Robert Raymond Roth
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Drsa
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Aug 2025
130 permits since 2000 (architect on 121 permits, engineer on 6 permits, designer on 2 permits, authorized agent-others on 1 permit): 89 completed, 4 in progress, 17 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 130.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 22 Battery St | Modern Construction Inc | 6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork.Details
6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork. | $150,000 |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall.Details
revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall. | |
| Jun 24, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lightingDetails
ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lighting | $35,000 |
| May 29, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen.Details
ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen. | $200,000 |
| May 9, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | 7/f: add ada bathroom on 7th floor for barrier removal worksDetails
7/f: add ada bathroom on 7th floor for barrier removal works | $32,000 |
| Mar 27, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Synergy Enterprises Inc. | suite 700: interior demo: remove (e) wall. remove ceiling tiles and t-bar. remove plaster and lath throughout suite. rmeove carpet & hardwood floor. no mep removal. reinstallation done by other.Details
suite 700: interior demo: remove (e) wall. remove ceiling tiles and t-bar. remove plaster and lath throughout suite. rmeove carpet & hardwood floor. no mep removal. reinstallation done by other. | $28,000 |
| Feb 28, 2024 | In progress issued Mar 2024 | 26 Ofarrell St | revision to 202310188915. change locations of offices and break area.Details
revision to 202310188915. change locations of offices and break area. | ||
| Nov 14, 2023 | Completed final sign-off Apr 2024 | 1663 Mission St | Modern Construction Inc | 7th flr. remove existing walls. install new walls, doors and glazing. minor mechanical and electrical work under separate permit.Details
7th flr. remove existing walls. install new walls, doors and glazing. minor mechanical and electrical work under separate permit. | $55,000 |
| Nov 9, 2023 | In progress filed Nov 2023, not yet issued | 4929 Mission St | install new power door operated at entrance. to comply with the abe program 51-16. (abe: 201911228686)Details
install new power door operated at entrance. to comply with the abe program 51-16. (abe: 201911228686) | $10,000 | |
| Oct 25, 2023 | Completed final sign-off May 2024 | 22 Battery St | Modern Construction Inc | 3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing.Details
3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing. | $80,000 |
| Oct 18, 2023 | In progress issued Oct 2023 | 26 Ofarrell St | remove existing walls and doors, construct new walls, doors, break area on 10th flDetails
remove existing walls and doors, construct new walls, doors, break area on 10th fl | $120,000 | |
| Jul 17, 2023 | Completed final sign-off Oct 2024 | 338 Capistrano Av | Professional Home Designs | revision to pa# 202210285364. additional demo of interior chimney. move structural sheer wall at rear of garage. add structural details per building inspector's request.Details
revision to pa# 202210285364. additional demo of interior chimney. move structural sheer wall at rear of garage. add structural details per building inspector's request. | $1,000 |
| Jul 10, 2023 | Never finaled filed Jul 2023, never issued | 956 Mission St | barrier removal for abe program compliance abe# 202001281383, install 2 power door operators. 1 exterior on window and 1 interior.Details
barrier removal for abe program compliance abe# 202001281383, install 2 power door operators. 1 exterior on window and 1 interior. | $1,500 | |
| Jul 10, 2023 | Expired or cancelled cancelled Jan 2026 | 960 Mission St | barrier removal for abe program compliance abe# 202001281385, install power door operator. 1 exterior pad on window and 1 interior.Details
barrier removal for abe program compliance abe# 202001281385, install power door operator. 1 exterior pad on window and 1 interior. | $1,500 | |
| Oct 28, 2022 | Expired or cancelled expired Oct 2024 | 338 Capistrano Av | Professional Home Designs | demolish portion of existing 1st fl, exterior and interior walls, doors & bathrooms. constructu portion of new 1st fl exterior and interior, ceiling, doors and bathrooms.Details
demolish portion of existing 1st fl, exterior and interior walls, doors & bathrooms. constructu portion of new 1st fl exterior and interior, ceiling, doors and bathrooms. | $100,000 |
| Sep 28, 2022 | Completed final sign-off Nov 2022 | 170 Day St | M F Construction | rev to pa# 2019-1002-3266: relocate 2 partiton walls, 1 door and bathroom plumbing in 3rd master, replace proposed rear exterior door in 1st floor bedroom windowDetails
rev to pa# 2019-1002-3266: relocate 2 partiton walls, 1 door and bathroom plumbing in 3rd master, replace proposed rear exterior door in 1st floor bedroom window | $10,000 |
| Aug 24, 2022 | Completed final sign-off Nov 2023 | 829 Kearny St | retail medical service use - install new walls doors and side lite, new ceiling and light fixtures. new power and data outlets, new plumbing fixtures and mill works. services include training, job and tech assistance and possible language services for congregationDetails
retail medical service use - install new walls doors and side lite, new ceiling and light fixtures. new power and data outlets, new plumbing fixtures and mill works. services include training, job and tech assistance and possible language services for congregation | $175,000 | |
| May 9, 2022 | Never finaled filed May 2022, never issued | 701 Clayton St | remove extg architectural material and finishes for new door and deck. install new structural for new deck. install new door.Details
remove extg architectural material and finishes for new door and deck. install new structural for new deck. install new door. | $25,000 | |
| Mar 11, 2022 | Expired or cancelled expired Apr 2025 | 22 Battery St | Modern Construction Inc | #22e. remove interior walls and ceiling tiles.Details
#22e. remove interior walls and ceiling tiles. | $15,000 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 1145 Market St | Northern Sun Associates | 6/f: remove non-structural walls and doors. build new non-rated partition walls and doors. no new ceiling work.Details
6/f: remove non-structural walls and doors. build new non-rated partition walls and doors. no new ceiling work. | $15,000 |
| Feb 28, 2022 | Completed final sign-off Sep 2022 | 1501 Waller St | voluntary soft story retrofitDetails
voluntary soft story retrofit | $17,000 | |
| Feb 23, 2022 | Completed final sign-off Aug 2022 | 20 Jones St | Gulf Construction Construction | build approx 10'-0 wall in ront of the fire sprinkler pipe & fire alarm equipment.Details
build approx 10'-0 wall in ront of the fire sprinkler pipe & fire alarm equipment. | $2,000 |
| Feb 1, 2022 | Completed final sign-off Aug 2022 | 825 Kearny St | David Jone | remove (e) walls, doors and plumbing fixtures. construct new walls and door. relocate plumbing fixtures. install power door operator on entry doors.Details
remove (e) walls, doors and plumbing fixtures. construct new walls and door. relocate plumbing fixtures. install power door operator on entry doors. | $35,000 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1515 Waller St | voluntary soft story retrofit & building repair. replace electrical & plumbing in-kind under slab. core and shell upgrade - ada compliant.Details
voluntary soft story retrofit & building repair. replace electrical & plumbing in-kind under slab. core and shell upgrade - ada compliant. | $40,000 | |
| Sep 7, 2021 | Never finaled issued Aug 2023, no final | 26 Ofarrell St | comply with planning enforcement case no. 2021-009416enf. minor demo @ ground fl. construct new walls, doors, ramp, ada lifts, stair, power, & lighting. mep & sprinkler will be a separate permit.Details
comply with planning enforcement case no. 2021-009416enf. minor demo @ ground fl. construct new walls, doors, ramp, ada lifts, stair, power, & lighting. mep & sprinkler will be a separate permit. | $140,000 | |
| Aug 11, 2021 | Completed final sign-off Mar 2022 | 468 Columbus Av | Integrated Builders Group Inc. | remove portions of existing wall, doors, grid, lights. replace with new. update teller line and officer. replace entry door to match (e) alum/glass entry door per plans.Details
remove portions of existing wall, doors, grid, lights. replace with new. update teller line and officer. replace entry door to match (e) alum/glass entry door per plans. | $275,000 |
| Aug 2, 2021 | Completed final sign-off Apr 2022 | 111 Maiden Ln | Northern Sun Associates | remove (e) steel bracing.intsall new steel bracking in new location.Details
remove (e) steel bracing.intsall new steel bracking in new location. | $20,000 |
| Jul 8, 2021 | Completed final sign-off Jan 2022 | 3366 Sacramento St | permit for planning review of copy imprinted on awning installed under pa 2002-0520-6986 and abate noe 2019-022784 enfDetails
permit for planning review of copy imprinted on awning installed under pa 2002-0520-6986 and abate noe 2019-022784 enf | $800 | |
| Jun 2, 2021 | Completed final sign-off Jan 2022 | 140 Geary St | Northern Sun Associates | 1/f:tenant improvement: construction of a demising wall. space a & b remain vacant, separate permit for future ti. maher n/a.Details
1/f:tenant improvement: construction of a demising wall. space a & b remain vacant, separate permit for future ti. maher n/a. | $5,000 |
| Mar 15, 2021 | Completed final sign-off Apr 2023 | 98 Battery St | Modern Construction Inc | ste #500: revision to pa# 201901049678. remove demising wall from plan & saving exit doors. mep will be on seperate permit. upgrade (e) restrooms to be accessible.Details
ste #500: revision to pa# 201901049678. remove demising wall from plan & saving exit doors. mep will be on seperate permit. upgrade (e) restrooms to be accessible. | $105,000 |
| Oct 20, 2020 | Never finaled issued Feb 2021, no final | 1663 Mission St | Modern Construction Inc | 3rd floor - suite 305/320: construct new wall, door & sidelight. install new light for the new office rooms. no exterior work, no change of use as defined by planning code.Details
3rd floor - suite 305/320: construct new wall, door & sidelight. install new light for the new office rooms. no exterior work, no change of use as defined by planning code. | $42,000 |
| Jan 14, 2020 | Expired or cancelled cancelled Jan 2026 | 1663 Mission St | install security gate at transformer accessDetails
install security gate at transformer access | $15,000 | |
| Dec 16, 2019 | Completed final sign-off Jan 2021 | 969 Folsom St | Blackline Construction | to comply with planning enforcement 2020-000171 and document proposed land use as engineering labaratory per p.c. section 890.52cbj; alterations include walls, doors, interiror glazing, ada shower, kitchenette, mep deferredDetails
to comply with planning enforcement 2020-000171 and document proposed land use as engineering labaratory per p.c. section 890.52cbj; alterations include walls, doors, interiror glazing, ada shower, kitchenette, mep deferred | $60,000 |
| Dec 13, 2019 | Completed final sign-off Jul 2020 | 1225 Potrero Av | M F Construction | to comply with physical inspection report cc8351 item #2: to restore dedicated path of travel from rear stairs to public right of way. maher n/a.Details
to comply with physical inspection report cc8351 item #2: to restore dedicated path of travel from rear stairs to public right of way. maher n/a. | $2,500 |
| Nov 20, 2019 | Completed final sign-off Dec 2020 | 98 Battery St | Modern Construction Inc | #220: remove partition walls and construct new partition walls, doors, and sidelight. maher naDetails
#220: remove partition walls and construct new partition walls, doors, and sidelight. maher na | $120,000 |
| Oct 24, 2019 | In progress issued Jun 2025 | 8222 Geary Bl | Krueger Bros Builders Inc. | vertical addition. demolish portion of (e) interior walls & doors. construct new exterior & interior walls, ceiling & doors to include 1 new bedroom & 1 new bathroom.Details
vertical addition. demolish portion of (e) interior walls & doors. construct new exterior & interior walls, ceiling & doors to include 1 new bedroom & 1 new bathroom. | $50,000 |
| Oct 9, 2019 | Completed final sign-off Nov 2019 | 1903 Fillmore St | Concore Development Group | install new dressing roomsDetails
install new dressing rooms | $15,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2022 | 170 Day St | M F Construction | gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylightsDetails
gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylights | $200,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2020 | 350 Capistrano Av | M F Construction | convert existing storage area into living space - add 3 bedrooms and 3 bathrooms; install new exterior sliding door, including new lighting, electrical and plumbing; demo concrete slab floor; install new lowered slab floor to gain code ht req; construct (n) ext & int walls, ceilings and doorsDetails
convert existing storage area into living space - add 3 bedrooms and 3 bathrooms; install new exterior sliding door, including new lighting, electrical and plumbing; demo concrete slab floor; install new lowered slab floor to gain code ht req; construct (n) ext & int walls, ceilings and doors | $100,000 |
| Aug 20, 2019 | Completed final sign-off Aug 2022 | 20 Jones St | Gulf Construction Construction | revision to app#201608084501. install fire curtain and electrical. build new walls 5x7 in front of the elevator doorDetails
revision to app#201608084501. install fire curtain and electrical. build new walls 5x7 in front of the elevator door | $50,000 |
| Aug 12, 2019 | Expired or cancelled withdrawn Jul 2022 | 199 Pine St | install roll-up security grill gateat entrance.*maher n/a**Details
install roll-up security grill gateat entrance.*maher n/a** | $5,000 | |
| Jul 3, 2019 | Completed final sign-off Jun 2020 | 832 Folsom St | Ca Bear Construction | demo walls, doors, plumbing, lighting, consruct walls, doors defer mech & elecDetails
demo walls, doors, plumbing, lighting, consruct walls, doors defer mech & elec | $75,000 |
| May 17, 2019 | Completed final sign-off Jul 2019 | 2800 03rd St | Block 12 Construction | revision to pa #201802010192. remove (e) walls, doors, stairs, handrails, guard & plumbing fixtures. install (n) wall, door & plumbing.Details
revision to pa #201802010192. remove (e) walls, doors, stairs, handrails, guard & plumbing fixtures. install (n) wall, door & plumbing. | $10,000 |
| May 13, 2019 | Completed final sign-off Jun 2019 | 209 Post St | Northern Sun Associates | suite 1000: remove existing walls and doors. construct new walls and doors. add new power, lighting, and data outlets. minor modification of mechanical.Details
suite 1000: remove existing walls and doors. construct new walls and doors. add new power, lighting, and data outlets. minor modification of mechanical. | $100,000 |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 187 Pine St | United California Access & Security Sys | comply w/ abe program, ordiance 51-16 -barrier removal; install entry door power door operator n/a maher.Details
comply w/ abe program, ordiance 51-16 -barrier removal; install entry door power door operator n/a maher. | $3,000 |
| Feb 15, 2019 | Completed final sign-off Apr 2019 | 1663 Mission St | Modern Construction Inc | suite #602 on 6th fl: removing existing partition wall, door, casework & furniture. construction new partition wall, door & casework. maher n/a.Details
suite #602 on 6th fl: removing existing partition wall, door, casework & furniture. construction new partition wall, door & casework. maher n/a. | $20,000 |
| Jan 17, 2019 | Completed final sign-off Aug 2019 | 236 08th St | Perez & Perez General Contractor Inc | 1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixturesDetails
1/f: remove & close (wall) existing boarded-up windows (exterior) -6).remove(e) interior walls, doors & plmbing, replace to spec of new design). install new exterior storefront & wall in (e) openings. build (n) interior & exterior walls, doors, sidelights & millworks. install new electrical fixtures | $90,000 |
| Jan 4, 2019 | Completed final sign-off Apr 2023 | 98 Battery St | Modern Construction Inc | #500 - remove (e) partition walls, ceiling tiles and flooring. install new non structural walls, doors. side lights, power outlets, relocate (e) lights install new finishesDetails
#500 - remove (e) partition walls, ceiling tiles and flooring. install new non structural walls, doors. side lights, power outlets, relocate (e) lights install new finishes | $105,000 |
| Dec 27, 2018 | Completed final sign-off Jun 2019 | 1877 Union St | Concore Development Group | change of occupancy from retail "m" to personal services "b". remove existing interior partitions, plumbing fixtures. install new partitions, doors, plumbing fixtures, casework, power/data, lighting. mech, plumb, fire/life safety deferred. maher naDetails
change of occupancy from retail "m" to personal services "b". remove existing interior partitions, plumbing fixtures. install new partitions, doors, plumbing fixtures, casework, power/data, lighting. mech, plumb, fire/life safety deferred. maher na | $125,000 |
| Sep 12, 2018 | Completed final sign-off Sep 2019 | 144 Townsend St | Design Max Construction | abe program: update entrance and stair to ada compliance. n/a for maherDetails
abe program: update entrance and stair to ada compliance. n/a for maher | $3,000 |
| Jul 25, 2018 | Expired or cancelled cancelled Nov 2022 | 481 Jessie St | 4th flr: change of use from storage to office. minor mep work. ref to pa# 2018-0403-5396.Details
4th flr: change of use from storage to office. minor mep work. ref to pa# 2018-0403-5396. | $1,000 | |
| Jul 10, 2018 | Completed final sign-off Oct 2018 | 735 Montgomery St | Concore Development Group | #111 -construct new interior walls, doors & finishes in suite 111 on 1st floor & lower floors. plumbing & fire/life safety permit is deferredDetails
#111 -construct new interior walls, doors & finishes in suite 111 on 1st floor & lower floors. plumbing & fire/life safety permit is deferred | $65,000 |
| Jun 26, 2018 | Completed final sign-off Jan 2019 | 144 Townsend St | to legalize change of use from self storage to office use per approved plan commission motion #19846, no construction work to be done, all work done under pa #201712085848, 201508015852 & 201509025891.Details
to legalize change of use from self storage to office use per approved plan commission motion #19846, no construction work to be done, all work done under pa #201712085848, 201508015852 & 201509025891. | $5,000 | |
| Apr 17, 2018 | Completed final sign-off Jan 2019 | 1844 Market St | Battery Street Construction | new partitions, non structural. 1st fl, walls, power, lighting, mech, sprinklers as needed.Details
new partitions, non structural. 1st fl, walls, power, lighting, mech, sprinklers as needed. | $40,000 |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 481 Jessie St | Modern Construction Inc | 4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showersDetails
4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showers | $135,000 |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 1 Franklin St | City Structures Inc. | revision to pa 2016-0610-9667, ti improvement in vacant space install new walls, doors, ceiling, glazing, power, lighting, finishes, restaurant equipmentDetails
revision to pa 2016-0610-9667, ti improvement in vacant space install new walls, doors, ceiling, glazing, power, lighting, finishes, restaurant equipment | |
| Mar 13, 2018 | Completed final sign-off Nov 2018 | 135 Townsend St | Modern Construction Inc | remodel partial 1st flr to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power.Details
remodel partial 1st flr to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power. | $120,000 |
| Mar 2, 2018 | Expired or cancelled cancelled Nov 2022 | 481 Jessie St | change the floor occupancy s-2 to b on 3rd floor. no work under this permit other than reducing & changing locations of (e) power outlets.Details
change the floor occupancy s-2 to b on 3rd floor. no work under this permit other than reducing & changing locations of (e) power outlets. | ||
| Jan 30, 2018 | Completed final sign-off Jul 2018 | 481 Jessie St | Modern Construction Inc | 3rd fl: revision to pa #201701257893 on women's ada bathroom layout change.Details
3rd fl: revision to pa #201701257893 on women's ada bathroom layout change. | |
| Jan 24, 2018 | Expired or cancelled cancelled Jan 2026 | 61 Gough St | constructd new room with ceiling. remove 1 light fixture, install 1 light fixture, hvac extg. minor duct work modificationDetails
constructd new room with ceiling. remove 1 light fixture, install 1 light fixture, hvac extg. minor duct work modification | $75,000 | |
| Jan 5, 2018 | Completed final sign-off Apr 2018 | 61 Gough St | Manny's Plumbing & Rooter | remove wall. construct new wall, door, and 2 showers. no lighting or hvac workDetails
remove wall. construct new wall, door, and 2 showers. no lighting or hvac work | $75,000 |
| Dec 28, 2017 | Expired or cancelled expired Mar 2026 | 40 Fair Av | North South Pacific Construction Inc | create new foundation and enclose existing one room structure, remove & replace siding, windows & doors, with new siding windows, doors to address deterioration.Details
create new foundation and enclose existing one room structure, remove & replace siding, windows & doors, with new siding windows, doors to address deterioration. | $75,000 |
| Dec 8, 2017 | Completed final sign-off Nov 2018 | 144 Townsend St | Design Max Construction | add lockers and bike storage. maher naDetails
add lockers and bike storage. maher na | $10,000 |
| Oct 20, 2017 | Completed final sign-off Jan 2018 | 704 Bryant St | Modern Construction Inc | install new ada ramp, lighting fixtures and power outlets. maher naDetails
install new ada ramp, lighting fixtures and power outlets. maher na | $110,000 |
| Sep 28, 2017 | Completed final sign-off Jan 2018 | 704 Bryant St | Modern Construction Inc | revise permit app#201708255998 to update toilet location. n/a for maherDetails
revise permit app#201708255998 to update toilet location. n/a for maher | |
| Aug 25, 2017 | Completed final sign-off Jan 2018 | 704 Bryant St | Modern Construction Inc | install 2 new unisex ada restrooms. no change of use; no exterior work. n/a maherDetails
install 2 new unisex ada restrooms. no change of use; no exterior work. n/a maher | $20,000 |
| Aug 15, 2017 | Completed final sign-off Jan 2018 | 459 Geary St | Modern Construction Inc | #300- construct new partition wall, side light and associate new finish, lighting and receptacles, install new casework with sink and faucet.Details
#300- construct new partition wall, side light and associate new finish, lighting and receptacles, install new casework with sink and faucet. | $75,000 |
| Aug 8, 2017 | Never finaled issued Sep 2018, no final | 1663 Mission St | this project is to upgrade electrical service to the building. remove interior & exterior walls & doors. construct new vault & associated electrical roomsDetails
this project is to upgrade electrical service to the building. remove interior & exterior walls & doors. construct new vault & associated electrical rooms | $1,000,000 | |
| Jul 28, 2017 | Expired or cancelled withdrawn Jul 2018 | 481 Jessie St | 1st flr: change the floor occupancy from s-2 to b. no new work other than reducing and changing locations of (e) power outlets.Details
1st flr: change the floor occupancy from s-2 to b. no new work other than reducing and changing locations of (e) power outlets. | $5,000 | |
| Jul 24, 2017 | Completed final sign-off Jun 2018 | 986 Mission St | Modern Construction Inc | to replace the existing metal gate with new storefront at the main entrance (2 gates and 2 storefronts).Details
to replace the existing metal gate with new storefront at the main entrance (2 gates and 2 storefronts). | $30,000 |
| Jul 24, 2017 | Completed final sign-off Oct 2017 | 735 Market St | Baxter Construction | remove existing walls, doors, finishes. construct new walls, doors, sidelights and install new finishesDetails
remove existing walls, doors, finishes. construct new walls, doors, sidelights and install new finishes | $85,000 |
| Jul 13, 2017 | Completed final sign-off May 2018 | 337 Warren Dr | M F Construction | remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1.Details
remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1. | $125,000 |
| Jun 30, 2017 | Completed final sign-off Aug 2018 | 1663 Mission St | Modern Construction Inc | 4/f: remove part of (e) interior partition wall and construction of new partition per layout plan. install new lighting and outlets, minor a/c duct work modification.Details
4/f: remove part of (e) interior partition wall and construction of new partition per layout plan. install new lighting and outlets, minor a/c duct work modification. | $180,000 |
| Jun 30, 2017 | Never finaled issued Apr 2019, no final | 716 Columbus Av | City Structures Inc. | legalize (e) restaurant use. install a metal roof mechanical equipment screening.Details
legalize (e) restaurant use. install a metal roof mechanical equipment screening. | $3,000 |
| May 25, 2017 | Completed final sign-off Aug 2018 | 481 Jessie St | Modern Construction Inc | 1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use.Details
1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use. | $120,000 |
| Mar 28, 2017 | Completed final sign-off Aug 2017 | 981 Howard St | M F Construction | demo extg walls and doors. install new non-structural walls and doors. install new finishes. n/a for maherDetails
demo extg walls and doors. install new non-structural walls and doors. install new finishes. n/a for maher | $20,000 |
| Jan 25, 2017 | Completed final sign-off Jun 2018 | 481 Jessie St | Modern Construction Inc | 3rd flr: construct new walls, doors, side lights, power outlets for new offices, storage and trash rooms and upgrade restrooms. replace all rusted drop ladder rivets, ladder runs, retaining washers and coffer pins. remove all obstructions on fire escape.Details
3rd flr: construct new walls, doors, side lights, power outlets for new offices, storage and trash rooms and upgrade restrooms. replace all rusted drop ladder rivets, ladder runs, retaining washers and coffer pins. remove all obstructions on fire escape. | $135,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 735 Montgomery St | Modern Construction Inc | suite #112 - revision to pa #201612074341: delete 8 track light heads on lighting layout.Details
suite #112 - revision to pa #201612074341: delete 8 track light heads on lighting layout. | |
| Dec 7, 2016 | Completed final sign-off Feb 2017 | 735 Montgomery St | Modern Construction Inc | 1/f & lower level #112- construct (n) interior walls & doors and finishes, install (n) lighting and outlet, install one fan coil unit and new ducts on (e) unit air duct stub. n/a ordinance #155-13Details
1/f & lower level #112- construct (n) interior walls & doors and finishes, install (n) lighting and outlet, install one fan coil unit and new ducts on (e) unit air duct stub. n/a ordinance #155-13 | $110,000 |
| Nov 14, 2016 | Completed final sign-off Jul 2017 | 481 Jessie St | Modern Construction Inc | 5/fl: change of occpancy on 5th floor from s-2 to b. includes modify (e) 2 ada restrooms, install 4 phone rooms. work will include relocating doors and light fixtures and adding (n) walls, doors, power outlets and light fixtures. maher not reqDetails
5/fl: change of occpancy on 5th floor from s-2 to b. includes modify (e) 2 ada restrooms, install 4 phone rooms. work will include relocating doors and light fixtures and adding (n) walls, doors, power outlets and light fixtures. maher not req | $12,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2017 | 1663 Mission St | Modern Construction Inc | #400: remove existing walls, door, and finishes, construct new walls, doors, sidelights and install new finishes; no mechanical. maher n/aDetails
#400: remove existing walls, door, and finishes, construct new walls, doors, sidelights and install new finishes; no mechanical. maher n/a | $85,000 |
| Oct 24, 2016 | Completed final sign-off Dec 2016 | 74 06th St | Monarch Builders Inc | to comply with 201641281: replace (e) reception deskDetails
to comply with 201641281: replace (e) reception desk | $3,500 |
| Oct 18, 2016 | Never finaled issued Oct 2016, no final | 211 Sutter St | Monarch Builders Inc | revision to pa #201609147720: title -24 lighting informationDetails
revision to pa #201609147720: title -24 lighting information | $800 |
| Aug 8, 2016 | Completed final sign-off Aug 2022 | 20 Jones St | change of use. remove (e) entry doors, install (n) entry doors. remove portion of (e) wall for (n) opening.Details
change of use. remove (e) entry doors, install (n) entry doors. remove portion of (e) wall for (n) opening. | $1,000 | |
| Jul 20, 2016 | Never finaled issued Jun 2017, no final | 3385 22nd St | applying for change of use from (e) limited restaurant to full restaurantDetails
applying for change of use from (e) limited restaurant to full restaurant | ||
| Jul 18, 2016 | Completed final sign-off Jul 2017 | 481 Jessie St | Modern Construction Inc | 5th fl new walls, doors, sidelights, power outlets and light fixtures. construct 2 new ada accessible restroomsDetails
5th fl new walls, doors, sidelights, power outlets and light fixtures. construct 2 new ada accessible restrooms | $135,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 98 Battery St | Modern Construction Inc | unit #500: remove (e) walls, doors & ceiling to install (n) non-structural walls, doors, side light and associated power and communicating outlets, relocate (e) lightDetails
unit #500: remove (e) walls, doors & ceiling to install (n) non-structural walls, doors, side light and associated power and communicating outlets, relocate (e) light | $70,000 |
| May 13, 2016 | Completed final sign-off Jul 2016 | 163 02nd St | Modern Construction Inc | demo existing partition walls and doors per ab-17. n/a ordinance#155-13Details
demo existing partition walls and doors per ab-17. n/a ordinance#155-13 | $5,000 |
| May 13, 2016 | Completed final sign-off Jul 2016 | 851 Van Ness Av | Modern Construction Inc | 1st fl: unit #c1: commercial- to remove existing partition wall, construct new partition wall, install new lighting and painting. n/a ordinance #155-13. alarm and sprinkler deferred if required.Details
1st fl: unit #c1: commercial- to remove existing partition wall, construct new partition wall, install new lighting and painting. n/a ordinance #155-13. alarm and sprinkler deferred if required. | $88,000 |
| Apr 20, 2016 | Completed final sign-off Aug 2016 | 1260 09th Av | Modern Construction Inc | remove existing bathroom fixtures, doors and cabinets, install new walls, bathroom fixtures, casework, light fixtures, outlets, bathroom flooring and paint, replace furnace with new. add new bath & laundry room.Details
remove existing bathroom fixtures, doors and cabinets, install new walls, bathroom fixtures, casework, light fixtures, outlets, bathroom flooring and paint, replace furnace with new. add new bath & laundry room. | $60,000 |
| Mar 30, 2016 | Never finaled issued Mar 2016, no final | 704 Bryant St | Modern Construction Inc | demo interior (e) partition walls, doors, stairs, fixtures and non functioning mep facilities. maher na. all non-structural demo. ab-017.Details
demo interior (e) partition walls, doors, stairs, fixtures and non functioning mep facilities. maher na. all non-structural demo. ab-017. | $4,000 |
| Feb 29, 2016 | Completed final sign-off Nov 2016 | 26 Ofarrell St | Modern Construction Inc | 7th floor - all work consists of new walls, doors, caseworks, finishes & lighting.Details
7th floor - all work consists of new walls, doors, caseworks, finishes & lighting. | $130,000 |
| Dec 28, 2015 | Completed final sign-off Dec 2017 | 155 Sansome St | 2nd flr: t.i. work on 2nd flr includes new partitions, doors, side lights, power outlets & light fixtures. mep under separate permitDetails
2nd flr: t.i. work on 2nd flr includes new partitions, doors, side lights, power outlets & light fixtures. mep under separate permit | $143,000 | |
| Dec 4, 2015 | Never finaled issued Dec 2015, no final | 489 Clementina St | Modern Construction Inc | to perform t-24 for lighting & mechanical system refer to bldg #201511051799. n/a maher ordinanceDetails
to perform t-24 for lighting & mechanical system refer to bldg #201511051799. n/a maher ordinance | $100,000 |
| Nov 5, 2015 | Never finaled issued Nov 2015, no final | 489 Clementina St | Modern Construction Inc | 2/f -build new walls, doors, frames, cabinet and sinks, build ada shower, install lights under seperate permit. n/a ordinance #155-13, separate sprinkler permit.Details
2/f -build new walls, doors, frames, cabinet and sinks, build ada shower, install lights under seperate permit. n/a ordinance #155-13, separate sprinkler permit. | $340,000 |
| Sep 29, 2015 | Completed final sign-off Dec 2015 | 735 Montgomery St | Euro Mind Design Corp | suite 109: add lights per t-24. add full wall/hals walls to create 5 rooms/spaces/partition. paint. new rubber flooring (roll out and cut). maher na. mech. under separate permit.Details
suite 109: add lights per t-24. add full wall/hals walls to create 5 rooms/spaces/partition. paint. new rubber flooring (roll out and cut). maher na. mech. under separate permit. | $60,000 |
| Aug 26, 2015 | Expired or cancelled cancelled Mar 2019 | 735 Montgomery St | 1st & lower levels: construct (n) interior walls, floors, windows & doors. maher naDetails
1st & lower levels: construct (n) interior walls, floors, windows & doors. maher na | $60,000 | |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 98 Battery St | Modern Construction Inc | #220- demo and reconstruction new partition walls, doors, and finishes. install new lighting and outlet. n/a for maher. lighting and tilte 24 under separate permit (all mechanical to remain)Details
#220- demo and reconstruction new partition walls, doors, and finishes. install new lighting and outlet. n/a for maher. lighting and tilte 24 under separate permit (all mechanical to remain) | $90,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 1061 Market St | Modern Construction Inc | #200- remove existing partition walls, doors and finishes, construct new walls, doors, side light and new finishes, replace with new ada door hardware, replace with new ada sink.Details
#200- remove existing partition walls, doors and finishes, construct new walls, doors, side light and new finishes, replace with new ada door hardware, replace with new ada sink. | $35,000 |
| Aug 12, 2014 | Completed final sign-off Sep 2014 | 1663 Mission St | Modern Construction Inc | #320 - revision to appl #2014.0603.7380: revision to the original plan - build additional office room. n/a maher ordinanceDetails
#320 - revision to appl #2014.0603.7380: revision to the original plan - build additional office room. n/a maher ordinance | $5,000 |