Block 3744, lot 005
2 Harrison St
- City’s use
- Commercial Office
- Built
- 1925
- Stories
- 7
- Rooms
- 14 bathrooms
- Building
- 232,922 sq ft
- Lot
- 41,088 sq ft
- Zoning
- M1
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen & rooftop equipment is part of separate permit. accessibility deferred due to hvac work only.Details
new grease duct from ground floor type-1 hood to roof. duct shaft is existing from 3rd floor to roof and new from ground floor through 2nd floor. kitchen & rooftop equipment is part of separate permit. accessibility deferred due to hvac work only. | $44,730 | |
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 1st floor: partial ground floor t.i. selective non-structural demolition. construction of open office, meeting rooms, restroom, and employee break room/pantry, and associated mepDetails
1st floor: partial ground floor t.i. selective non-structural demolition. construction of open office, meeting rooms, restroom, and employee break room/pantry, and associated mep | $2,283,427 | |
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230Details
1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230 | $4,552,623 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 2/f: replacement of (4) water source heat pumpDetails
2/f: replacement of (4) water source heat pump | $30,000 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 2 Harrison St | Sc Builders, Inc | 5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes.Details
5/f: selective demo and construction of non-load bearing partitions, (e) mods to ceiling grid & tile, light ficture relocatoi and new inlcuding reswitching, new doors & frames, millwork and finishes. | $470,000 |
| Jul 17, 2026 | In progress issued Aug 2026 | 2 Harrison St | B N Builders Inc | 1st floor- interior non-structural demo only permit per ab-017Details
1st floor- interior non-structural demo only permit per ab-017 | $300,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 2 Harrison St | B N Builders Inc | floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.Details
floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included. | |
| May 14, 2026 | In progress filed May 2026, not yet issued | 2 Harrison St | B N Builders Inc | 2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included.Details
2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included. | |
| Dec 30, 2025 | In progress issued Apr 2026 | 2 Harrison St | B N Builders Inc | 2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.Details
2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph. | $500,000 |
| Dec 30, 2025 | In progress issued Apr 2026 | 2 Harrison St | B N Builders Inc | 3/f, 4/f, 5/f - partial demo of non structural walls, ceilings and light fixtures. new construction of non structural walls, finishes and power. mech and electr included.Details
3/f, 4/f, 5/f - partial demo of non structural walls, ceilings and light fixtures. new construction of non structural walls, finishes and power. mech and electr included. | $1,870,000 |
| Dec 18, 2025 | Completed final sign-off Jan 2026 | 2 Harrison St | ref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblityDetails
ref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblity | ||
| Jun 10, 2025 | Completed final sign-off Nov 2025 | 2 Harrison St | Skyline Construction | barrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current codeDetails
barrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current code | $150,000 |
| Aug 1, 2024 | Completed final sign-off Sep 2024 | 2 Harrison St | Bcci Construction Company | 7/f: demo of partitions and ceilings. ref sprinkler 202407297491Details
7/f: demo of partitions and ceilings. ref sprinkler 202407297491 | $45,000 |
| Jul 29, 2024 | Completed final sign-off Sep 2024 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 7/f: relocate 103 fire sprinklers to provide shell protection.Details
7/f: relocate 103 fire sprinklers to provide shell protection. | $55,000 |
| Nov 16, 2023 | In progress issued Mar 2024 | 2 Harrison St | Rainbow Waterproofing & Restor | on street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters.Details
on street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters. | $1,750,000 |
| Oct 17, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Sabah International Incorporated | 2-4/f: fire alarm , add 14 led strobe- ceiling mounted, add 23 led speaker/strobes- ceiling mounted. ref pa# 202308144326, 202308144312, 202308144314.Details
2-4/f: fire alarm , add 14 led strobe- ceiling mounted, add 23 led speaker/strobes- ceiling mounted. ref pa# 202308144326, 202308144312, 202308144314. | $26,077 |
| Oct 17, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 2-5/f: existing fire sprnikler system tenant improvements 2nd fl. add 2 & relocate 3 sprinklers (pendents) 3rd fl. add 7 & relocate 21 pendent sprinkers 4th fl. add 8 & relocate 34 pendent sprinklers (remove 2) 5th fl. remove 3 & relocate 14 sprinklersDetails
2-5/f: existing fire sprnikler system tenant improvements 2nd fl. add 2 & relocate 3 sprinklers (pendents) 3rd fl. add 7 & relocate 21 pendent sprinkers 4th fl. add 8 & relocate 34 pendent sprinklers (remove 2) 5th fl. remove 3 & relocate 14 sprinklers | $56,000 |
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | rev to pa# 202308144301; to replace sinks @ restrooms and drinking fountain to scope of workDetails
rev to pa# 202308144301; to replace sinks @ restrooms and drinking fountain to scope of work | $75,000 |
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | rev to pa# 2023-0814-4326: to add drinking fountain to scope of work, ceiling and lighting near room 221. ref arch pa# 2023-0814-4326Details
rev to pa# 2023-0814-4326: to add drinking fountain to scope of work, ceiling and lighting near room 221. ref arch pa# 2023-0814-4326 | $15,000 |
| Aug 31, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | rev to pa# 2023-0814-4314; add restrooms to scope of workDetails
rev to pa# 2023-0814-4314; add restrooms to scope of work | $75,000 |
| Aug 29, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | revision to pa# 202308144312. add restrooms and enlarge conf 313 and 314. change doors and phone 327, 328.Details
revision to pa# 202308144312. add restrooms and enlarge conf 313 and 314. change doors and phone 327, 328. | $75,000 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | 5th fl: mechanical & electrical work on 5th fl for t.i.. ref arch pa# 202308144301.Details
5th fl: mechanical & electrical work on 5th fl for t.i.. ref arch pa# 202308144301. | $25,000 |
| Aug 24, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Novo Construction Inc | 4th fl: mechanical & electrical work on 4th fl for t.i.. ref arch pa# 202308144314.Details
4th fl: mechanical & electrical work on 4th fl for t.i.. ref arch pa# 202308144314. | $25,000 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | 2nd fl: mechanical & electrical work on 2nd fl for t.i.. ref arch pa# 202308144326.Details
2nd fl: mechanical & electrical work on 2nd fl for t.i.. ref arch pa# 202308144326. | $30,000 |
| Aug 23, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Novo Construction Inc | mechanical and electrical work to tenant improvement on the 3rd fl. ref 202308144312Details
mechanical and electrical work to tenant improvement on the 3rd fl. ref 202308144312 | $30,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | 2/f: demo of existing non-structural paritions acoustical grid, tile gyp board. construction of non-structural partitions, ceiling, light fixtires, millwork. mep, life safety panel fire sprinkler under separate permit.Details
2/f: demo of existing non-structural paritions acoustical grid, tile gyp board. construction of non-structural partitions, ceiling, light fixtires, millwork. mep, life safety panel fire sprinkler under separate permit. | $75,000 |
| Aug 14, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Novo Construction Inc | demo of (e) non-structual partitons accoustical grid tile a gyp board, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permitDetails
demo of (e) non-structual partitons accoustical grid tile a gyp board, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit | $175,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 2 Harrison St | Novo Construction Inc | 5/f: demo of existing non-structural partitions acoustical and tile & gyp board. construction of non-structural partitions,doors, ceilings, light fixtures & millwork. mep, life safety and fire sprinklers under separate permit.Details
5/f: demo of existing non-structural partitions acoustical and tile & gyp board. construction of non-structural partitions,doors, ceilings, light fixtures & millwork. mep, life safety and fire sprinklers under separate permit. | $175,000 |
| Aug 14, 2023 | Completed final sign-off Feb 2024 | 2 Harrison St | Novo Construction Inc | demo of (e) non-structual partitons accoustical grid tile a gyp bord, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permitDetails
demo of (e) non-structual partitons accoustical grid tile a gyp bord, construction of non structural partitions, ceiling lights fixtures millwork mep life safety and fire sprinklers under sep permit | $175,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 2 Harrison St | Source Planning And Construction Inc | 4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maherDetails
4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maher | $100,000 |
| Dec 15, 2020 | Completed final sign-off Feb 2021 | 2 Harrison St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 2 pendents for suite #180 (1st floor). ref #2020-0917-4438.Details
fire sprinkler only. relocate 2 pendents for suite #180 (1st floor). ref #2020-0917-4438. | $1,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 2 Harrison St | Everon Llc | fire alarm t.i.: suite 180. add (2) speaker strobes, relocate & remove notification appliances as shown on plan. ref # 2020-0917-4418.Details
fire alarm t.i.: suite 180. add (2) speaker strobes, relocate & remove notification appliances as shown on plan. ref # 2020-0917-4418. | $1,200 |
| Nov 12, 2020 | Completed final sign-off Feb 2021 | 2 Harrison St | Skyline Construction | ste #180: mechanical & electrical work for tenant improvement. ref arch pa# 202009174438.Details
ste #180: mechanical & electrical work for tenant improvement. ref arch pa# 202009174438. | $25,000 |
| Sep 17, 2020 | Completed final sign-off Feb 2021 | 2 Harrison St | Skyline Construction | suite 180. interior alterations are limited to 1,147 sq ft area of work on level 1. the purpose is to prepare for future tenant occupancy. limited demo of exist door, glass panels & finish flooringDetails
suite 180. interior alterations are limited to 1,147 sq ft area of work on level 1. the purpose is to prepare for future tenant occupancy. limited demo of exist door, glass panels & finish flooring | $135,000 |
| Aug 26, 2020 | Never finaled issued Sep 2020, no final | 2 Harrison St | Bcci Construction Company | 5/f: arch permit to reduce scope of work, eliminating all delayed egress locs. elevator lobby remains as-is with emergency release button for egress. new partition to enclose space for reception, new finishes, flooring & paint. new electrical, no new lighting.Details
5/f: arch permit to reduce scope of work, eliminating all delayed egress locs. elevator lobby remains as-is with emergency release button for egress. new partition to enclose space for reception, new finishes, flooring & paint. new electrical, no new lighting. | $45,000 |
| Jul 14, 2020 | Never finaled issued Aug 2020, no final | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | relocate 3 sprinklersDetails
relocate 3 sprinklers | $1,500 |
| Feb 4, 2020 | Completed final sign-off Oct 2020 | 2 Harrison St | Bcci Construction Company | 3rd floor: revision to app#201910184899 and 201911258090 due to change order at the client's request.Details
3rd floor: revision to app#201910184899 and 201911258090 due to change order at the client's request. | |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire alar ti on the 5th fl add 2 speaker strobes, 1 duct detector for fsd ref 201910285755Details
fire alar ti on the 5th fl add 2 speaker strobes, 1 duct detector for fsd ref 201910285755 | $3,000 |
| Jan 7, 2020 | Completed final sign-off Oct 2020 | 2 Harrison St | Bcci Construction Company | 3rd fl - revision to previously approved mep permit. add new fsds. ref pa 2019-1018-4899, 2019-1126-8218Details
3rd fl - revision to previously approved mep permit. add new fsds. ref pa 2019-1018-4899, 2019-1126-8218 | |
| Dec 30, 2019 | Completed final sign-off Feb 2020 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti relocated 2 sprinklersDetails
existing fire sprinkler system ti relocated 2 sprinklers | $8,500 |
| Dec 24, 2019 | Never finaled issued Jan 2020, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 3/f: fire alarm t.i. - add 5 speakers, 2 duct detectors with control relay and monitor module. ref t.i. pa201910184899. maher n/a.Details
3/f: fire alarm t.i. - add 5 speakers, 2 duct detectors with control relay and monitor module. ref t.i. pa201910184899. maher n/a. | $3,000 |
| Dec 13, 2019 | Completed final sign-off Feb 2020 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti 1 added & 14 relocated sprinklers, 1 plugged/removed. ref pa 2019-1126-8218Details
existing fire sprinkler system ti 1 added & 14 relocated sprinklers, 1 plugged/removed. ref pa 2019-1126-8218 | $7,500 |
| Nov 26, 2019 | Never finaled issued Dec 2019, no final | 2 Harrison St | Bcci Construction Company | 3rd & 4th flr mep submittal to support approved arch set. adjust air terminals and vav terminal units to accomodate new lighting and ceiling layout. reference pa# 2019-1125-8090, 2019-9018-4899Details
3rd & 4th flr mep submittal to support approved arch set. adjust air terminals and vav terminal units to accomodate new lighting and ceiling layout. reference pa# 2019-1125-8090, 2019-9018-4899 | $30,000 |
| Nov 25, 2019 | Completed final sign-off Oct 2020 | 2 Harrison St | Bcci Construction Company | 3rd fl - revision to pa previously approved arch set. mep dererred ref pa 2019-1018-4899Details
3rd fl - revision to pa previously approved arch set. mep dererred ref pa 2019-1018-4899 | |
| Oct 28, 2019 | Completed final sign-off Feb 2020 | 2 Harrison St | 5th fl new partitions to enclose space for 2 new genders neutral restrooms. new finishes, flooring, paint, elec, lighting. mep deferredDetails
5th fl new partitions to enclose space for 2 new genders neutral restrooms. new finishes, flooring, paint, elec, lighting. mep deferred | $100,000 | |
| Oct 18, 2019 | Completed final sign-off Oct 2020 | 2 Harrison St | Bcci Construction Company | 3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979Details
3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979 | $410,000 |
| Oct 11, 2019 | Completed final sign-off Oct 2020 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 2 way comm. revision to app#201903054457 update scope of work/area of work to remove comm on 3rd floor. ref: 201810193678 for 4th flr arch ti. n/a for maherDetails
2 way comm. revision to app#201903054457 update scope of work/area of work to remove comm on 3rd floor. ref: 201810193678 for 4th flr arch ti. n/a for maher | |
| Sep 30, 2019 | Expired or cancelled cancelled Jan 2026 | 2 Harrison St | Bcci Construction Company | 5th fl - new partitions to enclose space for reception. new finishes, flooring and paint. new electrical and lighting. mep deferredDetails
5th fl - new partitions to enclose space for reception. new finishes, flooring and paint. new electrical and lighting. mep deferred | $68,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 2 Harrison St | Bcci Construction Company | 3rd & 4th floor - furniture permit for rockwell partition system ref 201810193680 & 201810193678Details
3rd & 4th floor - furniture permit for rockwell partition system ref 201810193680 & 201810193678 | $10,000 |
| Mar 5, 2019 | Completed final sign-off Oct 2020 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | provide new 2 way communication system include 1 master unit to be installed in fcc, 1 sub station at security desk; 2 call stations to be located at elevator lobby on 3rd & 4th fl. ref pa 2018-1019-3680 & 2018-1019-3678Details
provide new 2 way communication system include 1 master unit to be installed in fcc, 1 sub station at security desk; 2 call stations to be located at elevator lobby on 3rd & 4th fl. ref pa 2018-1019-3680 & 2018-1019-3678 | $10,000 |
| Jan 23, 2019 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678.Details
4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678. | $100,000 |
| Jan 23, 2019 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 3/f revision to previously approved arch and mep permits. changes to turn gender neutral restroom into phone rooms. minor chagnes to mk tub storage room. ref pa# 201810193680Details
3/f revision to previously approved arch and mep permits. changes to turn gender neutral restroom into phone rooms. minor chagnes to mk tub storage room. ref pa# 201810193680 | $100,000 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 3/f & 4/f: fire alarm t.i. 3/f:remove (e) appliances shown on plan.add 34 ceiling speaker stronbe, 1 ceiling weatherproof speaker strobe, 2 celiing strobes, 3 ceiling speakrs 1 duct detctors for fsd w/ control & monitoring.Details
3/f & 4/f: fire alarm t.i. 3/f:remove (e) appliances shown on plan.add 34 ceiling speaker stronbe, 1 ceiling weatherproof speaker strobe, 2 celiing strobes, 3 ceiling speakrs 1 duct detctors for fsd w/ control & monitoring. | $46,000 |
| Jan 3, 2019 | Completed final sign-off Feb 2019 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 3rd & 4th flrs - modify (e) fire sprinkler system for ti ref 201810193680 & 201810193678 changeout 15 heads 3rd floor, remove 23 relocate 13 4th floor relocate 20, remove 4Details
3rd & 4th flrs - modify (e) fire sprinkler system for ti ref 201810193680 & 201810193678 changeout 15 heads 3rd floor, remove 23 relocate 13 4th floor relocate 20, remove 4 | $8,534 |
| Dec 28, 2018 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 3rdflr - mep dwgs to support previously approved arch set 201810193680 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pumpDetails
3rdflr - mep dwgs to support previously approved arch set 201810193680 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump | $610,000 |
| Dec 28, 2018 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 4th flr - mep dwgs to support previously approved arch set 201810193678 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pumpDetails
4th flr - mep dwgs to support previously approved arch set 201810193678 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump | $650,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | Bcci Construction Company | 4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.Details
4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area. | $980,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | Bcci Construction Company | 3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.Details
3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls. | $980,000 |
| Oct 3, 2018 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 3rd and 4th floor - demo of non-structural partitions. ab-017 applies.Details
3rd and 4th floor - demo of non-structural partitions. ab-017 applies. | $80,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2018 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 7/f: fire alarm as built drawing for app#201806141942. maher n/a.Details
7/f: fire alarm as built drawing for app#201806141942. maher n/a. | |
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 7th floor: fire alarm t.i. add 1 ceiling speaker strobes. ref app#201805159100. n/a for meharDetails
7th floor: fire alarm t.i. add 1 ceiling speaker strobes. ref app#201805159100. n/a for mehar | $500 |
| Jun 8, 2018 | Expired or cancelled cancelled Nov 2022 | 2 Harrison St | installation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software.Details
installation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software. | $52,998 | |
| Jun 5, 2018 | Completed final sign-off Jun 2018 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 7th floor sprinkler ti to existing fire sprinkler system ti 5 sprinklers ref pa 201805159100Details
7th floor sprinkler ti to existing fire sprinkler system ti 5 sprinklers ref pa 201805159100 | $2,500 |
| May 15, 2018 | Completed final sign-off Sep 2018 | 2 Harrison St | Bcci Construction Company | 7th fl - selective demo & divide an existing conference room into 2 phone room ref pa 2014-0307-0168. maher na.Details
7th fl - selective demo & divide an existing conference room into 2 phone room ref pa 2014-0307-0168. maher na. | $25,000 |
| Feb 28, 2018 | Completed final sign-off May 2018 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 1st flr - arch 201802201761 (e) fire sprinklers system ti - 3 added sprinklers 1 plug maher naDetails
1st flr - arch 201802201761 (e) fire sprinklers system ti - 3 added sprinklers 1 plug maher na | $2,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 2 Harrison St | Englewood Construction Inc | cosmetic in nature - new flooring, painting, ceiling tile, casework replacement minor demolition & construction of particions & pony walls, branch circuit electrical work & relocate plumbing fixture,maher naDetails
cosmetic in nature - new flooring, painting, ceiling tile, casework replacement minor demolition & construction of particions & pony walls, branch circuit electrical work & relocate plumbing fixture,maher na | $150,244 |
| Oct 30, 2017 | Completed final sign-off May 2018 | 2 Harrison St | Thomas Swan Sign Co Inc | to erect 3 electric, projecting, double faced signs.Details
to erect 3 electric, projecting, double faced signs. | $5,000 |
| Oct 30, 2017 | Completed final sign-off May 2018 | 2 Harrison St | Thomas Swan Sign Co Inc | to erect one non-illuminated wall single faced sign.Details
to erect one non-illuminated wall single faced sign. | $2,000 |
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 2nd fl add 3 speaker/strobes, relocate 1 speaker strobes, change candela setting on 1 existing speaker strobe maher not req; maher ord 155-13 naDetails
fire alarm ti on 2nd fl add 3 speaker/strobes, relocate 1 speaker strobes, change candela setting on 1 existing speaker strobe maher not req; maher ord 155-13 na | $1,500 |
| Aug 9, 2017 | Never finaled issued Aug 2017, no final | 2 Harrison St | Bcci Construction Company | 2/f #200- 1 new fan coil unit, 1 new branch selector box. plumbing of new ada resteroom, new fixtures, new lighting & power branch circuiting. t.i. pa#201706260334. n/a ordinance #155-13Details
2/f #200- 1 new fan coil unit, 1 new branch selector box. plumbing of new ada resteroom, new fixtures, new lighting & power branch circuiting. t.i. pa#201706260334. n/a ordinance #155-13 | $387,000 |
| Jul 25, 2017 | Completed final sign-off Aug 2017 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 2/f- existing fire sprinkler system ti relocate 9 sprinklers, add 3 sprinklers ref pa 2017-0626-0334. maher naDetails
2/f- existing fire sprinkler system ti relocate 9 sprinklers, add 3 sprinklers ref pa 2017-0626-0334. maher na | $6,000 |
| Jun 26, 2017 | Never finaled issued Jun 2017, no final | 2 Harrison St | Bcci Construction Company | 2nd floor - new partitions, ceilings and finishes. n/a for maher.Details
2nd floor - new partitions, ceilings and finishes. n/a for maher. | $300,000 |
| Jul 29, 2016 | Completed final sign-off Nov 2016 | 2 Harrison St | Gci, Inc | suite 138: minor ti -adding two doors and frames to office space maher naDetails
suite 138: minor ti -adding two doors and frames to office space maher na | $65,000 |
| May 2, 2016 | Completed final sign-off May 2016 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 2nd fl: fire alarm ti add 12 ceiling speaker strobes, 1 ceiling strobes, 2 duct detectors for heat pump. ref ti 2015-1221-5663. compliance with maher ordinance no 155-13 not required.Details
2nd fl: fire alarm ti add 12 ceiling speaker strobes, 1 ceiling strobes, 2 duct detectors for heat pump. ref ti 2015-1221-5663. compliance with maher ordinance no 155-13 not required. | $8,500 |
| Mar 22, 2016 | Completed final sign-off Mar 2016 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | fire sprinkler t.i., relocate 15 heads, add 2 heads, plug 1 head. t.i. pa#201512215663, n/a ordinance #155-13Details
fire sprinkler t.i., relocate 15 heads, add 2 heads, plug 1 head. t.i. pa#201512215663, n/a ordinance #155-13 | $9,000 |
| Mar 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2 Harrison St | 1st floor - minor tenant improvements on first floor of building. addition of counter areas in suites 138 and 146.Details
1st floor - minor tenant improvements on first floor of building. addition of counter areas in suites 138 and 146. | $135,000 | |
| Dec 21, 2015 | Completed final sign-off Jul 2016 | 2 Harrison St | Bcci Construction Company | t.i. in suite 201 including demo and new partitions, ceiling, finishes, associated mep. fire life safty under seperate permit.Details
t.i. in suite 201 including demo and new partitions, ceiling, finishes, associated mep. fire life safty under seperate permit. | $1,500,000 |
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | ste 200, add 3 duct detector with 3 relay. ref pa 2015-09023-7760. maher naDetails
ste 200, add 3 duct detector with 3 relay. ref pa 2015-09023-7760. maher na | $2,000 |
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | ste 149: add 1 speaker, 10 speaker/strobes, 1 strobe, 10 duct detectors with 10 relays. 11.16.15 approved otcDetails
ste 149: add 1 speaker, 10 speaker/strobes, 1 strobe, 10 duct detectors with 10 relays. 11.16.15 approved otc | $17,000 |
| Oct 21, 2015 | Completed final sign-off Jan 2016 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | fire sprinklers- 1st floor, suite #149: ref 2015 0814 4273: add hds: 3, relocate hds: 24 maher naDetails
fire sprinklers- 1st floor, suite #149: ref 2015 0814 4273: add hds: 3, relocate hds: 24 maher na | $14,000 |
| Sep 23, 2015 | Never finaled issued Sep 2015, no final | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 2nd floor suite 200: add 9 strobes, 24 speaker/strobes, 3 smoke detectors, 17 duct detectors w/17 relaysDetails
2nd floor suite 200: add 9 strobes, 24 speaker/strobes, 3 smoke detectors, 17 duct detectors w/17 relays | $15,000 |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 2nd flr: fire sprinkler ti - add 7 heads, relocate 46 heads, ref pa 2015 0710 1229 maher naDetails
2nd flr: fire sprinkler ti - add 7 heads, relocate 46 heads, ref pa 2015 0710 1229 maher na | $13,000 |
| Aug 10, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | t.i. suite #149 including minor demolition and the build back of new partitions, doors, finishes & associated mep. fire ls under separate permit. n/a maher ord. 155-13Details
t.i. suite #149 including minor demolition and the build back of new partitions, doors, finishes & associated mep. fire ls under separate permit. n/a maher ord. 155-13 | $265,000 |
| Jul 31, 2015 | Completed final sign-off Aug 2015 | 2 Harrison St | Engler Construction | (n) non structural partition, no change in occupancy, use or area. divide sute 168 into two tenant space. architectural, mep under separation permit. n/a ordinance #155-13Details
(n) non structural partition, no change in occupancy, use or area. divide sute 168 into two tenant space. architectural, mep under separation permit. n/a ordinance #155-13 | $10,000 |
| Jul 10, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | 2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a.Details
2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a. | $1,416,000 |
| May 4, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | suite #500: mechanical work associated with approval appl. #2015.0210.7968 including new vav boxes, heat pumps and fans. fire life safety under separate permit. maher n/a.Details
suite #500: mechanical work associated with approval appl. #2015.0210.7968 including new vav boxes, heat pumps and fans. fire life safety under separate permit. maher n/a. | $125,000 |
| Apr 27, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | demolition under ab-017 on level 2 suite 200 including demolition of extg walls, partitions and finish flooring. n/a for maher ordinance.Details
demolition under ab-017 on level 2 suite 200 including demolition of extg walls, partitions and finish flooring. n/a for maher ordinance. | $112,000 |
| Apr 3, 2015 | Completed final sign-off May 2015 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 5th floor: t.i. 6 speakers, 19 speaker strobes, 1 strobe. ref app#201502107968. n/a for the maher.Details
5th floor: t.i. 6 speakers, 19 speaker strobes, 1 strobe. ref app#201502107968. n/a for the maher. | $9,000 |
| Mar 2, 2015 | Completed final sign-off Sep 2015 | 2 Harrison St | Bcci Construction Company | installation of platform lift. n/a for the maher ordinanceDetails
installation of platform lift. n/a for the maher ordinance | $15,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | #350- fire sprinkler t.i., plug 4, relocate 19, add 3, total 22 sprinklers. arch. pa# 201501276745. n/a ordinance #155-13Details
#350- fire sprinkler t.i., plug 4, relocate 19, add 3, total 22 sprinklers. arch. pa# 201501276745. n/a ordinance #155-13 | $11,350 |
| Feb 24, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire alarm ti-3rd floor suite 350 fire alarm including 1 duct detector, 1 smoke detector, 2 relays, 2 monitor modules, 12 speaker/strobes. n/a maher ordinanceDetails
fire alarm ti-3rd floor suite 350 fire alarm including 1 duct detector, 1 smoke detector, 2 relays, 2 monitor modules, 12 speaker/strobes. n/a maher ordinance | $4,000 |
| Feb 24, 2015 | Completed final sign-off Mar 2015 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 1st floor suite 140 fire alarm including 3 strobes & 5 speaker/strobes. ref #2015.0202.7263. n/a maher ordinanceDetails
1st floor suite 140 fire alarm including 3 strobes & 5 speaker/strobes. ref #2015.0202.7263. n/a maher ordinance | $4,000 |
| Feb 20, 2015 | Completed final sign-off Mar 2015 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti: added sprk: 1, relocate sprk: 4 to suite 140 mahar - not requiredDetails
fire sprinkler ti: added sprk: 1, relocate sprk: 4 to suite 140 mahar - not required | $2,600 |
| Feb 20, 2015 | Completed final sign-off Mar 2015 | 2 Harrison St | Ayoob & Peery Plumbing Co Inc | relocate (3) sprinklers per tenant improvements. t.i. pa#201502057617. n/a ordinance #155-13Details
relocate (3) sprinklers per tenant improvements. t.i. pa#201502057617. n/a ordinance #155-13 | $1,542 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire alarm 6th fl 2 speaker strobes. reference ti 2015.0205.7617Details
fire alarm 6th fl 2 speaker strobes. reference ti 2015.0205.7617 | $3,000 |
| Feb 10, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | minor demolition of existing non-structural partitions and addition of new millwork and finishes- mep, sprinklesr and fire alarm separate permits.Details
minor demolition of existing non-structural partitions and addition of new millwork and finishes- mep, sprinklesr and fire alarm separate permits. | $250,000 |
| Feb 5, 2015 | Completed final sign-off Oct 2015 | 2 Harrison St | Bcci Construction Company | sute #600: new partitions, relocate supply grilles, t- stats and return grilles, re-balance supply grilles. associated electrical work. n/a for the maher.Details
sute #600: new partitions, relocate supply grilles, t- stats and return grilles, re-balance supply grilles. associated electrical work. n/a for the maher. | $66,000 |
| Feb 2, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | suite 140: t.i. including demolition of non-structural partitions and adding new partition finishes and associated mechanical, & electrical work. life safety deferred; under separate permit. n/a for the maher.Details
suite 140: t.i. including demolition of non-structural partitions and adding new partition finishes and associated mechanical, & electrical work. life safety deferred; under separate permit. n/a for the maher. | $300,000 |
| Jan 27, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | 3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permitDetails
3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permit | $678,000 |
| Jan 15, 2015 | Never finaled issued Jan 2015, no final | 2 Harrison St | C B F Inc | work is part of pa# 201412173892, #201412173889; minor electrical buildout of restrooms including adding (8) wall sconces and (8) dimmer switches. n/a ordinance #155-13Details
work is part of pa# 201412173892, #201412173889; minor electrical buildout of restrooms including adding (8) wall sconces and (8) dimmer switches. n/a ordinance #155-13 | $12,000 |
| Dec 17, 2014 | Completed final sign-off Apr 2015 | 2 Harrison St | Clune Construction Company L P | ground flr: non structural demo (n) plumb, fixtures, accessories, counter, finishes, no change in area, occupancy or use. maher n/aDetails
ground flr: non structural demo (n) plumb, fixtures, accessories, counter, finishes, no change in area, occupancy or use. maher n/a | $100,000 |
| Mar 24, 2014 | Never finaled issued Mar 2014, no final | 2 Harrison St | Skyline Construction | mechanical and electrical work for tenant improvment at first floor ref 201403110426Details
mechanical and electrical work for tenant improvment at first floor ref 201403110426 | $12,000 |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 2 Harrison St | Golden Gate Fire Protection Inc | 1st floor - relocate 11 pendent sprinklers. ref #2014.0311.0426. compliance with compliance #155-13 not requiredDetails
1st floor - relocate 11 pendent sprinklers. ref #2014.0311.0426. compliance with compliance #155-13 not required | $5,665 |
| Mar 18, 2014 | Completed final sign-off Apr 2014 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st fl including 2 speakers, 4 speaker strobes; compliance with ord 155-13 not required.Details
fire alarm ti on 1st fl including 2 speakers, 4 speaker strobes; compliance with ord 155-13 not required. | $4,000 |
| Mar 11, 2014 | Completed final sign-off May 2014 | 2 Harrison St | Skyline Construction | 1st & 5th floor - interior renovation of existing office space. no change in or occupancy. new finishes, lighting and minimal modification to mechanical system. f/a, sprinklers, mep under separate permit. compliance with ordinance #155-13 not requiredDetails
1st & 5th floor - interior renovation of existing office space. no change in or occupancy. new finishes, lighting and minimal modification to mechanical system. f/a, sprinklers, mep under separate permit. compliance with ordinance #155-13 not required | $30,000 |
| Mar 7, 2014 | Completed final sign-off Apr 2014 | 2 Harrison St | Bcci Construction Company | barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not requiredDetails
barrier removal in parking garage at hills plaza. compliance with ordinance #155-13 not required | $6,500 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 2 Harrison St | Bcci Construction Company | to obtain final inspection for work approved under pa#2011.0729.1376. all work is complete.Details
to obtain final inspection for work approved under pa#2011.0729.1376. all work is complete. | |
| Dec 4, 2013 | Completed final sign-off Jan 2014 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | fire sprinkler ti on 3rd and 4th fl including 5 speaker/strobes, 1 smoke detectorDetails
fire sprinkler ti on 3rd and 4th fl including 5 speaker/strobes, 1 smoke detector | $5,000 |
| Nov 15, 2013 | Never finaled issued Nov 2013, no final | 2 Harrison St | mta permitDetails
mta permit | ||
| Nov 15, 2013 | Completed final sign-off Nov 2013 | 2 Harrison St | Bcci Construction Company | remove existing 3 dimensional sign (non historic grain silo and concrete platform)Details
remove existing 3 dimensional sign (non historic grain silo and concrete platform) | $16,500 |
| Nov 14, 2013 | Never finaled issued Nov 2013, no final | 2 Harrison St | street spaceDetails
street space | ||
| Nov 14, 2013 | Never finaled issued Nov 2013, no final | 2 Harrison St | street space permit (scaffolding)Details
street space permit (scaffolding) | ||
| Nov 4, 2013 | Completed final sign-off Feb 2014 | 2 Harrison St | Principal Builders Inc. | voluntary accesibility upgrade to restroom on 4th floor existing t.i. space to relocate partitions and toilet accessory and finishes.Details
voluntary accesibility upgrade to restroom on 4th floor existing t.i. space to relocate partitions and toilet accessory and finishes. | $69,568 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 2 Harrison St | Bcci Construction Company | revision to pa# 2011-0525-6560-additional millwork & modify bathrooms to bring up to codeDetails
revision to pa# 2011-0525-6560-additional millwork & modify bathrooms to bring up to code | $20,000 |
| Oct 16, 2013 | Completed final sign-off Dec 2013 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 1st floor fire alarm t.i. including (1) speaker, (8) speaker/strobes. ref pa #2013.10.04.8493.Details
1st floor fire alarm t.i. including (1) speaker, (8) speaker/strobes. ref pa #2013.10.04.8493. | $4,000 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 2 Harrison St | Bcci Construction Company | 1st floor - revisions to approved & issued site application #201207306043s-1 & s-2 - mis. tenant improvement revisions, walls, sink, mechanical and electrical to create a training area & offices.Details
1st floor - revisions to approved & issued site application #201207306043s-1 & s-2 - mis. tenant improvement revisions, walls, sink, mechanical and electrical to create a training area & offices. | $20,000 |
| Oct 4, 2013 | Completed final sign-off Oct 2013 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti. add 2 sprinklers, relocate 3 sprinklers 1st flDetails
existing fire sprinkler system ti. add 2 sprinklers, relocate 3 sprinklers 1st fl | $2,500 |
| Sep 20, 2013 | Completed final sign-off Feb 2014 | 2 Harrison St | Thomas Swan Sign Co Inc | erect a ground electric four faced direct new signDetails
erect a ground electric four faced direct new sign | $12,000 |
| Jul 31, 2013 | Completed final sign-off Dec 2013 | 2 Harrison St | Dettaglio Construction Inc Dba Dci Const | 3rd floor-restroom upgradesDetails
3rd floor-restroom upgrades | $30,000 |
| Apr 23, 2013 | Expired or cancelled cancelled Feb 2020 | 2 Harrison St | Bcci Construction Company | revision to appl #2012.07.30.6043 - remove existing exterior lift @ embarcadero side, not in path of travel.Details
revision to appl #2012.07.30.6043 - remove existing exterior lift @ embarcadero side, not in path of travel. | $6,000 |
| Jan 17, 2013 | Completed final sign-off Apr 2013 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | expansion of (e) fire sprinkler system, add 2 sprinklers.basement. ti pa#2012-07-30-6043.Details
expansion of (e) fire sprinkler system, add 2 sprinklers.basement. ti pa#2012-07-30-6043. | $1,000 |
| Jan 9, 2013 | Completed final sign-off Mar 2014 | 2 Harrison St | Bcci Construction Company | revision to 201211284990 to include new infill.Details
revision to 201211284990 to include new infill. | $1,500 |
| Jan 8, 2013 | Never finaled issued Jan 2013, no final | 2 Harrison St | Eagle Bay Enterprises, Inc (Dba Garnett | install evacuation signs floor b1, 1-7Details
install evacuation signs floor b1, 1-7 | $8,400 |
| Nov 28, 2012 | Completed final sign-off Mar 2014 | 2 Harrison St | Bcci Construction Company | 2nd floor-revision to pa# 2012-1113-4123-change infill method for holes in slab to simpler pan deck & light weight concreteDetails
2nd floor-revision to pa# 2012-1113-4123-change infill method for holes in slab to simpler pan deck & light weight concrete | $100 |
| Nov 13, 2012 | Completed final sign-off Mar 2014 | 2 Harrison St | Bcci Construction Company | pre construction work under ab-017 to infill 6 existing floor openingsDetails
pre construction work under ab-017 to infill 6 existing floor openings | $22,500 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 2 Harrison St | Ayoob & Peery Plumbing Co Inc | 6th floor:add fire sprinkler heads per t. i. add 6. bldg app#201108112265Details
6th floor:add fire sprinkler heads per t. i. add 6. bldg app#201108112265 | $3,000 |
| Oct 4, 2012 | Completed final sign-off Apr 2014 | 2 Harrison St | Bcci Construction Company | 2nd floor-infill void area-concrete slab approx 500 sq ft. this is an unoccupied space & the work is to be performed under sfab-017. this space is to remain unoccupiedDetails
2nd floor-infill void area-concrete slab approx 500 sq ft. this is an unoccupied space & the work is to be performed under sfab-017. this space is to remain unoccupied | $40,000 |
| Sep 5, 2012 | Completed final sign-off Mar 2014 | 2 Harrison St | Bcci Construction Company | pre construction demo per ab017 of ste 138, 146, 156 and 238. no fire rated construction to be removed. sprinkler & life safety to remain operational.Details
pre construction demo per ab017 of ste 138, 146, 156 and 238. no fire rated construction to be removed. sprinkler & life safety to remain operational. | $85,000 |
| Aug 10, 2012 | Never finaled issued Sep 2013, no final | 2 Harrison St | Thomas Swan Sign Co Inc | to erect electric, projecting, double faced sign.Details
to erect electric, projecting, double faced sign. | $12,000 |
| Aug 10, 2012 | Never finaled issued Sep 2013, no final | 2 Harrison St | Thomas Swan Sign Co Inc | to erect non-electric, wall, single faced sign.Details
to erect non-electric, wall, single faced sign. | $12,000 |
| Aug 10, 2012 | Never finaled issued Sep 2013, no final | 2 Harrison St | Thomas Swan Sign Co Inc | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $12,000 |
| Aug 10, 2012 | Never finaled issued Sep 2013, no final | 2 Harrison St | Thomas Swan Sign Co Inc | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $12,000 |
| Jul 30, 2012 | Completed final sign-off Apr 2014 | 2 Harrison St | change of use. interior tenant improvement at suite, 138, 156, 146, 238 including converting a-3 to b use.Details
change of use. interior tenant improvement at suite, 138, 156, 146, 238 including converting a-3 to b use. | $2,500,000 | |
| May 2, 2012 | Never finaled issued May 2012, no final | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | tenant improvements, existing fire sprinkler system, 51 new sprinklers 3rd flDetails
tenant improvements, existing fire sprinkler system, 51 new sprinklers 3rd fl | $25,500 |
| Apr 23, 2012 | Never finaled issued Apr 2012, no final | 2 Harrison St | street space & mta permitDetails
street space & mta permit | ||
| Mar 29, 2012 | Completed final sign-off May 2012 | 2 Harrison St | Capitol Electric Const | 3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supplyDetails
3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supply | $12,000 |
| Mar 19, 2012 | Completed final sign-off Mar 2013 | 2 Harrison St | Bcci Construction Company | revision to 201104013334 per field inspector request to change mens room door swing and to install power operator at enry door to womens restroomDetails
revision to 201104013334 per field inspector request to change mens room door swing and to install power operator at enry door to womens restroom | |
| Feb 6, 2012 | Completed final sign-off Apr 2012 | 2 Harrison St | Bcci Construction Company | tenant improvement. no structural work, minor non load bearing wall demolition and construction. new ceiling.Details
tenant improvement. no structural work, minor non load bearing wall demolition and construction. new ceiling. | $389,060 |
| Dec 27, 2011 | Completed final sign-off Jan 2012 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | as built drawings for 201109215126. 6th fl fire alarm tiDetails
as built drawings for 201109215126. 6th fl fire alarm ti | |
| Dec 8, 2011 | Completed final sign-off Jan 2012 | 2 Harrison St | Ayoob & Peery Plumbing Co Inc | change out fire sprinker heads per tenant improvement, 32 changeDetails
change out fire sprinker heads per tenant improvement, 32 change | $16,448 |
| Dec 1, 2011 | Never finaled issued Dec 2011, no final | 2 Harrison St | Martinelli Environmental Graph | 4 evacuation maps to be fabricated and installedDetails
4 evacuation maps to be fabricated and installed | $400 |
| Nov 18, 2011 | Completed final sign-off Jul 2012 | 2 Harrison St | Bcci Construction Company | revision to 201104013334. occupancy number revision for assembly permit.Details
revision to 201104013334. occupancy number revision for assembly permit. | |
| Nov 4, 2011 | Completed final sign-off Dec 2011 | 2 Harrison St | Bcci Construction Company | interior non structural demo per sfab-017Details
interior non structural demo per sfab-017 | $10,000 |
| Sep 21, 2011 | Completed final sign-off Dec 2011 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 6th floor:ti for fire alarm system.18 duct detectors,21 ct2 dual imput, 12 smoke detectors, 3 relays, 1 speaker, 63 speaker/storbes, 3 strobes. note: no access controlled egress allowed (card readers) without first submitting on separate permit application.Details
6th floor:ti for fire alarm system.18 duct detectors,21 ct2 dual imput, 12 smoke detectors, 3 relays, 1 speaker, 63 speaker/storbes, 3 strobes. note: no access controlled egress allowed (card readers) without first submitting on separate permit application. | $20,000 |
| Sep 20, 2011 | Completed final sign-off Mar 2013 | 2 Harrison St | Bcci Construction Company | revision to approved pa #201104013334 and 201108092076. no changes regarding egress and life safety. add dimensions at floor plan, revised ceiling heights, wall & floor finishes & partition types.Details
revision to approved pa #201104013334 and 201108092076. no changes regarding egress and life safety. add dimensions at floor plan, revised ceiling heights, wall & floor finishes & partition types. | $35,000 |
| Aug 11, 2011 | Completed final sign-off Nov 2011 | 2 Harrison St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinklers heads per tenant improvement add 35 and 333 relocate.Details
add & relocate fire sprinklers heads per tenant improvement add 35 and 333 relocate. | $102,000 |
| Aug 10, 2011 | Completed final sign-off Mar 2013 | 2 Harrison St | Bcci Construction Company | reference pa# 2011-0401-3334-structural work associated with approved permit. rebuild (e) 3 beams in (e) mezzanine tower.Details
reference pa# 2011-0401-3334-structural work associated with approved permit. rebuild (e) 3 beams in (e) mezzanine tower. | $25,000 |
| Aug 9, 2011 | Completed final sign-off Mar 2013 | 2 Harrison St | Bcci Construction Company | 6th floor-arch pa# 2011-0401-3334-mechanical & electrical work associated with approved permitDetails
6th floor-arch pa# 2011-0401-3334-mechanical & electrical work associated with approved permit | |
| Aug 2, 2011 | Expired or cancelled cancelled Oct 2011 | 2 Harrison St | Niscayah Inc. | add 7 band readers, no door hardwareDetails
add 7 band readers, no door hardware | $15,000 |
| Jul 29, 2011 | Expired or cancelled expired Apr 2014 | 2 Harrison St | Bcci Construction Company | revision to appl #201106248876: addition 2 offices build-out added to scope.Details
revision to appl #201106248876: addition 2 offices build-out added to scope. | $11,000 |
| Jul 20, 2011 | Completed final sign-off Aug 2011 | 2 Harrison St | Red Hawk Fire & Security Ca Llc | 7th flr ti at 2 harrison fire alarm, 1-20 watt amplifier, 15 speakers, 1 strobe, 29 speaker strobes, 7 weatherproof speaker/strobesDetails
7th flr ti at 2 harrison fire alarm, 1-20 watt amplifier, 15 speakers, 1 strobe, 29 speaker strobes, 7 weatherproof speaker/strobes | $19,000 |
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | 7th floor tenant improvements existing fire sprinkler system, added 26 sprinklers.Details
7th floor tenant improvements existing fire sprinkler system, added 26 sprinklers. | $13,200 |
| Jun 29, 2011 | Completed final sign-off Feb 2013 | 2 Harrison St | Bcci Construction Company | revision to app#201106248876. move door and reduce walkway widthDetails
revision to app#201106248876. move door and reduce walkway width | |
| Jun 24, 2011 | Completed final sign-off Feb 2013 | 2 Harrison St | Bcci Construction Company | addition of pavers and railing to convert existing roof to roof deckDetails
addition of pavers and railing to convert existing roof to roof deck | $310,000 |
| Jun 1, 2011 | Completed final sign-off Oct 2011 | 2 Harrison St | Bcci Construction Company | preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairwayDetails
preconstruction demo of interior non-exit stair btn floors 6 and 7 and struc in fill of stairway | $35,000 |
| May 31, 2011 | Never finaled issued May 2011, no final | 2 Harrison St | street space and mtaDetails
street space and mta | ||
| May 25, 2011 | Never finaled issued Jun 2011, no final | 2 Harrison St | Thomas Swan Sign Co Inc | to erect eletctrical signDetails
to erect eletctrical sign | $5,000 |
| May 23, 2011 | Completed final sign-off Feb 2014 | 2 Harrison St | Bcci Construction Company | 7th floor-selective demo, new partitions, electrical outlets, lighting & finishes. add 2 new kitchettesDetails
7th floor-selective demo, new partitions, electrical outlets, lighting & finishes. add 2 new kitchettes | $665,000 |
| May 20, 2011 | Completed final sign-off Jul 2012 | 2 Harrison St | Bcci Construction Company | structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.)Details
structural work to remove columns and reinforce the structure to compensate and add structural for stair and support for operable partition.(accessibility for the area of work to be addressed under separate architecture permit application before occupancy.) | $220,000 |
| May 20, 2011 | Completed final sign-off Mar 2013 | 2 Harrison St | Bcci Construction Company | interior non struc demo on the 6th fl per ab 017. the floor will not be occupied until plans with full disabled access have been approved & work performed, no disabled access required at this timeDetails
interior non struc demo on the 6th fl per ab 017. the floor will not be occupied until plans with full disabled access have been approved & work performed, no disabled access required at this time | $120,000 |
| Apr 1, 2011 | Completed final sign-off Jul 2012 | 2 Harrison St | Bcci Construction Company | interior tenant improvement, including drywall, ceilings doors, millwork, glazing, finishes. change of use to include adult educational facility. mep, demolition & structural, under separate permit.Details
interior tenant improvement, including drywall, ceilings doors, millwork, glazing, finishes. change of use to include adult educational facility. mep, demolition & structural, under separate permit. | $3,900,000 |
| Dec 2, 2010 | Never finaled issued Dec 2010, no final | 2 Harrison St | street space & parking meterDetails
street space & parking meter | ||
| Sep 2, 2010 | Completed final sign-off Jul 2012 | 2 Harrison St | Capitol Electric Const | fire alarm system upgrade (from honywell to est edwds), install 2 new modes, new smoke control panel, new audio amplifiers, new system devices on floors b1, 1st,2nd,3rd,4th,5th,6th & 7th floors. audio/visual already complete on b-1. connect common garage area with 345 spear bldg.Details
fire alarm system upgrade (from honywell to est edwds), install 2 new modes, new smoke control panel, new audio amplifiers, new system devices on floors b1, 1st,2nd,3rd,4th,5th,6th & 7th floors. audio/visual already complete on b-1. connect common garage area with 345 spear bldg. | $761,280 |
| Nov 18, 2009 | Never finaled issued Nov 2009, no final | 2 Harrison St | Aaa Restaurant Fire Control/Dba Aaa Fire | gordon biersch brewery on 2nd floor, furnish and install one (!) ansul r-102 fire supression in the main kitchen area. fire alarm connection separte permit.Details
gordon biersch brewery on 2nd floor, furnish and install one (!) ansul r-102 fire supression in the main kitchen area. fire alarm connection separte permit. | $7,000 |
| Jun 23, 2009 | Completed final sign-off Jul 2009 | 2 Harrison St | C B F Inc | tenant improvement on 5th floor at 2 harrison. 1 speaker/strobe in conference roomDetails
tenant improvement on 5th floor at 2 harrison. 1 speaker/strobe in conference room | $18,000 |
| Apr 16, 2009 | Completed final sign-off Jul 2009 | 2 Harrison St | Principal Builders Inc. | design/build tenant improvement- minor demo, construction power/data. mep to be issued separately. (n) partitions to convert into offices.Details
design/build tenant improvement- minor demo, construction power/data. mep to be issued separately. (n) partitions to convert into offices. | $45,000 |
| Dec 30, 2008 | Completed final sign-off Jan 2009 | 2 Harrison St | Pioneer Fire Protection | 3rd floor-15 fire sprinklers removedDetails
3rd floor-15 fire sprinklers removed | $3,000 |
| Dec 19, 2008 | Completed final sign-off Jan 2009 | 2 Harrison St | Teamwrkx Construction | 3rd floor non-structural partition,& door and finishes.Details
3rd floor non-structural partition,& door and finishes. | $6,500 |
| Dec 16, 2008 | Completed final sign-off Mar 2011 | 2 Harrison St | Capitol Electric Const | garage level- install 33 sprinkler strobes units & connect to 1 power supply to be triggered to system, w/ devices in 345 spear st. common garage.Details
garage level- install 33 sprinkler strobes units & connect to 1 power supply to be triggered to system, w/ devices in 345 spear st. common garage. | $13,550 |
| Dec 11, 2008 | Never finaled issued Dec 2008, no final | 2 Harrison St | demo only of 1 partition wall for future tiDetails
demo only of 1 partition wall for future ti | $1,500 | |
| Dec 11, 2008 | Completed final sign-off Jan 2009 | 2 Harrison St | Teamwrkx Construction | 2nd floor: demolition of offices walls to existing offices space per ab017. construction work under separate permit.Details
2nd floor: demolition of offices walls to existing offices space per ab017. construction work under separate permit. | $9,000 |
| Jul 28, 2008 | Completed final sign-off Nov 2008 | 2 Harrison St | Novo Construction Inc | 6th fl: minor interior renovation with partial demolition of non structural partitions. installation of 2 dishwashers and 2 coffee makers at breakroom. upgrade restroom. mep, life safety, fire sprinkler under sep permit.Details
6th fl: minor interior renovation with partial demolition of non structural partitions. installation of 2 dishwashers and 2 coffee makers at breakroom. upgrade restroom. mep, life safety, fire sprinkler under sep permit. | $52,000 |
| Jul 16, 2008 | Completed final sign-off Jul 2008 | 2 Harrison St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system. relcoate 2 heads on 7th floor.Details
tenant improvements to existing fire sprinkler system. relcoate 2 heads on 7th floor. | $1,000 |
| Jun 18, 2008 | Completed final sign-off Jul 2008 | 2 Harrison St | Principal Builders Inc. | construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permitDetails
construction of a 2-hr rated enclosure at ex. convenience stair to separate 6th and 7th floor tenants. required mep and fire protection modifications will be design-built and under a separate permit | $60,000 |
| Jun 12, 2008 | Never finaled issued Jun 2008, no final | 2 Harrison St | Honeywell International, Inc | add 2 duct smoke detectors, 1 control module to new heat pump units.Details
add 2 duct smoke detectors, 1 control module to new heat pump units. | $6,500 |
| Nov 22, 2006 | Completed final sign-off Apr 2007 | 2 Harrison St | Decker Electric Co Inc Electrical Contra | for the babcock & brown tenant provide fire alarm (7) speaker strobes, 1 fsd, 1 duct detector, work to be done on the 2nd floorDetails
for the babcock & brown tenant provide fire alarm (7) speaker strobes, 1 fsd, 1 duct detector, work to be done on the 2nd floor | $7,000 |
| Nov 2, 2006 | Completed final sign-off Apr 2007 | 2 Harrison St | R L H Fire Protection Inc | 2nd floor-t.i. upgrade on fire sprinkler system for 2nd for babcock & brown (#3288). relocate 44 heads, add 11 heads, delete 9 heads.Details
2nd floor-t.i. upgrade on fire sprinkler system for 2nd for babcock & brown (#3288). relocate 44 heads, add 11 heads, delete 9 heads. | $11,000 |
| Sep 28, 2006 | Completed final sign-off Apr 2007 | 2 Harrison St | Principal Builders Inc. | 2nd floor - t.i. in existing structure including ceiling, floor, dfh, non-load bearing partitions, mep. work being performed in suite b only.Details
2nd floor - t.i. in existing structure including ceiling, floor, dfh, non-load bearing partitions, mep. work being performed in suite b only. | $467,590 |
| Sep 5, 2006 | Completed final sign-off Sep 2006 | 2 Harrison St | Skyline Construction | renewal of appl#200508311753 & 200506104774 for final inspection onlyDetails
renewal of appl#200508311753 & 200506104774 for final inspection only | |
| Sep 5, 2006 | Completed final sign-off Sep 2006 | 2 Harrison St | Skyline Construction | renewal of pa#2005/08/31/1756 & 2005/06/10/4777 (1st floor)Details
renewal of pa#2005/08/31/1756 & 2005/06/10/4777 (1st floor) | |
| Sep 5, 2006 | Completed final sign-off Sep 2006 | 2 Harrison St | Skyline Construction | renewal of appl#200510185776 for final inspection onlyDetails
renewal of appl#200510185776 for final inspection only | |
| Nov 2, 2005 | Completed final sign-off Sep 2006 | 2 Harrison St | Skyline Construction | electrical & mechanical work. no increase in office space.Details
electrical & mechanical work. no increase in office space. | $45,000 |
| Oct 19, 2005 | Completed final sign-off Sep 2006 | 2 Harrison St | Skyline Construction | mechanical work on the 1st floor - no increase in office spaceDetails
mechanical work on the 1st floor - no increase in office space | $12,000 |
| Oct 18, 2005 | Expired or cancelled expired Sep 2006 | 2 Harrison St | Sierra Electric Co | 1 smoke detector, 2 synchronization master, 13 speaker, 14 multi cal strobeDetails
1 smoke detector, 2 synchronization master, 13 speaker, 14 multi cal strobe | $14,000 |
| Aug 31, 2005 | Expired or cancelled expired Sep 2006 | 2 Harrison St | Skyline Construction | sprinkler work/8 new heads 37 relocates/3 removed/no increase of office spaceDetails
sprinkler work/8 new heads 37 relocates/3 removed/no increase of office space | $12,000 |
| Aug 31, 2005 | Expired or cancelled expired Sep 2006 | 2 Harrison St | Skyline Construction | sprinkler work 22 relocates/8 removal/no increase of office spaceDetails
sprinkler work 22 relocates/8 removal/no increase of office space | $8,500 |
| Jun 17, 2005 | Completed final sign-off Aug 2005 | 2 Harrison St | oti-3, 2nd floor, el, ls.Details
oti-3, 2nd floor, el, ls. | $84,000 | |
| Jun 13, 2005 | Completed final sign-off Sep 2005 | 2 Harrison St | Novo Construction Inc | oti-2, 2nd floor, me.Details
oti-2, 2nd floor, me. | $640,000 |
| Jun 10, 2005 | Expired or cancelled expired Sep 2006 | 2 Harrison St | oti-1 3rd/fl-el,me, sp, ls.Details
oti-1 3rd/fl-el,me, sp, ls. | $60,000 | |
| Jun 10, 2005 | Expired or cancelled expired Sep 2006 | 2 Harrison St | oti-1-1st fl-el,me,sp,ls.Details
oti-1-1st fl-el,me,sp,ls. | $40,000 | |
| May 25, 2005 | Completed final sign-off Aug 2005 | 2 Harrison St | Dpw Inc. | modify existing sprinkler system on 2nd floor for new officesDetails
modify existing sprinkler system on 2nd floor for new offices | $5,000 |
| May 9, 2005 | Completed final sign-off Sep 2005 | 2 Harrison St | Novo Construction Inc | oti-1, 2th floor, el, me, ls, sp.Details
oti-1, 2th floor, el, me, ls, sp. | $115,000 |
| Aug 10, 2004 | Completed final sign-off Aug 2004 | 2 Harrison St | Dome Construction Corp | renew app #20000128515Details
renew app #20000128515 | |
| Jul 8, 2004 | Completed final sign-off Aug 2004 | 2 Harrison St | Sierra Electric Co | install fire alarm devices through out the space at 3rd floorDetails
install fire alarm devices through out the space at 3rd floor | $15,500 |
| Jun 30, 2004 | Expired or cancelled expired Feb 2005 | 2 Harrison St | Skyline Construction | sprinkler work to be performed . no increase of office spaceDetails
sprinkler work to be performed . no increase of office space | $5,000 |
| May 26, 2004 | Completed final sign-off Aug 2004 | 2 Harrison St | Skyline Construction | oti-1 , 3rd floor, el, me ls, spDetails
oti-1 , 3rd floor, el, me ls, sp | $70,000 |
| May 26, 2004 | Completed final sign-off Aug 2004 | 2 Harrison St | Skyline Construction | oti - 2 , 3rd floor el, meDetails
oti - 2 , 3rd floor el, me | $85,000 |
| May 11, 2004 | Completed final sign-off Apr 2005 | 2 Harrison St | Bcci Construction Company | oti-4,5th floor, l sDetails
oti-4,5th floor, l s | $20,000 |
| Apr 21, 2004 | Completed final sign-off Apr 2005 | 2 Harrison St | Bcci Construction Company | oti-3 5th floor spDetails
oti-3 5th floor sp | $71,000 |
| Apr 7, 2004 | Completed final sign-off Apr 2005 | 2 Harrison St | Bcci Construction Company | oti-2, 5th fl, me, elDetails
oti-2, 5th fl, me, el | $500,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.