Modern Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Sep 2026
- Last 24 months
- 14 permits filed
321 permits since 2000: 245 completed, 11 in progress, 42 never finaled, 23 expired or cancelled.
Of the 42 never-finaled permits, 7 are 3 to 5 years old, 4 are 5 to 10 years old, 31 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 321.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Oct 2026 | 2765 16th St | minor structure framing for mechanical units. add t24 electrical for pa#: 202606082725.Details
minor structure framing for mechanical units. add t24 electrical for pa#: 202606082725. | |
| Sep 24, 2026 | In progress issued Oct 2026 | 98 Battery St | revision 3 to pa 202510298348: outside protal material cladding change new framing added at the exterior in order to support sheet metal. existing to be removedDetails
revision 3 to pa 202510298348: outside protal material cladding change new framing added at the exterior in order to support sheet metal. existing to be removed | |
| Sep 11, 2026 | In progress issued Sep 2026 | 98 Battery St | add mechanical t24 to pa: 2026.0812.6428Details
add mechanical t24 to pa: 2026.0812.6428 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 98 Battery St | revise pa#2025-1029-8348 to document actual field conditions, no material changes to project or construction scope.Details
revise pa#2025-1029-8348 to document actual field conditions, no material changes to project or construction scope. | $60,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 98 Battery St | add title 24 electrical to main entry and elevator lobby. ref permit 202510298348.Details
add title 24 electrical to main entry and elevator lobby. ref permit 202510298348. | |
| Apr 7, 2026 | In progress issued Jun 2026 | 98 Battery St | minor non structural lobby door support and building attachment. single story non structural commercial tenant improvement. ref 202510298348Details
minor non structural lobby door support and building attachment. single story non structural commercial tenant improvement. ref 202510298348 | $3,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 1902 Webster St | to obtain final inspection for work approved under pa#202111303353 & 202211156581. all work is complete.Details
to obtain final inspection for work approved under pa#202111303353 & 202211156581. all work is complete. | |
| Mar 30, 2026 | In progress issued Apr 2026 | 1902 Webster St | to obtain final inspection for work approved under pa#202201286952. all work is complete.Details
to obtain final inspection for work approved under pa#202201286952. all work is complete. | |
| Oct 29, 2025 | In progress issued Jan 2026 | 98 Battery St | single story non-structural commercial t.i. project entry finishes, storefront, and exterior lighting to be replaced in kind. interior finishes and lighting to be replaced. no structural work. ref. permit 201912119260Details
single story non-structural commercial t.i. project entry finishes, storefront, and exterior lighting to be replaced in kind. interior finishes and lighting to be replaced. no structural work. ref. permit 201912119260 | $60,000 |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 22 Battery St | 6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork.Details
6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork. | $150,000 |
| Aug 6, 2025 | Completed final sign-off Aug 2025 | 564 Commercial St | to obtain final inspection for work approved under pa 202303093349 and 202308023588. all work is complete.Details
to obtain final inspection for work approved under pa 202303093349 and 202308023588. all work is complete. | |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 22 Battery St | to obtain final inspection for work approved under pa202203119789.Details
to obtain final inspection for work approved under pa202203119789. | |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall.Details
revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall. | |
| Oct 16, 2024 | In progress issued Oct 2026 | 1902 Webster St | convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cutDetails
convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cut | $100,000 |
| Jun 24, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lightingDetails
ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lighting | $35,000 |
| May 29, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen.Details
ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen. | $200,000 |
| May 9, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | 7/f: add ada bathroom on 7th floor for barrier removal worksDetails
7/f: add ada bathroom on 7th floor for barrier removal works | $32,000 |
| Apr 25, 2024 | Completed final sign-off May 2025 | 972 Mission St | construction of (n) electrical utlitly room located at basement. separate mep & fire/life safety permits will need to be obtained.Details
construction of (n) electrical utlitly room located at basement. separate mep & fire/life safety permits will need to be obtained. | $15,000 |
| Dec 29, 2023 | Completed final sign-off Feb 2024 | 972 Mission St | renew pa#201909252719 and pa#201912200109 and 202205033442 for final inspection all work complete.Details
renew pa#201909252719 and pa#201912200109 and 202205033442 for final inspection all work complete. | |
| Dec 29, 2023 | Completed final sign-off Apr 2024 | 1663 Mission St | 7th fl, ste 700 - add mechanical & electrical title 24 to pa 202311140802Details
7th fl, ste 700 - add mechanical & electrical title 24 to pa 202311140802 | |
| Dec 21, 2023 | Completed final sign-off May 2024 | 22 Battery St | adding electrical t-24 set to pa#202310259485. an alteration to part of the 3rd floor at 22 battery st. alteration includes additional receptacles and led lighting and control. reference architectural permit #202310248485.Details
adding electrical t-24 set to pa#202310259485. an alteration to part of the 3rd floor at 22 battery st. alteration includes additional receptacles and led lighting and control. reference architectural permit #202310248485. | |
| Nov 29, 2023 | Completed final sign-off Jan 2024 | 527 Howard St | administrative permit to document the legal use and ocupancy of struture as a 4 story building consist of 3 story of office space over ground floor commercial. this determination is based on a review of city records as well as a dbi site visit. no work under this permitDetails
administrative permit to document the legal use and ocupancy of struture as a 4 story building consist of 3 story of office space over ground floor commercial. this determination is based on a review of city records as well as a dbi site visit. no work under this permit | |
| Nov 14, 2023 | Completed final sign-off Apr 2024 | 1663 Mission St | 7th flr. remove existing walls. install new walls, doors and glazing. minor mechanical and electrical work under separate permit.Details
7th flr. remove existing walls. install new walls, doors and glazing. minor mechanical and electrical work under separate permit. | $55,000 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 22 Battery St | 3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing.Details
3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing. | $80,000 |
| Oct 17, 2023 | In progress issued Jan 2024 | 1663 Mission St | new ceiling, lighting, and millwork at building lobby.Details
new ceiling, lighting, and millwork at building lobby. | $115,000 |
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 350 Brannan St | demo: remove all non-structure interior walls and ceiling on the 2nd floorDetails
demo: remove all non-structure interior walls and ceiling on the 2nd floor | $35,000 |
| Aug 2, 2023 | Expired or cancelled expired Aug 2025 | 564 Commercial St | base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenetteDetails
base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenette | $165,000 |
| Jul 3, 2023 | Completed final sign-off May 2024 | 527 Howard St | 3rd fl - removal of previous ti. installation of (n) accessible restrooms in advance of next tenant. repair & paint drywall and flooring as necessaryDetails
3rd fl - removal of previous ti. installation of (n) accessible restrooms in advance of next tenant. repair & paint drywall and flooring as necessary | $90,000 |
| Jun 22, 2023 | Expired or cancelled cancelled Jan 2026 | 345 West Portal Av | 4th/f ste 400: t.i. of (e) office(2166 sf) new lighting & hvac. no change of use & fire life safety systemDetails
4th/f ste 400: t.i. of (e) office(2166 sf) new lighting & hvac. no change of use & fire life safety system | $110,500 |
| Mar 9, 2023 | Expired or cancelled expired Aug 2025 | 564 Commercial St | soft demo of interior tenant improvements on ground flr of bldg including fixtures, furniture and non-structural partitions, storage mezzanine and stairs to access mezzanine to be removed. no structural work, no exterior work. no work on floors 2 or 3. under ab-017Details
soft demo of interior tenant improvements on ground flr of bldg including fixtures, furniture and non-structural partitions, storage mezzanine and stairs to access mezzanine to be removed. no structural work, no exterior work. no work on floors 2 or 3. under ab-017 | $10,000 |
| Feb 14, 2023 | Never finaled issued Aug 2023, no final | 567 29th St | add new concrete underpinning under existing concrete footings.Details
add new concrete underpinning under existing concrete footings. | $45,000 |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 555 19th St | interior t.i. includes 2 new accessible shingle user shower rooms with one shower and one lavatory each on level one.Details
interior t.i. includes 2 new accessible shingle user shower rooms with one shower and one lavatory each on level one. | $28,000 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 1902 Webster St | voluntary structural strengthening in the basement level of the buildingDetails
voluntary structural strengthening in the basement level of the building | $60,000 |
| Jul 11, 2022 | Completed final sign-off Nov 2022 | 2678 16th Av | rev to pa# 2021-0820-6859: to increase the contrucion cost by $100,000. per building inspector's commentDetails
rev to pa# 2021-0820-6859: to increase the contrucion cost by $100,000. per building inspector's comment | $100,000 |
| May 12, 2022 | Completed final sign-off Dec 2022 | 300 Brannan St | add electrical t24 to pa 202203089458.Details
add electrical t24 to pa 202203089458. | |
| May 9, 2022 | Completed final sign-off Dec 2022 | 300 Brannan St | install two hvac unitsDetails
install two hvac units | $20,000 |
| May 3, 2022 | Expired or cancelled expired Feb 2024 | 972 Mission St | lobby:add title 24 to permit application 201912200109. electrical compliance.Details
lobby:add title 24 to permit application 201912200109. electrical compliance. | |
| Apr 27, 2022 | Completed final sign-off Jul 2023 | 3169 Washington St | rev to pa202106142382: reconfigure decks at rear.Details
rev to pa202106142382: reconfigure decks at rear. | $40,000 |
| Mar 22, 2022 | Completed final sign-off Dec 2022 | 300 Brannan St | infill pit at the corner of the ground floor commercial space. g/f retail of use remained, ti works under separate permit.Details
infill pit at the corner of the ground floor commercial space. g/f retail of use remained, ti works under separate permit. | $40,000 |
| Mar 11, 2022 | Expired or cancelled expired Apr 2025 | 22 Battery St | #22e. remove interior walls and ceiling tiles.Details
#22e. remove interior walls and ceiling tiles. | $15,000 |
| Mar 8, 2022 | Completed final sign-off Jun 2022 | 300 Brannan St | ground floor: barrier removal, restroom upgrade. demo of (e) partitions, construction of (n) partitions, plumbing fixtures, associated mechanical and electrical.Details
ground floor: barrier removal, restroom upgrade. demo of (e) partitions, construction of (n) partitions, plumbing fixtures, associated mechanical and electrical. | $70,000 |
| Feb 9, 2022 | Completed final sign-off Feb 2022 | 120 19th Av | administrative to correct the scope of work underpa# 202101072242. delete the words "adu on the ground" ther is no adu.Details
administrative to correct the scope of work underpa# 202101072242. delete the words "adu on the ground" ther is no adu. | |
| Jan 28, 2022 | Never finaled issued Feb 2022, no final | 1902 Webster St | provide new retaining wall in the 1st floor.Details
provide new retaining wall in the 1st floor. | $98,000 |
| Nov 30, 2021 | Never finaled issued Dec 2021, no final | 1902 Webster St | exploratory demo for dryrot at 2/f total 8 nos. of 4'-4' sectionsDetails
exploratory demo for dryrot at 2/f total 8 nos. of 4'-4' sections | $3,500 |
| Aug 20, 2021 | Completed final sign-off Nov 2022 | 2678 16th Av | interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear newDetails
interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear new | $40,000 |
| Jul 15, 2021 | Completed final sign-off Jul 2023 | 3169 Washington St | replace foundation.Details
replace foundation. | $50,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2023 | 3169 Washington St | basement: add studio, den, half bath, full bath, sauna. 1st flr: total remodel, add 0.5 bath. 2nd flr: total remodel, add i full bath and laundry. 3rd flr: total remodel. reconfigure interior stairs. replace windows in-kind wood.Details
basement: add studio, den, half bath, full bath, sauna. 1st flr: total remodel, add 0.5 bath. 2nd flr: total remodel, add i full bath and laundry. 3rd flr: total remodel. reconfigure interior stairs. replace windows in-kind wood. | $250,000 |
| Apr 19, 2021 | Expired or cancelled cancelled Nov 2021 | 3169 Washington St | to replace all finishes with new for a ktichen and bathroom including cbinets, flooring and paiting with no change in plan (remodel kitchen & 1 bathroom).Details
to replace all finishes with new for a ktichen and bathroom including cbinets, flooring and paiting with no change in plan (remodel kitchen & 1 bathroom). | $65,000 |
| Mar 15, 2021 | Completed final sign-off Apr 2023 | 98 Battery St | ste #500: revision to pa# 201901049678. remove demising wall from plan & saving exit doors. mep will be on seperate permit. upgrade (e) restrooms to be accessible.Details
ste #500: revision to pa# 201901049678. remove demising wall from plan & saving exit doors. mep will be on seperate permit. upgrade (e) restrooms to be accessible. | $105,000 |
| Mar 12, 2021 | Never finaled issued May 2021, no final | 1663 Mission St | ste 305/320. add mechanical engineering to pa# 202010206985.Details
ste 305/320. add mechanical engineering to pa# 202010206985. | $2,500 |
| Dec 21, 2020 | Completed final sign-off Sep 2021 | 120 19th Av | rev to 202011068414: revise plywood shearwall and concrete footing in the first floor.Details
rev to 202011068414: revise plywood shearwall and concrete footing in the first floor. | |
| Nov 25, 2020 | Never finaled issued Jan 2022, no final | 2119 Castro St | erect 3-story (2) dwelling units (n) buildingDetails
erect 3-story (2) dwelling units (n) building | $800,000 |
| Nov 25, 2020 | Never finaled issued Jan 2022, no final | 2119 Castro St | demolish 1-story single family dwellingDetails
demolish 1-story single family dwelling | $10,000 |
| Nov 6, 2020 | Completed final sign-off Sep 2021 | 120 19th Av | 1/f: add 1 bedrm, 1.5 bath, media rm, & interior stairs to 2/f. 2/f (front): remodel kitchen, half bath, & stairs to roof deck. 3/f: remodel baths, & add 1 full bath. add roof deck and replace front windows with aluminum clad wood.Details
1/f: add 1 bedrm, 1.5 bath, media rm, & interior stairs to 2/f. 2/f (front): remodel kitchen, half bath, & stairs to roof deck. 3/f: remodel baths, & add 1 full bath. add roof deck and replace front windows with aluminum clad wood. | $125,000 |
| Oct 20, 2020 | Never finaled issued Feb 2021, no final | 1663 Mission St | 3rd floor - suite 305/320: construct new wall, door & sidelight. install new light for the new office rooms. no exterior work, no change of use as defined by planning code.Details
3rd floor - suite 305/320: construct new wall, door & sidelight. install new light for the new office rooms. no exterior work, no change of use as defined by planning code. | $42,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 22 Battery St | add title 24 pa 201910295879.Details
add title 24 pa 201910295879. | |
| Oct 9, 2020 | Completed final sign-off Jan 2021 | 1251 09th Av | remodel extg kitchen and bathroom in kind include kitchen counter, bathroom fixtures, lighting, and outlete. no floor plan change.Details
remodel extg kitchen and bathroom in kind include kitchen counter, bathroom fixtures, lighting, and outlete. no floor plan change. | $45,000 |
| Sep 12, 2020 | Completed final sign-off Dec 2020 | 98 Battery St | (ste 220) title 24 for pa# 201911207809Details
(ste 220) title 24 for pa# 201911207809 | |
| Sep 10, 2020 | Completed final sign-off Dec 2020 | 447 Sutter St | add title 24 set to reference pa #2019-1227-0845Details
add title 24 set to reference pa #2019-1227-0845 | |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 4409 20th St | interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom.Details
interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom. | $60,000 |
| Aug 21, 2020 | Completed final sign-off Feb 2022 | 490 Post St | tenant improvement - remove of non bearing partitions and case work, new break room. no lighting changes. fire protection/sprinkler work deferred.Details
tenant improvement - remove of non bearing partitions and case work, new break room. no lighting changes. fire protection/sprinkler work deferred. | $59,000 |
| Aug 19, 2020 | Completed final sign-off Oct 2021 | 120 19th Av | remodel kitchen, 2 full bath, and 1/2 bath at same location. all fixtures will remain at same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150. and ksDetails
remodel kitchen, 2 full bath, and 1/2 bath at same location. all fixtures will remain at same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150. and ks | $35,000 |
| Jul 2, 2020 | Completed final sign-off Sep 2020 | 1365 Dolores St | replace existing kitchen cabinets with new & associated lighting & receptacle,sink & applicances (no layout change) @ 2nd floorDetails
replace existing kitchen cabinets with new & associated lighting & receptacle,sink & applicances (no layout change) @ 2nd floor | $25,000 |
| Mar 10, 2020 | Completed final sign-off Jul 2020 | 2621 Ocean Av | reduction in scope:1) remove 1 mop sink in one bathroom. 2)remove urinal in the other bathroom. revision to app#201911258063Details
reduction in scope:1) remove 1 mop sink in one bathroom. 2)remove urinal in the other bathroom. revision to app#201911258063 | |
| Dec 27, 2019 | Completed final sign-off Dec 2020 | 447 Sutter St | interior architectural t.i. only. (demolition under separate permit 201911228042) hvac, eletrical, sprinkler and fire alarm designs will be sublmitted under separate permits. maher extended "no"Details
interior architectural t.i. only. (demolition under separate permit 201911228042) hvac, eletrical, sprinkler and fire alarm designs will be sublmitted under separate permits. maher extended "no" | $650,000 |
| Dec 20, 2019 | Expired or cancelled expired Feb 2024 | 972 Mission St | barrier removal project to include: removal of elevator and enlargement of elevator shaft in preparation for new elevator, work also includes new finishes and lighting at elevator lobby, mep, title 24 energy calcs, fire sprinklers and life safety under separate permitDetails
barrier removal project to include: removal of elevator and enlargement of elevator shaft in preparation for new elevator, work also includes new finishes and lighting at elevator lobby, mep, title 24 energy calcs, fire sprinklers and life safety under separate permit | $100,000 |
| Nov 25, 2019 | Completed final sign-off Jul 2020 | 2621 Ocean Av | t.i. of (e) office to become a formula retail after school math learning center no change of use, exterior facade, and areaDetails
t.i. of (e) office to become a formula retail after school math learning center no change of use, exterior facade, and area | $19,000 |
| Nov 20, 2019 | Completed final sign-off Dec 2020 | 98 Battery St | #220: remove partition walls and construct new partition walls, doors, and sidelight. maher naDetails
#220: remove partition walls and construct new partition walls, doors, and sidelight. maher na | $120,000 |
| Nov 8, 2019 | Completed final sign-off Jan 2020 | 462 03rd Av | add 2 bedrooms, office,1 bath & laundry sink at 1st fl. per planDetails
add 2 bedrooms, office,1 bath & laundry sink at 1st fl. per plan | $33,500 |
| Oct 29, 2019 | Completed final sign-off Dec 2020 | 22 Battery St | remove interior partition walls, construct new walls, sidelights, doors and lighting//vif door to existing rated stair case shall be fire ratedDetails
remove interior partition walls, construct new walls, sidelights, doors and lighting//vif door to existing rated stair case shall be fire rated | $95,000 |
| Sep 25, 2019 | Expired or cancelled expired Feb 2024 | 972 Mission St | barrier removal: replacement of (e) elevator with new larger elevator, work also includes new elevator machine room penthouse, to replace (e) mep, title 24 enerry calc, fire sprinklers, life safety, & elevator construction under separate permits: 201912200109.Details
barrier removal: replacement of (e) elevator with new larger elevator, work also includes new elevator machine room penthouse, to replace (e) mep, title 24 enerry calc, fire sprinklers, life safety, & elevator construction under separate permits: 201912200109. | $80,000 |
| Sep 19, 2019 | Completed final sign-off Aug 2020 | 693 25th Av | 1st fl. add 2 bedrooms, 2 full baths, media room, and wine storage, 2nd fl. rev to pa #201904228634; reconfigure kitchen and add 1 full bathDetails
1st fl. add 2 bedrooms, 2 full baths, media room, and wine storage, 2nd fl. rev to pa #201904228634; reconfigure kitchen and add 1 full bath | $80,000 |
| Aug 30, 2019 | Completed final sign-off Apr 2020 | 1245 Noriega St | lower (e) entrance to comply with ada requirements. renovate (e) restroom to comply with ada; to comply with accessible business entrance program per ordinance 51-16.Details
lower (e) entrance to comply with ada requirements. renovate (e) restroom to comply with ada; to comply with accessible business entrance program per ordinance 51-16. | $15,000 |
| Aug 29, 2019 | Completed final sign-off Mar 2020 | 15 Lafayette St | install operator and controls for entry door. accessible business entrance program per ordinance 51-16.Details
install operator and controls for entry door. accessible business entrance program per ordinance 51-16. | $1,500 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 288 Pacific Av | ada bathroom (connercial-r-1)Details
ada bathroom (connercial-r-1) | $10,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 288 Pacific Av | ada bathroom and heat pump, retail space r-2. all work is no strutural only.Details
ada bathroom and heat pump, retail space r-2. all work is no strutural only. | $10,000 |
| Jul 19, 2019 | Completed final sign-off Aug 2020 | 4407 20th St | revision to voluntary seismic retrofit 2018-0525-0265 due to change in engineering and engineer of record and layour of shear walls. this permit cost is for the additional structural work for the adu only (lower slab & replace foundation).Details
revision to voluntary seismic retrofit 2018-0525-0265 due to change in engineering and engineer of record and layour of shear walls. this permit cost is for the additional structural work for the adu only (lower slab & replace foundation). | $50,000 |
| May 29, 2019 | Completed final sign-off Oct 2019 | 565 Commercial St | 3/f & 4/f: non structural demo - (n) non structural partitions, lighting, finishes & toilet rooms; no change in occupancy, use or area. mep, life safety & sprinklers under separate permitDetails
3/f & 4/f: non structural demo - (n) non structural partitions, lighting, finishes & toilet rooms; no change in occupancy, use or area. mep, life safety & sprinklers under separate permit | $502,250 |
| May 24, 2019 | Completed final sign-off Nov 2019 | 320 10th St | revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layoutDetails
revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layout | |
| May 8, 2019 | Completed final sign-off Jun 2025 | 565 29th St | remodel, alterations, addition & creation of (n) 2nd dwelling unit to an (e) 2-story single family residence. interior & exterior alteratons throughout, full foundation replacement, 3rd & 4th fl vertical addition, front facade alterations, site & landscape improvementsDetails
remodel, alterations, addition & creation of (n) 2nd dwelling unit to an (e) 2-story single family residence. interior & exterior alteratons throughout, full foundation replacement, 3rd & 4th fl vertical addition, front facade alterations, site & landscape improvements | $400,000 |
| Apr 24, 2019 | Completed final sign-off Nov 2019 | 464 03rd Av | remodel existing kitchen and bathroom on 3/f with new fixtures and cabinets based on same layout with no floor plan change,150 sq ft. 80 sq ft bathDetails
remodel existing kitchen and bathroom on 3/f with new fixtures and cabinets based on same layout with no floor plan change,150 sq ft. 80 sq ft bath | $8,000 |
| Apr 22, 2019 | Completed final sign-off Aug 2020 | 693 25th Av | remodel existing kitchen and (2) restrooms at 2nd floor with new fixtures and cabinets of same layout without any floor plan changeDetails
remodel existing kitchen and (2) restrooms at 2nd floor with new fixtures and cabinets of same layout without any floor plan change | $8,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2020 | 4407 20th St | remodel 2nd fl apartment unit. replace existing rear windows.Details
remodel 2nd fl apartment unit. replace existing rear windows. | $60,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 770 23rd Av | add new bathroom (7'x5') in the first fl in existing unit.Details
add new bathroom (7'x5') in the first fl in existing unit. | $10,000 |
| Feb 21, 2019 | Completed final sign-off Jun 2019 | 115 Hearst Av | reconfigure (e) kitchen and bath, add half-bath, bedroom closets unit #1 replace (e) windows in kind aat front of building and windows throughout unit #1Details
reconfigure (e) kitchen and bath, add half-bath, bedroom closets unit #1 replace (e) windows in kind aat front of building and windows throughout unit #1 | $25,000 |
| Feb 15, 2019 | Completed final sign-off Apr 2019 | 1663 Mission St | suite #602 on 6th fl: removing existing partition wall, door, casework & furniture. construction new partition wall, door & casework. maher n/a.Details
suite #602 on 6th fl: removing existing partition wall, door, casework & furniture. construction new partition wall, door & casework. maher n/a. | $20,000 |
| Feb 15, 2019 | Completed final sign-off May 2019 | 555 19th St | revision to 201802070675. install sloped floor adjacent to break room to accomodate 2 inch drop in elevation due to actual field conditions and metal guard at the edge of sloped floor.Details
revision to 201802070675. install sloped floor adjacent to break room to accomodate 2 inch drop in elevation due to actual field conditions and metal guard at the edge of sloped floor. | |
| Feb 13, 2019 | Completed final sign-off May 2019 | 565 Commercial St | 2nd flr. demo of non-structural walls, constructin of (n) tenant suite incl non-structural walls, plumbing, ceiling and lighting systems. mech, electr, plumb, life-safety and sprinklers to be design-build under separate permits. maher n/a.Details
2nd flr. demo of non-structural walls, constructin of (n) tenant suite incl non-structural walls, plumbing, ceiling and lighting systems. mech, electr, plumb, life-safety and sprinklers to be design-build under separate permits. maher n/a. | $253,018 |
| Feb 4, 2019 | Completed final sign-off Nov 2019 | 320 10th St | install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed.Details
install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed. | $60,000 |
| Jan 4, 2019 | Completed final sign-off Apr 2023 | 98 Battery St | #500 - remove (e) partition walls, ceiling tiles and flooring. install new non structural walls, doors. side lights, power outlets, relocate (e) lights install new finishesDetails
#500 - remove (e) partition walls, ceiling tiles and flooring. install new non structural walls, doors. side lights, power outlets, relocate (e) lights install new finishes | $105,000 |
| Dec 31, 2018 | Completed final sign-off May 2019 | 770 23rd Av | replace existing windows and patio doors in-kind. 8 windows visible from street will be marvin aluminum wood-clad; 10 windows and sliding doors not visible from street.Details
replace existing windows and patio doors in-kind. 8 windows visible from street will be marvin aluminum wood-clad; 10 windows and sliding doors not visible from street. | $8,000 |
| Dec 19, 2018 | Completed final sign-off Aug 2020 | 4407 20th St | add unit per ord #162-16. remodel ground floor to accommodate 1 new studio apartment unit. soft story permit is approved & issued 201805250265.Details
add unit per ord #162-16. remodel ground floor to accommodate 1 new studio apartment unit. soft story permit is approved & issued 201805250265. | $95,000 |
| Dec 14, 2018 | Completed final sign-off Feb 2019 | 1663 Mission St | unit 720. construct new wall, glass wall and door in open officeDetails
unit 720. construct new wall, glass wall and door in open office | $35,000 |
| Dec 13, 2018 | Completed final sign-off Sep 2019 | 770 23rd Av | remodel (e) kitchen & 3-1/2 bathrooms, flor layout remain unchanged. new electrical and lighting, new plumbing and finishes. lighting in same location.Details
remodel (e) kitchen & 3-1/2 bathrooms, flor layout remain unchanged. new electrical and lighting, new plumbing and finishes. lighting in same location. | $78,000 |
| Dec 5, 2018 | Completed final sign-off May 2019 | 555 19th St | revision to pa 201802070675. eliminate several partitioned work spaces. change in egress path, eleminate kitchen counter and sliding glass door, add sloped floor (not a ramp) to coordinate floor height difference at 1st flr, floor slope @ 2% approx.Details
revision to pa 201802070675. eliminate several partitioned work spaces. change in egress path, eleminate kitchen counter and sliding glass door, add sloped floor (not a ramp) to coordinate floor height difference at 1st flr, floor slope @ 2% approx. | |
| Dec 5, 2018 | Never finaled issued Dec 2018, no final | 969 Folsom St | demolition of mezzanine floor and non structural partition walls. soft demo only. no structural work. n/a for maherDetails
demolition of mezzanine floor and non structural partition walls. soft demo only. no structural work. n/a for maher | $10,000 |
| Aug 30, 2018 | Completed final sign-off Nov 2018 | 1663 Mission St | demo interior wall to construct new walls, doors, sidelight and install cabinet with sink, new lighting and power outlet. approx 2600 sq ft, arch and elec set. fire under separate permitsDetails
demo interior wall to construct new walls, doors, sidelight and install cabinet with sink, new lighting and power outlet. approx 2600 sq ft, arch and elec set. fire under separate permits | $120,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 972 Mission St | 5/f -demolish door, sidelite and portion of wall, construct new walls, doors,sidelites, ada case work, power outlet and light fixtures, extend kitchen with sink and dishwasher, install 3 hvac unitsDetails
5/f -demolish door, sidelite and portion of wall, construct new walls, doors,sidelites, ada case work, power outlet and light fixtures, extend kitchen with sink and dishwasher, install 3 hvac units | $350,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2018 | 133 Townsend St | revision to permit #201803133553 for address correctin from 135 townsend st to 133 townsend st.Details
revision to permit #201803133553 for address correctin from 135 townsend st to 133 townsend st. | |
| Aug 7, 2018 | Completed final sign-off Aug 2018 | 1663 Mission St | replace (e) air duct with same size, extend partial air duct to new air registers. rev. to appt #201706300852. existing unit to remain.Details
replace (e) air duct with same size, extend partial air duct to new air registers. rev. to appt #201706300852. existing unit to remain. | $2,500 |