Charles Choe
- License
- E21276
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E21276 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Mk Engineerings Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Nov 2020
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Trim Fit Constr. - O'reilly Engineering
- Architects
- Edward Toby Morris, Zachary Nathan
- Engineers
- Donald David (2), Moon Kang, Steve H. Kang
- Subcontractors
- Trim Fit Const O'reilly Engin
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2020 | Completed final sign-off Sep 2025 | 1700 Waller St | provide one new accessory dwelling unit at ground floor of existing 4 unit apartment building. existing storage space (not for tenant use) will be converted into an adu within the existing building envelope. per ord 162-16.Details
provide one new accessory dwelling unit at ground floor of existing 4 unit apartment building. existing storage space (not for tenant use) will be converted into an adu within the existing building envelope. per ord 162-16. | $100,000 | |
| Jan 31, 2019 | Never finaled issued Jan 2022, no final | 6625 03rd St | Trim Fit Constr. - O'reilly Engineering | to erect a type v-a, 4-story, 3-dwelling unit with one basement.Details
to erect a type v-a, 4-story, 3-dwelling unit with one basement. | $1,800,000 |