled Feb 2020
2 Harrison StBcci Construction Companyrevision to appl #2012.07.30.6043 - remove existing exterior lift @ embarcadero side, not in path of travel.
Details
Permit
201304235190

revision to appl #2012.07.30.6043 - remove existing exterior lift @ embarcadero side, not in path of travel.

Open the permit page

$6,000
Jan 17, 2013Completed
final sign-off Apr 2013
2 Harrison StAnderson, Rowe & Buckley, Inc.expansion of (e) fire sprinkler system, add 2 sprinklers.basement. ti pa#2012-07-30-6043.
Details
Permit
201301178217
Permit issued
Jan 18, 2013
Final sign-off
Apr 26, 2013

expansion of (e) fire sprinkler system, add 2 sprinklers.basement. ti pa#2012-07-30-6043.

Open the permit page

$1,000
Jan 9, 2013Completed
final sign-off Mar 2014
2 Harrison StBcci Construction Companyrevision to 201211284990 to include new infill.
Details
Permit
201301097609
Permit issued
Jan 9, 2013
Final sign-off
Mar 6, 2014

revision to 201211284990 to include new infill.

Open the permit page

$1,500
Jan 8, 2013Never finaled
issued Jan 2013, no final
2 Harrison StEagle Bay Enterprises, Inc (Dba Garnettinstall evacuation signs floor b1, 1-7
Details
Permit
201301087432
Permit issued
Jan 14, 2013

install evacuation signs floor b1, 1-7

Open the permit page

$8,400
Nov 28, 2012Completed
final sign-off Mar 2014
2 Harrison StBcci Construction Company2nd floor-revision to pa# 2012-1113-4123-change infill method for holes in slab to simpler pan deck & light weight concrete
Details
Permit
201211284990
Permit issued
Nov 28, 2012
Final sign-off
Mar 6, 2014

2nd floor-revision to pa# 2012-1113-4123-change infill method for holes in slab to simpler pan deck & light weight concrete

Open the permit page

$100
Nov 13, 2012Completed
final sign-off Mar 2014
2 Harrison StBcci Construction Companypre construction work under ab-017 to infill 6 existing floor openings
Details
Permit
201211134123
Permit issued
Nov 14, 2012
Final sign-off
Mar 7, 2014

pre construction work under ab-017 to infill 6 existing floor openings

Open the permit page

$22,500
Nov 8, 2012Never finaled
issued Nov 2012, no final
2 Harrison StAyoob & Peery Plumbing Co Inc6th floor:add fire sprinkler heads per t. i. add 6. bldg app#201108112265
Details
Permit
201211083835
Permit issued
Nov 8, 2012

6th floor:add fire sprinkler heads per t. i. add 6. bldg app#201108112265

Open the permit page

$3,000
Oct 4, 2012Completed
final sign-off Apr 2014
2 Harrison StBcci Construction Company2nd floor-infill void area-concrete slab approx 500 sq ft. this is an unoccupied space & the work is to be performed under sfab-017. this space is to remain unoccupied
Details
Permit
201210041316
Permit issued
Oct 9, 2012
Final sign-off
Apr 14, 2014

2nd floor-infill void area-concrete slab approx 500 sq ft. this is an unoccupied space & the work is to be performed under sfab-017. this space is to remain unoccupied

Open the permit page

$40,000
Sep 5, 2012Completed
final sign-off Mar 2014
2 Harrison StBcci Construction Companypre construction demo per ab017 of ste 138, 146, 156 and 238. no fire rated construction to be removed. sprinkler & life safety to remain operational.
Details
Permit
201209058922
Permit issued
Sep 5, 2012
Final sign-off
Mar 6, 2014

pre construction demo per ab017 of ste 138, 146, 156 and 238. no fire rated construction to be removed. sprinkler & life safety to remain operational.

Open the permit page

$85,000
Aug 10, 2012Never finaled
issued Sep 2013, no final
2 Harrison StThomas Swan Sign Co Incto erect electric, wall, single faced sign.
Details
Permit
201208107128
Permit issued
Sep 24, 2013

to erect electric, wall, single faced sign.

Open the permit page

$12,000
Aug 10, 2012Never finaled
issued Sep 2013, no final
2 Harrison StThomas Swan Sign Co Incto erect non-electric, wall, single faced sign.
Details
Permit
201208107131
Permit issued
Sep 24, 2013

to erect non-electric, wall, single faced sign.

Open the permit page

$12,000
Aug 10, 2012Never finaled
issued Sep 2013, no final
2 Harrison StThomas Swan Sign Co Incto erect electric, projecting, double faced sign.
Details
Permit
201208107135
Permit issued
Sep 24, 2013

to erect electric, projecting, double faced sign.

Open the permit page

$12,000
Aug 10, 2012Never finaled
issued Sep 2013, no final
2 Harrison StThomas Swan Sign Co Incto erect electric, wall, single faced sign.
Details
Permit
201208107130
Permit issued
Sep 24, 2013

to erect electric, wall, single faced sign.

Open the permit page

$12,000
Jul 30, 2012Completed
final sign-off Apr 2014
2 Harrison Stchange of use. interior tenant improvement at suite, 138, 156, 146, 238 including converting a-3 to b use.
Details
Permit
201207306043
Permit issued
Aug 29, 2012
Final sign-off
Apr 16, 2014

change of use. interior tenant improvement at suite, 138, 156, 146, 238 including converting a-3 to b use.

Open the permit page

$2,500,000
May 2, 2012Never finaled
issued May 2012, no final
2 Harrison StAnderson, Rowe & Buckley, Inc.tenant improvements, existing fire sprinkler system, 51 new sprinklers 3rd fl
Details
Permit
201205029655
Permit issued
May 3, 2012

tenant improvements, existing fire sprinkler system, 51 new sprinklers 3rd fl

Open the permit page

$25,500
Apr 23, 2012Never finaled
issued Apr 2012, no final
2 Harrison Ststreet space & mta permit
Details
Permit
M315927
Permit issued
Apr 23, 2012

street space & mta permit

Open the permit page

Mar 29, 2012Completed
final sign-off May 2012
2 Harrison StCapitol Electric Const3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supply
Details
Permit
201203297114
Permit issued
Apr 5, 2012
Final sign-off
May 16, 2012

3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supply

Open the permit page

$12,000
Mar 19, 2012Completed
final sign-off Mar 2013
2 Harrison StBcci Construction Companyrevision to 201104013334 per field inspector request to change mens room door swing and to install power operator at enry door to womens restroom
Details
Permit
201203196317
Permit issued
Mar 19, 2012
Final sign-off
Mar 7, 2013

revision to 201104013334 per field inspector request to change mens room door swing and to install power operator at enry door to womens restroom

Open the permit page

Feb 6, 2012Completed
final sign-off Apr 2012
2 Harrison StBcci Construction Companytenant improvement. no structural work, minor non load bearing wall demolition and construction. new ceiling.
Details
Permit
201202063608
Permit issued
Mar 1, 2012
Final sign-off
Apr 23, 2012

tenant improvement. no structural work, minor non load bearing wall demolition and construction. new ceiling.

Open the permit page

$389,060
Dec 27, 2011Completed
final sign-off Jan 2012
2 Harrison StRed Hawk Fire & Security Ca Llcas built drawings for 201109215126. 6th fl fire alarm ti
Details
Permit
201112271309
Permit issued
Dec 27, 2011
Final sign-off
Jan 6, 2012

as built drawings for 201109215126. 6th fl fire alarm ti

Open the permit page

Dec 8, 2011Completed
final sign-off Jan 2012
2 Harrison StAyoob & Peery Plumbing Co Incchange out fire sprinker heads per tenant improvement, 32 change
Details
Permit
201112080300
Permit issued
Dec 8, 2011
Final sign-off
Jan 6, 2012

change out fire sprinker heads per tenant improvement, 32 change

Open the permit page

$16,448
Dec 1, 2011Never finaled
issued Dec 2011, no final
2 Harrison StMartinelli Environmental Graph4 evacuation maps to be fabricated and installed
Details
Permit
201112019936
Permit issued
Dec 8, 2011

4 evacuation maps to be fabricated and installed

Open the permit page

$400
Nov 18, 2011Completed
final sign-off Jul 2012
2 Harrison StBcci Construction Companyrevision to 201104013334. occupancy number revision for assembly permit.
Details
Permit
201111189295
Permit issued
Dec 21, 2011
Final sign-off
Jul 19, 2012

revision to 201104013334. occupancy number revision for assembly permit.

Open the permit page

Nov 4, 2011Completed
final sign-off Dec 2011
2 Harrison StBcci Construction Companyinterior non structural demo per sfab-017
Details
Permit
201111048272
Permit issued
Nov 4, 2011
Final sign-off
Dec 19, 2011

interior non structural demo per sfab-017

Open the permit page

$10,000
Sep 21, 2011Completed
final sign-off Dec 2011
2 Harrison StRed Hawk Fire & Security Ca Llc6th floor:ti for fire alarm system.18 duct detectors,21 ct2 dual imput, 12 smoke detectors, 3 relays, 1 speaker, 63 speaker/storbes, 3 strobes. note: no access controlled egress allowed (card readers) without first submitting on separate permit application.
Details
Permit
201109215126
Permit issued
Sep 21, 2011
Final sign-off
Dec 27, 2011

6th floor:ti for fire alarm system.18 duct detectors,21 ct2 dual imput, 12 smoke detectors, 3 relays, 1 speaker, 63 speaker/storbes, 3 strobes. note: no access controlled egress allowed (card readers) without first submitting on separate permit application.

Open the permit page

$20,000
Sep 20, 2011Completed
final sign-off Mar 2013
2 Harrison StBcci Construction Companyrevision to approved pa #201104013334 and 201108092076. no changes regarding egress and life safety. add dimensions at floor plan, revised ceiling heights, wall & floor finishes & partition types.
Details
Permit
201109205095
Permit issued
Sep 28, 2011
Final sign-off
Mar 8, 2013

revision to approved pa #201104013334 and 201108092076. no changes regarding egress and life safety. add dimensions at floor plan, revised ceiling heights, wall & floor finishes & partition types.

Open the permit page

$35,000
Aug 11, 2011Completed
final sign-off Nov 2011
2 Harrison StAyoob & Peery Plumbing Co Incadd & relocate fire sprinklers heads per tenant improvement add 35 and 333 relocate.
Details
Permit
201108112265
Permit issued
Aug 12, 2011
Final sign-off
Nov 18, 2011

add & relocate fire sprinklers heads per tenant improvement add 35 and 333 relocate.

Open the permit page

$102,000
Aug 10, 2011Completed
final sign-off Mar 2013
2 Harrison StBcci Construction Companyreference pa# 2011-0401-3334-structural work associated with approved permit. rebuild (e) 3 beams in (e) mezzanine tower.
Details
Permit
201108102184
Permit issued
Aug 11, 2011
Final sign-off
Mar 8, 2013

reference pa# 2011-0401-3334-structural work associated with approved permit. rebuild (e) 3 beams in (e) mezzanine tower.

Open the permit page

$25,000
Aug 9, 2011Completed
final sign-off Mar 2013
2 Harrison StBcci Construction Company6th floor-arch pa# 2011-0401-3334-mechanical & electrical work associated with approved permit
Details
Permit
201108092076
Permit issued
Aug 15, 2011
Final sign-off
Mar 7, 2013

6th floor-arch pa# 2011-0401-3334-mechanical & electrical work associated with approved permit

Open the permit page

Aug 2, 2011Expired or cancelled
cancelled Oct 2011
2 Harrison StNiscayah Inc.add 7 band readers, no door hardware
Details
Permit
201108021505
Permit issued
Aug 2, 2011

add 7 band readers, no door hardware

Open the permit page

$15,000
Jul 29, 2011Expired or cancelled
expired Apr 2014
2 Harrison StBcci Construction Companyrevision to appl #201106248876: addition 2 offices build-out added to scope.
Details
Permit
201107291376
Permit issued
Aug 1, 2011

revision to appl #201106248876: addition 2 offices build-out added to scope.

Open the permit page

$11,000
Jul 20, 2011Completed
final sign-off Aug 2011
2 Harrison StRed Hawk Fire & Security Ca Llc7th flr ti at 2 harrison fire alarm, 1-20 watt amplifier, 15 speakers, 1 strobe, 29 speaker strobes, 7 weatherproof speaker/strobes
Details
Permit
201107200589
Permit issued
Jul 20, 2011
Final sign-off
Aug 24, 2011

7th flr ti at 2 harrison fire alarm, 1-20 watt amplifier, 15 speakers, 1 strobe, 29 speaker strobes, 7 weatherproof speaker/strobes

Open the permit page

$19,000
Jul 12, 2011Completed
final sign-off Aug 2011
2 Harrison StAnderson, Rowe & Buckley, Inc.7th floor tenant improvements existing fire sprinkler system, added 26 sprinklers.
Details
Permit
201107120037
Permit issued
Jul 20, 2011
Final sign-off
Aug 24, 2011

7th floor tenant improvements existing fire sprinkler system, added 26 sprinklers.

Open the permit page

$13,200
Jun 29, 2011Completed
final sign-off Feb 2013
2 Harrison StBcci Construction Companyrevision to app#201106248876. move door and reduce walkway width
Details
Permit
201106299188
Permit issued
Jun 29, 2011
Final sign-off
Feb 7, 2013

revision to app#201106248876. move door and reduce walkway width

Open the permit page

Jun 24, 2011Completed
final sign-off Feb 2013
2 Harrison StBcci Construction Companyaddition of pavers and railing to convert existing roof to roof deck
Details
Permit
201106248876
Permit issued
Jun 24, 2011
Final sign-off
Feb 7, 2013

addition of pavers and railing to convert existing roof to roof deck

Open the permit page

$310,000
Jun 1, 2011Completed
final sign-off Oct 2011
2 Harrison StBcci Construction Companypreconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway
Details
Permit
201106017188
Permit issued
Jun 1, 2011
Final sign-off
Oct 25, 2011

preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway

Open the permit page

$35,000
May 31, 2011Never finaled
issued May 2011, no final
2 Harrison Ststreet space and mta
Details
Permit
M265288
Permit issued
May 31, 2011

street space and mta

Open the permit page

May 25, 2011Never finaled
issued Jun 2011, no final
2 Harrison StThomas Swan Sign Co Incto erect eletctrical sign
Details
Permit
201105256754
Permit issued
Jun 2, 2011

to erect eletctrical sign

Open the permit page

$5,000
May 23, 2011Completed
final sign-off Feb 2014
2 Harrison StBcci Construction Company7th floor-selective demo, new partitions, electrical outlets, lighting & finishes. add 2 new kitchettes
Details
Permit
201105236560
Permit issued
Jun 9, 2011
Final sign-off
Feb 20, 2014

7th floor-selective demo, new partitions, electrical outlets, lighting & finishes. add 2 new kitchettes

Open the permit page

$665,000
May 20, 2011Completed
final sign-off Jul 2012
2 Harrison StBcci Construction Companystructural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)
Details
Permit
201105206465
Permit issued
Jun 30, 2011
Final sign-off
Jul 18, 2012

structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)

Open the permit page

$220,000
May 20, 2011Completed
final sign-off Mar 2013
2 Harrison StBcci Construction Companyinterior non struc demo on the 6th fl per ab 017. the floor will not be occupied until plans with full disabled access have been approved & work performed, no disabled access required at this time
Details
Permit
201105206464
Permit issued
May 20, 2011
Final sign-off
Mar 8, 2013

interior non struc demo on the 6th fl per ab 017. the floor will not be occupied until plans with full disabled access have been approved & work performed, no disabled access required at this time

Open the permit page

$120,000
Apr 1, 2011Completed
final sign-off Jul 2012
2 Harrison StBcci Construction Companyinterior tenant improvement, including drywall, ceilings doors, millwork, glazing, finishes. change of use to include adult educational facility. mep, demolition & structural, under separate permit.
Details
Permit
201104013334
Permit issued
Aug 2, 2011
Final sign-off
Jul 19, 2012

interior tenant improvement, including drywall, ceilings doors, millwork, glazing, finishes. change of use to include adult educational facility. mep, demolition & structural, under separate permit.

Open the permit page

$3,900,000
Dec 2, 2010Never finaled
issued Dec 2010, no final
2 Harrison Ststreet space & parking meter
Details
Permit
M231429
Permit issued
Dec 2, 2010

street space & parking meter

Open the permit page

Sep 2, 2010Completed
final sign-off Jul 2012
2 Harrison StCapitol Electric Constfire alarm system upgrade (from honywell to est edwds), install 2 new modes, new smoke control panel, new audio amplifiers, new system devices on floors b1, 1st,2nd,3rd,4th,5th,6th & 7th floors. audio/visual already complete on b-1. connect common garage area with 345 spear bldg.
Details
Permit
201009020117
Permit issued
Dec 14, 2010
Final sign-off
Jul 2, 2012

fire alarm system upgrade (from honywell to est edwds), install 2 new modes, new smoke control panel, new audio amplifiers, new system devices on floors b1, 1st,2nd,3rd,4th,5th,6th & 7th floors. audio/visual already complete on b-1. connect common garage area with 345 spear bldg.

Open the permit page

$761,280
Nov 18, 2009Never finaled
issued Nov 2009, no final
2 Harrison StAaa Restaurant Fire Control/Dba Aaa Firegordon biersch brewery on 2nd floor, furnish and install one (!) ansul r-102 fire supression in the main kitchen area. fire alarm connection separte permit.
Details
Permit
200911181510
Permit issued
Nov 18, 2009

gordon biersch brewery on 2nd floor, furnish and install one (!) ansul r-102 fire supression in the main kitchen area. fire alarm connection separte permit.

Open the permit page

$7,000
Jun 23, 2009Completed
final sign-off Jul 2009
2 Harrison StC B F Inctenant improvement on 5th floor at 2 harrison. 1 speaker/strobe in conference room
Details
Permit
200906231054
Permit issued
Jun 23, 2009
Final sign-off
Jul 7, 2009

tenant improvement on 5th floor at 2 harrison. 1 speaker/strobe in conference room

Open the permit page

$18,000
Apr 16, 2009Completed
final sign-off Jul 2009
2 Harrison StPrincipal Builders Inc.design/build tenant improvement- minor demo, construction power/data. mep to be issued separately. (n) partitions to convert into offices.
Details
Permit
200904166429
Permit issued
May 14, 2009
Final sign-off
Jul 7, 2009

design/build tenant improvement- minor demo, construction power/data. mep to be issued separately. (n) partitions to convert into offices.

Open the permit page

$45,000
Dec 30, 2008Completed
final sign-off Jan 2009
2 Harrison StPioneer Fire Protection3rd floor-15 fire sprinklers removed
Details
Permit
200812309308
Permit issued
Dec 30, 2008
Final sign-off
Jan 29, 2009

3rd floor-15 fire sprinklers removed

Open the permit page

$3,000
Dec 19, 2008Completed
final sign-off Jan 2009
2 Harrison StTeamwrkx Construction3rd floor non-structural partition,& door and finishes.
Details
Permit
200812198831
Permit issued
Dec 19, 2008
Final sign-off
Jan 29, 2009

3rd floor non-structural partition,& door and finishes.

Open the permit page

$6,500
Dec 16, 2008Completed
final sign-off Mar 2011
2 Harrison StCapitol Electric Constgarage level- install 33 sprinkler strobes units & connect to 1 power supply to be triggered to system, w/ devices in 345 spear st. common garage.
Details
Permit
200812168556
Permit issued
Apr 29, 2009
Final sign-off
Mar 17, 2011

garage level- install 33 sprinkler strobes units & connect to 1 power supply to be triggered to system, w/ devices in 345 spear st. common garage.

Open the permit page

$13,550
Dec 11, 2008Completed
final sign-off Jan 2009
2 Harrison StTeamwrkx Construction2nd floor: demolition of offices walls to existing offices space per ab017. construction work under separate permit.
Details
Permit
200812118304
Permit issued
Dec 18, 2008
Final sign-off
Jan 29, 2009

2nd floor: demolition of offices walls to existing offices space per ab017. construction work under separate permit.

Open the permit page

$9,000
Dec 11, 2008Never finaled
issued Dec 2008, no final
2 Harrison Stdemo only of 1 partition wall for future ti
Details
Permit
200812118342
Permit issued
Dec 11, 2008

demo only of 1 partition wall for future ti

Open the permit page

$1,500
Jul 28, 2008Completed
final sign-off Nov 2008
2 Harrison StNovo Construction Inc6th fl: minor interior renovation with partial demolition of non structural partitions. installation of 2 dishwashers and 2 coffee makers at breakroom. upgrade restroom. mep, life safety, fire sprinkler under sep permit.
Details
Permit
200807287754
Permit issued
Jul 31, 2008
Final sign-off
Nov 19, 2008

6th fl: minor interior renovation with partial demolition of non structural partitions. installation of 2 dishwashers and 2 coffee makers at breakroom. upgrade restroom. mep, life safety, fire sprinkler under sep permit.

Open the permit page

$52,000
Jul 16, 2008Completed
final sign-off Jul 2008
2 Harrison StAnderson, Rowe & Buckley, Inc.tenant improvements to existing fire sprinkler system. relcoate 2 heads on 7th floor.
Details
Permit
200807166823
Permit issued
Jul 16, 2008
Final sign-off
Jul 31, 2008

tenant improvements to existing fire sprinkler system. relcoate 2 heads on 7th floor.

Open the permit page

$1,000
Jun 18, 2008Completed
final sign-off Jul 2008
2 Harrison StPrincipal Builders Inc.construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit
Details
Permit
200806184733
Permit issued
Jul 1, 2008
Final sign-off
Jul 31, 2008

construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit

Open the permit page

$60,000
Jun 12, 2008Never finaled
issued Jun 2008, no final
2 Harrison StHoneywell International, Incadd 2 duct smoke detectors, 1 control module to new heat pump units.
Details
Permit
200806124297
Permit issued
Jun 12, 2008

add 2 duct smoke detectors, 1 control module to new heat pump units.

Open the permit page

$6,500
Nov 22, 2006Completed
final sign-off Apr 2007
2 Harrison StDecker Electric Co Inc Electrical Contrafor the babcock & brown tenant provide fire alarm (7) speaker strobes, 1 fsd, 1 duct detector, work to be done on the 2nd floor
Details
Permit
200611228350
Permit issued
Nov 22, 2006
Final sign-off
Apr 20, 2007

for the babcock & brown tenant provide fire alarm (7) speaker strobes, 1 fsd, 1 duct detector, work to be done on the 2nd floor

Open the permit page

$7,000
Nov 2, 2006Completed
final sign-off Apr 2007
2 Harrison St2nd floor-t.i. upgrade on fire sprinkler system for 2nd for babcock & brown (#3288). relocate 44 heads, add 11 heads, delete 9 heads.
Details
Permit
200611026660
Permit issued
Nov 2, 2006
Final sign-off
Apr 20, 2007

2nd floor-t.i. upgrade on fire sprinkler system for 2nd for babcock & brown (#3288). relocate 44 heads, add 11 heads, delete 9 heads.

Open the permit page

$11,000
Sep 28, 2006Completed
final sign-off Apr 2007
2 Harrison StPrincipal Builders Inc.2nd floor - t.i. in existing structure including ceiling, floor, dfh, non-load bearing partitions, mep. work being performed in suite b only.
Details
Permit
200609283619
Permit issued
Nov 3, 2006
Final sign-off
Apr 20, 2007

2nd floor - t.i. in existing structure including ceiling, floor, dfh, non-load bearing partitions, mep. work being performed in suite b only.

Open the permit page

$467,590
Sep 5, 2006Completed
final sign-off Sep 2006
2 Harrison StSkyline Constructionrenewal of appl#200508311753 & 200506104774 for final inspection only
Details
Permit
200609051455
Permit issued
Sep 5, 2006
Final sign-off
Sep 21, 2006

renewal of appl#200508311753 & 200506104774 for final inspection only

Open the permit page

Sep 5, 2006Completed
final sign-off Sep 2006
2 Harrison StSkyline Constructionrenewal of pa#2005/08/31/1756 & 2005/06/10/4777 (1st floor)
Details
Permit
200609051456
Permit issued
Sep 5, 2006
Final sign-off
Sep 12, 2006

renewal of pa#2005/08/31/1756 & 2005/06/10/4777 (1st floor)

Open the permit page

Sep 5, 2006Completed
final sign-off Sep 2006
2 Harrison StSkyline Constructionrenewal of appl#200510185776 for final inspection only
Details
Permit
200609051457
Permit issued
Sep 5, 2006
Final sign-off
Sep 12, 2006

renewal of appl#200510185776 for final inspection only

Open the permit page

Nov 2, 2005Completed
final sign-off Sep 2006
2 Harrison StSkyline Constructionelectrical & mechanical work. no increase in office space.
Details
Permit
200511027186
Permit issued
Dec 23, 2005
Final sign-off
Sep 21, 2006

electrical & mechanical work. no increase in office space.

Open the permit page

$45,000
Oct 19, 2005Completed
final sign-off Sep 2006
2 Harrison StSkyline Constructionmechanical work on the 1st floor - no increase in office space
Details
Permit
200510196015
Permit issued
Nov 22, 2005
Final sign-off
Sep 12, 2006

mechanical work on the 1st floor - no increase in office space

Open the permit page

$12,000
Oct 18, 2005Expired or cancelled
expired Sep 2006
2 Harrison StSierra Electric Co1 smoke detector, 2 synchronization master, 13 speaker, 14 multi cal strobe
Details
Permit
200510185776
Permit issued
Oct 18, 2005

1 smoke detector, 2 synchronization master, 13 speaker, 14 multi cal strobe

Open the permit page

$14,000
Aug 31, 2005Expired or cancelled
expired Sep 2006
2 Harrison StSkyline Constructionsprinkler work/8 new heads 37 relocates/3 removed/no increase of office space
Details
Permit
200508311753
Permit issued
Aug 31, 2005

sprinkler work/8 new heads 37 relocates/3 removed/no increase of office space

Open the permit page

$12,000
Aug 31, 2005Expired or cancelled
expired Sep 2006
2 Harrison StSkyline Constructionsprinkler work 22 relocates/8 removal/no increase of office space
Details
Permit
200508311756
Permit issued
Aug 31, 2005

sprinkler work 22 relocates/8 removal/no increase of office space

Open the permit page

$8,500
Jun 17, 2005Completed
final sign-off Aug 2005
2 Harrison Stoti-3, 2nd floor, el, ls.
Details
Permit
200506175375
Permit issued
Jun 17, 2005
Final sign-off
Aug 22, 2005

oti-3, 2nd floor, el, ls.

Open the permit page

$84,000
Jun 13, 2005Completed
final sign-off Sep 2005
2 Harrison StNovo Construction Incoti-2, 2nd floor, me.
Details
Permit
200506134922
Permit issued
Jul 7, 2005
Final sign-off
Sep 28, 2005

oti-2, 2nd floor, me.

Open the permit page

$640,000
Jun 10, 2005Expired or cancelled
expired Sep 2006
2 Harrison Stoti-1-1st fl-el,me,sp,ls.
Details
Permit
200506104777
Permit issued
Jun 10, 2005

oti-1-1st fl-el,me,sp,ls.

Open the permit page

$40,000
Jun 10, 2005Expired or cancelled
expired Sep 2006
2 Harrison Stoti-1 3rd/fl-el,me, sp, ls.
Details
Permit
200506104774
Permit issued
Jun 10, 2005

oti-1 3rd/fl-el,me, sp, ls.

Open the permit page

$60,000
May 25, 2005Completed
final sign-off Aug 2005
2 Harrison StDpw Inc.modify existing sprinkler system on 2nd floor for new offices
Details
Permit
200505253442
Permit issued
May 25, 2005
Final sign-off
Aug 24, 2005

modify existing sprinkler system on 2nd floor for new offices

Open the permit page

$5,000
May 9, 2005Completed
final sign-off Sep 2005
2 Harrison StNovo Construction Incoti-1, 2th floor, el, me, ls, sp.
Details
Permit
200505091882
Permit issued
May 9, 2005
Final sign-off
Sep 28, 2005

oti-1, 2th floor, el, me, ls, sp.

Open the permit page

$115,000
Aug 10, 2004Completed
final sign-off Aug 2004
2 Harrison StDome Construction Corprenew app #20000128515
Details
Permit
200408101197
Permit issued
Aug 10, 2004
Final sign-off
Aug 11, 2004

renew app #20000128515

Open the permit page

Jul 8, 2004Completed
final sign-off Aug 2004
2 Harrison StSierra Electric Coinstall fire alarm devices through out the space at 3rd floor
Details
Permit
200407088285
Permit issued
Jul 8, 2004
Final sign-off
Aug 26, 2004

install fire alarm devices through out the space at 3rd floor

Open the permit page

$15,500
Jun 30, 2004Expired or cancelled
expired Feb 2005
2 Harrison StSkyline Constructionsprinkler work to be performed . no increase of office space
Details
Permit
200406307712
Permit issued
Jun 30, 2004

sprinkler work to be performed . no increase of office space

Open the permit page

$5,000
May 26, 2004Completed
final sign-off Aug 2004
2 Harrison StSkyline Constructionoti-1 , 3rd floor, el, me ls, sp
Details
Permit
200405264845
Permit issued
Jun 30, 2004
Final sign-off
Aug 26, 2004

oti-1 , 3rd floor, el, me ls, sp

Open the permit page

$70,000
May 26, 2004Completed
final sign-off Aug 2004
2 Harrison StSkyline Constructionoti - 2 , 3rd floor el, me
Details
Permit
200405264847
Permit issued
Jul 12, 2004
Final sign-off
Aug 26, 2004

oti - 2 , 3rd floor el, me

Open the permit page

$85,000
May 11, 2004Completed
final sign-off Apr 2005
2 Harrison StBcci Construction Companyoti-4,5th floor, l s
Details
Permit
200405113587
Permit issued
Jun 1, 2004
Final sign-off
Apr 14, 2005

oti-4,5th floor, l s

Open the permit page

$20,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Bcci Construction Company (56), Red Hawk Fire & Security Ca Llc (22), Anderson, Rowe & Buckley, Inc. (19), Novo Construction Inc (15), Skyline Construction (15), Thomas Swan Sign Co Inc (8), B N Builders Inc (6), Ayoob & Peery Plumbing Co Inc (4), Principal Builders Inc. (4), Capitol Electric Const (3), Sc Builders, Inc (3), C B F Inc (2), Golden Gate Fire Protection Inc (2), Sabah International Incorporated (2), Sierra Electric Co (2), Teamwrkx Construction (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Clune Construction Company L P, Decker Electric Co Inc Electrical Contra, Dettaglio Construction Inc Dba Dci Const, Dome Construction Corp, Dpw Inc., Eagle Bay Enterprises, Inc (Dba Garnett, Engler Construction, Englewood Construction Inc, Everon Llc, Gci, Inc, Honeywell International, Inc, Martinelli Environmental Graph, Niscayah Inc., Pioneer Fire Protection, Rainbow Waterproofing & Restor, Source Planning And Construction Inc
Architects
Marc Penninger (11), Steven Kelley (9), Michael Zelazek (4), Victoria Salgado (4), Douglas Zucker (2), George S Soskin (2), Kevin Schaeffer (2), Alan Johansen, Annie Lo, Ashley Miller, Barry Bourbon, Byron Kwong, J. Bradford Gambrell, James Kemp, Jonas Kellner, Michael Castro, My My Ly, Naveen Mathur, Thomas Lauck, William Loftis
Engineers
Jevin Almazan (5), Joshua Mcmahan (4), Alexander Joseph Pacheco (2), Donald Dammen (2), Erica Hays (2), Madison Mcmahan (2), Carlo Biscocho, Guil Orihuela, Guil Orihuela, Henry Holbrook Hyde Iii, Jesus Cabellon Jr., Joshua Mcmmahan, Rodolfo Bustos Iii, Thomas Lauck, Tom Sammons, William Haddinger, Zhen Chao Xiong
Attorneys
Dennis Ps Chemg
Authorized agents
Jonas Kellner (4), Alex Morin
Designers
Matthew Pietras

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.