Block 1035, lot 001
3525 California St
- City’s use
- Commercial Retail
- Built
- 1952
- Stories
- 2
- Units
- 4
- Rooms
- 8 bathrooms
- Building
- 6,358 sq ft
- Lot
- 11,329 sq ft
- Zoning
- NCS
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | Completed final sign-off Jun 2025 | 3525 California St | Turner Construction Co | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $3,000 |
| May 3, 2022 | Never finaled issued Jun 2022, no final | 3519 California St | Rockwall Construction Company | c02 tank only. 48 gallon tank in prep/storage area of panda express (ti under pa#202109148354Details
c02 tank only. 48 gallon tank in prep/storage area of panda express (ti under pa#202109148354 | $8,000 |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 3519 California St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install 1 ansul r-102 fire suppression system with 2 tanks in the main kitchen area. ref pa# 202109148354.Details
furnish & install 1 ansul r-102 fire suppression system with 2 tanks in the main kitchen area. ref pa# 202109148354. | $5,000 |
| Sep 14, 2021 | Completed final sign-off Jul 2022 | 3519 California St | Rockwall Construction Company | t.i. to include new non-load bearing partitions, ceilings, walk in cooler/freezer, finishes and associated mep work. exterior improvement inlcudes replacing storefront door and facade finishes.Details
t.i. to include new non-load bearing partitions, ceilings, walk in cooler/freezer, finishes and associated mep work. exterior improvement inlcudes replacing storefront door and facade finishes. | $250,000 |
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 3519 California St | install 1 illuminated wall sign "panda express"Details
install 1 illuminated wall sign "panda express" | $4,000 | |
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 3519 California St | install 1 illuminated wall sign "panda express"Details
install 1 illuminated wall sign "panda express" | $5,000 | |
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 3519 California St | install 1 non-illuminated double faced projecting sign "panda express" into (e) bracket.Details
install 1 non-illuminated double faced projecting sign "panda express" into (e) bracket. | $2,000 | |
| Nov 25, 2020 | Completed final sign-off Apr 2021 | 3525 California St | Arrow Sign Company | install (1) double faced non-illuminated projecting sign c: "paper source"Details
install (1) double faced non-illuminated projecting sign c: "paper source" | $450 |
| Nov 25, 2020 | Completed final sign-off Apr 2021 | 3525 California St | Arrow Sign Company | install (1) set vinyl letters on aluminum panel, sign b: "paper source"Details
install (1) set vinyl letters on aluminum panel, sign b: "paper source" | $300 |
| Nov 25, 2020 | Completed final sign-off Apr 2021 | 3525 California St | Arrow Sign Company | install (1) set halo-lit letters mounted on aluminum pan sign a: "paper source"Details
install (1) set halo-lit letters mounted on aluminum pan sign a: "paper source" | $800 |
| Jun 20, 2006 | Never finaled issued Jun 2006, no final | 3525 California St | Sign & Sign Again | erect non electric single faced wall sign.Details
erect non electric single faced wall sign. | |
| Jun 20, 2006 | Never finaled issued Jun 2006, no final | 3525 California St | Sign & Sign Again | erect electric single faced wall sign.Details
erect electric single faced wall sign. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arrow Sign Company (3), Rockwall Construction Company (2), Sign & Sign Again (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Turner Construction Co
- Architects
- Gary Wang, Jeffrey Schmierer
- Engineers
- Shadie Azab
- Designers
- Elizabeth Vernengo, Kevin James
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.