Block 0266, lot 006
22 Battery St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 11
- Building
- 66,032 sq ft
- Lot
- 7,431 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
68 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 22 Battery St | install 1 illuminated wall signDetails
install 1 illuminated wall sign | $8,000 | |
| Apr 23, 2026 | In progress issued Sep 2026 | 22 Battery St | 8/f - suite 810: tenant improvement of existing office with new conference room and breakroom. exsiting radiators remain. new lighting and control. no change of use, mechanical system, and exteriors. demo work was permitted under bpa 202411215492.Details
8/f - suite 810: tenant improvement of existing office with new conference room and breakroom. exsiting radiators remain. new lighting and control. no change of use, mechanical system, and exteriors. demo work was permitted under bpa 202411215492. | $284,000 | |
| Mar 10, 2026 | In progress filed Mar 2026, not yet issued | 22 Battery St | ground floor- ti of exterior and interior of (e) building for a fast casual restaurant . (n) partition and includes upgrade to mepDetails
ground floor- ti of exterior and interior of (e) building for a fast casual restaurant . (n) partition and includes upgrade to mep | $500,000 | |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 22 Battery St | Crime Watch Security Sys Llc | 6/f suite 610: add 4 ceiling horn strobes for the t.i. ref renovation permit 202508213663Details
6/f suite 610: add 4 ceiling horn strobes for the t.i. ref renovation permit 202508213663 | $2,600 |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 22 Battery St | Modern Construction Inc | 6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork.Details
6th flr. ref 202411215492- remove portion of (e) wall and construct (n) walls, power, lighting system, finishes and millwork. | $150,000 |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 22 Battery St | Modern Construction Inc | to obtain final inspection for work approved under pa202203119789.Details
to obtain final inspection for work approved under pa202203119789. | |
| Jan 8, 2025 | Completed final sign-off Feb 2025 | 22 Battery St | Crime Watch Security Sys Llc | tenant improvement: add 3 wall amount hron strobe in the ground floor storage.Details
tenant improvement: add 3 wall amount hron strobe in the ground floor storage. | $2,100 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 22 Battery St | Crime Watch Security Sys Llc | tenant improvement: add a wall mount strobe in the restroom on the 7/f. all other existing devices to remain unchanged. ref pa#202405091813Details
tenant improvement: add a wall mount strobe in the restroom on the 7/f. all other existing devices to remain unchanged. ref pa#202405091813 | $700 |
| Nov 21, 2024 | Completed final sign-off Dec 2025 | 22 Battery St | Synergy Enterprises Inc. | 6&8/fl- ste 610 & 810-per ab 017- removal of plaster walls, t bar grid , cabinets, and carpet throughout. all meps stays in place. the unit will not be built back. soft demo only.Details
6&8/fl- ste 610 & 810-per ab 017- removal of plaster walls, t bar grid , cabinets, and carpet throughout. all meps stays in place. the unit will not be built back. soft demo only. | $42,000 |
| Nov 6, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall.Details
revision to pa# 202406245087: (ste e) add hardlid ceiling for storage room. add one hour rated wall. | |
| Jul 24, 2024 | Completed final sign-off Aug 2024 | 22 Battery St | Crime Watch Security Sys Llc | suite 700: t.i. improvement: supply and install a remote power supply next to the facu on the ground floor. ref ppa#202405293242Details
suite 700: t.i. improvement: supply and install a remote power supply next to the facu on the ground floor. ref ppa#202405293242 | $4,000 |
| Jun 24, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lightingDetails
ste e (retail space) remove portion of (e) walls & lighting; install walls,doors, power and lighting | $35,000 |
| May 29, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen.Details
ste 700: install new walls, doors, glazing, ceiling, power receptacles and lighting; install accessible kitchen. | $200,000 |
| May 9, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Modern Construction Inc | 7/f: add ada bathroom on 7th floor for barrier removal worksDetails
7/f: add ada bathroom on 7th floor for barrier removal works | $32,000 |
| May 7, 2024 | Completed final sign-off Aug 2024 | 22 Battery St | Build Group Inc. | ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior workDetails
ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior work | $190,000 |
| Mar 27, 2024 | Completed final sign-off Feb 2025 | 22 Battery St | Synergy Enterprises Inc. | suite 700: interior demo: remove (e) wall. remove ceiling tiles and t-bar. remove plaster and lath throughout suite. rmeove carpet & hardwood floor. no mep removal. reinstallation done by other.Details
suite 700: interior demo: remove (e) wall. remove ceiling tiles and t-bar. remove plaster and lath throughout suite. rmeove carpet & hardwood floor. no mep removal. reinstallation done by other. | $28,000 |
| Mar 13, 2024 | Completed final sign-off Jun 2024 | 22 Battery St | C B 2 Builders Incorporated | 10/f: revision to permit 202310168720 to replace drinking fountain with accessible bottle filling station due to technical infeasibility and new suspended light fixture.Details
10/f: revision to permit 202310168720 to replace drinking fountain with accessible bottle filling station due to technical infeasibility and new suspended light fixture. | |
| Dec 21, 2023 | Completed final sign-off May 2024 | 22 Battery St | Modern Construction Inc | adding electrical t-24 set to pa#202310259485. an alteration to part of the 3rd floor at 22 battery st. alteration includes additional receptacles and led lighting and control. reference architectural permit #202310248485.Details
adding electrical t-24 set to pa#202310259485. an alteration to part of the 3rd floor at 22 battery st. alteration includes additional receptacles and led lighting and control. reference architectural permit #202310248485. | |
| Nov 15, 2023 | Completed final sign-off Feb 2024 | 22 Battery St | Crime Watch Security Sys Llc | 3rd fl tenant improvement: supply and install additional notification devices for the newly renovated 3rd fl.ref pa# 202310259485.Details
3rd fl tenant improvement: supply and install additional notification devices for the newly renovated 3rd fl.ref pa# 202310259485. | $4,800 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 22 Battery St | Modern Construction Inc | 3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing.Details
3rd fl: remove exsiting walls, doors, celing, lightings, interior glazing. install new walls, doors, ceiling, lighting, and interior glazing. | $80,000 |
| Oct 16, 2023 | Completed final sign-off Jun 2024 | 22 Battery St | C B 2 Builders Incorporated | 10th fl - project consists of interior improvements to an (e) tenant space of approx 5000 sf space. addition of a (n) cabinet area (n) kitchen island to compliment the (e) kitchenDetails
10th fl - project consists of interior improvements to an (e) tenant space of approx 5000 sf space. addition of a (n) cabinet area (n) kitchen island to compliment the (e) kitchen | $186,000 |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 2 Battery St | Premier Roofing Associates Inc | re-roofing removal and replacement 2ply sbs: comply w/ cool roof requirementsDetails
re-roofing removal and replacement 2ply sbs: comply w/ cool roof requirements | $60,000 |
| Aug 30, 2022 | Completed final sign-off Aug 2023 | 22 Battery St | Lemcon | att modification of unmanned telecom facility. remove/replace 6 antennas, new rf safety signs,secure barricades w/locked gates & striping at rooftop.new 6648 baseband unit in e rack.Details
att modification of unmanned telecom facility. remove/replace 6 antennas, new rf safety signs,secure barricades w/locked gates & striping at rooftop.new 6648 baseband unit in e rack. | $45,000 |
| Mar 11, 2022 | Expired or cancelled expired Apr 2025 | 22 Battery St | Modern Construction Inc | #22e. remove interior walls and ceiling tiles.Details
#22e. remove interior walls and ceiling tiles. | $15,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 22 Battery St | Modern Construction Inc | add title 24 pa 201910295879.Details
add title 24 pa 201910295879. | |
| Mar 4, 2020 | Completed final sign-off Apr 2022 | 22 Battery St | Electric Tech Construction Inc | att modification 44 6 e antennas with 6 new antennas r+r 3 e rrus w 3 new antennas, r and r 6 e batteries w 6 n batteriesDetails
att modification 44 6 e antennas with 6 new antennas r+r 3 e rrus w 3 new antennas, r and r 6 e batteries w 6 n batteries | $19,500 |
| Dec 18, 2019 | Completed final sign-off Feb 2020 | 22 Battery St | Crime Watch Security Sys Llc | 4th fl - t.i. upgrade extg fire alarm system to provide notification nw 4th floor office. ref app#201910295879Details
4th fl - t.i. upgrade extg fire alarm system to provide notification nw 4th floor office. ref app#201910295879 | $1,500 |
| Oct 29, 2019 | Completed final sign-off Dec 2020 | 22 Battery St | Modern Construction Inc | remove interior partition walls, construct new walls, sidelights, doors and lighting//vif door to existing rated stair case shall be fire ratedDetails
remove interior partition walls, construct new walls, sidelights, doors and lighting//vif door to existing rated stair case shall be fire rated | $95,000 |
| Jan 17, 2019 | Completed final sign-off May 2019 | 22 Battery St | T C B Builders Inc | additional casework for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mechanical workDetails
additional casework for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mechanical work | $75,000 |
| Dec 18, 2018 | Expired or cancelled cancelled Jun 2022 | 22 Battery St | C I K Power Distributors, Llc | att modification: install 3 new antennas, and other sm equip. no changes to batteriesDetails
att modification: install 3 new antennas, and other sm equip. no changes to batteries | $19,000 |
| Oct 16, 2018 | Completed final sign-off Jul 2019 | 22 Battery St | Premium Roofing & Waterproofing Inc | reroofing: remove & replace roof on main area. dispose extg. gravel roof & flashings. install new multi ply modifier. asphalt roof w/title 24 surfacing.Details
reroofing: remove & replace roof on main area. dispose extg. gravel roof & flashings. install new multi ply modifier. asphalt roof w/title 24 surfacing. | $70,000 |
| Mar 30, 2018 | Completed final sign-off Aug 2022 | 22 Battery St | C I K Power Distributors, Llc | at&t wirelessl swap 2 antennas, install 3 new rrus-4478, swap 1 rus-11 &a2 for 1 rrus - total 3. swap 1 gps antenna with lte gps. install 1 - 5216 in rack., remove 4 batteriesDetails
at&t wirelessl swap 2 antennas, install 3 new rrus-4478, swap 1 rus-11 &a2 for 1 rrus - total 3. swap 1 gps antenna with lte gps. install 1 - 5216 in rack., remove 4 batteries | $15,000 |
| Dec 18, 2017 | Completed final sign-off Jun 2018 | 22 Battery St | Modern Construction Inc | remove and relocate extg bathroom fixtures. install new or relocated bathroom fixtures to meet current bldg and ada codes.Details
remove and relocate extg bathroom fixtures. install new or relocated bathroom fixtures to meet current bldg and ada codes. | $25,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 22 Battery St | Crime Watch Security Sys Llc | emergency fire alarm panel replacement for the inoperable/defective facu. like for like. fa upgrade for the entire system will be under a separate permit. maher naDetails
emergency fire alarm panel replacement for the inoperable/defective facu. like for like. fa upgrade for the entire system will be under a separate permit. maher na | $3,000 |
| May 11, 2017 | Completed final sign-off Sep 2017 | 22 Battery St | Electric Tech Construction Inc | att - r&r 3(e) antennas w/3 new antennas, 3 new rrus with 3 new rrus; install 3 isco filters & connectivity box, 3 rrus and other small equip maher naDetails
att - r&r 3(e) antennas w/3 new antennas, 3 new rrus with 3 new rrus; install 3 isco filters & connectivity box, 3 rrus and other small equip maher na | $33,000 |
| Nov 9, 2016 | Completed final sign-off May 2022 | 22 Battery St | Electric Tech Construction Inc | modification to e at&t facility including: removing/replacing 8 antennas like for like, install 3 n rrus near antennas and 3 new rrus in equip room, other minor upgrades including 6 n dtmas, 1 n du41 & rotating antennas slightly. maher not reqDetails
modification to e at&t facility including: removing/replacing 8 antennas like for like, install 3 n rrus near antennas and 3 new rrus in equip room, other minor upgrades including 6 n dtmas, 1 n du41 & rotating antennas slightly. maher not req | $61,000 |
| Nov 3, 2016 | Completed final sign-off Nov 2016 | 22 Battery St | to obtain final inspection for work approved under pa# 9306730 and # 9308081. all work is completeDetails
to obtain final inspection for work approved under pa# 9306730 and # 9308081. all work is complete | ||
| Jul 20, 2016 | Expired or cancelled withdrawn Nov 2016 | 22 Battery St | modification to an(e) at&t facility including: relocate 3(e) antennas from bldg facade to top of penthouse; remove/replace 4(e) with 4 (n) antennas (like for like swap); install 3(n) rrus in equip rm & 3 (n) rrus on roof; other minor equipment upgrades in equip room. n/a maher ordinanceDetails
modification to an(e) at&t facility including: relocate 3(e) antennas from bldg facade to top of penthouse; remove/replace 4(e) with 4 (n) antennas (like for like swap); install 3(n) rrus in equip rm & 3 (n) rrus on roof; other minor equipment upgrades in equip room. n/a maher ordinance | $48,000 | |
| Jun 29, 2015 | Expired or cancelled cancelled Jan 2026 | 22 Battery St | g/f-remodel to (e)peets coffee &tea shop. no structural exterior or civil work. install new interior partitions, finishes, fixtures, casework, millwork, equipment, elec work: nw power/data & ltg throughout. plmg work:nw floor sinks, floor drains, handsinks.Details
g/f-remodel to (e)peets coffee &tea shop. no structural exterior or civil work. install new interior partitions, finishes, fixtures, casework, millwork, equipment, elec work: nw power/data & ltg throughout. plmg work:nw floor sinks, floor drains, handsinks. | $90,000 | |
| Jun 25, 2015 | Completed final sign-off May 2016 | 22 Battery St | Triton Tower Inc | modification of an(e) at&t facility including: remove/replace 3 (e) antennas with 3 (n) antennas of similar size; remove/replace 3(e) surge supressors; install 3 (n) rrus and 3 (n) dtmas near antennas; other minor improvements to equipment including (n) innerduct & (n) dvs 41 unit.n/a maher ordinancDetails
modification of an(e) at&t facility including: remove/replace 3 (e) antennas with 3 (n) antennas of similar size; remove/replace 3(e) surge supressors; install 3 (n) rrus and 3 (n) dtmas near antennas; other minor improvements to equipment including (n) innerduct & (n) dvs 41 unit.n/a maher ordinanc | $16,000 |
| Apr 14, 2014 | Completed final sign-off Oct 2014 | 22 Battery St | Nu Rev Communications Inc. | modification to (e) at & t facility consisting of relocating 3 (e) rrus from equipment room to roof, installing 3 (n) rrus at roof, installing 3 (n) a-2 moduels, installing 3 (n) surge suppressors, 3 (n) windwe boxes, 1 (n) splice box and (n)innerduct for fiver & power.Details
modification to (e) at & t facility consisting of relocating 3 (e) rrus from equipment room to roof, installing 3 (n) rrus at roof, installing 3 (n) a-2 moduels, installing 3 (n) surge suppressors, 3 (n) windwe boxes, 1 (n) splice box and (n)innerduct for fiver & power. | $20,000 |
| Nov 18, 2013 | Completed final sign-off Aug 2014 | 22 Battery St | 10th floor: create and produce 2 evacuation plan signs on the 10th floorDetails
10th floor: create and produce 2 evacuation plan signs on the 10th floor | $1,200 | |
| Aug 1, 2013 | Completed final sign-off Jun 2018 | 22 Battery St | Johnson Controls Security Solutions Llc | 10th floor - install horn storbe in conference room. ref pa #2013.04.30.5771Details
10th floor - install horn storbe in conference room. ref pa #2013.04.30.5771 | $3,000 |
| Jul 25, 2013 | Completed final sign-off May 2014 | 22 Battery St | to obtain final inspection for work approved under pa#200603066008 all work is complete.Details
to obtain final inspection for work approved under pa#200603066008 all work is complete. | ||
| Jun 25, 2013 | Expired or cancelled withdrawn Sep 2014 | 22 Battery St | remove 3 extg at&t antennas and replace with 3 new antenas of similar dimensions. add 6 new rru s at antenna location. also more three extg rrus from equipment area to rooftops. add 3 new surge suppressures and one new splice box. remove 6 extg diplexers.Details
remove 3 extg at&t antennas and replace with 3 new antenas of similar dimensions. add 6 new rru s at antenna location. also more three extg rrus from equipment area to rooftops. add 3 new surge suppressures and one new splice box. remove 6 extg diplexers. | $40,000 | |
| May 31, 2013 | Completed final sign-off Jan 2014 | 22 Battery St | Slc Inc | removal of (e) towerstream facility-5 antennas, 3 mounts, an equipment enclosure & cat 5 cablesDetails
removal of (e) towerstream facility-5 antennas, 3 mounts, an equipment enclosure & cat 5 cables | $500 |
| May 30, 2013 | Never finaled issued May 2013, no final | 22 Battery St | Synergy Enterprises Inc. | revision to pa#2013-0418-4857, work done on 10th floor not 1st floor.Details
revision to pa#2013-0418-4857, work done on 10th floor not 1st floor. | |
| Apr 30, 2013 | Completed final sign-off Dec 2013 | 22 Battery St | Modern Construction Inc | 10th floor suite 1000 - remove exisitng finishes, construct new walls, doors, lights, install new finishes.Details
10th floor suite 1000 - remove exisitng finishes, construct new walls, doors, lights, install new finishes. | $105,000 |
| Apr 18, 2013 | Never finaled issued Apr 2013, no final | 22 Battery St | Synergy Enterprises Inc. | 1st floor-drywall removal & non structural frame removal. all electrical & plumbing stay in place, ab-017Details
1st floor-drywall removal & non structural frame removal. all electrical & plumbing stay in place, ab-017 | $21,000 |
| Aug 28, 2012 | Expired or cancelled withdrawn Jun 2013 | 22 Battery St | revision to appl #2011.06.01.7154 - revision includes only the following: instead of adding 3 (n) antennas, project consists of removing & replacing 3 (e) antennas, the 6 (n) rru's have slightly revised locations on rooftop penthouse.Details
revision to appl #2011.06.01.7154 - revision includes only the following: instead of adding 3 (n) antennas, project consists of removing & replacing 3 (e) antennas, the 6 (n) rru's have slightly revised locations on rooftop penthouse. | ||
| May 11, 2012 | Completed final sign-off Feb 2013 | 22 Battery St | Modern Construction Inc | on 3rd floor - construct new walls, door, lights, and install new finishes. see permit application # 201204208779 for demolition.Details
on 3rd floor - construct new walls, door, lights, and install new finishes. see permit application # 201204208779 for demolition. | $75,000 |
| Apr 20, 2012 | Completed final sign-off Feb 2013 | 22 Battery St | Modern Construction Inc | 3rd floor - remove partiton walls, doors, and finishes per ab-017Details
3rd floor - remove partiton walls, doors, and finishes per ab-017 | $10,000 |
| Apr 4, 2012 | Completed final sign-off Feb 2013 | 22 Battery St | Modern Construction Inc | 4th floor suite #404 - construct new walls, lights. install new finishesDetails
4th floor suite #404 - construct new walls, lights. install new finishes | $50,000 |
| Mar 12, 2012 | Completed final sign-off Apr 2012 | 22 Battery St | Eagle Systems International Inc. | removal of drywall and non-bearing partitions. per ab-017Details
removal of drywall and non-bearing partitions. per ab-017 | $17,000 |
| Jul 7, 2011 | Completed final sign-off May 2012 | 22 Battery St | Modern Construction Inc | 11th floor-remove (e) walls, lights, doors, finishes. construct new walls, doors, lights & new finishes.mep, fire alarm separate permitDetails
11th floor-remove (e) walls, lights, doors, finishes. construct new walls, doors, lights & new finishes.mep, fire alarm separate permit | $85,000 |
| Jul 5, 2011 | Never finaled issued Sep 2011, no final | 22 Battery St | Oakstone Construction Inc. | interior t.i. replace counter at expresso bar. relocate extg equp. new 3 comp sink, new hand sink. no exterior change. (filed verify sprinkler/fa coverage.)Details
interior t.i. replace counter at expresso bar. relocate extg equp. new 3 comp sink, new hand sink. no exterior change. (filed verify sprinkler/fa coverage.) | $65,000 |
| Jun 1, 2011 | Expired or cancelled cancelled Jun 2016 | 22 Battery St | Norcal Communications & Construction Inc | add (3) antennas, relocate (4) (e) antennas, add (3) antenna mounts for (n) antennas. add (1) gps antenna. add (3) surge suppressors & (6) rru's , (n) splice box. add (1) 6601 equipment cabinet into (e) lease area.Details
add (3) antennas, relocate (4) (e) antennas, add (3) antenna mounts for (n) antennas. add (1) gps antenna. add (3) surge suppressors & (6) rru's , (n) splice box. add (1) 6601 equipment cabinet into (e) lease area. | $66,050 |
| Nov 2, 2010 | Never finaled issued Nov 2010, no final | 22 Battery St | Tyco Integrated Security | adt will connect one waterflow device & two tamper switches to existing panel, due to addiiton of new riser in the basement, located on 1st floor for monitoring.Details
adt will connect one waterflow device & two tamper switches to existing panel, due to addiiton of new riser in the basement, located on 1st floor for monitoring. | $3,300 |
| Oct 26, 2010 | Completed final sign-off Jul 2011 | 22 Battery St | Pacific Automatic Sprinkler | to install a fire sparinkler system to protect the basement storage areas. fire sprinkler work onlyDetails
to install a fire sparinkler system to protect the basement storage areas. fire sprinkler work only | $35,000 |
| Mar 12, 2010 | Expired or cancelled cancelled Oct 2013 | 2 Battery St | Broken Arrow Communications Inc | modification to an (e) unmanned telecommumincation facility consisting of adding 1 new 3206 rbs cabinet inside (e) equipment roomDetails
modification to an (e) unmanned telecommumincation facility consisting of adding 1 new 3206 rbs cabinet inside (e) equipment room | $25,000 |
| Feb 5, 2010 | Never finaled issued Feb 2010, no final | 22 Battery St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| May 20, 2009 | Expired or cancelled withdrawn May 2013 | 22 Battery St | remove (e( tdma equipment, add (2) new lines at colax per sector, add (2) tover mounted ampliers (tmas at antenna position 1, (1) per sector.Details
remove (e( tdma equipment, add (2) new lines at colax per sector, add (2) tover mounted ampliers (tmas at antenna position 1, (1) per sector. | $4,700 | |
| Jan 8, 2009 | Expired or cancelled cancelled Nov 2011 | 22 Battery St | remove existing tdma cabinets, 2 new lines of coax per sector, add 2 tmas at antenna position 1 per sector. connect cabinets to antennas by using new coax.Details
remove existing tdma cabinets, 2 new lines of coax per sector, add 2 tmas at antenna position 1 per sector. connect cabinets to antennas by using new coax. | $5,000 | |
| Oct 6, 2008 | Never finaled issued Oct 2008, no final | 22 Battery St | move the advertising sign down on the wall so that top of vinyl does not exceed 100'from grade. bring into compliance with approved original characteristics.Details
move the advertising sign down on the wall so that top of vinyl does not exceed 100'from grade. bring into compliance with approved original characteristics. | $4,000 | |
| Feb 11, 2008 | Completed final sign-off Apr 2008 | 22 Battery St | Premium Roofing Waterproofing | reroofing.Details
reroofing. | $20,000 |
| Aug 17, 2007 | Never finaled issued Aug 2007, no final | 22 Battery St | street spaceDetails
street space | ||
| Mar 6, 2006 | Expired or cancelled expired Feb 2009 | 22 Battery St | Broken Arrow Communications Inc | install 1 new antenna, replace 2 existing antennas, 6 cables to existing telecommunications site.Details
install 1 new antenna, replace 2 existing antennas, 6 cables to existing telecommunications site. | $20,000 |
| Nov 29, 2001 | Completed final sign-off Feb 2002 | 22 Battery St | M C Metal Inc | window washing tie back on roofDetails
window washing tie back on roof | $7,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.