Erica Hayes
- License
- S6428
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6428 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Degenkolb
- Based in
- San Francisco
- On San Francisco permits
- Aug 2021 to Sep 2026
18 permits since 2000 (engineer on 17 permits, architect on 1 permit): 7 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (8), Devcon Construction (3), B N Builders Inc, Novo Construction Inc, Plant Construction Co, Lp, Sc Builders, Inc, Woolsey Construction Inc
- Architects
- Anne Torney (4), Lisa Bieringer (3), Victoria Salgado (3), Wesley Herr (2), Greg Hagey, Michael Castro
- Engineers
- Joshua Mcmmahan (3), Madison Ryutaro Roberts (2), Carl Milsum, Craig Ristow, Dmitry Korshakovsky, Elisabeth M Allen, Guil Orihuela, Jesus Esqueda, Jevin Almazan, Joshua Mcmahan, Madison Mcmahan, Ray J Park
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230Details
1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230 | $4,552,623 | |
| Aug 18, 2026 | In progress issued Oct 2026 | 250 Howard St | Sc Builders, Inc | lvl 38-43: installation of office phone booth, structural anchorage involvedDetails
lvl 38-43: installation of office phone booth, structural anchorage involved | $100,000 |
| Jul 21, 2026 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | 1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be servicedDetails
1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced | $350,000 |
| May 18, 2026 | In progress issued Nov 2026 | 2 Harrison St | B N Builders Inc | floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.Details
floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included. | |
| May 12, 2026 | In progress issued Jul 2026 | 1 Market St | 6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural.Details
6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural. | $3,000,000 | |
| Apr 14, 2026 | In progress issued Jul 2026 | 353 Sacramento St | Bcci Construction Company | 3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferredDetails
3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred | $1,596,000 |
| Apr 13, 2026 | Completed final sign-off Oct 2026 | 188 The Embarcadero | Novo Construction Inc | basement - set of document is for construction of an mep equipement platform avoce the existing parking access rampDetails
basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp | $35,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 353 Sacramento St | Bcci Construction Company | 3rd/fl- structural permit submittal to reinforce 3rd floor slabDetails
3rd/fl- structural permit submittal to reinforce 3rd floor slab | $50,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | Devcon Construction | tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardwareDetails
tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware | $350,000 |
| Dec 11, 2025 | In progress issued Jul 2026 | 345 Spear St | Devcon Construction | 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.Details
1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. | $367,000 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 350 University St | Woolsey Construction Inc | all work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associatedDetails
all work is at 1/f -project is limited to modifications to the north stair egress path & associated modifications to existing components along this path. scope includes slective demolition of non-load bearing partitions, new rated doors and frames, exit lighting, new exterior exit stair & associated | $150,000 |
| Nov 20, 2023 | Completed final sign-off Jan 2024 | 300 Clay St | Bcci Construction Company | 2nd floor: structural permit to install (4) "stuff station" vending machines and brace them to (e) partition. added architectural sheet to show (4) new equipment unit in the supply room. ref pa# 201810092629Details
2nd floor: structural permit to install (4) "stuff station" vending machines and brace them to (e) partition. added architectural sheet to show (4) new equipment unit in the supply room. ref pa# 201810092629 | $1,000 |
| Nov 16, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.Details
6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood. | $50,000 |
| Oct 21, 2022 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | 7/f: structural only permit to strengthen slabs. ref bpa#202208170721Details
7/f: structural only permit to strengthen slabs. ref bpa#202208170721 | $80,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 1st fl: revision to pa# 202203180339. changes to handrail at staircaseDetails
1st fl: revision to pa# 202203180339. changes to handrail at staircase | |
| Mar 18, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.Details
1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered. | $450,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included.Details
4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included. | $6,241,495 |
| Aug 11, 2021 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Plant Construction Co, Lp | rooftop existing equipment seismic anchorage.Details
rooftop existing equipment seismic anchorage. | $25,000 |