Back to bathroom remodel contractors
Modern Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Sep 2026
- Last 24 months
- 14 permits filed
321 permits since 2000: 245 completed, 11 in progress, 42 never finaled, 23 expired or cancelled.
Of the 42 never-finaled permits, 7 are 3 to 5 years old, 4 are 5 to 10 years old, 31 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
67 bathroom remodel permits: 60 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 6 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2024 | In progress issued Oct 2026 | 1902 Webster St | convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cutDetails
convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cut | $100,000 |
| May 9, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | 7/f: add ada bathroom on 7th floor for barrier removal worksDetails
7/f: add ada bathroom on 7th floor for barrier removal works | $32,000 |
| Aug 2, 2023 | Expired or cancelled expired Aug 2025 | 564 Commercial St | base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenetteDetails
base building upgrade to provide accessible entrance door, accessible bathroom, and add office kitchenette | $165,000 |
| Aug 20, 2021 | Completed final sign-off Nov 2022 | 2678 16th Av | interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear newDetails
interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear new | $40,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2023 | 3169 Washington St | basement: add studio, den, half bath, full bath, sauna. 1st flr: total remodel, add 0.5 bath. 2nd flr: total remodel, add i full bath and laundry. 3rd flr: total remodel. reconfigure interior stairs. replace windows in-kind wood.Details
basement: add studio, den, half bath, full bath, sauna. 1st flr: total remodel, add 0.5 bath. 2nd flr: total remodel, add i full bath and laundry. 3rd flr: total remodel. reconfigure interior stairs. replace windows in-kind wood. | $250,000 |
| Apr 19, 2021 | Expired or cancelled cancelled Nov 2021 | 3169 Washington St | to replace all finishes with new for a ktichen and bathroom including cbinets, flooring and paiting with no change in plan (remodel kitchen & 1 bathroom).Details
to replace all finishes with new for a ktichen and bathroom including cbinets, flooring and paiting with no change in plan (remodel kitchen & 1 bathroom). | $65,000 |
| Nov 6, 2020 | Completed final sign-off Sep 2021 | 120 19th Av | 1/f: add 1 bedrm, 1.5 bath, media rm, & interior stairs to 2/f. 2/f (front): remodel kitchen, half bath, & stairs to roof deck. 3/f: remodel baths, & add 1 full bath. add roof deck and replace front windows with aluminum clad wood.Details
1/f: add 1 bedrm, 1.5 bath, media rm, & interior stairs to 2/f. 2/f (front): remodel kitchen, half bath, & stairs to roof deck. 3/f: remodel baths, & add 1 full bath. add roof deck and replace front windows with aluminum clad wood. | $125,000 |
| Oct 9, 2020 | Completed final sign-off Jan 2021 | 1251 09th Av | remodel extg kitchen and bathroom in kind include kitchen counter, bathroom fixtures, lighting, and outlete. no floor plan change.Details
remodel extg kitchen and bathroom in kind include kitchen counter, bathroom fixtures, lighting, and outlete. no floor plan change. | $45,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 4409 20th St | interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom.Details
interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom. | $60,000 |
| Aug 19, 2020 | Completed final sign-off Oct 2021 | 120 19th Av | remodel kitchen, 2 full bath, and 1/2 bath at same location. all fixtures will remain at same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150. and ksDetails
remodel kitchen, 2 full bath, and 1/2 bath at same location. all fixtures will remain at same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150. and ks | $35,000 |
| Mar 10, 2020 | Completed final sign-off Jul 2020 | 2621 Ocean Av | reduction in scope:1) remove 1 mop sink in one bathroom. 2)remove urinal in the other bathroom. revision to app#201911258063Details
reduction in scope:1) remove 1 mop sink in one bathroom. 2)remove urinal in the other bathroom. revision to app#201911258063 | |
| Nov 8, 2019 | Completed final sign-off Jan 2020 | 462 03rd Av | add 2 bedrooms, office,1 bath & laundry sink at 1st fl. per planDetails
add 2 bedrooms, office,1 bath & laundry sink at 1st fl. per plan | $33,500 |
| Sep 19, 2019 | Completed final sign-off Aug 2020 | 693 25th Av | 1st fl. add 2 bedrooms, 2 full baths, media room, and wine storage, 2nd fl. rev to pa #201904228634; reconfigure kitchen and add 1 full bathDetails
1st fl. add 2 bedrooms, 2 full baths, media room, and wine storage, 2nd fl. rev to pa #201904228634; reconfigure kitchen and add 1 full bath | $80,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 288 Pacific Av | ada bathroom (connercial-r-1)Details
ada bathroom (connercial-r-1) | $10,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 288 Pacific Av | ada bathroom and heat pump, retail space r-2. all work is no strutural only.Details
ada bathroom and heat pump, retail space r-2. all work is no strutural only. | $10,000 |
| May 24, 2019 | Completed final sign-off Nov 2019 | 320 10th St | revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layoutDetails
revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layout | |
| Apr 24, 2019 | Completed final sign-off Nov 2019 | 464 03rd Av | remodel existing kitchen and bathroom on 3/f with new fixtures and cabinets based on same layout with no floor plan change,150 sq ft. 80 sq ft bathDetails
remodel existing kitchen and bathroom on 3/f with new fixtures and cabinets based on same layout with no floor plan change,150 sq ft. 80 sq ft bath | $8,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 770 23rd Av | add new bathroom (7'x5') in the first fl in existing unit.Details
add new bathroom (7'x5') in the first fl in existing unit. | $10,000 |
| Feb 21, 2019 | Completed final sign-off Jun 2019 | 115 Hearst Av | reconfigure (e) kitchen and bath, add half-bath, bedroom closets unit #1 replace (e) windows in kind aat front of building and windows throughout unit #1Details
reconfigure (e) kitchen and bath, add half-bath, bedroom closets unit #1 replace (e) windows in kind aat front of building and windows throughout unit #1 | $25,000 |
| Feb 4, 2019 | Completed final sign-off Nov 2019 | 320 10th St | install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed.Details
install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed. | $60,000 |
| Dec 13, 2018 | Completed final sign-off Sep 2019 | 770 23rd Av | remodel (e) kitchen & 3-1/2 bathrooms, flor layout remain unchanged. new electrical and lighting, new plumbing and finishes. lighting in same location.Details
remodel (e) kitchen & 3-1/2 bathrooms, flor layout remain unchanged. new electrical and lighting, new plumbing and finishes. lighting in same location. | $78,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 481 Jessie St | revision to pa 2018-0403-5396 revise dimension in ada men's bathroom #312.Details
revision to pa 2018-0403-5396 revise dimension in ada men's bathroom #312. | |
| Apr 12, 2018 | Expired or cancelled withdrawn Jun 2018 | 770 23rd Av | interior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets,Details
interior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets, | $210,000 |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 481 Jessie St | 4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showersDetails
4th flr - construct new walls, doors, sidelights, power outlets, and lighting fixtures, new ada bathrooms and showers | $135,000 |
| Mar 13, 2018 | Completed final sign-off Nov 2018 | 135 Townsend St | remodel partial 1st flr to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power.Details
remodel partial 1st flr to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power. | $120,000 |
| Feb 12, 2018 | Completed final sign-off Jun 2018 | 298 07th St | minor demolition work, new partition wall for ada bathroom, showers, and changing rooms, new lighting, receptacles and new heating and ventilation system. n/a for maherDetails
minor demolition work, new partition wall for ada bathroom, showers, and changing rooms, new lighting, receptacles and new heating and ventilation system. n/a for maher | $80,000 |
| Feb 7, 2018 | Completed final sign-off Jun 2019 | 555 19th St | minor remodel of existing industrial space to provide small enclosed workshop spaces w/ doors/partitions, a remodeled break area, and conversion of urinals to toilet in two bathrooms 1st, 2nd, 3rd floor. maher ord 155-13 naDetails
minor remodel of existing industrial space to provide small enclosed workshop spaces w/ doors/partitions, a remodeled break area, and conversion of urinals to toilet in two bathrooms 1st, 2nd, 3rd floor. maher ord 155-13 na | $35,000 |
| Jan 30, 2018 | Completed final sign-off Jul 2018 | 481 Jessie St | 3rd fl: revision to pa #201701257893 on women's ada bathroom layout change.Details
3rd fl: revision to pa #201701257893 on women's ada bathroom layout change. | |
| Dec 18, 2017 | Completed final sign-off Jun 2018 | 22 Battery St | remove and relocate extg bathroom fixtures. install new or relocated bathroom fixtures to meet current bldg and ada codes.Details
remove and relocate extg bathroom fixtures. install new or relocated bathroom fixtures to meet current bldg and ada codes. | $25,000 |
| Jun 12, 2017 | Completed final sign-off Jul 2018 | 252 Cotter St | revision to pa #201702109209 for conversion of 1st flr into conidtioned space w/relocated dktichen & living/dining area w/new 1/2 bath & interior stair: 2nd flr w/3 bedrooms & 2 baths; window replacement & modifications as indicated.Details
revision to pa #201702109209 for conversion of 1st flr into conidtioned space w/relocated dktichen & living/dining area w/new 1/2 bath & interior stair: 2nd flr w/3 bedrooms & 2 baths; window replacement & modifications as indicated. | |
| May 25, 2017 | Completed final sign-off Aug 2018 | 481 Jessie St | 1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use.Details
1st fl/mezz: construction new ada bathroom & ada shower, new walls, doors, sidelights, power and associated lighting. no change of use. | $120,000 |
| Feb 10, 2017 | Completed final sign-off Jul 2018 | 252 Cotter St | renovation of (e) kitchen & bath, reconfigure (e) living/dining area @ 2nd flr, new interior stair to 1st. convert 1st flr into conditioned space for 2 bedrooms, new bath and family room, replace (e) windows & add windows & doors.Details
renovation of (e) kitchen & bath, reconfigure (e) living/dining area @ 2nd flr, new interior stair to 1st. convert 1st flr into conditioned space for 2 bedrooms, new bath and family room, replace (e) windows & add windows & doors. | $120,000 |
| Jan 18, 2017 | Completed final sign-off Jun 2017 | 676 Geary St | #508- remodel unit# 508, add washer & dryer, convert (e) kitchen to bedroom, relocate kitchen, remodel (e) bathroom. n/a ordinance #155-13Details
#508- remodel unit# 508, add washer & dryer, convert (e) kitchen to bedroom, relocate kitchen, remodel (e) bathroom. n/a ordinance #155-13 | $33,000 |
| Dec 14, 2016 | Completed final sign-off Feb 2017 | 2400 17th Av | untis 4 & 6: replace bath fixtures, re-tile shower walls & floors, relocate kitchen, replace cabinets, fixtures & appliance. mep and fire alarm work on separate permits.Details
untis 4 & 6: replace bath fixtures, re-tile shower walls & floors, relocate kitchen, replace cabinets, fixtures & appliance. mep and fire alarm work on separate permits. | $40,000 |
| Dec 9, 2016 | Completed final sign-off Jan 2018 | 1310 Turk St | to comply with nov 201641602: repair fire damage @ light well, interior repair to plaster @ hallway & bath rooms. r&r tub & showers on 2 floors and patch plaster @ basement level. n/a for maher.Details
to comply with nov 201641602: repair fire damage @ light well, interior repair to plaster @ hallway & bath rooms. r&r tub & showers on 2 floors and patch plaster @ basement level. n/a for maher. | $20,000 |
| Dec 9, 2016 | Completed final sign-off Jul 2019 | 29 29th St | rebuild fire damage. vertical addition & interior alterations for new 2nd dwelling unit. add 2 bed & 1 bath. type iiib to iiib & va. ** maher: n/a **Details
rebuild fire damage. vertical addition & interior alterations for new 2nd dwelling unit. add 2 bed & 1 bath. type iiib to iiib & va. ** maher: n/a ** | $250,000 |
| Nov 30, 2016 | Completed final sign-off Mar 2018 | 591 18th Av | remodel (e) kitchen and 3-1/2 bathrooms. installk new fixtures and ifnished. no floor plan changed. (e) layout to remain unchanged.Details
remodel (e) kitchen and 3-1/2 bathrooms. installk new fixtures and ifnished. no floor plan changed. (e) layout to remain unchanged. | $50,000 |
| Oct 12, 2016 | Expired or cancelled expired Apr 2026 | 1265 Washington St | ordinance 30-15 remodel ground floor to accommodate 2 (n) apartment units. (n) windows on rear facade. each (n) unit has bathroom & kitchen.Details
ordinance 30-15 remodel ground floor to accommodate 2 (n) apartment units. (n) windows on rear facade. each (n) unit has bathroom & kitchen. | $120,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 8222 Geary Bl | construct full bathroom, office and media room on ground floor (garage level).Details
construct full bathroom, office and media room on ground floor (garage level). | $35,000 |
| Apr 20, 2016 | Completed final sign-off Aug 2016 | 1260 09th Av | remove existing bathroom fixtures, doors and cabinets, install new walls, bathroom fixtures, casework, light fixtures, outlets, bathroom flooring and paint, replace furnace with new. add new bath & laundry room.Details
remove existing bathroom fixtures, doors and cabinets, install new walls, bathroom fixtures, casework, light fixtures, outlets, bathroom flooring and paint, replace furnace with new. add new bath & laundry room. | $60,000 |
| Feb 4, 2016 | Completed final sign-off Aug 2016 | 37 Tingley St | 1)interior remodel of kitchen and 3 bathrooms. 2)new lighting and outlets. 3)replace roofing and waterproofing in lightwell and replace with tile. replace lightwell window and sliding glass door.Details
1)interior remodel of kitchen and 3 bathrooms. 2)new lighting and outlets. 3)replace roofing and waterproofing in lightwell and replace with tile. replace lightwell window and sliding glass door. | $56,000 |
| Sep 11, 2015 | Completed final sign-off Nov 2015 | 983 Jackson St | remodel/remove/replace bath tub & wash basin, install new tub & vanity, ceramic tile floor & tub surround. install new ceramic tile floor, tub surround & wainscot. no structural demolition of walls.Details
remodel/remove/replace bath tub & wash basin, install new tub & vanity, ceramic tile floor & tub surround. install new ceramic tile floor, tub surround & wainscot. no structural demolition of walls. | $7,500 |
| Jan 26, 2015 | Completed final sign-off Nov 2016 | 493 Utah St | remodel kitchen & (2) bathrooms; replace furnace, cabinets, countertop, appliances & bath fixtures; no walls moved, removed or added; all (e) layouts to remain unchanged.Details
remodel kitchen & (2) bathrooms; replace furnace, cabinets, countertop, appliances & bath fixtures; no walls moved, removed or added; all (e) layouts to remain unchanged. | $45,000 |
| Jan 26, 2015 | Completed final sign-off Nov 2016 | 491 Utah St | remodel kitchen & (2) bathrooms; replace furnace, cabinets, countertop, appliances & bath fixtures; no walls moved, removed or added; all (e) layouts to remain unchanged.Details
remodel kitchen & (2) bathrooms; replace furnace, cabinets, countertop, appliances & bath fixtures; no walls moved, removed or added; all (e) layouts to remain unchanged. | $45,000 |
| Jan 16, 2015 | Completed final sign-off Aug 2015 | 225 San Anselmo Av | kitchen and bathrooms remodel. replace cabinets, counter, replace bath tub, shower, retile, replace new fixtures, repainting interial, & patch stucco outside wall.Details
kitchen and bathrooms remodel. replace cabinets, counter, replace bath tub, shower, retile, replace new fixtures, repainting interial, & patch stucco outside wall. | $38,000 |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 9 Kearny St | demolish existing walls, construct entry door, upgrade toilet fixtures to ada compliance, refinish floor and paint.full bathroom upgrade is technically infeasable n/a ordinance #155-13Details
demolish existing walls, construct entry door, upgrade toilet fixtures to ada compliance, refinish floor and paint.full bathroom upgrade is technically infeasable n/a ordinance #155-13 | $15,000 |
| Jun 30, 2014 | Completed final sign-off Jun 2015 | 255 11th Av | remodel (e) kitchen and add new bathroom at 3rd floor. replace 5-windows, rear side facing at rear. n/a ordinance #155-13.Details
remodel (e) kitchen and add new bathroom at 3rd floor. replace 5-windows, rear side facing at rear. n/a ordinance #155-13. | $14,000 |
| Oct 8, 2013 | Completed final sign-off Jan 2014 | 45 Powell St | remove existing partitions walls, doors, finishes. new partiton walls, doors, finishes. sink for breakrooms. reconnect ductwork for existing furnace. reinstall existing bath fixtures after tileDetails
remove existing partitions walls, doors, finishes. new partiton walls, doors, finishes. sink for breakrooms. reconnect ductwork for existing furnace. reinstall existing bath fixtures after tile | $28,000 |
| Sep 5, 2013 | Completed final sign-off Mar 2014 | 98 Madrone Av | kitchen & bathroom remodel, replace shower, toilet, sink, tile , replace cabinet, counter top. remove partition walls, replace side door, new window in bathroom. not visable from streetDetails
kitchen & bathroom remodel, replace shower, toilet, sink, tile , replace cabinet, counter top. remove partition walls, replace side door, new window in bathroom. not visable from street | $28,000 |
| Aug 21, 2013 | Completed final sign-off Jan 2014 | 1310 Turk St | #503- remodel kitchen - replace cabinet, sink, stove. remodel bathroom - replace fixtures & finishes.Details
#503- remodel kitchen - replace cabinet, sink, stove. remodel bathroom - replace fixtures & finishes. | $15,000 |
| Feb 19, 2013 | Completed final sign-off Apr 2013 | 508 Baker St | replace existing cabinets, countertop and appliances, remodel 2 existing bathrooms, replace tub, sink & fixture, replace 4 windows in lightwell, not visable from street.Details
replace existing cabinets, countertop and appliances, remodel 2 existing bathrooms, replace tub, sink & fixture, replace 4 windows in lightwell, not visable from street. | $38,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2012 | 510 Baker St | referance to application number 20120601-1670- replace 4 windows (not visable from street) build new bathroom next to existing bathroom, construct one new partiton wall, install one door.Details
referance to application number 20120601-1670- replace 4 windows (not visable from street) build new bathroom next to existing bathroom, construct one new partiton wall, install one door. | $6,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2012 | 1474 Grove St | referace to application 2012 0801-6244 build new bathroom, construct one new partition wall for bathroom, install one new door.Details
referace to application 2012 0801-6244 build new bathroom, construct one new partition wall for bathroom, install one new door. | $6,000 |
| Aug 1, 2012 | Completed final sign-off Dec 2012 | 1474 Grove St | replace (e) kitchen cabinets, countertops, fixtures, bathroom fixts & finishes, 5 windows in kind facing rear of bldg.Details
replace (e) kitchen cabinets, countertops, fixtures, bathroom fixts & finishes, 5 windows in kind facing rear of bldg. | $21,277 |
| Jun 1, 2012 | Completed final sign-off Dec 2012 | 510 Baker St | replace one existing kitchen cabinets, counter top, fixtures and finishes, replace one existing bathroom fixtures and finishes.Details
replace one existing kitchen cabinets, counter top, fixtures and finishes, replace one existing bathroom fixtures and finishes. | $16,000 |
| Mar 12, 2012 | Never finaled issued Mar 2012, no final | 135 Lakeview Av | comply with nov #201293873. revision to pa# 201201051721 (rear bldg) - remodel kitchen, bathroom & bedroom at 2nd floor. add laundry room, bedrooms & bathroom at ground floor. voluntary strength existing foundation.Details
comply with nov #201293873. revision to pa# 201201051721 (rear bldg) - remodel kitchen, bathroom & bedroom at 2nd floor. add laundry room, bedrooms & bathroom at ground floor. voluntary strength existing foundation. | $38,000 |
| Jan 5, 2012 | Completed final sign-off Jun 2013 | 135 Lakeview Av | remodel (e) kitchen & bathroom on 2nd. flr. replace lath & plaster @ 2-bedrms. w/ 5/8" type "x" gyp. bd. add 2-bedrooms, half bath & entertainment rm. relocate (e) furnace, water heater @ 1st. flr.Details
remodel (e) kitchen & bathroom on 2nd. flr. replace lath & plaster @ 2-bedrms. w/ 5/8" type "x" gyp. bd. add 2-bedrooms, half bath & entertainment rm. relocate (e) furnace, water heater @ 1st. flr. | $40,000 |
| Aug 10, 2011 | Completed final sign-off Jan 2012 | 632 Parnassus Av | add two-bedrooms & 1-bathrooms & 1-storage at first floor (ground).Details
add two-bedrooms & 1-bathrooms & 1-storage at first floor (ground). | $34,000 |
| May 13, 2011 | Completed final sign-off Sep 2011 | 3132 Ulloa St | remodel (e) 2 bathrooms & kitchen on 2nd floorDetails
remodel (e) 2 bathrooms & kitchen on 2nd floor | $20,000 |
| Jun 15, 2010 | Completed final sign-off Oct 2010 | 34 Colby St | remove (e) half bath at garage floor. add two full bath rooms, and a family room at garage floor. no work done at 2nd floorDetails
remove (e) half bath at garage floor. add two full bath rooms, and a family room at garage floor. no work done at 2nd floor | $40,000 |
| Apr 9, 2010 | Completed final sign-off Jul 2010 | 81 Forest Side Av | legalize (e) bedroom, laundry room, family room, bathroom on 1st fl. remodel (e) kitchen on 2nd fl. replace (e) window on north side of building.Details
legalize (e) bedroom, laundry room, family room, bathroom on 1st fl. remodel (e) kitchen on 2nd fl. replace (e) window on north side of building. | $40,000 |
| Mar 9, 2010 | Completed final sign-off May 2010 | 575 Sutter St | unit #301 -to comply the report of physical inspection application 3r-5031. ref. appl.#200704179016. install bathroom & kitchenette.Details
unit #301 -to comply the report of physical inspection application 3r-5031. ref. appl.#200704179016. install bathroom & kitchenette. | $12,000 |
| Mar 17, 2009 | Completed final sign-off Oct 2009 | 346 23rd Av | remodel (e) kitchen/bath room & construct a new wall separate bedroom & hallway for 2nd & 3rd floor; construct one bedroom, one play room, one half bathroom at ground floor; construct a new deck at rear of bldg ( size approx 12' x 7.5').Details
remodel (e) kitchen/bath room & construct a new wall separate bedroom & hallway for 2nd & 3rd floor; construct one bedroom, one play room, one half bathroom at ground floor; construct a new deck at rear of bldg ( size approx 12' x 7.5'). | $58,000 |
| Apr 13, 2006 | Completed final sign-off Jul 2006 | 2139 46th Av | remodel 1 bedroom, 1 bathroom & storage room at the basement. replace 2 windows at ground floor.Details
remodel 1 bedroom, 1 bathroom & storage room at the basement. replace 2 windows at ground floor. | $26,000 |
| Feb 15, 2006 | Completed final sign-off May 2006 | 2301 Ortega St | replace tile on kitchen & bathroom wall & floor.Details
replace tile on kitchen & bathroom wall & floor. | $5,000 |
| Nov 30, 2005 | Completed final sign-off Feb 2006 | 1145 Green St | kitchen and bath remodel. replace cabinett, tilesDetails
kitchen and bath remodel. replace cabinett, tiles | $15,000 |
| Jul 25, 2005 | Completed final sign-off Aug 2005 | 318 Frederick St | replace wall cabinet & granite countertop for kitchen; replace wall & floor tile for bathroomDetails
replace wall cabinet & granite countertop for kitchen; replace wall & floor tile for bathroom | $8,700 |