Permit GraphShortlistSan Francisco building permits since 2000

Turner Construction Co

Contractor license
210639
State license record
Based in
San Francisco
On San Francisco permits
Jan 2000 to Sep 2026
Last 24 months
31 permits filed

944 permits since 2000: 674 completed, 21 in progress, 114 never finaled, 135 expired or cancelled.

Of the 114 never-finaled permits, 8 are 3 to 5 years old, 35 are 5 to 10 years old, 71 are over 10 years old. 9 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 1Pergola or trellis 1Deck 1Stairs 30Kitchen remodel 6Bathroom remodel 6

Showing the 100 most recent of 944.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 25, 2026In progress
filed Sep 2026, not yet issued
1 Beach Stdeferred mep for pa#2026-0302-6788 suite 350.
Details
Permit
202609258635
Status
filed
Filed
Sep 25, 2026
Declared cost
$500,000
Address
1 Beach St

deferred mep for pa#2026-0302-6788 suite 350.

Open the permit page

$500,000
Sep 25, 2026In progress
filed Sep 2026, not yet issued
1 Beach Strevision to pa#: 202509084794, to separate suites 100 to 200.
Details
Permit
202609258620
Status
filed
Filed
Sep 25, 2026
Address
1 Beach St

revision to pa#: 202509084794, to separate suites 100 to 200.

Open the permit page

Sep 25, 2026In progress
filed Sep 2026, not yet issued
1 Beach Stdeferred mep for 202608206913 suite 150.
Details
Permit
202609258621
Status
filed
Filed
Sep 25, 2026
Declared cost
$187,000
Address
1 Beach St

deferred mep for 202608206913 suite 150.

Open the permit page

$187,000
Aug 11, 2026In progress
issued Aug 2026
100 California Stto obtain final inspection for work approved under pa#: 202503071771. all work is complete.
Details
Permit
202608116384
Status
issued
Filed
Aug 11, 2026
Permit issued
Aug 11, 2026
Address
100 California St

to obtain final inspection for work approved under pa#: 202503071771. all work is complete.

Open the permit page

Jul 28, 2026In progress
filed Jul 2026, not yet issued
100 California Stpa#: 202602135930. update one line diagaram.
Details
Permit
202607285647
Status
filed
Filed
Jul 28, 2026
Address
100 California St

pa#: 202602135930. update one line diagaram.

Open the permit page

Jun 8, 2026Completed
final sign-off Jul 2026
100 California Strevision to bpa#202503283322. removal of the remaining t-24 information
Details
Permit
202606082718
Status
complete
Filed
Jun 8, 2026
Permit issued
Jun 16, 2026
Final sign-off
Jul 22, 2026
Address
100 California St

revision to bpa#202503283322. removal of the remaining t-24 information

Open the permit page

May 12, 2026Completed
final sign-off Sep 2026
100 California Stremoval of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322.
Details
Permit
202605121105
Status
complete
Filed
May 12, 2026
Permit issued
May 21, 2026
Final sign-off
Sep 11, 2026
Address
100 California St

removal of the mep systems and dimensioning/noting of the existing drains withing the planter. revision to 2025-0328-3322.

Open the permit page

Mar 25, 2026In progress
issued Mar 2026
100 California Strevision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct
Details
Permit
202603258253
Status
issued
Filed
Mar 25, 2026
Permit issued
Mar 27, 2026
Address
100 California St

revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct

Open the permit page

Mar 23, 2026Completed
final sign-off Sep 2026
100 California Strevision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column.
Details
Permit
202603238046
Status
complete
Filed
Mar 23, 2026
Permit issued
Mar 27, 2026
Final sign-off
Sep 11, 2026
Address
100 California St

revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to be cleaned of plaster, patched and finished. (n) rated enclosure for (n) hss column.

Open the permit page

Mar 16, 2026Completed
final sign-off Sep 2026
100 California Strevision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.
Details
Permit
202603167649
Status
complete
Filed
Mar 16, 2026
Permit issued
Mar 17, 2026
Final sign-off
Sep 11, 2026
Address
100 California St

revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.

Open the permit page

Mar 9, 2026In progress
issued Jun 2026
1 Beach Stground floor: deferred mep to pa #202508294258
Details
Permit
202603097200
Status
issued
Filed
Mar 9, 2026
Permit issued
Jun 9, 2026
Declared cost
$1,292,400
Address
1 Beach St

ground floor: deferred mep to pa #202508294258

Open the permit page

$1,292,400
Mar 2, 2026In progress
issued Apr 2026
1 Beach St3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred
Details
Permit
202603026788
Status
issued
Filed
Mar 2, 2026
Permit issued
Apr 3, 2026
Declared cost
$1,809,790
Address
1 Beach St

3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred

Open the permit page

$1,809,790
Feb 13, 2026In progress
issued Mar 2026
100 California Strevision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearance
Details
Permit
202602135930
Status
issued
Filed
Feb 13, 2026
Permit issued
Mar 13, 2026
Address
100 California St

revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossing the corridor, show elevation with available clearance

Open the permit page

Jan 28, 2026In progress
issued Feb 2026
1 Beach Stste 300 - deferred mep to 202511240285
Details
Permit
202601284777
Status
issued
Filed
Jan 28, 2026
Permit issued
Feb 11, 2026
Declared cost
$700,000
Address
1 Beach St

ste 300 - deferred mep to 202511240285

Open the permit page

$700,000
Jan 20, 2026Completed
final sign-off Sep 2026
100 California Stthe interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening.
Details
Permit
202601204116
Status
complete
Filed
Jan 20, 2026
Permit issued
Feb 25, 2026
Final sign-off
Sep 11, 2026
Declared cost
$55,000
Address
100 California St

the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening.

Open the permit page

$55,000
Jan 12, 2026In progress
issued Feb 2026
1 Beach Stlevel 1 and level 2: suites 100 and 200. deferred mep for 202509084794
Details
Permit
202601123684
Status
issued
Filed
Jan 12, 2026
Permit issued
Feb 11, 2026
Declared cost
$2,146,752
Address
1 Beach St

level 1 and level 2: suites 100 and 200. deferred mep for 202509084794

Open the permit page

$2,146,752
Jan 12, 2026In progress
issued Feb 2026
1 Beach St2nd fl, ste 250 deferred mep for pa 202509084793
Details
Permit
202601123677
Status
reinstated
Filed
Jan 12, 2026
Permit issued
Feb 11, 2026
Declared cost
$731,160
Address
1 Beach St

2nd fl, ste 250 deferred mep for pa 202509084793

Open the permit page

$731,160
Nov 24, 2025In progress
issued Dec 2025
1 Beach Stsuite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred.
Details
Permit
202511240285
Status
issued
Filed
Nov 24, 2025
Permit issued
Dec 10, 2025
Declared cost
$1,400,000
Address
1 Beach St

suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred.

Open the permit page

$1,400,000
Sep 8, 2025In progress
issued Dec 2025
1 Beach St1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit.
Details
Permit
202509084794
Status
issued
Filed
Sep 8, 2025
Permit issued
Dec 4, 2025
Declared cost
$4,266,704
Address
1 Beach St

1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit.

Open the permit page

$4,266,704
Sep 8, 2025In progress
issued Dec 2025
1 Beach St2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred
Details
Permit
202509084793
Status
issued
Filed
Sep 8, 2025
Permit issued
Dec 4, 2025
Declared cost
$1,469,928
Address
1 Beach St

2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred

Open the permit page

$1,469,928
Aug 29, 2025In progress
issued Mar 2026
1 Beach Stg/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use
Details
Permit
202508294258
Status
issued
Filed
Aug 29, 2025
Permit issued
Mar 9, 2026
Declared cost
$2,620,700
Address
1 Beach St

g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use

Open the permit page

$2,620,700
Apr 9, 2025Completed
final sign-off Sep 2026
100 California Stalterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.
Details
Permit
202503283322
Status
complete
Filed
Apr 9, 2025
Permit issued
Oct 8, 2025
Final sign-off
Sep 11, 2026
Declared cost
$1,300,000
Address
100 California St

alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.

Open the permit page

$1,300,000
Mar 27, 2025Completed
final sign-off Jun 2025
3525 California Stdisabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.
Details
Permit
202503273147
Status
complete
Filed
Mar 27, 2025
Permit issued
Apr 7, 2025
Final sign-off
Jun 18, 2025
Declared cost
$3,000
Address
3525 California St

disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.

Open the permit page

$3,000
Mar 26, 2025Completed
final sign-off Sep 2026
350 Saint Josephs Avfire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#.
Details
Permit
202412237287
Status
complete
Filed
Mar 26, 2025
Permit issued
Aug 14, 2025
Final sign-off
Sep 9, 2026
Declared cost
$665,000
Address
350 Saint Josephs Av

fire alarm system migration at the kaiser (cn31-05) medical office building; migrating to new equipment - 1 control panel, 1 nac power supply, remote annunciator, 8 pull stations, 14 modules, 4 smoke detectors, 13 duct smoke detectors, 28 strobes, 22 horn/strobes, and 10 horns. no ref permit app#.

Open the permit page

$665,000
Mar 7, 2025In progress
issued Mar 2025
100 California Strev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level.
Details
Permit
202503071771
Status
issued
Filed
Mar 7, 2025
Permit issued
Mar 27, 2025
Declared cost
$98,147
Address
100 California St

rev 2023-1005-8107: demo & replacement of (e) structural slab to hoist new switchgear into place on the basement level.

Open the permit page

$98,147
Feb 12, 2025Completed
final sign-off Dec 2025
3533 California Stt.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parking
Details
Permit
202412116614
Status
complete
Filed
Feb 12, 2025
Permit issued
May 23, 2025
Final sign-off
Dec 22, 2025
Declared cost
$3,500,000
Address
3533 California St

t.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parking

Open the permit page

$3,500,000
Feb 5, 2025Completed
final sign-off May 2025
3533 California Stinterior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical
Details
Permit
202502059696
Status
complete
Filed
Feb 5, 2025
Permit issued
Feb 21, 2025
Final sign-off
May 30, 2025
Declared cost
$100,000
Address
3533 California St

interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical

Open the permit page

$100,000
Dec 17, 2024Completed
final sign-off Apr 2025
111 Pine Strevision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room.
Details
Permit
202412177001
Status
complete
Filed
Dec 17, 2024
Permit issued
Jan 14, 2025
Final sign-off
Apr 11, 2025
Declared cost
$20,000
Address
111 Pine St

revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room.

Open the permit page

$20,000
Dec 6, 2024Completed
final sign-off Apr 2025
331 Powell Stdeferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only
Details
Permit
202412066325
Status
complete
Filed
Dec 6, 2024
Permit issued
Feb 5, 2025
Final sign-off
Apr 1, 2025
Declared cost
$497,168
Address
331 Powell St

deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only

Open the permit page

$497,168
Nov 13, 2024Completed
final sign-off Mar 2025
331 Powell St13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677
Details
Permit
202411134908
Status
complete
Filed
Nov 13, 2024
Permit issued
Dec 11, 2024
Final sign-off
Mar 26, 2025
Declared cost
$50,000
Address
331 Powell St

13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677

Open the permit page

$50,000
Oct 24, 2024Completed
final sign-off Apr 2025
331 Powell Sttenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.
Details
Permit
202410243677
Status
complete
Filed
Oct 24, 2024
Permit issued
Oct 28, 2024
Final sign-off
Apr 1, 2025
Declared cost
$145,500
Address
331 Powell St

tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.

Open the permit page

$145,500
Sep 25, 2024Completed
final sign-off Apr 2025
111 Pine St2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.
Details
Permit
202409251567
Status
complete
Filed
Sep 25, 2024
Permit issued
Oct 2, 2024
Final sign-off
Apr 11, 2025
Declared cost
$50,000
Address
111 Pine St

2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.

Open the permit page

$50,000
Aug 15, 2024Completed
final sign-off May 2025
331 Powell Stdeferred electrical from pa# 2024-0710-618 includes exterior lighting and controls
Details
Permit
202408158793
Status
complete
Filed
Aug 15, 2024
Permit issued
Aug 27, 2024
Final sign-off
May 9, 2025
Declared cost
$19,775
Address
331 Powell St

deferred electrical from pa# 2024-0710-618 includes exterior lighting and controls

Open the permit page

$19,775
Aug 9, 2024Completed
final sign-off Feb 2025
111 Pine Strevision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only.
Details
Permit
202408098331
Status
complete
Filed
Aug 9, 2024
Permit issued
Aug 21, 2024
Final sign-off
Feb 26, 2025
Address
111 Pine St

revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only.

Open the permit page

Jul 10, 2024Completed
final sign-off Apr 2025
331 Powell Streplace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom.
Details
Permit
202407106185
Status
complete
Filed
Jul 10, 2024
Permit issued
Aug 7, 2024
Final sign-off
Apr 4, 2025
Declared cost
$120,000
Address
331 Powell St

replace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom.

Open the permit page

$120,000
Jun 27, 2024Completed
final sign-off Apr 2025
111 Pine St2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.
Details
Permit
202406275356
Status
complete
Filed
Jun 27, 2024
Permit issued
Aug 22, 2024
Final sign-off
Apr 11, 2025
Declared cost
$960,000
Address
111 Pine St

2nd floor: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.

Open the permit page

$960,000
Jun 14, 2024Completed
final sign-off Jul 2026
2350 Geary Blfire alarm system migration @ the kaiser(cn31-03)medical office bldg;migrant to (n) equipment, 1 control panel,11 pull stations, 7 modules,75 smoke detectors,15 heat detectors,43 strobes,12 chime/strobes, and 22 chimes.
Details
Permit
202406073980
Status
complete
Filed
Jun 14, 2024
Permit issued
Mar 27, 2025
Final sign-off
Jul 1, 2026
Declared cost
$1,345,515
Address
2350 Geary Bl

fire alarm system migration @ the kaiser(cn31-03)medical office bldg;migrant to (n) equipment, 1 control panel,11 pull stations, 7 modules,75 smoke detectors,15 heat detectors,43 strobes,12 chime/strobes, and 22 chimes.

Open the permit page

$1,345,515
Jun 11, 2024Completed
final sign-off Apr 2025
331 Powell St1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.
Details
Permit
202406114197
Status
complete
Filed
Jun 11, 2024
Permit issued
Jul 9, 2024
Final sign-off
Apr 4, 2025
Declared cost
$2,236,032
Address
331 Powell St

1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.

Open the permit page

$2,236,032
Jun 7, 2024Completed
final sign-off Mar 2025
111 Pine Sttenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations
Details
Permit
202406073940
Status
complete
Filed
Jun 7, 2024
Permit issued
Aug 1, 2024
Final sign-off
Mar 31, 2025
Declared cost
$308,000
Address
111 Pine St

tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations

Open the permit page

$308,000
May 31, 2024Completed
final sign-off Feb 2025
111 Pine Strevision to permit 202402075406. revision will be on 1/f and cellar interior
Details
Permit
202405313422
Status
complete
Filed
May 31, 2024
Permit issued
Aug 1, 2024
Final sign-off
Feb 26, 2025
Address
111 Pine St

revision to permit 202402075406. revision will be on 1/f and cellar interior

Open the permit page

Feb 7, 2024In progress
issued Apr 2024
560 Mission Strevision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.
Details
Permit
202402075383
Status
issued
Filed
Feb 7, 2024
Permit issued
Apr 24, 2024
Declared cost
$200,000
Address
560 Mission St

revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices.

Open the permit page

$200,000
Feb 7, 2024Completed
final sign-off Apr 2025
111 Pine Stgr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.
Details
Permit
202402075406
Status
complete
Filed
Feb 7, 2024
Permit issued
Mar 27, 2024
Final sign-off
Apr 11, 2025
Declared cost
$2,100,000
Address
111 Pine St

gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical.

Open the permit page

$2,100,000
Feb 2, 2024Completed
final sign-off Apr 2025
331 Powell St1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.
Details
Permit
202402025176
Status
complete
Filed
Feb 2, 2024
Permit issued
Mar 8, 2024
Final sign-off
Apr 4, 2025
Declared cost
$120,000
Address
331 Powell St

1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.

Open the permit page

$120,000
Jan 23, 2024Completed
final sign-off Feb 2025
111 Pine Stwork is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i.
Details
Permit
202401234416
Status
complete
Filed
Jan 23, 2024
Permit issued
Feb 15, 2024
Final sign-off
Feb 26, 2025
Declared cost
$80,000
Address
111 Pine St

work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i.

Open the permit page

$80,000
Oct 5, 2023In progress
issued Dec 2023
100 California Stswitchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.
Details
Permit
202310058107
Status
issued
Filed
Oct 5, 2023
Permit issued
Dec 14, 2023
Declared cost
$190,000
Address
100 California St

switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.

Open the permit page

$190,000
Aug 28, 2023In progress
issued Nov 2023
560 Mission St27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work
Details
Permit
202308285394
Status
issued
Filed
Aug 28, 2023
Permit issued
Nov 20, 2023
Declared cost
$115,000
Address
560 Mission St

27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work

Open the permit page

$115,000
Jul 28, 2023In progress
issued Mar 2024
986 Mission Stg/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors.
Details
Permit
202307283206
Status
issued
Filed
Jul 28, 2023
Permit issued
Mar 29, 2024
Declared cost
$150,000
Address
986 Mission St

g/f: interior tenant improvement including new non-load bearing walls, sofit & finishes, replacing light fixtures & modifying switching, adding electrical outlets, add exhaust fan at trash room, panic hardware at existing exit doors.

Open the permit page

$150,000
Jun 29, 2023Expired or cancelled
cancelled Jan 2026
101 California Strev to pa 202006198935 to address new stair landings. exterior work.
Details
Permit
202306291177
Status
cancelled
Filed
Jun 29, 2023
Address
101 California St

rev to pa 202006198935 to address new stair landings. exterior work.

Open the permit page

Jun 13, 2023Expired or cancelled
cancelled Jan 2026
101 California Stcold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935
Details
Permit
202306130004
Status
cancelled
Filed
Jun 13, 2023
Declared cost
$1,220,734
Address
101 California St

cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935

Open the permit page

$1,220,734
Jun 13, 2023Expired or cancelled
cancelled Jan 2026
101 California Streplacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935
Details
Permit
202306130005
Status
cancelled
Filed
Jun 13, 2023
Address
101 California St

replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935

Open the permit page

Mar 7, 2023Never finaled
issued Mar 2023, no final
39 Tehama Stremove & replcace in-kind plaza area topping slab 69' 6"x 59' 3".
Details
Permit
202303073201
Status
issued
Filed
Mar 7, 2023
Permit issued
Mar 8, 2023
Declared cost
$55,000
Address
39 Tehama St

remove & replcace in-kind plaza area topping slab 69' 6"x 59' 3".

Open the permit page

$55,000
Nov 1, 2022Completed
final sign-off May 2023
101 California Stdeferred submittal of exterior penthouse framing ref pa# 2021-0628-3370
Details
Permit
202211015637
Status
complete
Filed
Nov 1, 2022
Permit issued
Nov 1, 2022
Final sign-off
May 16, 2023
Declared cost
$174,000
Address
101 California St

deferred submittal of exterior penthouse framing ref pa# 2021-0628-3370

Open the permit page

$174,000
Nov 1, 2022Completed
final sign-off May 2023
101 California Stmetal stairs deferred submittal for 202106283370
Details
Permit
202211015633
Status
complete
Filed
Nov 1, 2022
Permit issued
Nov 8, 2022
Final sign-off
May 16, 2023
Declared cost
$152,000
Address
101 California St

metal stairs deferred submittal for 202106283370

Open the permit page

$152,000
Sep 12, 2022Completed
final sign-off Dec 2023
33 Tehama Stany work that requires building permpit will be submitted under a separate application. fire alarm safety systems damaged by water incident 06/30/2022. speaker strobes, smoke control system, e lighting, g-gen, monitoring, transfer, errcs, 2-way comm, smoke detectors, epos
Details
Permit
202209122242
Status
complete
Filed
Sep 12, 2022
Permit issued
Sep 12, 2022
Final sign-off
Dec 22, 2023
Address
33 Tehama St

any work that requires building permpit will be submitted under a separate application. fire alarm safety systems damaged by water incident 06/30/2022. speaker strobes, smoke control system, e lighting, g-gen, monitoring, transfer, errcs, 2-way comm, smoke detectors, epos

Open the permit page

Sep 8, 2022Expired or cancelled
withdrawn Sep 2025
50 Main Stto construct a 88-story, 808 dwelling units, type 1-a building.
Details
Permit
202209082126
Status
withdrawn
Filed
Sep 8, 2022
Declared cost
$180,239,092
Address
50 Main St

to construct a 88-story, 808 dwelling units, type 1-a building.

Open the permit page

$180,239,092
Sep 8, 2022Expired or cancelled
withdrawn May 2026
50 Main Stto demolish existing parking garage. 2-story, 1-basement, type i.
Details
Permit
202209082124
Status
withdrawn
Filed
Sep 8, 2022
Address
50 Main St

to demolish existing parking garage. 2-story, 1-basement, type i.

Open the permit page

Sep 6, 2022Completed
final sign-off Nov 2022
100 California St1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319.
Details
Permit
202209061890
Status
complete
Filed
Sep 6, 2022
Permit issued
Sep 16, 2022
Final sign-off
Nov 17, 2022
Declared cost
$20,000
Address
100 California St

1st fl: common restrooms: new electrical & lighting. existing circuits to be revised. invlices title 24 for lighting. ref pa# 202203079319.

Open the permit page

$20,000
Sep 6, 2022Completed
final sign-off May 2023
100 California St6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724.
Details
Permit
202209061891
Status
complete
Filed
Sep 6, 2022
Permit issued
Sep 16, 2022
Final sign-off
May 10, 2023
Declared cost
$25,000
Address
100 California St

6th fl: elevator lobby & common corridors, includes (n) lighting plan. existing circuits to be revised. incluides title 24 for new lighting. fire alarm submitted separately. ref pa# 202205063724.

Open the permit page

$25,000
Sep 6, 2022Completed
final sign-off May 2023
100 California St13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620.
Details
Permit
202209061892
Status
complete
Filed
Sep 6, 2022
Permit issued
Sep 16, 2022
Final sign-off
May 10, 2023
Declared cost
$50,000
Address
100 California St

13th fl: new electrical for spec suite remodel. revise & reuse circuits as needed. includes (n) lighting, also includes (n) mechanical for revised zones. title-24 for lighting & mechanical included. fire alarm submitted separately. ref pa# 202202097620.

Open the permit page

$50,000
Aug 26, 2022Completed
final sign-off Feb 2024
33 Tehama Stto comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35,
Details
Permit
202208261334
Status
complete
Filed
Aug 26, 2022
Permit issued
Aug 26, 2022
Final sign-off
Feb 8, 2024
Declared cost
$1,000,000
Address
33 Tehama St

to comply with amended notice of violation 202291731 to capture additional water damage occured on 08/10/22. *see 202207188677 for initial nov* remediation and repair of finishes/partitions in: corridors levels: -2 & -1, stairs 2 and associated vestibules levels: 36, amenity spaces level 3 & 35,

Open the permit page

$1,000,000
Jul 19, 2022Completed
final sign-off May 2024
101 California Strevise scr will comply and match existing smoke control system at 101 california st sf, ca. ref pa# 202006198935.
Details
Permit
202207198778
Status
complete
Filed
Jul 19, 2022
Permit issued
Sep 26, 2022
Final sign-off
May 17, 2024
Address
101 California St

revise scr will comply and match existing smoke control system at 101 california st sf, ca. ref pa# 202006198935.

Open the permit page

Jul 18, 2022Completed
final sign-off Feb 2024
33 Tehama Stcomply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35,
Details
Permit
202207188677
Status
complete
Filed
Jul 18, 2022
Permit issued
Jul 20, 2022
Final sign-off
Feb 8, 2024
Address
33 Tehama St

comply with nov#202291731 dd 06/06/22 repair and replace water damaged systems-electrical elevator, low voltage, internet , phone, cable & security as wel as finishes/rated partitions in elevator lobby levels : -3-35 corridors levels: 1-35 stairs, stair 2 and associated vestibules levels :1-35,

Open the permit page

Jun 28, 2022Never finaled
issued Aug 2022, no final
77 Beale Stwork on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.
Details
Permit
202206287307
Status
issued
Filed
Jun 28, 2022
Permit issued
Aug 9, 2022
Declared cost
$728,548
Address
77 Beale St

work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.

Open the permit page

$728,548
Jun 13, 2022Never finaled
issued Jun 2022, no final
215 Market Stinterior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area.
Details
Permit
202206136143
Status
reinstated
Filed
Jun 13, 2022
Permit issued
Jun 24, 2022
Declared cost
$89,500
Address
215 Market St

interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area.

Open the permit page

$89,500
Jun 7, 2022Completed
final sign-off May 2023
101 California Stdefferred submittal: fiber-reinforced ploymer strengthening for pa# 2021 0628 3370.
Details
Permit
202206075812
Status
complete
Filed
Jun 7, 2022
Permit issued
Jun 8, 2022
Final sign-off
May 16, 2023
Declared cost
$92,922
Address
101 California St

defferred submittal: fiber-reinforced ploymer strengthening for pa# 2021 0628 3370.

Open the permit page

$92,922
May 6, 2022Completed
final sign-off Dec 2022
100 California St6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately.
Details
Permit
202205063724
Status
complete
Filed
May 6, 2022
Permit issued
Aug 2, 2022
Final sign-off
Dec 22, 2022
Declared cost
$95,000
Address
100 California St

6th floor: building upgrade includes common area corridor- elevator lobby. scope does not include the removal of any structural partitions. all new or revised meps, life saftey work will be by design build and if needed will be submitted seperately.

Open the permit page

$95,000
Mar 29, 2022Completed
final sign-off Oct 2022
2225 Folsom Streplacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction;
Details
Permit
202203291114
Status
complete
Filed
Mar 29, 2022
Permit issued
Jun 14, 2022
Final sign-off
Oct 20, 2022
Declared cost
$107,500
Address
2225 Folsom St

replacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction;

Open the permit page

$107,500
Mar 7, 2022Completed
final sign-off Nov 2022
100 California St1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits.
Details
Permit
202203079319
Status
complete
Filed
Mar 7, 2022
Permit issued
Aug 2, 2022
Final sign-off
Nov 17, 2022
Declared cost
$199,000
Address
100 California St

1/f: building upgrades include new fully accessible g/f restrooms . scope does not include the removal of any structural partitions. all new or revised meps and life safety work/design build if need under separate permits.

Open the permit page

$199,000
Feb 17, 2022Completed
final sign-off Dec 2022
340 Townsend Strenovation of 2nd generation commerical interior office space. work includes structural reinforing as required by structural drawings. revisions to permit 202107134301 and 202107134269
Details
Permit
202202178167
Status
complete
Filed
Feb 17, 2022
Permit issued
May 3, 2022
Final sign-off
Dec 12, 2022
Declared cost
$70,000
Address
340 Townsend St

renovation of 2nd generation commerical interior office space. work includes structural reinforing as required by structural drawings. revisions to permit 202107134301 and 202107134269

Open the permit page

$70,000
Feb 15, 2022Expired or cancelled
withdrawn Sep 2025
77 Beale Strenovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.
Details
Permit
202202157996
Status
withdrawn
Filed
Feb 15, 2022
Declared cost
$105,596,280
Address
77 Beale St

renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.

Open the permit page

$105,596,280
Feb 9, 2022Completed
final sign-off Nov 2022
100 California St13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered.
Details
Permit
202202097620
Status
complete
Filed
Feb 9, 2022
Permit issued
Aug 2, 2022
Final sign-off
Nov 17, 2022
Declared cost
$150,000
Address
100 California St

13th flr. t.i. includes demo of non struc partitions and new non struc partitions. all new or revised mep, life safety and sprinkler work will be design build and submitted under sep permits. bldg is fully sprinklered.

Open the permit page

$150,000
Dec 6, 2021Completed
final sign-off May 2023
101 California St8th lvel annex space improvements. paving, planting, lighting, and trellis.
Details
Permit
202112063741
Status
complete
Filed
Dec 6, 2021
Permit issued
Aug 8, 2022
Final sign-off
May 18, 2023
Declared cost
$912,467
Address
101 California St

8th lvel annex space improvements. paving, planting, lighting, and trellis.

Open the permit page

$912,467
Oct 22, 2021Never finaled
issued Jan 2022, no final
1 California St24th fl interior tenant improvement - demo & construction of non-structural partitions, doors, ceilings, electrical, hvac & finishes.
Details
Permit
202110221003
Status
issued
Filed
Oct 22, 2021
Permit issued
Jan 24, 2022
Declared cost
$600,000
Address
1 California St

24th fl interior tenant improvement - demo & construction of non-structural partitions, doors, ceilings, electrical, hvac & finishes.

Open the permit page

$600,000
Oct 22, 2021Never finaled
issued Jan 2022, no final
1 California St25th fl: interior ti - includes demo & construction of non structural partitions, doors, ceilings, electrical, plumbing, hvac & finishes.
Details
Permit
202110221009
Status
issued
Filed
Oct 22, 2021
Permit issued
Jan 24, 2022
Declared cost
$600,000
Address
1 California St

25th fl: interior ti - includes demo & construction of non structural partitions, doors, ceilings, electrical, plumbing, hvac & finishes.

Open the permit page

$600,000
Oct 15, 2021Completed
final sign-off Jun 2023
101 California Strev to pa 202006198935 canopy drain gutters amd plumbing drains and plaza
Details
Permit
202110150579
Status
complete
Filed
Oct 15, 2021
Permit issued
Oct 19, 2021
Final sign-off
Jun 27, 2023
Address
101 California St

rev to pa 202006198935 canopy drain gutters amd plumbing drains and plaza

Open the permit page

Oct 15, 2021Completed
final sign-off May 2022
560 Mission St19/f: demolition of non structural partitions, doors, ceilings, lighting millwork and finishes. limited construction of temporary light fixtures. no change in occupancy/use. mep, sprinkler and life safety under separate permit. - sprinkler permit for demo/ceiling removal: 202112144336
Details
Permit
202110150548
Status
complete
Filed
Oct 15, 2021
Permit issued
Feb 18, 2022
Final sign-off
May 2, 2022
Declared cost
$117,746
Address
560 Mission St

19/f: demolition of non structural partitions, doors, ceilings, lighting millwork and finishes. limited construction of temporary light fixtures. no change in occupancy/use. mep, sprinkler and life safety under separate permit. - sprinkler permit for demo/ceiling removal: 202112144336

Open the permit page

$117,746
Oct 4, 2021Completed
final sign-off May 2023
101 California Stg/f: composite strengthening to (e) playa area concrete beams. maher n/a.
Details
Permit
202110049716
Status
complete
Filed
Oct 4, 2021
Permit issued
Apr 5, 2022
Final sign-off
May 19, 2023
Declared cost
$12,000
Address
101 California St

g/f: composite strengthening to (e) playa area concrete beams. maher n/a.

Open the permit page

$12,000
Sep 24, 2021Never finaled
issued Nov 2021, no final
101 California Stlobby art installation of hanging wires to (e) metal beams
Details
Permit
202109249086
Status
issued
Filed
Sep 24, 2021
Permit issued
Nov 16, 2021
Declared cost
$3,000
Address
101 California St

lobby art installation of hanging wires to (e) metal beams

Open the permit page

$3,000
Sep 22, 2021Never finaled
issued Nov 2021, no final
560 Mission Stti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.
Details
Permit
202109228950
Status
issued
Filed
Sep 22, 2021
Permit issued
Nov 9, 2021
Declared cost
$1,500,000
Address
560 Mission St

ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.

Open the permit page

$1,500,000
Aug 26, 2021Completed
final sign-off May 2023
101 California St8/f: hvac & electrical modifications for new elevator and stairs
Details
Permit
202108267226
Status
complete
Filed
Aug 26, 2021
Permit issued
Dec 1, 2021
Final sign-off
May 16, 2023
Declared cost
$11,000
Address
101 California St

8/f: hvac & electrical modifications for new elevator and stairs

Open the permit page

$11,000
Aug 23, 2021Completed
final sign-off May 2023
101 California Stmodify & replace existing windows washing davits for new window washing eq. modify/replace guardrails at 8th level roof.
Details
Permit
202108236918
Status
complete
Filed
Aug 23, 2021
Permit issued
Aug 26, 2021
Final sign-off
May 16, 2023
Address
101 California St

modify & replace existing windows washing davits for new window washing eq. modify/replace guardrails at 8th level roof.

Open the permit page

Jul 19, 2021Expired or cancelled
cancelled Jul 2024
598 Brannan Sttemporary excavation. shoring system for the brannan st project. the excavation with cuts up to 25', will be shored using a soil mixed cut off walls w/ tiebacjs on all sides of the excation. refer to 201909060913. 201909060914.
Details
Permit
202107194611
Status
cancelled
Filed
Jul 19, 2021
Address
598 Brannan St

temporary excavation. shoring system for the brannan st project. the excavation with cuts up to 25', will be shored using a soil mixed cut off walls w/ tiebacjs on all sides of the excation. refer to 201909060913. 201909060914.

Open the permit page

Jul 12, 2021Completed
final sign-off Sep 2021
2180 Harrison Stt.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.
Details
Permit
202107124142
Status
complete
Filed
Jul 12, 2021
Permit issued
Aug 4, 2021
Final sign-off
Sep 29, 2021
Declared cost
$195,000
Address
2180 Harrison St

t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.

Open the permit page

$195,000
Jun 30, 2021Never finaled
issued Sep 2021, no final
2270 Folsom Stincludes installation of card readers at 1st fl. elevator & 1st fl. stairwell door
Details
Permit
202106303502
Status
issued
Filed
Jun 30, 2021
Permit issued
Sep 7, 2021
Declared cost
$50,000
Address
2270 Folsom St

includes installation of card readers at 1st fl. elevator & 1st fl. stairwell door

Open the permit page

$50,000
Jun 28, 2021Completed
final sign-off May 2023
101 California Stmodifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layer
Details
Permit
202106283370
Status
complete
Filed
Jun 28, 2021
Permit issued
Feb 11, 2022
Final sign-off
May 16, 2023
Declared cost
$4,669,527
Address
101 California St

modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layer

Open the permit page

$4,669,527
Feb 4, 2021Never finaled
issued Oct 2021, no final
30 Otis Stthe proposed project is an alteration of the lobby bar previously approved under pa# 2016-11-28-3577 s3 (arch / mep).
Details
Permit
202102043934
Status
issued
Filed
Feb 4, 2021
Permit issued
Oct 14, 2021
Address
30 Otis St

the proposed project is an alteration of the lobby bar previously approved under pa# 2016-11-28-3577 s3 (arch / mep).

Open the permit page

Sep 14, 2020Never finaled
issued Oct 2020, no final
598 Brannan Stdeferred submittal to pa 201909060913 & 201909060914. pile loading tests for building 1 & 2.
Details
Permit
202009144172
Status
issued
Filed
Sep 14, 2020
Permit issued
Oct 19, 2020
Declared cost
$183,000
Address
598 Brannan St

deferred submittal to pa 201909060913 & 201909060914. pile loading tests for building 1 & 2.

Open the permit page

$183,000
Aug 24, 2020Completed
final sign-off Oct 2021
1600 Owens Stthis project is to convert an existing shell space on level 2 into a non-oshpd clinic space. comprised of a pet-ct scan room and related supporting spaces. the scope of work also includes the installation of the pet-ct scanner and associated equipment. interior work only. no exterior work.
Details
Permit
202008242491
Status
complete
Filed
Aug 24, 2020
Permit issued
Feb 10, 2021
Final sign-off
Oct 18, 2021
Declared cost
$2,500,000
Address
1600 Owens St

this project is to convert an existing shell space on level 2 into a non-oshpd clinic space. comprised of a pet-ct scan room and related supporting spaces. the scope of work also includes the installation of the pet-ct scanner and associated equipment. interior work only. no exterior work.

Open the permit page

$2,500,000
Aug 24, 2020Completed
final sign-off Jan 2023
1600 Owens Stproject area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work.
Details
Permit
202008242483
Status
complete
Filed
Aug 24, 2020
Permit issued
Jan 25, 2021
Final sign-off
Jan 27, 2023
Declared cost
$4,400,000
Address
1600 Owens St

project area: 2,307sf; this project is to convert an existing shell space on level 2 into a non-oshpd clinic space comprised of a pet-ct scan room, equipment, and related supporting spaces. interior work only. not exterior work.

Open the permit page

$4,400,000
Jul 10, 2020Completed
final sign-off Jul 2021
2180 Harrison Stpg&e service center ti for conf rm, office, locker rms & 4 break conter, demo/new non-bearing patitions, modification (e) fire sprinkler/alarm system, new flor play lay out, new plumb and electrical, hvac system.
Details
Permit
202007109978
Status
complete
Filed
Jul 10, 2020
Permit issued
Jan 15, 2021
Final sign-off
Jul 8, 2021
Declared cost
$2,000,000
Address
2180 Harrison St

pg&e service center ti for conf rm, office, locker rms & 4 break conter, demo/new non-bearing patitions, modification (e) fire sprinkler/alarm system, new flor play lay out, new plumb and electrical, hvac system.

Open the permit page

$2,000,000
Jun 19, 2020Never finaled
issued Jul 2021, no final
101 California Stimprovements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop.
Details
Permit
202006198935
Status
issued
Filed
Jun 19, 2020
Permit issued
Jul 23, 2021
Declared cost
$31,349,352
Address
101 California St

improvements to the exterior plaza & interior spaces. exterior renovation: (n)landscaping, water features, fixtures, kiosk, paving, cladding around mech vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop.

Open the permit page

$31,349,352
May 18, 2020Completed
final sign-off Jun 2021
645 Bryant Stdemolition of a type 3 1 story industrial
Details
Permit
202005187585
Status
complete
Filed
May 18, 2020
Permit issued
Mar 30, 2021
Final sign-off
Jun 25, 2021
Declared cost
$5,000
Address
645 Bryant St

demolition of a type 3 1 story industrial

Open the permit page

$5,000
Mar 10, 2020Never finaled
issued Nov 2020, no final
1 Post Strevision to pa 2017-1013-1240 to update overhead coiling door info at room service 104
Details
Permit
202003106599
Status
issued
Filed
Mar 10, 2020
Permit issued
Nov 30, 2020
Address
1 Post St

revision to pa 2017-1013-1240 to update overhead coiling door info at room service 104

Open the permit page

Feb 18, 2020Never finaled
issued Mar 2021, no final
1 Post Strevision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif compliance
Details
Permit
202002184728
Status
issued
Filed
Feb 18, 2020
Permit issued
Mar 9, 2021
Declared cost
$45,000
Address
1 Post St

revision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif compliance

Open the permit page

$45,000
Feb 11, 2020Completed
final sign-off Jun 2021
590 Brannan Stto demolish a 2-story warehouse with office and retail.
Details
Permit
202002114084
Status
complete
Filed
Feb 11, 2020
Permit issued
Mar 30, 2021
Final sign-off
Jun 25, 2021
Declared cost
$40,000
Address
590 Brannan St

to demolish a 2-story warehouse with office and retail.

Open the permit page

$40,000
Feb 11, 2020Never finaled
issued Mar 2021, no final
649 Bryant Stexcavation and grading for demo of (e) surface parking lot
Details
Permit
202002114094
Status
issued
Filed
Feb 11, 2020
Permit issued
Mar 29, 2021
Declared cost
$10,000
Address
649 Bryant St

excavation and grading for demo of (e) surface parking lot

Open the permit page

$10,000
Dec 23, 2019Never finaled
issued Mar 2021, no final
98 12th Stinterior t.i. for theater & ballet including installation of finishes, furnishing, equiptment & lighting. the project includes mep branching installation tying into the permitted under shell systems & main distribution under pa# 2016-1128-3577.
Details
Permit
201912230380
Status
issued
Filed
Dec 23, 2019
Permit issued
Mar 25, 2021
Address
98 12th St

interior t.i. for theater & ballet including installation of finishes, furnishing, equiptment & lighting. the project includes mep branching installation tying into the permitted under shell systems & main distribution under pa# 2016-1128-3577.

Open the permit page

Sep 20, 2019Completed
final sign-off Dec 2019
4 Embarcadero Centerrevision to pa #201905291924 & 201906183730. as builts for mpe system for 25th fl.
Details
Permit
201909202238
Status
complete
Filed
Sep 20, 2019
Permit issued
Oct 9, 2019
Final sign-off
Dec 4, 2019
Address
4 Embarcadero Center

revision to pa #201905291924 & 201906183730. as builts for mpe system for 25th fl.

Open the permit page

Sep 19, 2019Never finaled
issued Oct 2019, no final
555 California St30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system
Details
Permit
201909192166
Status
issued
Filed
Sep 19, 2019
Permit issued
Oct 9, 2019
Declared cost
$100,000
Address
555 California St

30th floor: demo. and removal of t.i. mech electrical, and plumbing, equipment, add distabution system that are not part of the base building life safety system

Open the permit page

$100,000
Sep 19, 2019Expired or cancelled
cancelled Jan 2026
4 Embarcadero Center25/f - ste 2500 - rev to pa# 201906183730; eliminate partiton from breakroom and rearrange layout of work area. mep under separate permit. new ceilings. fire alarm & sprinkler under sep permit.
Details
Permit
201909192168
Status
cancelled
Filed
Sep 19, 2019
Declared cost
$5,000
Address
4 Embarcadero Center

25/f - ste 2500 - rev to pa# 201906183730; eliminate partiton from breakroom and rearrange layout of work area. mep under separate permit. new ceilings. fire alarm & sprinkler under sep permit.

Open the permit page

$5,000