Shadie Azab
- License
- 71590
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Kimley-Horn
- Based in
- Pleasanton
- On San Francisco permits
- Mar 2025 to Feb 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Turner Construction Co
- Architects
- Jeffrey Schmierer (2), Marc Dimalanta
- Engineers
- Jefferson Chen, Steve Kang, Wenda Wang
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 200 Duboce Av | convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior designDetails
convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior design | $1,800,000 | |
| Mar 27, 2025 | Completed final sign-off Jun 2025 | 3525 California St | Turner Construction Co | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $3,000 |
| Mar 6, 2025 | Completed final sign-off Jun 2025 | 3533 California St | disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces.Details
disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. | $27,000 |