Steve Kang
- Listed as
- architect, engineer
- Firm
- Mk Engineers Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Aug 2026
100 permits since 2000 (engineer on 98 permits, architect on 2 permits): 52 completed, 19 in progress, 16 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1737 Post St | ste 385- adding an electrical heat pump split unit (for cooling) to (e) ciling of suite 385- a retail store. exterior condenser unit to be installed on (e) roof. electric conduit to be subpanel at elevator area. no change to (e), structure, area, heating and ventilation, fire sprinkler and lighting.Details
ste 385- adding an electrical heat pump split unit (for cooling) to (e) ciling of suite 385- a retail store. exterior condenser unit to be installed on (e) roof. electric conduit to be subpanel at elevator area. no change to (e), structure, area, heating and ventilation, fire sprinkler and lighting. | $8,900 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1737 Post St | ste 330- adding an electrical heat pump split unit (for cooling) to (e) ciling of suite 330- a retail store. exterior condenser unit to be installed on (e) roof. electric conduit to be subpanel at elevator area. no change to (e), structure, area, heating and ventilation, fire sprinkler and lighting.Details
ste 330- adding an electrical heat pump split unit (for cooling) to (e) ciling of suite 330- a retail store. exterior condenser unit to be installed on (e) roof. electric conduit to be subpanel at elevator area. no change to (e), structure, area, heating and ventilation, fire sprinkler and lighting. | $8,900 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 160 10th St | change of use from existing commercial to single family residence. remove partial non-structural wall and provide new wall. variance application is required for open space #202210592prj.Details
change of use from existing commercial to single family residence. remove partial non-structural wall and provide new wall. variance application is required for open space #202210592prj. | $20,000 | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 350 Kansas St | revision to pa# 202512161930: modification of new elec. room, show room kitchen, and (n) ada shower.Details
revision to pa# 202512161930: modification of new elec. room, show room kitchen, and (n) ada shower. | ||
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 1190 Pine St | enlarge (e) room with room with (n) electrical equipment per utility company's requierement. relocate (e) laundry room. no change of use, height, egress path, exits, exterior, gross area.Details
enlarge (e) room with room with (n) electrical equipment per utility company's requierement. relocate (e) laundry room. no change of use, height, egress path, exits, exterior, gross area. | $33,000 | |
| May 15, 2026 | In progress issued Jul 2026 | 505 Grand View Av | add (1) full bath room at level 1Details
add (1) full bath room at level 1 | $10,000 | |
| May 12, 2026 | Completed final sign-off Aug 2026 | 4620 California St | Camello Inc. | revision to bpa: 202512151832 - (bldg b) sundry, minor mep updates.Details
revision to bpa: 202512151832 - (bldg b) sundry, minor mep updates. | |
| May 4, 2026 | In progress issued Aug 2026 | 731 Irving St | Innovation Plumbing And Rooter | t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range.Details
t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range. | $45,000 |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 200 Duboce Av | convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior designDetails
convert (e) single story food / beverage business into new music production studio. new horizontal addition include new recording room & control room. infill (e) duboce ave curb cut & shift (e) guerrero st curb cut. re-stripe (e) parking lot. new parking lot fence & gate.new building exterior design | $1,800,000 | |
| Feb 13, 2026 | Completed final sign-off Aug 2026 | 1200 04th St | Nelson Jameson Construction Inc | g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture.Details
g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture. | $300,000 |
| Jan 9, 2026 | In progress issued Jun 2026 | 350 Kansas St | Leonard Schendel Const.Co | change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor...Details
change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor... | $1,500,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 4614 California St | Camello Inc. | mep upgrades. building aDetails
mep upgrades. building a | $12,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 4620 California St | Camello Inc. | mep upgrades. building bDetails
mep upgrades. building b | $20,000 |
| Nov 18, 2025 | Completed final sign-off Sep 2026 | 1518 Irving St | Sinh Electric Co. | revision to pa # 202508153144. revised ductwork locationDetails
revision to pa # 202508153144. revised ductwork location | |
| Nov 13, 2025 | In progress filed Nov 2025, not yet issued | 560 Valencia St | revision to approved renovation of an (e) space with public use areas, retail & restaurant. bpa 202110059878. no change in envelope, no front facade, storefront or sidewalk work. includes restrooms, interior partitions, finishes, equipment, lighting & mepDetails
revision to approved renovation of an (e) space with public use areas, retail & restaurant. bpa 202110059878. no change in envelope, no front facade, storefront or sidewalk work. includes restrooms, interior partitions, finishes, equipment, lighting & mep | $450,000 | |
| Sep 29, 2025 | Completed final sign-off Sep 2026 | 1518 Irving St | Sinh Electric Co. | mep for ref pa 202508153144Details
mep for ref pa 202508153144 | |
| Sep 17, 2025 | Expired or cancelled withdrawn Nov 2025 | 350 Mission St | modification to existing fire sprinklers system to add heads to proposed golf simulators. ref pa # 2025-0630-9783Details
modification to existing fire sprinklers system to add heads to proposed golf simulators. ref pa # 2025-0630-9783 | $40,000 | |
| Sep 4, 2025 | Completed final sign-off Feb 2026 | 2001 Oakdale Av | revision 202503031448- to include deferred mechanical work and title 24Details
revision 202503031448- to include deferred mechanical work and title 24 | ||
| Aug 13, 2025 | Completed final sign-off Jan 2026 | 272 Capp St | Tripoli Carpentry And Construction | deferred mep for t.i. pa 202412237335.Details
deferred mep for t.i. pa 202412237335. | $2,500 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2832 Union St | Fontana Construction, Inc. | revision to pa#: 201511021455; modifications to mep; including hvac, ducts, fire place, panel schedule and lighting. relocate non-structural positions.Details
revision to pa#: 201511021455; modifications to mep; including hvac, ducts, fire place, panel schedule and lighting. relocate non-structural positions. | |
| Jul 24, 2025 | Completed final sign-off Dec 2025 | 20 San Pablo Av | revision to 202405172388: revise mech system for residential 1st/f addition & 2nd/f alteration (no arch changes, only mechanical)Details
revision to 202405172388: revise mech system for residential 1st/f addition & 2nd/f alteration (no arch changes, only mechanical) | ||
| May 19, 2025 | Completed final sign-off May 2026 | 642 Washington St | Radiant Construction Company | rev to pa# 2025-0103-7686: omit architectural key notes used in previous approved permit update rcp and lighting schedule upadate supply and exhaust fan schedule update electrical plans add gas shut off valve and cd to sink tail pieceDetails
rev to pa# 2025-0103-7686: omit architectural key notes used in previous approved permit update rcp and lighting schedule upadate supply and exhaust fan schedule update electrical plans add gas shut off valve and cd to sink tail piece | |
| Feb 21, 2025 | In progress issued Mar 2025 | 3516 Sacramento St | this permit is for m.e.p. under pa# 2021-0802-5569Details
this permit is for m.e.p. under pa# 2021-0802-5569 | ||
| Feb 11, 2025 | Completed final sign-off Feb 2026 | 2990 Baker St | tenant improvement: resize (e) bar, new bathrooms, new kitchen, new finishes & lighting, enlarge windows. replace front door with code complaint doorDetails
tenant improvement: resize (e) bar, new bathrooms, new kitchen, new finishes & lighting, enlarge windows. replace front door with code complaint door | $180,000 | |
| Feb 5, 2025 | Expired or cancelled expired Oct 2026 | 324 Clement St | West-Tech General Engineer And Builder | revision to pa# 202406063896: change exhaust vent plans.Details
revision to pa# 202406063896: change exhaust vent plans. | $100,000 |
| Jan 3, 2025 | Completed final sign-off May 2026 | 642 Washington St | Radiant Construction Company | tenant improvement and change of use permit: change of use from (e) vacant space former garment shop (f-1) to new office (b) and mechanical/electrical/plumbing improvement throughout.Details
tenant improvement and change of use permit: change of use from (e) vacant space former garment shop (f-1) to new office (b) and mechanical/electrical/plumbing improvement throughout. | $80,000 |
| Jan 2, 2025 | In progress issued Sep 2025 | 500 Castro St | Buzzer 9 Development Inc | prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors.Details
prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors. | $550,000 |
| Nov 19, 2024 | In progress issued Nov 2025 | 2434 43rd Av | new 297 sf horizontal addition for workshop on 1st floor (138 sf infill+159sf)interior renovation of (e)single family home to include fire-rated hallway to rear yard. 2nd floor create new deck and door to rear yard. no exterior work to front to house.Details
new 297 sf horizontal addition for workshop on 1st floor (138 sf infill+159sf)interior renovation of (e)single family home to include fire-rated hallway to rear yard. 2nd floor create new deck and door to rear yard. no exterior work to front to house. | $50,000 | |
| Oct 10, 2024 | In progress issued Dec 2024 | 235 Capitol Av | Baron Construction | prop h: first time tenant improvement for new house cleaning business in existing shell building. replace front facade windows with fiberglass. mep work deferred. structural work associated with tenant improvement. ref pa# 201204259123, to be finaled prior or simultanious.Details
prop h: first time tenant improvement for new house cleaning business in existing shell building. replace front facade windows with fiberglass. mep work deferred. structural work associated with tenant improvement. ref pa# 201204259123, to be finaled prior or simultanious. | $450,000 |
| Sep 12, 2024 | Completed final sign-off Sep 2024 | 3330 Steiner St | Cookline Construction Inc | revision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system.Details
revision to permit 202403218311. relocate rooftop mechanical units. repair (e) floor joist system. | |
| Aug 5, 2024 | Completed final sign-off Oct 2024 | 151 Warriors Wy | Pacific Wide Builders Inc. | revision to pa 202311281506 changes include revise interior ceiling height; remove exterior canopy for exterior elevations; change manager desk and pass through window layout; update finishes. no changes to water fixturesDetails
revision to pa 202311281506 changes include revise interior ceiling height; remove exterior canopy for exterior elevations; change manager desk and pass through window layout; update finishes. no changes to water fixtures | |
| Jul 2, 2024 | Expired or cancelled expired Nov 2025 | 250 Main St | K A Construction | food prep. install and plumbing for (n) hand sink, prep sink & three compartment sinks. for installed on walls behind it.Details
food prep. install and plumbing for (n) hand sink, prep sink & three compartment sinks. for installed on walls behind it. | $18,500 |
| Jun 6, 2024 | Completed final sign-off Oct 2026 | 324 Clement St | West-Tec General Engineering Inc | mechanical design for improvement of space for new restaurant. ref pa# 202405162315Details
mechanical design for improvement of space for new restaurant. ref pa# 202405162315 | $200,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 343 Clement St | Occidental Express | to comply w/ nov 202423787: work without permit. if unable to provide documentation for makeup air (kitchen hood) obtain a building/mechnical permit revision to permit: 202403258568Details
to comply w/ nov 202423787: work without permit. if unable to provide documentation for makeup air (kitchen hood) obtain a building/mechnical permit revision to permit: 202403258568 | $3,000 |
| Jun 5, 2024 | Completed final sign-off Oct 2025 | 685 Townsend St | Artstone Creations General Builder | demolition, new walls, new mechanical, new plumbing, new electrical. space is changing from thai restaurant to new bagel shopDetails
demolition, new walls, new mechanical, new plumbing, new electrical. space is changing from thai restaurant to new bagel shop | $200,000 |
| May 28, 2024 | Completed final sign-off Apr 2025 | 140 New Montgomery St | Novo Construction Inc | mep permit related to t.i. bpa#202403208260 for interior restaurant t.i.Details
mep permit related to t.i. bpa#202403208260 for interior restaurant t.i. | $50,000 |
| May 21, 2024 | Completed final sign-off May 2024 | 3862 24th St | Hoffs Handyman | rev to pa# 2023-0523-8361; mechanical all unneccessary items for final sign off (a/c) will happen at future dateDetails
rev to pa# 2023-0523-8361; mechanical all unneccessary items for final sign off (a/c) will happen at future date | $154,062 |
| May 16, 2024 | Completed final sign-off Oct 2026 | 324 Clement St | West-Tec General Engineering Inc | ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permitDetails
ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permit | $120,000 |
| Apr 8, 2024 | In progress issued May 2024 | 1145 Polk St | Landmark Construction Inc. | revision to approved pa# 202109168601: alter kitchen equipment layout and remove previously proposed bar area.Details
revision to approved pa# 202109168601: alter kitchen equipment layout and remove previously proposed bar area. | |
| Feb 13, 2024 | Completed final sign-off Jul 2024 | 1525 Union St | Barrett Karber Built Llc | mep improvement of gr fl in ref to 202310319864. scope of work to include new restroom and new coffee barDetails
mep improvement of gr fl in ref to 202310319864. scope of work to include new restroom and new coffee bar | $50,000 |
| Dec 14, 2023 | In progress filed Dec 2023, not yet issued | 2000 Mckinnon Av | Builderduty Inc | bldg 427: add 1 office, 3 unisex toilets and 2 dry goods room. renovate (e) toilet rooms and (e) room partitions for offices, filing room, emplooyee breakrooms, utility room. update electrical, mechanical and plumbing. update (e) entry stairs, add 1 entry stair and 1 entry door. area of improvementDetails
bldg 427: add 1 office, 3 unisex toilets and 2 dry goods room. renovate (e) toilet rooms and (e) room partitions for offices, filing room, emplooyee breakrooms, utility room. update electrical, mechanical and plumbing. update (e) entry stairs, add 1 entry stair and 1 entry door. area of improvement | $180,000 |
| Nov 28, 2023 | Completed final sign-off Oct 2024 | 151 Warriors Wy | Pacific Wide Builders Inc. | suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permitDetails
suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permit | $2,250,000 |
| Jul 18, 2023 | In progress issued Feb 2024 | 301 Lyon St | Tripalink Builders Llc | interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination.Details
interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination. | $2,000,000 |
| May 24, 2023 | Completed final sign-off May 2026 | 1133 South Van Ness Av | S L M Development Inc. | mep work only. ref 202108045753. mechanical hvac system design for daycare ti. (remodel e space for daycare facility) reuse e sercie, new t24 compliance docs for indoor lighting amd elec power distributionDetails
mep work only. ref 202108045753. mechanical hvac system design for daycare ti. (remodel e space for daycare facility) reuse e sercie, new t24 compliance docs for indoor lighting amd elec power distribution | $334,626 |
| Feb 17, 2023 | Never finaled issued Mar 2023, no final | 888 Folsom St | Yefa Construction Inc | revision to pa# 202010267434. removing rear e garage door and infilling opening after removal, relocating n electrical closet and install n storefront windows at e opening on the front facade. no change to fire exiting and accessibility. fire alarm on separate permit.Details
revision to pa# 202010267434. removing rear e garage door and infilling opening after removal, relocating n electrical closet and install n storefront windows at e opening on the front facade. no change to fire exiting and accessibility. fire alarm on separate permit. | |
| Nov 10, 2022 | Completed final sign-off Aug 2023 | 3296 Sacramento St | Ap- Build Inc | hvac system re-assign. architectural work under pa 2021-1215-4503 & 2022-0512-4170Details
hvac system re-assign. architectural work under pa 2021-1215-4503 & 2022-0512-4170 | $18,000 |
| Oct 31, 2022 | Completed final sign-off Jul 2024 | 3133 Taraval St | L C Builders Inc. | revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entryDetails
revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entry | $35,000 |
| Oct 28, 2022 | Completed final sign-off Feb 2023 | 401 Columbus Av | Occidental Express | as built reduced scope of work as per issued bpa 202202188355: electrical and mechnical.Details
as built reduced scope of work as per issued bpa 202202188355: electrical and mechnical. | |
| Oct 3, 2022 | In progress issued Jun 2024 | 3701 Buchanan St | Acg Construction Inc | core and shell improvements and compliance with abeDetails
core and shell improvements and compliance with abe | $500,000 |
| Sep 19, 2022 | Completed final sign-off Oct 2023 | 1500 07th St | Bilt Rite Inc | installation of new heat pump hvac system ref pa 202105049716Details
installation of new heat pump hvac system ref pa 202105049716 | $20,000 |
| Sep 14, 2022 | Completed final sign-off Aug 2023 | 1700 Post St | Estrada Design Build | unit a: mechanical and plumbing work for interior ti ref 202206226861Details
unit a: mechanical and plumbing work for interior ti ref 202206226861 | $170,500 |
| Mar 28, 2022 | Expired or cancelled withdrawn Nov 2023 | 526 Columbus Av | Sean Rattigan Construction | full restaurant ti, includes new cooking, prep, dishwashing, dining, ada restroom, mechanical systems, finishes & equipment. no exterior changes except at the entrance, change of use approved.Details
full restaurant ti, includes new cooking, prep, dishwashing, dining, ada restroom, mechanical systems, finishes & equipment. no exterior changes except at the entrance, change of use approved. | $125,000 |
| Feb 18, 2022 | Completed final sign-off Feb 2023 | 401 Columbus Av | Eric F Anderson Incorporated | complete interior tenant improvement of an (e) restaurant incl. interior construction of walls, ceiling, millwork, electrical, plumbing and mechanical. deferred: fire alarm, fire sprinkler, steel shop drawings and kitchena fire suppresion system.Details
complete interior tenant improvement of an (e) restaurant incl. interior construction of walls, ceiling, millwork, electrical, plumbing and mechanical. deferred: fire alarm, fire sprinkler, steel shop drawings and kitchena fire suppresion system. | $148,000 |
| Jan 20, 2022 | Expired or cancelled cancelled Jan 2026 | 3101 Mission St | provide and install new ductless air conditioning system.Details
provide and install new ductless air conditioning system. | $8,750 | |
| Jan 18, 2022 | Completed final sign-off May 2023 | 2898 Sloat Bl | All Air Mechanical Contractors Inc. | reference bpa#202110059867. install (2) furnaces & duct work w/flue pipes.Details
reference bpa#202110059867. install (2) furnaces & duct work w/flue pipes. | $37,000 |
| Nov 22, 2021 | Never finaled issued Dec 2021, no final | 519 Hayes St | Gray West Construction Inc | revision to permit 202106253257. work to include mech hvac, electrical distribution, and structural replacement of storefront curb. no change to floor area, occupancy, exit path, or accessibility features.Details
revision to permit 202106253257. work to include mech hvac, electrical distribution, and structural replacement of storefront curb. no change to floor area, occupancy, exit path, or accessibility features. | $55,000 |
| Oct 5, 2021 | Never finaled issued Dec 2021, no final | 560 Valencia St | interior t.i for cannabis retail with consumption area. cannabis retail approved with recorded nsr, permit #2020-006575 cua. no change in bldg area. no facade or storefront, entry or sidewalk work. it includes new mech, accessible restrms, int. partitions and finishes, equip, lighting,mep,(n) a2Details
interior t.i for cannabis retail with consumption area. cannabis retail approved with recorded nsr, permit #2020-006575 cua. no change in bldg area. no facade or storefront, entry or sidewalk work. it includes new mech, accessible restrms, int. partitions and finishes, equip, lighting,mep,(n) a2 | $450,000 | |
| Sep 22, 2021 | Expired or cancelled cancelled Jul 2024 | 400 Winston Dr | space 3105: tenant improvement at (e) 3rd fl vacant tenant space for (n) arcade gaming space. construction of (n) non-bearing interior partition, finishes, accessible restrooms, ada lift, bar & kitchen.Details
space 3105: tenant improvement at (e) 3rd fl vacant tenant space for (n) arcade gaming space. construction of (n) non-bearing interior partition, finishes, accessible restrooms, ada lift, bar & kitchen. | $950,000 | |
| Jun 15, 2021 | Never finaled issued Aug 2021, no final | 1315 Egbert Av | O'keeffe-Mechanical Co | install hood, exhaust and air systemDetails
install hood, exhaust and air system | $20,000 |
| Dec 15, 2020 | Never finaled issued Aug 2021, no final | 468 Geary St | Gci, Inc | change of use from deli to cannibas retail. paint, fixtures, shelving, lighting, partitions, non load bearing, handicap counter.Details
change of use from deli to cannibas retail. paint, fixtures, shelving, lighting, partitions, non load bearing, handicap counter. | $200,000 |
| Dec 4, 2020 | Expired or cancelled withdrawn Jul 2024 | 2575 Mission St | proposed t.i. at 1/f to accomodate remodel of (e) bar, kitchen & reviving the mezzanine. maher n/a.Details
proposed t.i. at 1/f to accomodate remodel of (e) bar, kitchen & reviving the mezzanine. maher n/a. | $80,000 | |
| Sep 9, 2020 | Completed final sign-off Dec 2021 | 2075 Mission St | Hasz Construction Inc | per cua 2019-004451prj tenant build out cannabis retail consumption lounge, mill work, storage, locker, shower rooms, office, existing restroom to be ada compliant, relocate doors at entry, new finishes, lighting.Details
per cua 2019-004451prj tenant build out cannabis retail consumption lounge, mill work, storage, locker, shower rooms, office, existing restroom to be ada compliant, relocate doors at entry, new finishes, lighting. | $420,000 |
| May 20, 2020 | Never finaled issued Jul 2020, no final | 3198 24th St | Amone Corp | mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801Details
mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801 | $100,000 |
| Feb 20, 2020 | Never finaled issued Aug 2021, no final | 300 Octavia St | Parkson Construction Company | altered site permit: to pa# 2008-1001-3158 s to add mezzanine at commercial level. revised interior layout at 1st flr. modification of facade material to eliminate retractable folding perf metal screen. change type 3a to type 5a over 1.Details
altered site permit: to pa# 2008-1001-3158 s to add mezzanine at commercial level. revised interior layout at 1st flr. modification of facade material to eliminate retractable folding perf metal screen. change type 3a to type 5a over 1. | $150,000 |
| Dec 24, 2019 | Never finaled filed Dec 2019, never issued | 425 Mission St | tjpa ti suite# 103. project#-19-0300. interior t.i. remodel to (e) tenant space on 1st flr(suite 103), for new restanrant tenant. scope to include non-strucral partions millwork and finishes and lighting, equipment, and mep.**maher n/a**Details
tjpa ti suite# 103. project#-19-0300. interior t.i. remodel to (e) tenant space on 1st flr(suite 103), for new restanrant tenant. scope to include non-strucral partions millwork and finishes and lighting, equipment, and mep.**maher n/a** | $290,000 | |
| Nov 20, 2019 | Completed final sign-off Mar 2021 | 4526 03rd St | Vsa Construction | new mechanical system for cannabis dispensary and smoking lounge. reference pa# 2019-0628-4706Details
new mechanical system for cannabis dispensary and smoking lounge. reference pa# 2019-0628-4706 | $40,000 |
| Nov 5, 2019 | Completed final sign-off Mar 2022 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts.Details
revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts. | $30,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2021 | 3101 Mission St | Midstate Construction Corporation | selective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing atDetails
selective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing at | $2,500,000 |
| Jun 14, 2019 | Completed final sign-off Dec 2019 | 517 Clement St | Cookline Construction Inc | tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations.Details
tenant improvement & change of use to new restaurant. work includes finishes, lighting, kitchen equipment, and storefront renovations. | $251,000 |
| May 16, 2019 | Completed final sign-off Dec 2019 | 1301 Folsom St | B-Side Inc. | mechanical plans for 201903124978. maher n/a.Details
mechanical plans for 201903124978. maher n/a. | $100,000 |
| Mar 14, 2019 | Never finaled issued Apr 2019, no final | 1429 Mendell St | Alive Design & Construction | install new hvac unit on roof. no work involving kitchen exhaust hood system.Details
install new hvac unit on roof. no work involving kitchen exhaust hood system. | $25,000 |
| Feb 14, 2019 | Never finaled issued Mar 2019, no final | 75 Boardman Pl | Air Flow Pro's | roof: installation of (n) air supply & exhaust air system.Details
roof: installation of (n) air supply & exhaust air system. | $15,000 |
| Jan 31, 2019 | Never finaled issued Jan 2022, no final | 6625 03rd St | Trim Fit Constr. - O'reilly Engineering | to erect a type v-a, 4-story, 3-dwelling unit with one basement.Details
to erect a type v-a, 4-story, 3-dwelling unit with one basement. | $1,800,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2019 | 1000 Tompkins Av | Midstate Construction Corporation | selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard;Details
selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard; | $2,900,000 |
| Oct 30, 2018 | Completed final sign-off Mar 2022 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | mep upgrade plans: mechanical, electrical and plumbing upgrades to entire building. ref pa #201804045454. maher naDetails
mep upgrade plans: mechanical, electrical and plumbing upgrades to entire building. ref pa #201804045454. maher na | $75,000 |
| Aug 1, 2018 | Never finaled issued Sep 2018, no final | 555 California St | Dome Construction Corp | ti - of (e) tenant space for a restaurant. scope - new bar, new kitchen and equipment, new finishes, new lighting, new accessible restrooms. no change of use. maher naDetails
ti - of (e) tenant space for a restaurant. scope - new bar, new kitchen and equipment, new finishes, new lighting, new accessible restrooms. no change of use. maher na | $680,000 |
| Jun 29, 2018 | Completed final sign-off Jul 2018 | 845 Market St | Pacific Wide Builders Inc. | demo work and relocationof mechanical equipment based on approved permit #201803264585 maher naDetails
demo work and relocationof mechanical equipment based on approved permit #201803264585 maher na | $5,000 |
| Jan 30, 2018 | Expired or cancelled withdrawn Jan 2019 | 829 Oak St | Details
| $100,000 | |
| Jan 5, 2018 | Completed final sign-off Nov 2018 | 680 Folsom St | Dome Construction Corp | ti of (e) ground floor tenant space for new restaurant. scope of work to include mechanical hvac and plumbing. ref pa 2017-1130-5111. n/a for maher.Details
ti of (e) ground floor tenant space for new restaurant. scope of work to include mechanical hvac and plumbing. ref pa 2017-1130-5111. n/a for maher. | |
| Sep 13, 2017 | Expired or cancelled expired Apr 2025 | 715 Brannan St | Rockland Construction Group Inc | scope of work to include installation of plumbing and electrical hvac systems for proposed restraurant. see architectural and structural drawings, pa 2016-0401-3768 s1Details
scope of work to include installation of plumbing and electrical hvac systems for proposed restraurant. see architectural and structural drawings, pa 2016-0401-3768 s1 | $80,000 |
| Sep 6, 2017 | Completed final sign-off Dec 2019 | 1 Henry Adams St | K Bali Construction | first time tenant improvement for restaurant. ** maher: n/a **Details
first time tenant improvement for restaurant. ** maher: n/a ** | $707,000 |
| Aug 16, 2017 | Completed final sign-off Jan 2018 | 201 Steiner St | 21st Century Home Improvt | interior t.i. of (e) g/f tenant space for a new cafe, work to include (n) coffee area, (n) kitchen & equipment. m.e.p. under separate permitDetails
interior t.i. of (e) g/f tenant space for a new cafe, work to include (n) coffee area, (n) kitchen & equipment. m.e.p. under separate permit | $75,000 |
| Feb 14, 2017 | Completed final sign-off Mar 2017 | 1220 Market St | Tony Chang | non compliant hood replacement, new hvac work, new ada counter at existing counter, new opening in load bearing wall for security.Details
non compliant hood replacement, new hvac work, new ada counter at existing counter, new opening in load bearing wall for security. | $50,000 |
| Dec 22, 2016 | Completed final sign-off Sep 2017 | 2031 Chestnut St | Hasz Construction Inc | interior ti of existing restaurant for new tenant. replace floor and wall finishes, new millwork and furniture. new ktichen equipment. (e) hvac systems to remain. n/a ordinance #155-13Details
interior ti of existing restaurant for new tenant. replace floor and wall finishes, new millwork and furniture. new ktichen equipment. (e) hvac systems to remain. n/a ordinance #155-13 | $140,000 |
| Nov 1, 2016 | Never finaled issued Nov 2016, no final | 171 Stillman St | James Andrew Zorn | redo commercial hood - remove and install type ii hood, add a new type i commercial kitchen hood with fire suppression system. ansul system under separate permit. maher naDetails
redo commercial hood - remove and install type ii hood, add a new type i commercial kitchen hood with fire suppression system. ansul system under separate permit. maher na | $23,000 |
| Oct 17, 2016 | Completed final sign-off May 2018 | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | interior t.i. for d.p.w. materials testing lab relocation.Details
interior t.i. for d.p.w. materials testing lab relocation. | $1,300,000 |
| Aug 31, 2016 | Expired or cancelled withdrawn Aug 2017 | 723 Taraval St | Bc United Construction Inc | ti of existing massage shop at ground floor building. partial removal of existing non-bearing walls and new construction of interior non-bearing walls to create new sauna room and employee's loungeDetails
ti of existing massage shop at ground floor building. partial removal of existing non-bearing walls and new construction of interior non-bearing walls to create new sauna room and employee's lounge | $15,000 |
| Aug 4, 2016 | Never finaled issued Jan 2017, no final | 4410 Geary Bl | Northern Sun Associates | remove exisitng baseboard heaters, install new rooftop hvac system to replace ventilation fan. install new lighting. ref interior arch ti pa # 201604205231Details
remove exisitng baseboard heaters, install new rooftop hvac system to replace ventilation fan. install new lighting. ref interior arch ti pa # 201604205231 | $15,000 |
| Jul 14, 2016 | Completed final sign-off May 2017 | 940 Sutter St | Greentree Design/Build | electrical plans and title 24 documents with mechanical plans and title 24 documents provided for pa 2014-1208-3220. final inspectionDetails
electrical plans and title 24 documents with mechanical plans and title 24 documents provided for pa 2014-1208-3220. final inspection | $10,000 |
| Mar 11, 2016 | Completed final sign-off Mar 2018 | 618 Bush St | Nomellini Construction * Ask For Id * | convert existing storage rooms into new electrical room and new laundry. n/a ordinance #155-13Details
convert existing storage rooms into new electrical room and new laundry. n/a ordinance #155-13 | $18,000 |
| Jan 21, 2016 | Completed final sign-off Oct 2016 | 2151 Lombard St | Genuine Construction Inc. | revision to pa#201505146406 s1/r- kitchen work only, new kitchen equipment layout & hood.Details
revision to pa#201505146406 s1/r- kitchen work only, new kitchen equipment layout & hood. | |
| Nov 3, 2015 | Completed final sign-off Nov 2015 | 917 Folsom St | James Andrew Zorn | new type 1 hood in grease duct and fansDetails
new type 1 hood in grease duct and fans | $38,000 |
| Nov 2, 2015 | Never finaled issued Oct 2022, no final | 2832 Union St | Fontana Construction, Inc. | construct (n) 3-story single family residenceDetails
construct (n) 3-story single family residence | $1,300,000 |
| Oct 16, 2015 | Completed final sign-off May 2016 | 1069 Pennsylvania Av | Mrcc | revised second floor layout, revision to previously approved pa# 201508043322. mep to be submitted under sep permit. n/a ordinance #155-13Details
revised second floor layout, revision to previously approved pa# 201508043322. mep to be submitted under sep permit. n/a ordinance #155-13 | |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 40 Hanover St | to comply with complaint 2015 60931: remodel kitchen and bathroom. remove carpet/refinish kitchen floors& wood floors, blown insulation upstairs, roll insulation in storage & garage area. drywall downstairs wall and upgrade elecDetails
to comply with complaint 2015 60931: remodel kitchen and bathroom. remove carpet/refinish kitchen floors& wood floors, blown insulation upstairs, roll insulation in storage & garage area. drywall downstairs wall and upgrade elec | $25,000 | |
| Jan 20, 2015 | Expired or cancelled cancelled Jan 2026 | 1446 Market St | mechanical submission for 201412244497 - installation of plumbing & hvac systems for 1st floor restaurant remodel. n/a maher ordinanceDetails
mechanical submission for 201412244497 - installation of plumbing & hvac systems for 1st floor restaurant remodel. n/a maher ordinance | ||
| Dec 8, 2014 | Completed final sign-off Feb 2015 | 342 09th St | Blackline Construction | hvac ducts. compliance with maher ordinance no 155-13 not required.Details
hvac ducts. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Dec 8, 2014 | Expired or cancelled cancelled Jan 2026 | 500 Bryant St | common area- interior upgrade of common spaces in multi unit bldg. upgrade mechanical ventilation system in units, new ducting running from units to roof. new entry door & sidelight, new flooring & wall finishes in common hallways & entry atrium. add 1 (n) skylight & replace 3 in common hallway.Details
common area- interior upgrade of common spaces in multi unit bldg. upgrade mechanical ventilation system in units, new ducting running from units to roof. new entry door & sidelight, new flooring & wall finishes in common hallways & entry atrium. add 1 (n) skylight & replace 3 in common hallway. | $284,193 | |
| Feb 13, 2014 | Expired or cancelled cancelled Jan 2026 | 724 Lombard St | modifying existing hvac unit in ground floor commercial space & basement areas. compliance with ordinance #155-13 not requiredDetails
modifying existing hvac unit in ground floor commercial space & basement areas. compliance with ordinance #155-13 not required | $5,000 | |
| Apr 25, 2012 | Never finaled issued Nov 2014, no final | 235 Capitol Av | Ace Drilling & Excavation | to erect 1 story, type 5, core & shell commercial building. project may be on hold per note onbase, email sent to project architect, dmj 07/29/2024;Details
to erect 1 story, type 5, core & shell commercial building. project may be on hold per note onbase, email sent to project architect, dmj 07/29/2024; | $550,000 |