Block 3715, lot 013
177 Steuart St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 7
- Building
- 92,093 sq ft
- Lot
- 12,956 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | Completed final sign-off Oct 2026 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | as built 202602115723- 1/fl: add (2) fire sprinkler per ti -ref 202511038763Details
as built 202602115723- 1/fl: add (2) fire sprinkler per ti -ref 202511038763 | $1,242 |
| Aug 5, 2026 | In progress issued Aug 2026 | 188 The Embarcadero | Novo Construction Inc | roof: equipment anchorage for new hvac units. ref #202605211690Details
roof: equipment anchorage for new hvac units. ref #202605211690 | $15,000 |
| May 21, 2026 | In progress issued Jun 2026 | 188 The Embarcadero | Novo Construction Inc | removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included.Details
removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included. | $2,000,000 |
| May 14, 2026 | In progress issued May 2026 | 188 The Embarcadero | Novo Construction Inc | this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes.Details
this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes. | $55,000 |
| Apr 13, 2026 | In progress issued May 2026 | 188 The Embarcadero | Novo Construction Inc | basement - set of document is for construction of an mep equipement platform avoce the existing parking access rampDetails
basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp | $35,000 |
| Mar 26, 2026 | Completed final sign-off Jun 2026 | 188 The Embarcadero | L.D. Strobel Co Ltd | remove verizon equipment only & antannas from roof of the building & disconnect power & fiberDetails
remove verizon equipment only & antannas from roof of the building & disconnect power & fiber | $10,000 |
| Feb 11, 2026 | Completed final sign-off Oct 2026 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | ground fl ref pa #2025-1103-8763: add 5 relocate 28 change 1 fire sprinkler tiDetails
ground fl ref pa #2025-1103-8763: add 5 relocate 28 change 1 fire sprinkler ti | $20,736 |
| Feb 3, 2026 | Expired or cancelled withdrawn Mar 2026 | 188 The Embarcadero | verizon: remove (2) (e) antennas, (2)(e) rrus, (e) elec panel; relocate 9(e) rrus' and 1 transformer; install (n) 200a elec panel, 1 (n) cabinet, 8(n) batteries, (n) conduits.Details
verizon: remove (2) (e) antennas, (2)(e) rrus, (e) elec panel; relocate 9(e) rrus' and 1 transformer; install (n) 200a elec panel, 1 (n) cabinet, 8(n) batteries, (n) conduits. | $75,000 | |
| Jan 22, 2026 | In progress issued Jan 2026 | 188 The Embarcadero | Sabah International Incorporated | 4/f: provide a modification of the (e) fire alarm system. remove 5, reloc 2, add 3 notification appliances as shown on plans. ref t.i. pa 202510066797Details
4/f: provide a modification of the (e) fire alarm system. remove 5, reloc 2, add 3 notification appliances as shown on plans. ref t.i. pa 202510066797 | $14,000 |
| Dec 15, 2025 | In progress issued Feb 2026 | 188 The Embarcadero | Novo Construction Inc | mechanical and electrical work for tenant improvement at the 1st fl and basement. reference pa#2025-1103-8763 and pa#202512020700.Details
mechanical and electrical work for tenant improvement at the 1st fl and basement. reference pa#2025-1103-8763 and pa#202512020700. | $190,000 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | record as built for pa# 202510227896 - fire sprinklers. 2/f: relocate (3) fire sprinkler per t.i. update drawings for adjusted piping plan. job# 25-684. ref pa# 202508082645Details
record as built for pa# 202510227896 - fire sprinklers. 2/f: relocate (3) fire sprinkler per t.i. update drawings for adjusted piping plan. job# 25-684. ref pa# 202508082645 | $1,863 |
| Dec 3, 2025 | Completed final sign-off Sep 2026 | 188 The Embarcadero | Novo Construction Inc | 4/f: mechanical, electrical, and plumbing for tenant improvement on the 4th floor. ref ti pa# 202510066797Details
4/f: mechanical, electrical, and plumbing for tenant improvement on the 4th floor. ref ti pa# 202510066797 | $145,000 |
| Dec 2, 2025 | In progress issued Feb 2026 | 188 The Embarcadero | Novo Construction Inc | 1st, 6th, & basement: alteration of a front of house into a catering nook to include construction of non-bearing partitions, finishes, door, frames and hardware. mep on seperate permit.Details
1st, 6th, & basement: alteration of a front of house into a catering nook to include construction of non-bearing partitions, finishes, door, frames and hardware. mep on seperate permit. | $275,000 |
| Nov 20, 2025 | In progress issued Nov 2025 | 188 The Embarcadero | Novo Construction Inc | 6th flr: this set of documents is for alteration of an (e) conference room to a lounge. the t.i. scope of work includes the construction of non-bearing partitions, finishes, door, frame and hardware, electrical mechanical, and plumbing shall be submitted as separate permits.Details
6th flr: this set of documents is for alteration of an (e) conference room to a lounge. the t.i. scope of work includes the construction of non-bearing partitions, finishes, door, frame and hardware, electrical mechanical, and plumbing shall be submitted as separate permits. | $115,000 |
| Nov 3, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | ground fl: ti for event space. scope consists of selective demolition and construction of finishes, non bearing partitions, lights, doors, frames and hardware.Details
ground fl: ti for event space. scope consists of selective demolition and construction of finishes, non bearing partitions, lights, doors, frames and hardware. | $2,000,000 |
| Oct 31, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | 1st floor-fitness room: mechanical and electrical and plumbing work for t.i, ref. pa #202508112719Details
1st floor-fitness room: mechanical and electrical and plumbing work for t.i, ref. pa #202508112719 | $22,000 |
| Oct 31, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | deferred mechanical and electrical ti for 1st floor-board room and 2nd floor library. reference pa 202508082645Details
deferred mechanical and electrical ti for 1st floor-board room and 2nd floor library. reference pa 202508082645 | $20,000 |
| Oct 28, 2025 | Completed final sign-off Dec 2025 | 188 The Embarcadero | Sabah International Incorporated | provide a modification of e fire alarm system on 1st fl. add 1 new weather proof led speaker strobe. new notificatiappliance will be connected to the e notification circuit fed from existing power supply. ref 202508112719Details
provide a modification of e fire alarm system on 1st fl. add 1 new weather proof led speaker strobe. new notificatiappliance will be connected to the e notification circuit fed from existing power supply. ref 202508112719 | $13,000 |
| Oct 24, 2025 | Completed final sign-off Jan 2026 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | 4th fl- add 6 relocate 14 fire sprinkler ti. job #25-984. ref pa# 2025-1006-6797Details
4th fl- add 6 relocate 14 fire sprinkler ti. job #25-984. ref pa# 2025-1006-6797 | $12,422 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | 1st and 2nd floor. 1/f: relocate (4) fire sprinkler per t.i. 2/f: add (3) relocate (1) fire sprinkler per t.i. job 254-684. ref#: 202508082645Details
1st and 2nd floor. 1/f: relocate (4) fire sprinkler per t.i. 2/f: add (3) relocate (1) fire sprinkler per t.i. job 254-684. ref#: 202508082645 | $4,969 |
| Oct 14, 2025 | Completed final sign-off Dec 2025 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | 1st/fl: add (2) relocate (1) fire sprinkler per t.i job# 25-684 ref# 2025-0811-2719Details
1st/fl: add (2) relocate (1) fire sprinkler per t.i job# 25-684 ref# 2025-0811-2719 | $1,863 |
| Oct 6, 2025 | Completed final sign-off Sep 2026 | 188 The Embarcadero | Novo Construction Inc | 4th fl - this set of doc's is for the minor alteratin of an (e) open office to an executive suite; ti includes construction of non-bearing partitions, finishes, doors, frames and hardware and toilet accessibleDetails
4th fl - this set of doc's is for the minor alteratin of an (e) open office to an executive suite; ti includes construction of non-bearing partitions, finishes, doors, frames and hardware and toilet accessible | $75,000 |
| Aug 11, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | 1st floor: minor alteration of an existing confrence pace to a private fitness area. the scope of work includes selective demolition of finishes, non bearing partitions, lights, doors, frames and hardware. construction of new partitions finishing, doors, frames & hardware & toilet accessories.Details
1st floor: minor alteration of an existing confrence pace to a private fitness area. the scope of work includes selective demolition of finishes, non bearing partitions, lights, doors, frames and hardware. construction of new partitions finishing, doors, frames & hardware & toilet accessories. | $65,000 |
| Aug 8, 2025 | Completed final sign-off Aug 2026 | 188 The Embarcadero | Novo Construction Inc | 1st & 2nd fl - minor alteration of an (e) conference space to an executive board room and library; selective demo of finishes, lights, doors, frames and hardware; construction of partitions, finishes, doors, frames & hardwareDetails
1st & 2nd fl - minor alteration of an (e) conference space to an executive board room and library; selective demo of finishes, lights, doors, frames and hardware; construction of partitions, finishes, doors, frames & hardware | $50,000 |
| Jun 17, 2025 | Expired or cancelled cancelled Aug 2025 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | tenant improvements existing fire sprinker system relocate 4 sprinklers, ref to 202504013463Details
tenant improvements existing fire sprinker system relocate 4 sprinklers, ref to 202504013463 | $1,000 |
| Jun 16, 2025 | Completed final sign-off Oct 2025 | 188 The Embarcadero | Novo Construction Inc | the scope of project consist of minor alterations of an (e) assembly space. selective demolition and the installation of new security doors and door hardware.Details
the scope of project consist of minor alterations of an (e) assembly space. selective demolition and the installation of new security doors and door hardware. | $20,000 |
| May 8, 2025 | Completed final sign-off Sep 2025 | 188 The Embarcadero | Sabah International Incorporated | 1st fl - provide a modification of the (e) fire alarm system. remove 2 existing notification appliances add 1 new weather proof. led speaker strobe ref pa 202504013463Details
1st fl - provide a modification of the (e) fire alarm system. remove 2 existing notification appliances add 1 new weather proof. led speaker strobe ref pa 202504013463 | $4,961 |
| Apr 1, 2025 | Completed final sign-off Nov 2025 | 188 The Embarcadero | Novo Construction Inc | convert one gender neutral restroom and one mothers room into new accessible shower room. mep included.Details
convert one gender neutral restroom and one mothers room into new accessible shower room. mep included. | $300,000 |
| Jan 22, 2025 | Completed final sign-off Apr 2025 | 188 The Embarcadero | Novo Construction Inc | basement & 8th/f: repair of broken stair tread welds at stair #1 and # 2 on basement through 8th floorDetails
basement & 8th/f: repair of broken stair tread welds at stair #1 and # 2 on basement through 8th floor | $50,000 |
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 188 The Embarcadero | Novo Construction Inc | revision to pa 202409120601 and 202411044348 to add roof drains. plumbing plans added for drainage details low rise buildingDetails
revision to pa 202409120601 and 202411044348 to add roof drains. plumbing plans added for drainage details low rise building | |
| Nov 4, 2024 | Completed final sign-off Mar 2025 | 188 The Embarcadero | Novo Construction Inc | revision to pa # 202409120601 to remove proposed work at penthouse roof from scope of work.Details
revision to pa # 202409120601 to remove proposed work at penthouse roof from scope of work. | |
| Oct 25, 2024 | In progress issued Nov 2024 | 188 The Embarcadero | Novo Construction Inc | 1st fl evacuation maps (5).Details
1st fl evacuation maps (5). | $100 |
| Sep 25, 2024 | Completed final sign-off Dec 2024 | 188 The Embarcadero | Sabah International Incorporated | 6th fl ref pa # 2024-0612-4271 addition to (e) fire alarm system. 4 (n) smoke detectors 2 (n) high power control relaysDetails
6th fl ref pa # 2024-0612-4271 addition to (e) fire alarm system. 4 (n) smoke detectors 2 (n) high power control relays | $18,000 |
| Sep 25, 2024 | Completed final sign-off Dec 2024 | 188 The Embarcadero | Sabah International Incorporated | 1/f: ref pa# 202406124276- addition to (e) fire alarm system on the first floor. add (1) high power control relay. relocate (2) existing speaker strobes.Details
1/f: ref pa# 202406124276- addition to (e) fire alarm system on the first floor. add (1) high power control relay. relocate (2) existing speaker strobes. | $18,000 |
| Sep 20, 2024 | Completed final sign-off Oct 2024 | 188 The Embarcadero | Pioneer Fire Inc. | level 1: relocate 3 pendents. ref pa#202406124276Details
level 1: relocate 3 pendents. ref pa#202406124276 | $750 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 188 The Embarcadero | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $500,000 |
| Jun 12, 2024 | Completed final sign-off Jan 2025 | 188 The Embarcadero | Novo Construction Inc | 6th fl - modification of existing tenant space to include new finishes, light fixtures, new convenience power receptacles, water lines and powerDetails
6th fl - modification of existing tenant space to include new finishes, light fixtures, new convenience power receptacles, water lines and power | $250,000 |
| Jun 12, 2024 | Completed final sign-off Feb 2025 | 188 The Embarcadero | Novo Construction Inc | 1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement.Details
1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement. | $500,000 |
| Feb 8, 2024 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | fire pump replacement including jockey pump and controllers.Details
fire pump replacement including jockey pump and controllers. | |
| Feb 6, 2024 | Completed final sign-off Feb 2024 | 188 The Embarcadero | Martin Sign Co Inc. | fabrication and installation of (6) acrylic evacuation mapsDetails
fabrication and installation of (6) acrylic evacuation maps | $500 |
| Jan 31, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to pa #202311100598 to revise plumbing and electrical. ref mep pa #202311100598 ref arch pa#202212198622Details
revision to pa #202311100598 to revise plumbing and electrical. ref mep pa #202311100598 ref arch pa#202212198622 | |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 188 The Embarcadero | Novo Construction Inc | 5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803Details
5th fl - revision to pa 202311171022 to revise mechanical and electrical ref pa 2024-0111-3803 | |
| Jan 25, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to pa# 202311171037 to revise plumbing and electrical. ref arch# 202207279364Details
revision to pa# 202311171037 to revise plumbing and electrical. ref arch# 202207279364 | |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | 2/f: exsiting fire sprinkler system, tenant improvement, ref pa# 202312142558.Details
2/f: exsiting fire sprinkler system, tenant improvement, ref pa# 202312142558. | $8,500 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | 3/f: exsiting fire sprinkler system, tenant improvement, add 2 pendents & relocate 6 pendent sprinklers, ref pa# 202312142507.Details
3/f: exsiting fire sprinkler system, tenant improvement, add 2 pendents & relocate 6 pendent sprinklers, ref pa# 202312142507. | $5,000 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | 5/f: exsiting fire sprinkler system, tenant improvement, add 2 penmdents & relocate 2 pendent sprinklers, ref pa# 202312122338.Details
5/f: exsiting fire sprinkler system, tenant improvement, add 2 penmdents & relocate 2 pendent sprinklers, ref pa# 202312122338. | $2,500 |
| Jan 11, 2024 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to pa#202207279366, 202310239228, 202312122338 for the 5th floor. demolition of phone rooms 518,519, and 520 converting to a hallway at stair #2. relocating 2 phone rooms.Details
revision to pa#202207279366, 202310239228, 202312122338 for the 5th floor. demolition of phone rooms 518,519, and 520 converting to a hallway at stair #2. relocating 2 phone rooms. | |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Sabah International Incorporated | 2/f: fire alarm modification to accommodate 2nd flr t.i. project, ref pa# 202207279364.Details
2/f: fire alarm modification to accommodate 2nd flr t.i. project, ref pa# 202207279364. | $14,257 |
| Dec 19, 2023 | Completed final sign-off Feb 2024 | 188 The Embarcadero | Sabah International Incorporated | 5/f: fire alarm modification to accomodate 5th floor ti rpoject. ref 202207279366.Details
5/f: fire alarm modification to accomodate 5th floor ti rpoject. ref 202207279366. | $13,115 |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Sabah International Incorporated | 3/f: fire alarm modification to accommodate 3rd flr t.i. project, ref pa# 202212198622.Details
3/f: fire alarm modification to accommodate 3rd flr t.i. project, ref pa# 202212198622. | $13,396 |
| Dec 14, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 2nd fl - revision to pa 202207279364 & 202310199071 to remove white boards demo door e228 and portion of wall at idf/riser. mesc changes on construction plan reflected ceiling, power & signal & finishes plansDetails
2nd fl - revision to pa 202207279364 & 202310199071 to remove white boards demo door e228 and portion of wall at idf/riser. mesc changes on construction plan reflected ceiling, power & signal & finishes plans | |
| Dec 14, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 3/f: revision to pa# 202212198622, to construct a hallway at stair #2 and the addition of a coffee and bevi machine and fridge with millwork modifications.Details
3/f: revision to pa# 202212198622, to construct a hallway at stair #2 and the addition of a coffee and bevi machine and fridge with millwork modifications. | |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | revision to 202207279366 and 202310239228 to include demolition of phone room 518 and converting to a hallway at stair #2. the addition of a coffee/bevi machine/fridge with related millwork modifications.Details
revision to 202207279366 and 202310239228 to include demolition of phone room 518 and converting to a hallway at stair #2. the addition of a coffee/bevi machine/fridge with related millwork modifications. | |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | 5/f: mechanical/electrical work for t.i. improvement. ref bpa#202310239228Details
5/f: mechanical/electrical work for t.i. improvement. ref bpa#202310239228 | $125,000 |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | 2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071.Details
2nd fl: mech and elec work for tenant improbement. ref arch pa# 202310199071. | $125,000 |
| Nov 10, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 3/f: mechanical/electrical work for t.i. ref bpa#202212198622Details
3/f: mechanical/electrical work for t.i. ref bpa#202212198622 | $150,000 |
| Oct 23, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 5/f: revision to bpa#202207279366, remove gender neutral restroom, removal of banquettes in hall 505, relocation of mk522 & revise layout in lounch 524.Details
5/f: revision to bpa#202207279366, remove gender neutral restroom, removal of banquettes in hall 505, relocation of mk522 & revise layout in lounch 524. | |
| Oct 19, 2023 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 2/f: revision to bpa#202207279364, modification to non-load bearing partitions @ (e)tenant suite entrances/exits to for single tenant, reduce scope of work throughoutDetails
2/f: revision to bpa#202207279364, modification to non-load bearing partitions @ (e)tenant suite entrances/exits to for single tenant, reduce scope of work throughout | |
| Feb 15, 2023 | Completed final sign-off Feb 2023 | 188 The Embarcadero | Novo Construction Inc | 8th fl - fire only evacuation mapDetails
8th fl - fire only evacuation map | $100 |
| Feb 15, 2023 | Completed final sign-off Apr 2023 | 188 The Embarcadero | Novo Construction Inc | 7th fl - fire only evacuation mapDetails
7th fl - fire only evacuation map | $100 |
| Jan 27, 2023 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | for dph review only as it was missed under issued permit# 2022-0719-8766(t.i. for floor 8)Details
for dph review only as it was missed under issued permit# 2022-0719-8766(t.i. for floor 8) | |
| Jan 11, 2023 | Completed final sign-off Jun 2023 | 188 The Embarcadero | Legacy Wireless Services Inc | removing & replacing (5) (e) antennas w/ (5) (n) antennas behind (e) frp screen *retaining (3) (e) antennas behind (e) frp screen *installing (n) antennas pipes as needed behind (e) frp screen *removing & replacing (4) (e) rrus-32 b2 units w/ (4) (n) radio 4449 units @ antennas removing & ...Details
removing & replacing (5) (e) antennas w/ (5) (n) antennas behind (e) frp screen *retaining (3) (e) antennas behind (e) frp screen *installing (n) antennas pipes as needed behind (e) frp screen *removing & replacing (4) (e) rrus-32 b2 units w/ (4) (n) radio 4449 units @ antennas removing & ... | $175,000 |
| Dec 19, 2022 | Expired or cancelled withdrawn Feb 2025 | 188 The Embarcadero | Novo Construction Inc | this project includes modifications on (e) mens & womens base bldg restrooms for fl 4 & 6, to remove accessibility barriers & update partitions, accessories & finishes as needed. scope incl replacement of toilet partitions & (n) or relocated plumbing fixtures + accessories. mep deferred submittal.Details
this project includes modifications on (e) mens & womens base bldg restrooms for fl 4 & 6, to remove accessibility barriers & update partitions, accessories & finishes as needed. scope incl replacement of toilet partitions & (n) or relocated plumbing fixtures + accessories. mep deferred submittal. | $250,000 |
| Dec 19, 2022 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | 3/flr: ti modifications to non-load bearing partitions, new doors, glazing & door frames, n ceilings & light fixtures, n power & data receptacles, n millwork & finishes. mep & life safety deferred.Details
3/flr: ti modifications to non-load bearing partitions, new doors, glazing & door frames, n ceilings & light fixtures, n power & data receptacles, n millwork & finishes. mep & life safety deferred. | $1,000,000 |
| Dec 19, 2022 | Completed final sign-off Feb 2025 | 188 The Embarcadero | Novo Construction Inc | 1st/flr & basement: ti modification to create an enclosed 1st flr elevator lobby. construction of non-load bearing partition, n doors, glazing, door frame, ceilings, light fixtures, reception desk, power & data receptacles. bsmt lvl only involves mod to e elevators lobby door. mep & life safety defDetails
1st/flr & basement: ti modification to create an enclosed 1st flr elevator lobby. construction of non-load bearing partition, n doors, glazing, door frame, ceilings, light fixtures, reception desk, power & data receptacles. bsmt lvl only involves mod to e elevators lobby door. mep & life safety def | $900,000 |
| Nov 15, 2022 | Completed final sign-off Feb 2023 | 188 The Embarcadero | Sabah International Incorporated | 8/fl modification existing fire alarm system to accomodate 8th floor tenant improvement project.Details
8/fl modification existing fire alarm system to accomodate 8th floor tenant improvement project. | $21,903 |
| Nov 15, 2022 | Completed final sign-off Apr 2023 | 188 The Embarcadero | Sabah International Incorporated | 7/fl existing fire alarm system modification to accomodate 7th floor tenant improvement project.Details
7/fl existing fire alarm system modification to accomodate 7th floor tenant improvement project. | $16,500 |
| Oct 27, 2022 | Completed final sign-off Jan 2023 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | fire sprinkler only 202207067840. relocate 23 pendents, relocate 65 uprights, add 6 uprights. for google 7th fl 94 headsDetails
fire sprinkler only 202207067840. relocate 23 pendents, relocate 65 uprights, add 6 uprights. for google 7th fl 94 heads | $47,000 |
| Oct 27, 2022 | Completed final sign-off Jan 2023 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | fire sprinkler only 202207198766. relocate 16 pendents, add 1 relocate 5 uprights, add 1 for google 8th floor. total 23 headsDetails
fire sprinkler only 202207198766. relocate 16 pendents, add 1 relocate 5 uprights, add 1 for google 8th floor. total 23 heads | $11,500 |
| Aug 25, 2022 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | deferred mep for pa 202207279366Details
deferred mep for pa 202207279366 | $400,000 |
| Aug 24, 2022 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Legacy Wireless Services Inc | to obtain final inspection for work approved under permit application no(s): 201510159791. all work is complete.Details
to obtain final inspection for work approved under permit application no(s): 201510159791. all work is complete. | |
| Aug 23, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | 7/f: deferred mep for bpa#202207067840Details
7/f: deferred mep for bpa#202207067840 | $400,000 |
| Aug 11, 2022 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | deferred mep submittal for pa 202207279364.Details
deferred mep submittal for pa 202207279364. | $400,000 |
| Aug 11, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | deferred mep for 202207198766. new vav boxes. no fsd's. fire alarm under sep permit.Details
deferred mep for 202207198766. new vav boxes. no fsd's. fire alarm under sep permit. | $400,000 |
| Aug 5, 2022 | Completed final sign-off Feb 2023 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | 7,8/flrs: fire sprinkler demo plan: 7/f-change pendent to upright 74 counts. 8/f-change pendent to upright 81 counts.Details
7,8/flrs: fire sprinkler demo plan: 7/f-change pendent to upright 74 counts. 8/f-change pendent to upright 81 counts. | $77,500 |
| Jul 27, 2022 | Completed final sign-off Jun 2024 | 188 The Embarcadero | Novo Construction Inc | tenant improvement on fl 5: new non-load bearing partitions, doors and frames, ceilings and light fixtures, power/data receptacles, millwork finshes. fire alarm/sprinkler under sep permits.Details
tenant improvement on fl 5: new non-load bearing partitions, doors and frames, ceilings and light fixtures, power/data receptacles, millwork finshes. fire alarm/sprinkler under sep permits. | $1,250,000 |
| Jul 27, 2022 | Completed final sign-off Apr 2024 | 188 The Embarcadero | Novo Construction Inc | ti on floor 2: new non load bearing partition doors, frames, ceilings, light fistures, power/data receptacles, millwork, finishesDetails
ti on floor 2: new non load bearing partition doors, frames, ceilings, light fistures, power/data receptacles, millwork, finishes | $1,250,000 |
| Jul 19, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | 8/fl: ti including the construction of non load bearing partitionsnew office doors and door frames. new ceiling and light fixtures new power and data receptacles, new millwork finishes. ref pa 201603242951Details
8/fl: ti including the construction of non load bearing partitionsnew office doors and door frames. new ceiling and light fixtures new power and data receptacles, new millwork finishes. ref pa 201603242951 | $2,000,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | 7th fl: modification of (e) ti including the construction of non-load bearing partitions, new office doors & frames, new ceilings, and light fixtures, new power & data receptacles, new millwork & finishes.Details
7th fl: modification of (e) ti including the construction of non-load bearing partitions, new office doors & frames, new ceilings, and light fixtures, new power & data receptacles, new millwork & finishes. | $4,000,000 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Novo Construction Inc | 7/f: full demo of (e) t.i. including non-load bearing partitions, doors and frames, light fixtures, wall and floor finishes, millwork and power/data receptacles and switches. returning the floor to shell condition - ab-017 compliant. no ceiling work. maher n/a.Details
7/f: full demo of (e) t.i. including non-load bearing partitions, doors and frames, light fixtures, wall and floor finishes, millwork and power/data receptacles and switches. returning the floor to shell condition - ab-017 compliant. no ceiling work. maher n/a. | $80,000 |
| Jun 2, 2022 | Completed final sign-off Jul 2022 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system t.i.. basement 22 sprinklers, 1st fl 6 sprinklers. ref 202105210786.Details
existing fire sprinkler system t.i.. basement 22 sprinklers, 1st fl 6 sprinklers. ref 202105210786. | $14,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2023 | 188 The Embarcadero | Plant Construction Co, Lp | demo existing ductwork. relocae fire damper. install exhaust fans & ductworkDetails
demo existing ductwork. relocae fire damper. install exhaust fans & ductwork | $40,000 |
| Sep 29, 2021 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Plant Construction Co, Lp | g/f: remodel of 2 (e) all gender restrooms and 1 (e) mothers room. maher n/a.Details
g/f: remodel of 2 (e) all gender restrooms and 1 (e) mothers room. maher n/a. | $25,000 |
| Aug 31, 2021 | Completed final sign-off Feb 2022 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | demo extg fire sprinkler system. 3rd floor: 22 sprinklers removed & added. 5th floor: 21 sprinklers removed & added.Details
demo extg fire sprinkler system. 3rd floor: 22 sprinklers removed & added. 5th floor: 21 sprinklers removed & added. | $11,000 |
| Aug 18, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | 3/f & 5/f: voluntary structural strengtheningDetails
3/f & 5/f: voluntary structural strengthening | $500,000 |
| Aug 11, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary anchoring and seismic strengthening of multiple extg mechanical roof platform. all bracing designs per chapter 13 in asce 7-16.Details
voluntary anchoring and seismic strengthening of multiple extg mechanical roof platform. all bracing designs per chapter 13 in asce 7-16. | $50,000 |
| Aug 11, 2021 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Plant Construction Co, Lp | rooftop existing equipment seismic anchorage.Details
rooftop existing equipment seismic anchorage. | $25,000 |
| Aug 11, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary anchoring and seismic bracing of multiple extg shelves and distribution systems. all anchorage. designs are per chapter 13 in asce 7-16. basement seismic equipment anchorage.Details
voluntary anchoring and seismic bracing of multiple extg shelves and distribution systems. all anchorage. designs are per chapter 13 in asce 7-16. basement seismic equipment anchorage. | $25,000 |
| Jul 21, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary structural strengthening 4th level of e 8 story concrete office bldg with basement parking garage. structural improvement include install fiberglass reinforced polymer frp spandrel beam and column wraps. 4th level will be brought into accessibility compliance the balance of the scope isDetails
voluntary structural strengthening 4th level of e 8 story concrete office bldg with basement parking garage. structural improvement include install fiberglass reinforced polymer frp spandrel beam and column wraps. 4th level will be brought into accessibility compliance the balance of the scope is | $250,000 |
| Jul 8, 2021 | Completed final sign-off Sep 2021 | 188 The Embarcadero | Sabah International Incorporated | voluntary upgrade (e) non-voice fa system to voice system. replace est3 head-end w/est4. (e) addressable field devices to remain, replace horn/strobe w/speaker/strobe on a one-for one basis. new speaker/strobes in phone/huddle rooms where no(e) device is located.Details
voluntary upgrade (e) non-voice fa system to voice system. replace est3 head-end w/est4. (e) addressable field devices to remain, replace horn/strobe w/speaker/strobe on a one-for one basis. new speaker/strobes in phone/huddle rooms where no(e) device is located. | $96,475 |
| Jul 8, 2021 | Completed final sign-off Sep 2022 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | basement, 1/f & 4/f: demo of (e) fire sprinkler system: b - uprights to remain, 1/f - 10 relocate to upright position; 4/f-uprights to remain.Details
basement, 1/f & 4/f: demo of (e) fire sprinkler system: b - uprights to remain, 1/f - 10 relocate to upright position; 4/f-uprights to remain. | $2,000 |
| Jun 16, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | architectural demo for the basement level, ground level, & 4th level for non-structural woerk in an extg 8 story bldg with a basement parking garage. the balance of the scope of work is under app#202105210786. ab-017 applies.Details
architectural demo for the basement level, ground level, & 4th level for non-structural woerk in an extg 8 story bldg with a basement parking garage. the balance of the scope of work is under app#202105210786. ab-017 applies. | $75,000 |
| May 21, 2021 | Completed final sign-off May 2023 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)columnDetails
voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column | $6,000,000 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 188 The Embarcadero | Siemens Industry, Inc. | fire only work to add 1 strobe for the gnr remodel on floor 3; ref. permit app# 2021 0121 3020Details
fire only work to add 1 strobe for the gnr remodel on floor 3; ref. permit app# 2021 0121 3020 | $550 |
| Feb 25, 2021 | Never finaled issued Mar 2021, no final | 188 The Embarcadero | Golden Gate Fire Protection Inc | fire sprinklers; relocate 1 pendent sprinkler and delete 1 pendent sprinkler. t.i. ref# 2021-01-21-3020Details
fire sprinklers; relocate 1 pendent sprinkler and delete 1 pendent sprinkler. t.i. ref# 2021-01-21-3020 | $1,000 |
| Feb 11, 2021 | Expired or cancelled cancelled Jan 2026 | 188 The Embarcadero | Skyline Construction | 8th fl: mep only ti for restroom upgrade to gender neutral. arch pa# 202101213021 under review.Details
8th fl: mep only ti for restroom upgrade to gender neutral. arch pa# 202101213021 under review. | $78,000 |
| Feb 11, 2021 | Never finaled issued Jun 2021, no final | 188 The Embarcadero | Skyline Construction | 3rd fl: mep only for gender neutral restroom. arch pa# 202101213020 under review.Details
3rd fl: mep only for gender neutral restroom. arch pa# 202101213020 under review. | $78,000 |
| Jan 21, 2021 | Expired or cancelled cancelled Jan 2026 | 188 The Embarcadero | Skyline Construction | 8/f: addition of new restrooms. tenant improvement. interior demo of non-structural partitions, new fixtures & finishes. maher n/a.Details
8/f: addition of new restrooms. tenant improvement. interior demo of non-structural partitions, new fixtures & finishes. maher n/a. | $242,317 |
| Jan 21, 2021 | Never finaled issued May 2021, no final | 188 The Embarcadero | Skyline Construction | 3/f: addition of new restrooms. tenant improvement. interior demo of non-structural partitions, new fixtures & finishes. maher n/a.Details
3/f: addition of new restrooms. tenant improvement. interior demo of non-structural partitions, new fixtures & finishes. maher n/a. | $242,317 |
| Nov 30, 2020 | Completed final sign-off Feb 2021 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm addition of 1 relay module on floor 4 for door lock release; no permit ref. application number.Details
fire alarm addition of 1 relay module on floor 4 for door lock release; no permit ref. application number. | $550 |
| Sep 29, 2020 | Completed final sign-off Nov 2020 | 188 The Embarcadero | Allied Fire Protection | relocate fifty fire sprinklers. add fourteen fire sprinklers for a total of sixty-four sprinklers. located on the 4th floor. reference to pa #202002033333Details
relocate fifty fire sprinklers. add fourteen fire sprinklers for a total of sixty-four sprinklers. located on the 4th floor. reference to pa #202002033333 | $34,500 |
| Jul 22, 2020 | Completed final sign-off Apr 2021 | 188 The Embarcadero | Level 10 Construction Lp | 4th floor: revision to app#202002033333 create new large office, new interior partitions door, finishes etc . this location org, new lighting/mechanical/electrical outlets.Details
4th floor: revision to app#202002033333 create new large office, new interior partitions door, finishes etc . this location org, new lighting/mechanical/electrical outlets. | $20,000 |
| Jun 12, 2020 | Completed final sign-off Apr 2021 | 188 The Embarcadero | Siemens Industry, Inc. | 4/f: fire alarm work for t.i. additions are 5 smoke detectors, 1 module, 1 horn/strobe power supply, 17 horn/strobes and 21 strobes. ref t.i. pa 202002033333. maher n/a.Details
4/f: fire alarm work for t.i. additions are 5 smoke detectors, 1 module, 1 horn/strobe power supply, 17 horn/strobes and 21 strobes. ref t.i. pa 202002033333. maher n/a. | $27,600 |
| Feb 3, 2020 | Never finaled issued Mar 2020, no final | 188 The Embarcadero | Level 10 Construction Lp | 4th floor: new office space, meeting rooms, lounge spaces, and break room. new interior partitions, doors, finishes, ceiling, lighting, mechanical, electrical outlets & switches.Details
4th floor: new office space, meeting rooms, lounge spaces, and break room. new interior partitions, doors, finishes, ceiling, lighting, mechanical, electrical outlets & switches. | $3,000,000 |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 188 The Embarcadero | R L H Fire Protection Inc | voluntary: fire sprinkler elevator modernization- remove sprinklers in machine room and elevator shafts.Details
voluntary: fire sprinkler elevator modernization- remove sprinklers in machine room and elevator shafts. | $9,515 |
| Dec 16, 2019 | Completed final sign-off Apr 2021 | 188 The Embarcadero | Level 10 Construction Lp | 4th floor: demo of existing walls, doors, ceilings, electrical, plumbing, millwork, finishes, and hvac throughout.Details
4th floor: demo of existing walls, doors, ceilings, electrical, plumbing, millwork, finishes, and hvac throughout. | $55,000 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 188 The Embarcadero | street spaceDetails
street space | ||
| Jun 3, 2019 | Completed final sign-off Jun 2019 | 188 The Embarcadero | Ayoob & Peery Plumbing Co Inc | 3rd flr - relocate 8 sprinklers due to distribution for code compliance3Details
3rd flr - relocate 8 sprinklers due to distribution for code compliance3 | $1,800 |
| Jan 4, 2018 | Completed final sign-off Feb 2018 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the "jull workshop" remodel on the basement level; additions are 1 duct detector, 1 module and 1 horn strobe. ref pa 2017-1121-4534Details
fire alarm work for the "jull workshop" remodel on the basement level; additions are 1 duct detector, 1 module and 1 horn strobe. ref pa 2017-1121-4534 | $2,870 |
| Nov 21, 2017 | Completed final sign-off Apr 2018 | 188 The Embarcadero | Bcci Construction Company | basement: renovation to remove wall and create workspace. mep included. n/a for maher interior work onlyDetails
basement: renovation to remove wall and create workspace. mep included. n/a for maher interior work only | $60,000 |
| Oct 2, 2017 | Never finaled issued Oct 2017, no final | 188 The Embarcadero | street space w/mtaDetails
street space w/mta | ||
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 188 The Embarcadero | street spaceDetails
street space | ||
| Feb 24, 2017 | Completed final sign-off Mar 2017 | 188 The Embarcadero | R L H Fire Protection Inc | 4th floor: fire sprinkler - relocate 11 pendent & add 1 pendent sprinklers ref 201612195265 maher naDetails
4th floor: fire sprinkler - relocate 11 pendent & add 1 pendent sprinklers ref 201612195265 maher na | $3,000 |
| Feb 16, 2017 | Completed final sign-off Apr 2017 | 188 The Embarcadero | Siemens Industry, Inc. | 4th flr: fires alarm work for th "google" - add 3 speaker/strobes and 7 strobes. maher na ref 201612195265Details
4th flr: fires alarm work for th "google" - add 3 speaker/strobes and 7 strobes. maher na ref 201612195265 | $5,100 |
| Jan 18, 2017 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | revision to 201606291145 ti permit to update da checklist. no new construction, administrative onlyDetails
revision to 201606291145 ti permit to update da checklist. no new construction, administrative only | |
| Dec 19, 2016 | Completed final sign-off May 2017 | 188 The Embarcadero | Dpr Construction | #420 - interior alterations including walls, coilings, flooring and casework. mechanical, electrical and plumbing work to support new interior space, demo and safe off per the demo drawings. ref. sprinkler permit app#2016-1202-4076. n/a ordinance #155-13Details
#420 - interior alterations including walls, coilings, flooring and casework. mechanical, electrical and plumbing work to support new interior space, demo and safe off per the demo drawings. ref. sprinkler permit app#2016-1202-4076. n/a ordinance #155-13 | $1,200,000 |
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 188 The Embarcadero | R L H Fire Protection Inc | 4th floor: fire sprinkler demo:delete 36 pendent sprinkers. add 36 new pendent sprinklers 12" from the deck. n/a for maher.Details
4th floor: fire sprinkler demo:delete 36 pendent sprinkers. add 36 new pendent sprinklers 12" from the deck. n/a for maher. | $18,000 |
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 188 The Embarcadero | street space permit 7 mta permitDetails
street space permit 7 mta permit | ||
| Sep 15, 2016 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | ground floor - fire sprinkler ti relocated 83, added 8. ref pa 2016-0629-1145Details
ground floor - fire sprinkler ti relocated 83, added 8. ref pa 2016-0629-1145 | $47,500 |
| Sep 12, 2016 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | 1st floor - administrative purposes to document a-3 assembly space 114 and 118 in office bldg. t.i. portion is under a separate permit #201606291145.Details
1st floor - administrative purposes to document a-3 assembly space 114 and 118 in office bldg. t.i. portion is under a separate permit #201606291145. | |
| Sep 9, 2016 | Completed final sign-off Nov 2016 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the "google" remodel on floor 1 (and roof); additions are 1 smoke detector, 9 duct detectors, 1 horn/strobe power supply, 11 modules, 13 horn/strobes, and 10 strobes. ref pa 2016-0629-1145. maher naDetails
fire alarm work for the "google" remodel on floor 1 (and roof); additions are 1 smoke detector, 9 duct detectors, 1 horn/strobe power supply, 11 modules, 13 horn/strobes, and 10 strobes. ref pa 2016-0629-1145. maher na | $25,210 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 188 The Embarcadero | Everest Waterproofing & Restoration Inc. | street space & mta parking meterDetails
street space & mta parking meter | |
| Aug 9, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher naDetails
revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher na | |
| Aug 9, 2016 | Completed final sign-off Mar 2017 | 188 The Embarcadero | Siemens Industry, Inc. | basement - fire alarm work for the "generator room" remodel. additions are 2 smoke detectors, 1 duct detector, 3 modules, 5 horn/strobes, and 2 strobes. ref pa 2015-0512-6148 and generator 2016.08.09.45805. maher naDetails
basement - fire alarm work for the "generator room" remodel. additions are 2 smoke detectors, 1 duct detector, 3 modules, 5 horn/strobes, and 2 strobes. ref pa 2015-0512-6148 and generator 2016.08.09.45805. maher na | $6,930 |
| Aug 9, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher naDetails
revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher naDetails
revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher naDetails
revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher naDetails
revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher na | |
| Aug 3, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | 4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Aug 3, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | 8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 188 The Embarcadero | Dpr Construction Inc | 6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13Details
6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 | |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 188 The Embarcadero | street spaceDetails
street space | ||
| Jun 29, 2016 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | interior alterations including walls, ceilings, flooring and casework. mech, elec, plumbing to support new interior space. demo under 201602119345 maher not reqDetails
interior alterations including walls, ceilings, flooring and casework. mech, elec, plumbing to support new interior space. demo under 201602119345 maher not req | $2,400,000 |
| Jun 10, 2016 | Completed final sign-off Nov 2016 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the "idf" room ti remodel on floor 1; additions are 2 horn/strobes. ref pa 2016-0401-3708. maher naDetails
fire alarm work for the "idf" room ti remodel on floor 1; additions are 2 horn/strobes. ref pa 2016-0401-3708. maher na | $1,020 |
| Jun 8, 2016 | Completed final sign-off Mar 2017 | 188 The Embarcadero | Dpr Construction | basement & roof- m.e.p. work - new lighting fixtures, controls, power & signal outlets for central plant upgrades, replace existing mechanical equipment. ref pa #201505126148. n/a meher ordinanceDetails
basement & roof- m.e.p. work - new lighting fixtures, controls, power & signal outlets for central plant upgrades, replace existing mechanical equipment. ref pa #201505126148. n/a meher ordinance | $3,500,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 188 The Embarcadero | Dpr Construction Inc | work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to extg equipment. floor 1: add mechanical box to extg column and provide 2 hour partition at extg mech shaft. ** maher: n/a **Details
work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to extg equipment. floor 1: add mechanical box to extg column and provide 2 hour partition at extg mech shaft. ** maher: n/a ** | $3,400,000 |
| May 25, 2016 | Completed final sign-off Jul 2016 | 188 The Embarcadero | Siemens Industry, Inc. | 2nd floor: fire alarm: add 3 smoke detectors, 2 duct detectors, 2 modules, 1 strobe power supply, 19 horn/strobes and 12 strobes.Details
2nd floor: fire alarm: add 3 smoke detectors, 2 duct detectors, 2 modules, 1 strobe power supply, 19 horn/strobes and 12 strobes. | $21,880 |
| May 20, 2016 | Never finaled issued May 2016, no final | 188 The Embarcadero | R L H Fire Protection Inc | 1st floor fire sprinkler permit - relocate 3 & add 2 sprinklers. ref pa #201604013708. n/a maher ordinanceDetails
1st floor fire sprinkler permit - relocate 3 & add 2 sprinklers. ref pa #201604013708. n/a maher ordinance | $1,600 |
| May 18, 2016 | Completed final sign-off May 2016 | 188 The Embarcadero | Siemens Industry, Inc. | per sfeid inspection comments, revise f/a matrix on the floor 6 "google" remodel. original fa permit pa 2016-0329-3270. ref pa 2015-1103-1646. maher naDetails
per sfeid inspection comments, revise f/a matrix on the floor 6 "google" remodel. original fa permit pa 2016-0329-3270. ref pa 2015-1103-1646. maher na | $1,020 |
| May 13, 2016 | Completed final sign-off May 2016 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the added devices on the "google" ti remodel on floor 6; the new devices are 6 smoke detectors, 2 duct detectros, and a horn/strobe power supply replace an older unit. the original fa permit pa in 2016-0329-3270 and pa 2015-1103-1646. maher naDetails
fire alarm work for the added devices on the "google" ti remodel on floor 6; the new devices are 6 smoke detectors, 2 duct detectros, and a horn/strobe power supply replace an older unit. the original fa permit pa in 2016-0329-3270 and pa 2015-1103-1646. maher na | $6,880 |
| May 10, 2016 | Completed final sign-off May 2016 | 188 The Embarcadero | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ul 300 pyro chem fire suppression system in the hood and duct in kitchen area; maher n/aDetails
installation of ul 300 pyro chem fire suppression system in the hood and duct in kitchen area; maher n/a | $3,500 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 188 The Embarcadero | R L H Fire Protection Inc | fire sprinkler permit, relocate 80, add 27 and delete 6 pendent sprinklers on the 2/f. t.i. pa#201509116686. n/a ordinance #155-13Details
fire sprinkler permit, relocate 80, add 27 and delete 6 pendent sprinklers on the 2/f. t.i. pa#201509116686. n/a ordinance #155-13 | $29,500 |
| Apr 1, 2016 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | 1st floor: demolition of extg idf room. added lighting, water source heat pump cooling system, new static dissipative flooring, paint.Details
1st floor: demolition of extg idf room. added lighting, water source heat pump cooling system, new static dissipative flooring, paint. | $500,000 |
| Mar 29, 2016 | Completed final sign-off May 2016 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the "google" ti remodel on floor 6; additions are 4 smoke detectors, 11 duct detectors, 14 modules, 13 horn/strobes, and 6 strobes. ref pa 2015-1103-1646. maher naDetails
fire alarm work for the "google" ti remodel on floor 6; additions are 4 smoke detectors, 11 duct detectors, 14 modules, 13 horn/strobes, and 6 strobes. ref pa 2015-1103-1646. maher na | $25,500 |
| Mar 24, 2016 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | revision to pa #201509116686 - revisions include additoinal t. i. by means of new conference rooms, open office & re-routing of mechanical duct work, to supply new open office area. n/a maher ordinanceDetails
revision to pa #201509116686 - revisions include additoinal t. i. by means of new conference rooms, open office & re-routing of mechanical duct work, to supply new open office area. n/a maher ordinance | $500,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 188 The Embarcadero | R L H Fire Protection Inc | fire sprinkler permit relocate 48, add 15 and delete 7 pendents, relocate 22 and add 6 uprights on the 6th floor. ti 2015-1103-1646. maher naDetails
fire sprinkler permit relocate 48, add 15 and delete 7 pendents, relocate 22 and add 6 uprights on the 6th floor. ti 2015-1103-1646. maher na | $24,857 |
| Feb 11, 2016 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction | 1st flr: demolition of interior finishes. remove existing furring @ colums, ceiling and lighting fixtures, partitions as labeled on drawing. ; maher n/a. (vacant space)Details
1st flr: demolition of interior finishes. remove existing furring @ colums, ceiling and lighting fixtures, partitions as labeled on drawing. ; maher n/a. (vacant space) | $33,000 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | as built 201506249800 5th fl fire sprinklerDetails
as built 201506249800 5th fl fire sprinkler | $24,000 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | as built 201506189347 fire sprinklerDetails
as built 201506189347 fire sprinkler | $24,000 |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 188 The Embarcadero | Dpr Construction Inc | interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals.Details
interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals. | $2,000,000 |
| Oct 21, 2015 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | modification of (e) cellular phone equipment and platform. raising of equipment on roof. compliance with maher ordinance not required.Details
modification of (e) cellular phone equipment and platform. raising of equipment on roof. compliance with maher ordinance not required. | $24,000 |
| Oct 15, 2015 | Expired or cancelled expired Dec 2022 | 188 The Embarcadero | Cba Site Services Inc. | verizon wireless: remove (6)(e) antennas,install 8 new antennas,install 8 rrus12,5new,3 relocate)install 3 raycaps @ antennas,&1 in shelter (4 total),2 raycaps @antennas,2 in shelter,remove ret home run cable,install 2 new hybrid cables;maher n/aDetails
verizon wireless: remove (6)(e) antennas,install 8 new antennas,install 8 rrus12,5new,3 relocate)install 3 raycaps @ antennas,&1 in shelter (4 total),2 raycaps @antennas,2 in shelter,remove ret home run cable,install 2 new hybrid cables;maher n/a | $15,000 |
| Sep 29, 2015 | Never finaled issued Sep 2015, no final | 188 The Embarcadero | street space & mta parking meterDetails
street space & mta parking meter | ||
| Sep 25, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction | replacement of the waterproofing membrane @ the floors with balconies (5,6,7,8), as well as some ada upgrades to the guardrail. demo sliding doors and replace w/ada complaint. demo balcony plantar and replace w/non-mobile plantar. maher naDetails
replacement of the waterproofing membrane @ the floors with balconies (5,6,7,8), as well as some ada upgrades to the guardrail. demo sliding doors and replace w/ada complaint. demo balcony plantar and replace w/non-mobile plantar. maher na | $1,500,000 |
| Sep 11, 2015 | Never finaled issued Sep 2015, no final | 188 The Embarcadero | Dpr Construction | 2nd floor: ti - addition of conference rooms and open office seating. mep & electrical included. maher naDetails
2nd floor: ti - addition of conference rooms and open office seating. mep & electrical included. maher na | $2,500,000 |
| Aug 18, 2015 | Never finaled issued Aug 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | 4th floor: fire sprinkler for ti ref pa 2015 0603 8003 maher naDetails
4th floor: fire sprinkler for ti ref pa 2015 0603 8003 maher na | $20,000 |
| Aug 18, 2015 | Never finaled issued Aug 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | 8th floor: fire sprinkler ti remodel. ref pa 2015 0604 8095 maher naDetails
8th floor: fire sprinkler ti remodel. ref pa 2015 0604 8095 maher na | $69,000 |
| Jul 30, 2015 | Never finaled filed Jul 2015, never issued | 188 The Embarcadero | Dpr Construction | 8th flr: deferred submittal to permit 201506048095; for decorative ceiling trellis on 8th flr; maher n/aDetails
8th flr: deferred submittal to permit 201506048095; for decorative ceiling trellis on 8th flr; maher n/a | |
| Jul 28, 2015 | Completed final sign-off Feb 2016 | 188 The Embarcadero | Dpr Construction | revision to pa#201506048095 re-arranging some conference room walls. n/a ordinance #155-13.Details
revision to pa#201506048095 re-arranging some conference room walls. n/a ordinance #155-13. | |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work for the floor 4 and 8 ti google remodel. additions are 3 smoke detectors, 2 modules, 1 strobe power supply, 25 horn strobes 10 strobes. ref. app# 201506038003 (flr4) app.# 2015.0604.8095 (flr8)n/a maher ord # 155-13Details
fire alarm work for the floor 4 and 8 ti google remodel. additions are 3 smoke detectors, 2 modules, 1 strobe power supply, 25 horn strobes 10 strobes. ref. app# 201506038003 (flr4) app.# 2015.0604.8095 (flr8)n/a maher ord # 155-13 | $20,800 |
| Jun 29, 2015 | Expired or cancelled cancelled Jan 2026 | 188 The Embarcadero | Dpr Construction | 3rd floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. revision to pa #201504204091. n/a for maher.Details
3rd floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. revision to pa #201504204091. n/a for maher. | |
| Jun 29, 2015 | Expired or cancelled cancelled Jan 2026 | 188 The Embarcadero | Dpr Construction | 5th floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. ref pa# #201504204092. n/a for maher.Details
5th floor: permit ammendment: utilize class rading of wood in decorative trellis as suitable material in lieu of fire resistive paint. ref pa# #201504204092. n/a for maher. | |
| Jun 26, 2015 | Completed final sign-off Dec 2015 | 188 The Embarcadero | Siemens Industry, Inc. | fire alarm work fot google ti remodels on floor 3 and 5. additions are 6 smoke detectors, 4 modules, 2 horn strobes power supplies, 31 horn strobes, 13 strobesDetails
fire alarm work fot google ti remodels on floor 3 and 5. additions are 6 smoke detectors, 4 modules, 2 horn strobes power supplies, 31 horn strobes, 13 strobes | $28,400 |
| Jun 24, 2015 | Never finaled issued Jun 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | 5th flr: add/relocate existing fire sprinklers to provide proper coverage to new tenant remodel walls & ceilings modifications, relocate 14 ssps, replace 76 ssps. ref. 201504204092; maher n/a permit 201504204092Details
5th flr: add/relocate existing fire sprinklers to provide proper coverage to new tenant remodel walls & ceilings modifications, relocate 14 ssps, replace 76 ssps. ref. 201504204092; maher n/a permit 201504204092 | $16,000 |
| Jun 18, 2015 | Never finaled issued Jun 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | 3rd fl: fire sprinkler ti remodel. 14 new or relocated heads, 85 existing heads to be replaced, 21 to remain.Details
3rd fl: fire sprinkler ti remodel. 14 new or relocated heads, 85 existing heads to be replaced, 21 to remain. | $36,000 |
| Jun 4, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | tenant improvment to 8th fl, upgrades to restrooms maher not req. ceiling trellis and updated fire sprinklers under deferred separate permitsDetails
tenant improvment to 8th fl, upgrades to restrooms maher not req. ceiling trellis and updated fire sprinklers under deferred separate permits | $1,500,000 | |
| Jun 3, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | interior alterations to partial 4th fl office space in 8 story mid rise bldg. area of work is unoccupiedDetails
interior alterations to partial 4th fl office space in 8 story mid rise bldg. area of work is unoccupied | $140,000 | |
| May 12, 2015 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction Inc | alterations to (e) 8 story bldg. work includes new mep upgrades,roof screen & mech platform.2nd flr: work includes computer lab, idf & elec rm & bathrm upgrades.lower level work to remove 8 parking spaces for future mep upgrades.upgrade 9e)mech shfat @stair #1 &add(n)vent shaft @roof;maher n/aDetails
alterations to (e) 8 story bldg. work includes new mep upgrades,roof screen & mech platform.2nd flr: work includes computer lab, idf & elec rm & bathrm upgrades.lower level work to remove 8 parking spaces for future mep upgrades.upgrade 9e)mech shfat @stair #1 &add(n)vent shaft @roof;maher n/a | $3,356,000 |
| May 7, 2015 | Never finaled issued May 2015, no final | 188 The Embarcadero | street spaceDetails
street space | ||
| May 4, 2015 | Completed final sign-off Jun 2015 | 188 The Embarcadero | Intrepid Electronic Systems Inc | 2nd & 3rd floor - provide pre-action control panel for cross zones smoke detection for 2nd floor ups room & 3rd floor site core room. provide vesda, spot, alarm bell, hvac room shutdown, & pre-action activation. ref #2015.0427.4628 (pre-action sprinkler plan). n/a maher ordinanceDetails
2nd & 3rd floor - provide pre-action control panel for cross zones smoke detection for 2nd floor ups room & 3rd floor site core room. provide vesda, spot, alarm bell, hvac room shutdown, & pre-action activation. ref #2015.0427.4628 (pre-action sprinkler plan). n/a maher ordinance | $25,000 |
| Apr 27, 2015 | Never finaled issued Apr 2015, no final | 188 The Embarcadero | Cosco Fire Protection Inc. | 2nd flr: (n) preaction system w/1 sprinkler for (n) server room activated by vesda system by others. 3rd flr: (n) preaction system w/3 sprinkler for (n) server room activated by vesda system by others, reloact 3 sprinklers. maher - naDetails
2nd flr: (n) preaction system w/1 sprinkler for (n) server room activated by vesda system by others. 3rd flr: (n) preaction system w/3 sprinkler for (n) server room activated by vesda system by others, reloact 3 sprinklers. maher - na | $45,000 |
| Apr 20, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | interior renovations to 3rd fl including arch, mep. demo completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required.Details
interior renovations to 3rd fl including arch, mep. demo completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required. | $1,500,000 |
| Apr 20, 2015 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | interior renovations to 5th fl including new arch mep work. demo completed under 201502037319Details
interior renovations to 5th fl including new arch mep work. demo completed under 201502037319 | $1,500,000 |
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 188 The Embarcadero | street space & mta parking meterDetails
street space & mta parking meter | ||
| Mar 9, 2015 | Completed final sign-off Aug 2015 | 188 The Embarcadero | Pyro-Comm Systems, Inc. | (2) new door holders added to 7th flr and 1 relay module plus voltage relay for door holder release. maher - not req'dDetails
(2) new door holders added to 7th flr and 1 relay module plus voltage relay for door holder release. maher - not req'd | $2,300 |
| Mar 3, 2015 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | revision to 2015 0203 7319 ncluding removal/now build-out of rated elevator lobbies per cbc sect. 713.14.1 exception #4 and cbc sect. 1007.4 exception #2 in a fully sprinklered non high rise building. maher - not req'dDetails
revision to 2015 0203 7319 ncluding removal/now build-out of rated elevator lobbies per cbc sect. 713.14.1 exception #4 and cbc sect. 1007.4 exception #2 in a fully sprinklered non high rise building. maher - not req'd | |
| Feb 3, 2015 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | new interior build out of idf room on 3rd fl. minor mech and elec work. 1 floor drain. somoe work on 2nd fl to support 3rd fl room. no changes to e fire alarm or smoke systemsDetails
new interior build out of idf room on 3rd fl. minor mech and elec work. 1 floor drain. somoe work on 2nd fl to support 3rd fl room. no changes to e fire alarm or smoke systems | $110,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2016 | 188 The Embarcadero | Dpr Construction Inc | flrs: 2,6 and 8: non-structural demo of partitions, doors, frames, millwork, ceiling tile & grid, lighting, finishes. there is no new construction; maher n/aDetails
flrs: 2,6 and 8: non-structural demo of partitions, doors, frames, millwork, ceiling tile & grid, lighting, finishes. there is no new construction; maher n/a | $210,000 |
| May 27, 2014 | Completed final sign-off Jun 2014 | 188 The Embarcadero | 7th floor:188 embarcadero evacuation plan 7th floor. n/a for the maher 155-13Details
7th floor:188 embarcadero evacuation plan 7th floor. n/a for the maher 155-13 | $1,500 | |
| Apr 22, 2014 | Never finaled issued Apr 2014, no final | 188 The Embarcadero | Pyro-Comm Systems, Inc. | new fire alarm devices for spec suite build out to include 1 relay module, 1 monitor module, 1 smoke detector, 9 horn strobes, 2 strobes ti 201403039700Details
new fire alarm devices for spec suite build out to include 1 relay module, 1 monitor module, 1 smoke detector, 9 horn strobes, 2 strobes ti 201403039700 | $5,500 |
| Apr 4, 2014 | Completed final sign-off Jun 2014 | 188 The Embarcadero | Pyro-Comm Systems, Inc. | new fire alarm devices for spec suite build out to include 2 relay modules, 1 voltage relay, 2 smoke detectors, 3 strobes 14 horn/strobes. associated with pa # 201402269402.Details
new fire alarm devices for spec suite build out to include 2 relay modules, 1 voltage relay, 2 smoke detectors, 3 strobes 14 horn/strobes. associated with pa # 201402269402. | $6,000 |
| Mar 26, 2014 | Completed final sign-off Apr 2014 | 188 The Embarcadero | Pioneer Fire Inc. | relocate 2 fire sprinklers. ref #201403039700. compliance with ordinance #155-13 not requiredDetails
relocate 2 fire sprinklers. ref #201403039700. compliance with ordinance #155-13 not required | $3,000 |
| Mar 3, 2014 | Completed final sign-off Jul 2014 | 188 The Embarcadero | Skyline Construction | new construction includes new interior partitions, installment of doors, glazing, millwork and finishes. mep, life safety separate permitDetails
new construction includes new interior partitions, installment of doors, glazing, millwork and finishes. mep, life safety separate permit | $285,000 |
| Oct 31, 2013 | Completed final sign-off Nov 2015 | 188 The Embarcadero | Cba Site Services Inc. | add 2 antennas & replace 3 (e) antennas w/ (n) like-for-like antennas. install (n) rrh units & raycaps in each sector. install hybrid & ret cables.Details
add 2 antennas & replace 3 (e) antennas w/ (n) like-for-like antennas. install (n) rrh units & raycaps in each sector. install hybrid & ret cables. | $18,000 |
| Sep 16, 2013 | Completed final sign-off Oct 2013 | 188 The Embarcadero | Anderson, Rowe & Buckley, Inc. | 7th floor:fire sprinkler system. 72 removed sprinklers and 72 added sprinklers.Details
7th floor:fire sprinkler system. 72 removed sprinklers and 72 added sprinklers. | $34,500 |
| Sep 12, 2013 | Expired or cancelled cancelled Jan 2026 | 188 The Embarcadero | 7th floor-demoltiion of (e) non load bearing partitions, minor modifications to ceiling grid, light fixtures, floor finishes. new construction includes new interior partitions, installment of doors, glazing, millwork. m.e.p under seperate permitDetails
7th floor-demoltiion of (e) non load bearing partitions, minor modifications to ceiling grid, light fixtures, floor finishes. new construction includes new interior partitions, installment of doors, glazing, millwork. m.e.p under seperate permit | $200,000 | |
| May 27, 2011 | Completed final sign-off Feb 2012 | 188 The Embarcadero | L.D. Strobel Co Ltd | verizon proposes to remove / replace / reposition 6 (e) antennas with new type; to add 6 new runs of coax, to extend stealth screens by 2'.Details
verizon proposes to remove / replace / reposition 6 (e) antennas with new type; to add 6 new runs of coax, to extend stealth screens by 2'. | $10,000 |
| Nov 10, 2009 | Completed final sign-off Dec 2009 | 188 The Embarcadero | Mayta & Jensen | office ti on 4th floor. minor alteration incl partitions w/ doors, side loghts, new offices. no plbg, no clg, no case work. add 1 strobe to exit signs. life safety (sprinkler/fa) under seperate permit.Details
office ti on 4th floor. minor alteration incl partitions w/ doors, side loghts, new offices. no plbg, no clg, no case work. add 1 strobe to exit signs. life safety (sprinkler/fa) under seperate permit. | $12,644 |
| May 12, 2009 | Never finaled issued May 2009, no final | 188 The Embarcadero | street space permit only.Details
street space permit only. | ||
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 188 The Embarcadero | Ward Alan Emery Construction Inc. | ti minor non structural demo, drywall partitions, acoustic ceiling and finishes. no mech this permit, no sprinkler & life safety.Details
ti minor non structural demo, drywall partitions, acoustic ceiling and finishes. no mech this permit, no sprinkler & life safety. | $38,000 |
| Jan 7, 2009 | Never finaled issued Jan 2009, no final | 188 The Embarcadero | D A Pope Inc | 7th floor revision to appl #200810073577 - alteration of previously submitted plans to reflect deletion of tenant space build out, new plans show area demo's to a shell. reduced scope of work: no new partitions, plumbing or electrical work at t.i. space.Details
7th floor revision to appl #200810073577 - alteration of previously submitted plans to reflect deletion of tenant space build out, new plans show area demo's to a shell. reduced scope of work: no new partitions, plumbing or electrical work at t.i. space. | $64,000 |
| Oct 7, 2008 | Completed final sign-off Mar 2009 | 188 The Embarcadero | D A Pope Inc | at 7th fl: upgrade existing elevator lobby/office space to include ceilings, new partiions, finishes, ada accessibility upgrades to existing restrooms. sprinkler, life safety & mep to be under sererate permit.Details
at 7th fl: upgrade existing elevator lobby/office space to include ceilings, new partiions, finishes, ada accessibility upgrades to existing restrooms. sprinkler, life safety & mep to be under sererate permit. | $64,000 |
| Jun 19, 2008 | Completed final sign-off Dec 2008 | 188 The Embarcadero | D A Pope Inc | 5th & 6th floor: upgrade of (e) elevator lobby & restrooms, new finishes, lighting fixtures to be replaced. sprinkler, mep, life safety to be design /build & to be submitted under separate permit.Details
5th & 6th floor: upgrade of (e) elevator lobby & restrooms, new finishes, lighting fixtures to be replaced. sprinkler, mep, life safety to be design /build & to be submitted under separate permit. | $73,400 |
| Sep 10, 2007 | Completed final sign-off Oct 2007 | 188 The Embarcadero | Ward Alan Emery Construction Inc. | to comply with n.o.v. #200719931. non-strl. interior demo in preparation for new construction (to follow under separate permit).demolition only. no new construction under this permit. will comply with sfbc ab-17.Details
to comply with n.o.v. #200719931. non-strl. interior demo in preparation for new construction (to follow under separate permit).demolition only. no new construction under this permit. will comply with sfbc ab-17. | $51,000 |
| Aug 10, 2006 | Expired or cancelled expired Jun 2007 | 188 The Embarcadero | Sabah International Incorporated | renewal of pa# 2005/08/05/9568 for final test only.Details
renewal of pa# 2005/08/05/9568 for final test only. | |
| Mar 23, 2006 | Completed final sign-off Sep 2006 | 188 The Embarcadero | oti-1, 4th floor, ls.Details
oti-1, 4th floor, ls. | $2,000 | |
| Aug 5, 2005 | Expired or cancelled expired Nov 2006 | 188 The Embarcadero | Sabah International Incorporated | furnish/install & test/final fm200 system in equipment shelter,1 control panel,1 pull station,Details
furnish/install & test/final fm200 system in equipment shelter,1 control panel,1 pull station, | $9,280 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (49), Dpr Construction (18), Dpr Construction Inc (16), Siemens Industry, Inc. (14), Anderson, Rowe & Buckley, Inc. (13), Sabah International Incorporated (13), Plant Construction Co, Lp (9), Ayoob & Peery Plumbing Co Inc (7), Cosco Fire Protection Inc. (7), R L H Fire Protection Inc (6), Skyline Construction (5), D A Pope Inc (3), Level 10 Construction Lp (3), Pyro-Comm Systems, Inc. (3), Cba Site Services Inc. (2), L.D. Strobel Co Ltd (2), Legacy Wireless Services Inc (2), Pioneer Fire Inc. (2), Ward Alan Emery Construction Inc. (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Allied Fire Protection, Bcci Construction Company, Enterprise Roofing Service Inc, Everest Waterproofing & Restoration Inc., Golden Gate Fire Protection Inc, Intrepid Electronic Systems Inc, Martin Sign Co Inc., Mayta & Jensen
- Architects
- Marc Pfenninger (17), Donna Kim Cook (12), Anne Torney (9), Marc Pfenninger (6), Byron Kwong (3), William Loftis (3), Ashley Miller, Bob Roth, Eugene Buick, M Melissa Duffy, Michael Castro
- Engineers
- Guil Orihuela (11), Joshua Mcmahan (5), Rudolfo P Bustos Iii (3), Valeria Balderramos (3), Donna Kim Cook (2), Erica Hayes (2), Joshua Mcmmahan (2), Lars Mortensen (2), Mozart Faizi (2), Rey T. Solidum (2), Sebastian Asvaraksh (2), Caiping Su, Donald Dammen, Eugene Buick, James R. Spore, Joe Fitzsimons, Josh Mcmahan, Kevin Sorensen, Larry Strobel, Robert Pekelnicky, Sherry Chaumpluke
- Authorized agent-otherss
- Jacob Christie (3), Joshua Mcmmahan, Noel Lostica
- Designers