Block 3704, lot 024
986 Mission St
- City’s use
- Industrial
- Built
- 1907
- Stories
- 5
- Units
- 1
- Rooms
- 14 bathrooms
- Building
- 45,060 sq ft
- Lot
- 8,000 sq ft
- Zoning
- C3G
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 27, 2024 | Completed final sign-off Aug 2024 | 986 Mission St | Value Fire Protection Inc | relocate (e) upright sprinkler heads to pendant position for tenant improvement (32) headsDetails
relocate (e) upright sprinkler heads to pendant position for tenant improvement (32) heads | $11,500 |
| Jul 28, 2023 | In progress issued Mar 2024 | 986 Mission St | Turner Construction Co | g/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors.Details
g/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors. | $150,000 |
| Aug 26, 2022 | Completed final sign-off Jul 2023 | 986 Mission St | Alpha Restoration & Wateproof | scaffold building facades. sound concrete. remove and replace unsound concrete in kind. this work does not fully comply with the requirements of ab-110 work being done to stabalize bad concrete in architectural details.Details
scaffold building facades. sound concrete. remove and replace unsound concrete in kind. this work does not fully comply with the requirements of ab-110 work being done to stabalize bad concrete in architectural details. | $40,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 481 Jessie St | Crime Watch Security Sys Llc | remove all elevator lobby smokes except one near facu, add ra next to facu, remove all relay modules. ref fire pa 201810163311Details
remove all elevator lobby smokes except one near facu, add ra next to facu, remove all relay modules. ref fire pa 201810163311 | |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 481 Jessie St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to include sprinkler monitoring and install (n) notification devices. ref pa 201705257613, re sprinkler pa 201711022946Details
upgrade (e) fire alarm system to include sprinkler monitoring and install (n) notification devices. ref pa 201705257613, re sprinkler pa 201711022946 | $45,000 |
| Sep 7, 2018 | Never finaled issued Sep 2018, no final | 986 Mission St | street space and mtaDetails
street space and mta | ||
| Aug 2, 2018 | Completed final sign-off Sep 2018 | 481 Jessie St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | 4th floor: installation of sprinkler heads for new office layout 13. ref app# 201804035396Details
4th floor: installation of sprinkler heads for new office layout 13. ref app# 201804035396 | $5,000 |
| Jul 25, 2018 | Expired or cancelled cancelled Nov 2022 | 481 Jessie St | 4th flr: change of use from storage to office. minor mep work. ref to pa# 2018-0403-5396.Details
4th flr: change of use from storage to office. minor mep work. ref to pa# 2018-0403-5396. | $1,000 | |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 481 Jessie St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 481 Jessie St | Modern Construction Inc | revision to pa 2018-0403-5396 revise dimension in ada men's bathroom #312.Details
revision to pa 2018-0403-5396 revise dimension in ada men's bathroom #312. | |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 481 Jessie St | street spaceDetails
street space | ||
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 481 Jessie St | Modern Construction Inc | 4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showersDetails
4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showers | $135,000 |
| Mar 2, 2018 | Expired or cancelled cancelled Nov 2022 | 481 Jessie St | change the floor occupancy s-2 to b on 3rd floor. no work under this permit other than reducing & changing locations of (e) power outlets.Details
change the floor occupancy s-2 to b on 3rd floor. no work under this permit other than reducing & changing locations of (e) power outlets. | ||
| Jan 30, 2018 | Completed final sign-off Jul 2018 | 481 Jessie St | Modern Construction Inc | 3rd fl: revision to pa #201701257893 on women's ada bathroom layout change.Details
3rd fl: revision to pa #201701257893 on women's ada bathroom layout change. | |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 481 Jessie St | street spaceDetails
street space | ||
| Nov 2, 2017 | Completed final sign-off Jun 2018 | 481 Jessie St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | modify existing automatic fire sprinkler system per tenant improvement, 28 new pendent sprinklers installed and 1 sidewall sprinkler to be added to existing system ref 201705257613Details
modify existing automatic fire sprinkler system per tenant improvement, 28 new pendent sprinklers installed and 1 sidewall sprinkler to be added to existing system ref 201705257613 | $25,000 |
| Aug 16, 2017 | Expired or cancelled cancelled Jan 2026 | 481 Jessie St | Bellwether L P | fire sprinkler: install 28 pendent quick response head and 1 sidewall head in mezzanine area on 1st flDetails
fire sprinkler: install 28 pendent quick response head and 1 sidewall head in mezzanine area on 1st fl | $7,000 |
| Jul 28, 2017 | Expired or cancelled withdrawn Jul 2018 | 481 Jessie St | 1st flr: change the floor occupancy from s-2 to b. no new work other than reducing and changing locations of (e) power outlets.Details
1st flr: change the floor occupancy from s-2 to b. no new work other than reducing and changing locations of (e) power outlets. | $5,000 | |
| Jul 24, 2017 | Completed final sign-off Jun 2018 | 986 Mission St | Modern Construction Inc | to replace the existing metal gate with new storefront at the main entrance (2 gates and 2 storefronts).Details
to replace the existing metal gate with new storefront at the main entrance (2 gates and 2 storefronts). | $30,000 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 481 Jessie St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | 5th fl: move sprinkler heads for new layout. ref #201611142655.Details
5th fl: move sprinkler heads for new layout. ref #201611142655. | $5,000 |
| Jun 5, 2017 | Never finaled issued Jul 2017, no final | 481 Jessie St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | 3rd fl: installation of more sprinkler heads for new layout. ref #201607182610.Details
3rd fl: installation of more sprinkler heads for new layout. ref #201607182610. | $5,000 |
| May 25, 2017 | Completed final sign-off Aug 2018 | 481 Jessie St | Modern Construction Inc | 1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use.Details
1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use. | $120,000 |
| Jan 25, 2017 | Completed final sign-off Jun 2018 | 481 Jessie St | Modern Construction Inc | 3rd flr: construct new walls, doors, side lights, power outlets for new offices, storage and trash rooms and upgrade restrooms. replace all rusted drop ladder rivets, ladder runs, retaining washers and coffer pins. remove all obstructions on fire escape.Details
3rd flr: construct new walls, doors, side lights, power outlets for new offices, storage and trash rooms and upgrade restrooms. replace all rusted drop ladder rivets, ladder runs, retaining washers and coffer pins. remove all obstructions on fire escape. | $135,000 |
| Nov 14, 2016 | Completed final sign-off Jul 2017 | 481 Jessie St | Modern Construction Inc | 5/fl: change of occpancy on 5th floor from s-2 to b. includes modify (e) 2 ada restrooms, install 4 phone rooms. work will include relocating doors and light fixtures and adding (n) walls, doors, power outlets and light fixtures. maher not reqDetails
5/fl: change of occpancy on 5th floor from s-2 to b. includes modify (e) 2 ada restrooms, install 4 phone rooms. work will include relocating doors and light fixtures and adding (n) walls, doors, power outlets and light fixtures. maher not req | $12,000 |
| Jul 18, 2016 | Completed final sign-off Jul 2017 | 481 Jessie St | Modern Construction Inc | 5th fl new walls, doors, sidelights, power outlets and light fixtures. construct 2 new ada accessible restroomsDetails
5th fl new walls, doors, sidelights, power outlets and light fixtures. construct 2 new ada accessible restrooms | $135,000 |
| May 29, 2015 | Completed final sign-off Nov 2015 | 481 Jessie St | Edco Garage Door | replace existing commercial metal garage doors in like kind.Details
replace existing commercial metal garage doors in like kind. | $5,000 |
| May 21, 2015 | Completed final sign-off Nov 2015 | 481 Jessie St | abate nov 201536851, 2nd fl. new bathrooms, partition wall. 5th fl: new bathrooms, partition wallsDetails
abate nov 201536851, 2nd fl. new bathrooms, partition wall. 5th fl: new bathrooms, partition walls | $70,000 | |
| May 18, 2015 | Completed final sign-off Dec 2015 | 986 Mission St | partial compliance with nov 201536851: remove unpermitted stove and walls at basementDetails
partial compliance with nov 201536851: remove unpermitted stove and walls at basement | $3,000 | |
| Apr 7, 2015 | Never finaled issued Apr 2015, no final | 481 Jessie St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Apr 7, 2015 | Never finaled issued Apr 2015, no final | 986 Mission St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 986 Mission St | street space permitDetails
street space permit | ||
| Nov 26, 2014 | Never finaled issued Nov 2014, no final | 481 Jessie St | street spaceDetails
street space | ||
| Oct 25, 2000 | Expired or cancelled expired Mar 2002 | 481 Jessie St | barrier removal work includes a new stair restroom upgrade for all levels and replacementDetails
barrier removal work includes a new stair restroom upgrade for all levels and replacement | $265,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Modern Construction Inc (8), Steven Yeung Inc Dba Chung Wah Plbg&Fire (4), Crime Watch Security Sys Llc (2), Alpha Restoration & Wateproof, Bellwether L P, Edco Garage Door, Turner Construction Co, Value Fire Protection Inc
- Architects
- Robert Roth (9), Lucia Castello
- Engineers
- Donald Yu (2), Larry Fowler, Robert Raymond Roth, Rodrigo Santos, Tin Nguyen